CN106989323A - A kind of installation method of lamp installation sectional shelf-unit and light fixture - Google Patents
A kind of installation method of lamp installation sectional shelf-unit and light fixture Download PDFInfo
- Publication number
- CN106989323A CN106989323A CN201710335482.XA CN201710335482A CN106989323A CN 106989323 A CN106989323 A CN 106989323A CN 201710335482 A CN201710335482 A CN 201710335482A CN 106989323 A CN106989323 A CN 106989323A
- Authority
- CN
- China
- Prior art keywords
- pipe arrangement
- branch
- unit
- installation
- light fixture
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F21—LIGHTING
- F21S—NON-PORTABLE LIGHTING DEVICES; SYSTEMS THEREOF; VEHICLE LIGHTING DEVICES SPECIALLY ADAPTED FOR VEHICLE EXTERIORS
- F21S8/00—Lighting devices intended for fixed installation
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F21—LIGHTING
- F21V—FUNCTIONAL FEATURES OR DETAILS OF LIGHTING DEVICES OR SYSTEMS THEREOF; STRUCTURAL COMBINATIONS OF LIGHTING DEVICES WITH OTHER ARTICLES, NOT OTHERWISE PROVIDED FOR
- F21V23/00—Arrangement of electric circuit elements in or on lighting devices
- F21V23/06—Arrangement of electric circuit elements in or on lighting devices the elements being coupling devices, e.g. connectors
Abstract
The invention discloses a kind of lamp installation sectional shelf-unit and the installation method of light fixture, the sectional shelf-unit includes multiple carrier units, the two neighboring carrier unit is connected by socket component socket joint, the carrier unit includes bright pipe arrangement and hangs unit with the branch that stated clearly pipe arrangement is connected, stated clearly pipe arrangement is in horizontal layout, states the fixture being set with pipe arrangement for mounted lamp clearly;The lamp installation construction technology includes step:First, preparation of construction;2nd, the assembling of sectional shelf-unit;3rd, the installation of sectional shelf-unit;4th, the installation of light fixture.Reasonable in design, easy construction of the invention and using effect is good, laying from dark apply of traditional approach for pipeline is changed into bright and matched somebody with somebody, it is easy to the maintenance in later stage, according to construction drawing in combination with BIM softwares, determine installation site of the branch device for hoisting on top plate, the collision problem in pipeline compact district lamp installation is avoided, lamp installation is in a row embarked on journey, improve perception effect.
Description
Technical field
The invention belongs to technical field of building construction, more particularly, to the peace of a kind of lamp installation sectional shelf-unit and light fixture
Dress method.
Background technology
It is traditional at present in the building structure that need not be fitted up when using in the later stages such as underground garage, tunnel and factory building
The bright pipe arrangement of the electric wire of light fixture generally uses dark pipe arrangement or metal raceway in lamp installation construction technology.
Dark pipe arrangement is primarily present following deficiency:Dark pipe arrangement carries out pre-buried in top board construction, treats top board structure integral construction
After the completion of can carry out the installation of light fixture, installing engineering progress is influenceed by the project overall duration, and is constructed in top board structure
Cheng Zhonghui causes the blocking of dark pipe arrangement, adds project progress and the difficulty of cost control;Have all operations of construction technique
High-rise working is belonged to, workload is big, and difficulty of construction is big, and work efficiency is low, and the duration is longer;Electric wire is secretly applied in pre-buried bright pipe arrangement,
The maintenance in later stage is not easy to, and maintenance cost is high;Lamp installation can only change the installation direction of light fixture when running into pipeline compact district,
Light fixture after installation rate of in a row embarking on journey is poor;Generally using flexible cord connection or chain sling lifting during lamp installation, increase is applied
Work cost, and the less stable installed.
Metal raceway is primarily present following deficiency:Because its volume is larger, lamp installation needs office when running into pipeline compact district
Portion changes the position of lamp installation;Metal raceway installation connection process is more, and light fixture is installed on metal raceway using Clip Reed
Bottom, in shake frequency district occurred frequently such as underground garage, the jump ring of fixed light fixture easy off card after being shaken influences the service life of light fixture.
The content of the invention
In view of the above-mentioned deficiencies in the prior art, the technical problem to be solved by the present invention is that providing a kind of lamp installation
With sectional shelf-unit, laying from dark apply of traditional approach for pipeline is changed into bright by its reasonable in design, easy construction and using effect is good
Match somebody with somebody, be easy to the maintenance in later stage, according to construction drawing in combination with BIM softwares, it is determined that branch hangs installation site of the unit on top plate, keep away
Exempt from the collision problem in pipeline compact district lamp installation, lamp installation is in a row embarked on journey, improve perception effect.
In order to solve the above technical problems, the technical solution adopted by the present invention is:A kind of lamp installation sectional shelf-unit, it is special
Levy and be:Including multiple carrier units, the two neighboring carrier unit is connected by socket component socket joint, the carrier unit bag
Include bright pipe arrangement and hang unit with the branch that stated clearly pipe arrangement is connected, state pipe arrangement clearly in horizontal layout, state clearly and be set with pipe arrangement
For the fixture of mounted lamp, the branch hangs unit in vertical laying, and the branch is hung unit including branch suspension rod and hung with the branch
The branch swing pipe of bar lower end connection, the lower end of the branch suspension rod is connected with the upper end of the branch swing pipe, and the upper end of the branch suspension rod is consolidated
It is scheduled on top plate, the lower end of the branch swing pipe is connected with the top of stated clearly pipe arrangement.
A kind of above-mentioned lamp installation sectional shelf-unit, it is characterized in that:The bright pipe arrangement of the two neighboring carrier unit passes through
The socket component socket joint connection, the cross sectional shape of the socket component is identical with the cross sectional shape of stated clearly pipe arrangement, and the socket joint
The sectional dimension of part is not less than to offer on the sectional dimension for stating pipe arrangement clearly, the socket component states pipe arrangement level clearly for adjustment
The screwed hole that the regulating bolt of degree is passed through.
A kind of above-mentioned lamp installation sectional shelf-unit, it is characterized in that:The upper end of the branch swing pipe is welded with steel plate, the steel
The mounting hole for the branch hanger erection is offered on plate.
A kind of above-mentioned lamp installation sectional shelf-unit, it is characterized in that:The branch swing pipe connects position with stated clearly pipe arrangement top
Corresponding stated clearly the pipe arrangement bottom in the place of putting is offered to be provided with and blocking up that it is used cooperatively in first through hole, the first through hole
Head.
A kind of above-mentioned lamp installation sectional shelf-unit, it is characterized in that:The fixture includes being sleeved on stated clearly pipe arrangement
Jig body and the chuck used cooperatively with the jig body, being shaped as of the jig body open up on U-shaped, the chuck
There is the block button hole passed through for the jig body two ends.
Present invention also offers a kind of method installed using combinations thereof support to light fixture, it is characterised in that should
Method comprises the following steps:
Step 1: preparation of construction:According to construction drawing determine initial makeup location of the branch suspension rod on the top plate and
Initial makeup location of the light fixture on stated clearly pipe arrangement, then computer by BIM softwares to the branch suspension rod described
The initial makeup location of initial makeup location and the light fixture on stated clearly pipe arrangement on top plate is optimized, after optimization
As a result it is adjusted, finally determines that final installation site of the branch suspension rod on the top plate and the light fixture are matched somebody with somebody stating clearly
Final installation site on pipe;
Step 2: the assembling of sectional shelf-unit, including procedure below:
The assembling of step 201, carrier unit:, will be described after the lower end of institute's branch swing pipe is connected with the top of stated clearly pipe arrangement
The upper end of branch swing pipe is connected with the lower end of the branch suspension rod, forms the carrier unit;
Step 202, repeat step 201, complete the assembling of multiple carrier units;
Step 203, by step 202 multiple carrier units state clearly pipe arrangement by socket component socket joint connect after,
The sectional shelf-unit is completed;
Step 3: the installation of sectional shelf-unit:In step 203 after being completed of sectional shelf-unit, using hanging machinery by institute
State sectional shelf-unit to be lifted, the upper end of the branch suspension rod is fixed on to the branch suspension rod determined in step one in the top plate
On final installed position;
Step 4: the installation of light fixture:The light fixture is fixedly connected in step one by the fixture described in determining
Final installed position of the light fixture on stated clearly pipe arrangement.
Above-mentioned method, it is characterized in that:The upper end of the branch swing pipe, which is welded with steel plate, the steel plate, to be offered for described
The mounting hole of branch hanger erection;
The branch swing pipe stated clearly pipe arrangement bottom corresponding with the communicating position of stated clearly pipe arrangement top offers first and led to
The plug used cooperatively with it is provided with hole, the first through hole.
Above-mentioned method, it is characterized in that:Carrier unit described in step 201 assemble when, by the upper end of the branch suspension rod according to
It is secondary pass through the first through hole and the mounting hole, after the branch downrod lower end is connected with the steel plate.
Above-mentioned method, it is characterized in that:The fixture include being sleeved on jig body on stated clearly pipe arrangement and with it is described
The chuck that jig body is used cooperatively, being shaped as of the jig body is offered on U-shaped, the chuck for the jig body
The block button hole that two ends are passed through;
The lampshade of the light fixture is provided at both ends with the second through hole passed through for the jig body two ends.
Above-mentioned method, it is characterized in that:Before step 4 lamp installation, electric wire is penetrated in stated clearly pipe arrangement using conduit,
And by the electric wire at the first through hole and connector female joint connect;
In step 4 during lamp installation, the reserved line of the light fixture is inserted to the pin end of the connector, grafting is completed
After the connection of device, the first through hole is blocked with the plug, the two ends of the jig body are passed through described second
After through hole, then the jig body is sleeved on stated clearly pipe arrangement, then inserts the card at the two ends of the jig body
Disk, the two ends of the jig body are bent, and complete the installation of light fixture.
The present invention has advantages below compared with prior art:
1st, the combination rack structure is simple and processing and fabricating is easy, and input cost is relatively low.
2nd, the sectional shelf-unit includes multiple carrier units, and two neighboring carrier unit is connected by socket component socket joint, support
Unit includes bright pipe arrangement and hangs unit with the branch that bright pipe arrangement is connected, and bright pipe arrangement is in be set with horizontal layout, bright pipe arrangement for pacifying
The fixture of light fixture is filled, branch hangs unit in vertical laying, and branch, which hangs unit, includes branch suspension rod and the branch swing pipe being connected with branch downrod lower end,
The lower end of branch suspension rod is connected with the upper end of branch swing pipe, and the upper end of branch suspension rod is fixed on top plate, the lower end of branch swing pipe and bright pipe arrangement
Top connection, connection is simple.
3rd, the sectional shelf-unit can realize batch production processing and field combinations, then overall to carry out lifting installation, reduce
The process of work high above the ground, reduces difficulty of construction, improves efficiency of construction, shortens the construction period.
4th, bright pipe arrangement of the invention need not be embedded on top plate, and laying from dark apply of traditional approach for pipeline is changed into bright
Match somebody with somebody, the installation progress of light fixture is not influenceed by the project overall duration, is easy to the maintenance in later stage.
5th, the present invention hangs installation site of the unit on top plate according to construction drawing in combination with BIM softwares it is determined that propping up, it is to avoid
In the collision problem of pipeline compact district lamp installation, lamp installation is in a row embarked on journey, and improves perception effect.
6th, in the present invention, light fixture carries out clamp by fixture and bright pipe arrangement, and connected mode is simple, and connects firm, simultaneously
Fixture modern design is attractive in appearance.
In summary, reasonable in design, easy construction of the invention and using effect is good, by laying by traditional approach for pipeline
Dark apply is changed into bright and matched somebody with somebody, and is easy to the maintenance in later stage, according to construction drawing in combination with BIM softwares, it is determined that branch hangs unit on top plate
Installation site, it is to avoid in the collision problem of pipeline compact district lamp installation, lamp installation is in a row embarked on journey, and improves perception effect
Really.
Below by drawings and examples, technical scheme is described in further detail.
Brief description of the drawings
Fig. 1 is the structural representation of sectional shelf-unit of the present invention.
Fig. 2 is the use state figure of sectional shelf-unit of the present invention.
Fig. 3 hangs the structural representation of unit for present invention branch.
Fig. 4 is the structural representation of socket component of the present invention.
Fig. 5 is the annexation schematic diagram of branch swing pipe of the present invention and steel plate.
Fig. 6 is the structural representation explosive view of fixture of the present invention.
Fig. 7 is the FB(flow block) of lamp installation method of the present invention.
Description of reference numerals:
1-bright pipe arrangement;2-1-branch swing pipe;2-2-sleeve pipe;
2-3-branch suspension rod;3-top plate;4-fixture;
4-1-jig body;4-2-chuck;5-light fixture;
6-plug;7-steel plate;7-1-mounting hole;
8-socket component;9-screwed hole;10-rib tape.
Embodiment
A kind of lamp installation sectional shelf-unit as shown in Figure 1, Figure 2 and Figure 3, including multiple carrier units, it is two neighboring
The carrier unit is connected by the socket joint of socket component 8, and the carrier unit includes bright pipe arrangement 1 and is connected with stated clearly pipe arrangement 1
Branch hangs unit, states pipe arrangement 1 clearly in horizontal layout, states the fixture 4 being set with pipe arrangement 1 for mounted lamp 5, the branch clearly
Unit is hung in vertical laying, the branch, which hangs unit, includes branch suspension rod 2-3 and the branch swing pipe 2- being connected with the branch suspension rod 2-3 lower ends
1, the lower end of the branch suspension rod 2-3 is connected with the upper end of the branch swing pipe 2-1, and the upper end of the branch suspension rod 2-3 is fixed on top plate 3
On, the lower end of the branch swing pipe 2-1 is connected with the top of stated clearly pipe arrangement 1.
When actual use, stating the effect of pipe arrangement 1 clearly has two:Bright pipe arrangement 1 is laid by the electric wire as electric wire
Lay from dark apply and be changed into bright and match somebody with somebody, during the use of later stage light fixture 5, be easy to safeguard, it is traditional it is dark apply, used in later stage light fixture 5
When breaking down, it is necessary to top plate 3 is carried out into a certain degree of damage, and maintenance is complicated, and cost is higher;It is used as the support list
A part for member, plays a part of branch to light fixture 5 and hangs.
Stated clearly pipe arrangement 1 need not be embedded on top plate 3, and laying from dark apply of traditional approach for pipeline is changed into bright and matched somebody with somebody, lamp
The installation progress of tool 5 is not influenceed by the project overall duration, meanwhile, it can pass through inserting in bright pipe arrangement 1 in pipeline compact district
The mode for connecing connection electric wire on device adjusts the problem of running into the point of impingement when light fixture 5 that staggers is installed, and makes the light fixture 5 of installation in a row
Arranged in column.
When actual use, the pipeline is by the bright pipe arrangement 1 in the present embodiment and the electric wire stated clearly in pipe arrangement 1 that is laid in.
When actual use, unit is hung to bright pipe arrangement 1, the branch in the factory and fixture 4 carries out batch machining, is then being applied
Work scene is assembled, and is readily transported, and the process for largely reducing work high above the ground, advantageously reduces security risk,
Difficulty of construction is reduced, efficiency of construction is improved, the construction period is shortened.
In the present embodiment, the periphery of the branch suspension rod 2-3 is set with sleeve pipe 2-2, preferably pvc pipe, it is therefore an objective to institute
Branch suspension rod 2-3 is stated to play a protective role, and with certain aesthetic.
When actual use, the branch swing pipe 2-1 is rectangular tube, the size of the branch swing pipe 2-1 be preferably 20mm ×
20mm × 100mm, and the lower end of the branch swing pipe 2-1 welds with stated clearly pipe arrangement 1, compared with other connected modes, easily
Construct and process is simple.
When actual use, the rectangular cross-section section of pipe arrangement 1 is stated clearly, if the section of stated clearly pipe arrangement 1 is cut to be circular
Face, then the top of stated clearly pipe arrangement 1 is curved surface, and the branch hangs unit and is connected general using welding with the top of stated clearly pipe arrangement 1
Mode be fixedly connected, the lower end that the branch hangs unit is plane, when plane and curved surface are welded, is not easy to apply
Weldering, and connect not firm.
The sectional dimension of stated clearly pipe arrangement 1 is preferably 20mm × 20mm.
As shown in figure 4, in the present embodiment, the bright pipe arrangement 1 of the two neighboring carrier unit passes through the socket joint of socket component 8
Connection, the cross sectional shape of the socket component 8 is identical with the cross sectional shape of stated clearly pipe arrangement 1, and the sectional dimension of the socket component 8
Not less than the sectional dimension of stated clearly pipe arrangement 1, the regulation for stating the levelness of pipe arrangement 1 clearly for adjustment is offered on the socket component 8
The screwed hole 9 that bolt is passed through.
When actual use, the middle position on the length direction of socket component 8 is provided with rib tape 10, and the rib tape 10 is wrapped
The circumferential projection laid along the inner and outer wall of socket component 8 is included, the length of the rib tape 10 is preferably 5mm, the muscle
Projection thickness with 10 on the inwall of the socket component 8 is identical with the thickness of stated clearly pipe arrangement 1, it is therefore an objective to stated clearly pipe arrangement
Length in the 1 insertion socket component 8 is limited, it is ensured that previous is stated clearly the length that pipe arrangement 1 is inserted in the socket component 8
It is the 1/2 of the length of socket component 8 to state the length that pipe arrangement 1 inserted in the socket component 8 clearly with previous, prevents adjacent two
Socket joint length allocation of the individual bright pipe arrangement 1 in the socket component 8 is uneven, causes the carrier unit connection unstable, after influence
The service life of phase light fixture 5.
Projection of the rib tape 10 on the outer wall of the socket component 8, which is mainly, plays effect attractive in appearance.
When actual use, the size of the socket component 8 is preferably 30mm × 30mm × 100mm.
When actual use, the quantity of the regulating bolt preferably is 8, and 8 regulating bolts are respectively symmetrically set
In the both sides of rib tape 10 and it is arranged on the side of the socket component 8, after the branch suspension rod 2-3 is connected with the top plate 3,
The levelness of stated clearly pipe arrangement 1 is finely adjusted by the regulating bolt, it is ensured that the levelness that the light fixture 5 is installed.
As shown in figure 5, in the present embodiment, the upper end of the branch swing pipe 2-1, which is welded with steel plate 7, the steel plate 7, to be offered
The mounting hole 7-1 installed for the branch suspension rod 2-3.
When actual use, the steel plate 7 is rectangular steel plates, and the size of the steel plate 7 is not more than cutting for the branch swing pipe 2-1
Face size, the size of the steel plate 7 preferably is 18mm × 18mm, the steel plate 7 and the inwall in the branch swing pipe 2-1 upper ends
Welding, under the premise of ensureing that connection is reliable, the weld seam of welding is arranged on the inner side of the branch swing pipe 2-1, reached attractive in appearance
Effect.
When actual use, the branch suspension rod 2-3 is fixedly connected with the steel plate 7, and connected mode can be welding or bolt
Connection, preferably bolt connection, it is therefore an objective in actual installation, are easy to the adjustment to the height of light fixture 5, preferably described
Branch suspension rod 2-3 is leading screw, and the lower end of the leading screw is provided with screw thread, and the upper end of the leading screw is provided with tube expansion, the tube expansion with
After the top plate 3 is connected, the sectional shelf-unit installation, the combination rack structure is simple and processing and fabricating is easy, input
Cost is relatively low.
When actual use, the mounting hole 7-1 is preferably a diameter of 10mm circular port.
In the present embodiment, the branch swing pipe 2-1 and corresponding stated clearly pipe arrangement 1 at stated clearly the top communicating position of pipe arrangement 1
Bottom offers the plug 6 for being provided with and being used cooperatively with it in first through hole, the first through hole.
During actual installation, be provided with the lower end of the branch suspension rod 2-3 with the branch suspension rod 2-3 use cooperatively in six sides
After locking nut, by the upper end of the branch suspension rod 2-3 by the first through hole and through the mounting hole 7-1, then by institute
The upper end for stating branch suspension rod 2-3 is connected with the top plate 3, the lower end of the branch suspension rod 2-3 by the interior six sides locking nut with
The steel plate 7 is connected, easy for installation.
When actual use, the preferably a diameter of 16mm circular port of the first through hole.
When actual use, after the installation of light fixture 5, blocked using described 6 pairs of first through hole of plug,
Purpose is protection electric wire, while when later stage light fixture 5 is using breaking down or safeguarding, it is easy to disassemble after inspection to trouble point
And maintenance.
As shown in fig. 6, in the present embodiment, the fixture 4 include the jig body 4-1 being sleeved on stated clearly pipe arrangement 1 and
Being shaped as of the chuck 4-2, the jig body 4-1 used cooperatively with the jig body 4-1 is opened on U-shaped, the chuck 4-2
Provided with the block button hole passed through for the jig body 4-1 two ends.
When actual use, the material that the preferred fixture 4 is is the iron sheet of stainless steel, and the chuck 4-2's is shaped as
Rectangle, the size of the chuck 4-2 is preferably 20mm × 10mm, and the length of the block button hole is not less than the jig body 4-
The width at 1 two ends.
When actual use, when light fixture 5 is installed, the two ends of the jig body 4-1 are passed through after second through hole, then
The jig body 4-1 is sleeved on stated clearly pipe arrangement 1, then the chuck is inserted at the two ends of the jig body 4-1
4-2, the two ends of the jig body 4-1 are bent, and complete the installation of light fixture 5, and connected mode is simple, and connect firm, simultaneously
The modern design of fixture 4 is attractive in appearance.
When actual use, the light fixture 5 is arranged on using the fixture and stated clearly on pipe arrangement 1, be connected with using flexible cord
Or chain sling lifting is compared, and has saved construction cost, and general when being lifted with flexible cord connection or chain sling, the flexible cord or hang
Chain is slender member, while the length of the flexible cord or chain sling is 1.5m~2m, it is poor that the light fixture 5 installs rear stability.
As shown in Fig. 1~Fig. 7, the method that the present invention is installed using the sectional shelf-unit to light fixture includes following step
Suddenly:
Step 1: preparation of construction:Initial installation positions of the branch suspension rod 2-3 on the top plate 3 is determined according to construction drawing
Put the initial makeup location on stated clearly pipe arrangement 1 with the light fixture 5, then computer by BIM softwares to the branch suspension rod
Initial makeup location of initial makeup locations and the light fixture 5 of the 2-3 on the top plate 3 on stated clearly pipe arrangement 1 carries out excellent
Change, the result after optimization is adjusted, finally determine final installation sites of the branch suspension rod 2-3 on the top plate 3 and
Final installation site of the light fixture 5 on stated clearly pipe arrangement 1;
Step 2: the assembling of sectional shelf-unit, including procedure below:
The assembling of step 201, carrier unit:, will after institute branch swing pipe 2-1 lower end is connected with the top of stated clearly pipe arrangement 1
The upper end of the branch swing pipe 2-1 is connected with the lower end of the branch suspension rod 2-3, forms the carrier unit;
Step 202, repeat step 201, complete the assembling of multiple carrier units;
Step 203, by step 202 multiple carrier units state clearly pipe arrangement 1 pass through the socket joint of socket component 8 connect
Afterwards, the sectional shelf-unit is completed;
Step 3: the installation of sectional shelf-unit:In step 203 after being completed of sectional shelf-unit, using hanging machinery by institute
State sectional shelf-unit to be lifted, the upper end of the branch suspension rod 2-3 is fixed on the branch suspension rod 2-3 determined in step one in institute
State the final installed position on top plate 3;
Step 4: the installation of light fixture:The light fixture 5 is fixedly connected on the institute determined in step one by the fixture 4
State final installed position of the light fixture 5 on stated clearly pipe arrangement 1.
During actual installation, in the preparation of construction of step one, searched according only to construction drawing in pipeline compact district lamp installation
The point of impingement, carries out the comprehensive of bright pipe arrangement using BIM softwares and arranges, detect and cut down the pipeline point of impingement, make the bright of pipeline compact district
The arrangement of pipe arrangement 1 reaches overall balance, it is to avoid in the collision problem of pipeline compact district lamp installation, the installation of light fixture 5 is arranged as
OK, perception effect is improved.
During actual installation, in the preparation of construction of step one, according only to construction drawing in combination with BIM softwares, finally determining
Final installation sites of the branch suspension rod 2-3 on the top plate 3, it is not necessary to the dark pipe arrangement 1 on the top plate 3, by pipeline
Lay from dark apply of traditional approach and be changed into bright and match somebody with somebody, the installation progress of light fixture 5 is not influenceed by the project overall duration, while after being easy to
Maintenance during the use of light fixture 5 described in phase.
During actual installation, each processing of the sectional shelf-unit and assembling can realize that batch production is processed, after machining
It is combined at the construction field (site), then overall to carry out lifting installation, the process for reducing work high above the ground reduces difficulty of construction,
Efficiency of construction is improved, the construction period is shortened.
During actual installation, in step 3 during the installation of sectional shelf-unit, the branch suspension rod 2-3 is entered using infrared ray position indicator
Row location and installation, it is ensured that in a row embarked on journey after the branch suspension rod 2-3 installations, meet construction requirement.
In the present embodiment, the upper end of the branch swing pipe 2-1 is welded with steel plate 7, the steel plate 7 to offer and hung for the branch
The mounting hole 7-1 that bar 2-3 is installed;
The branch swing pipe 2-1 offers with corresponding stated clearly the bottom of pipe arrangement 1 at stated clearly the top communicating position of pipe arrangement 1
The plug 6 used cooperatively with it is provided with one through hole, the first through hole.
In the present embodiment, when carrier unit described in step 201 is assembled, the upper end of the branch suspension rod 2-3 is sequentially passed through
The first through hole and the mounting hole 7-1, after the branch suspension rod 2-3 lower ends are connected with the steel plate 7.
In the present embodiment, the fixture 4 include being sleeved on jig body 4-1 on stated clearly pipe arrangement 1 and with the fixture
Being shaped as of the chuck 4-2, the jig body 4-1 that body 4-1 is used cooperatively is offered on U-shaped, the chuck 4-2 for described
The block button hole that jig body 4-1 two ends are passed through;
The lampshade of the light fixture 5 is provided at both ends with the second through hole passed through for the jig body 4-1 two ends.
In the present embodiment, before step 4 lamp installation, electric wire is penetrated in stated clearly pipe arrangement 1 using conduit, and will be described
Electric wire at the first through hole and connector female joint connect;
In step 4 during lamp installation, the reserved line of the light fixture 5 is inserted to the pin end of the connector, grafting is completed
After the connection of device, blocked with described 6 pairs of first through hole of plug, by the two ends of the jig body 4-1 described in
After second through hole, then the jig body 4-1 is sleeved on stated clearly pipe arrangement 1, then at the two ends of the jig body 4-1
The chuck 4-2 is inserted, the two ends of the jig body 4-1 are bent, the installation of light fixture 5 is completed.
During actual installation, the quantity of light fixture 5 is determined according to construction drawing.
It is described above, only it is presently preferred embodiments of the present invention, not the present invention is imposed any restrictions, it is every according to the present invention
Any simple modification, change and equivalent structure change that technical spirit is made to above example, still fall within skill of the present invention
In the protection domain of art scheme.
Claims (10)
1. a kind of lamp installation sectional shelf-unit, it is characterised in that:Including multiple carrier units, the two neighboring carrier unit
Connected by socket component (8) socket joint, the carrier unit includes bright pipe arrangement (1) and hangs list with the branch that stated clearly pipe arrangement (1) is connected
Member, states pipe arrangement (1) clearly in horizontal layout, states the fixture (4) being set with pipe arrangement (1) for mounted lamp (5) clearly, described
Branch hangs unit in vertical laying, and the branch, which hangs unit, includes branch suspension rod (2-3) and the branch being connected with branch suspension rod (2-3) lower end
Swing pipe (2-1), the lower end of the branch suspension rod (2-3) is connected with the upper end of the branch swing pipe (2-1), the branch suspension rod (2-3)
Upper end is fixed on top plate (3), and the lower end of the branch swing pipe (2-1) is connected with the top of stated clearly pipe arrangement (1).
2. according to a kind of lamp installation sectional shelf-unit described in claim 1, it is characterised in that:The two neighboring support list
The bright pipe arrangement (1) of member is connected by the socket component (8) socket joint, and the cross sectional shape of the socket component (8) is with stating pipe arrangement (1) clearly
Cross sectional shape it is identical, and the sectional dimension of the socket component (8) is not less than and states the sectional dimension of pipe arrangement (1) clearly, described to hold
Offered on plug-in unit (8) and state the screwed hole (9) that the regulating bolt of pipe arrangement (1) levelness is passed through clearly for adjustment.
3. according to a kind of lamp installation sectional shelf-unit described in claim 1, it is characterised in that:The branch swing pipe (2-1)
Upper end is welded with the mounting hole (7-1) for offering and being installed for the branch suspension rod (2-3) on steel plate (7), the steel plate (7).
4. according to a kind of lamp installation sectional shelf-unit described in claim 1, it is characterised in that:The branch swing pipe (2-1) with
Corresponding stated clearly pipe arrangement (1) bottom offers first through hole, the first through hole at the communicating position of stated clearly pipe arrangement (1) top
On be provided with the plug (6) used cooperatively with it.
5. according to a kind of lamp installation sectional shelf-unit described in claim 1, it is characterised in that:The fixture (4) includes set
Jig body (4-1) on stated clearly pipe arrangement (1) and the chuck (4-2) used cooperatively with the jig body (4-1), institute
State to offer on the U-shaped that is shaped as of jig body (4-1), the chuck (4-2) and passed through for the jig body (4-1) two ends
Block button hole.
6. a kind of method installed using sectional shelf-unit described in claim 1 to light fixture, it is characterised in that this method includes
Following steps:
Step 1: preparation of construction:Initial installation position of the branch suspension rod (2-3) on the top plate (3) is determined according to construction drawing
Put the initial makeup location on stated clearly pipe arrangement (1) with the light fixture (5), then computer by BIM softwares to the branch
Initial makeup location and the light fixture (5) initial peace on stated pipe arrangement (1) of the suspension rod (2-3) on the top plate (3)
Holding position is optimized, and the result after optimization is adjusted, and finally determines the branch suspension rod (2-3) on the top plate (3)
Final installation site on stated clearly pipe arrangement (1) of final installation site and the light fixture (5);
Step 2: the assembling of sectional shelf-unit, including procedure below:
The assembling of step 201, carrier unit:, will after the lower end of institute's branch swing pipe (2-1) is connected with the top of stated clearly pipe arrangement (1)
The upper end of the branch swing pipe (2-1) is connected with the lower end of the branch suspension rod (2-3), forms the carrier unit;
Step 202, repeat step 201, complete the assembling of multiple carrier units;
Step 203, by step 202 multiple carrier units state clearly pipe arrangement (1) pass through socket component (8) socket joint connect
Afterwards, the sectional shelf-unit is completed;
Step 3: the installation of sectional shelf-unit:In step 203 after being completed of sectional shelf-unit, using hanging machinery by described group
Close support to be lifted, the upper end of the branch suspension rod (2-3) is fixed on to the branch suspension rod (2-3) determined in step one in institute
State the final installed position on top plate (3);
Step 4: the installation of light fixture:The light fixture (5) is fixedly connected on the institute determined in step one by the fixture (4)
State final installed position of the light fixture (5) on stated clearly pipe arrangement (1).
7. in accordance with the method for claim 6, it is characterised in that:The upper end of the branch swing pipe (2-1) is welded with steel plate (7),
The mounting hole (7-1) installed for the branch suspension rod (2-3) is offered on the steel plate (7);
The branch swing pipe (2-1) stated clearly pipe arrangement (1) bottom corresponding with the communicating position of stated clearly pipe arrangement (1) top is offered
The plug (6) used cooperatively with it is provided with first through hole, the first through hole.
8. according to the method for claim 7, it is characterised in that:When carrier unit described in step 201 is assembled, by the branch suspension rod
The upper end of (2-3) sequentially passes through the first through hole and the mounting hole (7-1), after by branch suspension rod (2-3) lower end and institute
State steel plate (7) connection.
9. according to the method for claim 7, it is characterised in that:The fixture (4) includes the card being sleeved on stated clearly pipe arrangement (1)
Have body (4-1) and the chuck (4-2) used cooperatively with the jig body (4-1), jig body (4-1's) is shaped as
The block button hole passed through for the jig body (4-1) two ends is offered on U-shaped, the chuck (4-2);
The lampshade of the light fixture (5) is provided at both ends with the second through hole passed through for the jig body (4-1) two ends.
10. according to the method for claim 9, it is characterised in that:Before step 4 lamp installation, electric wire is penetrated using conduit described
In bright pipe arrangement (1), and the electric wire is connected at the first through hole with the female joint of connector;
In step 4 during lamp installation, the reserved line of the light fixture (5) is inserted to the pin end of the connector, connector is completed
Connection after, the first through hole is blocked with the plug (6), by the two ends of the jig body (4-1) pass through institute
State after the second through hole, then the jig body (4-1) is sleeved on stated clearly pipe arrangement (1), then in the jig body (4-
1) chuck (4-2) is inserted at two ends, and the two ends of the jig body (4-1) are bent, and completes the installation of light fixture (5).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710335482.XA CN106989323B (en) | 2017-05-12 | 2017-05-12 | Combined support for lamp installation and lamp installation method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710335482.XA CN106989323B (en) | 2017-05-12 | 2017-05-12 | Combined support for lamp installation and lamp installation method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106989323A true CN106989323A (en) | 2017-07-28 |
CN106989323B CN106989323B (en) | 2023-09-26 |
Family
ID=59419727
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710335482.XA Active CN106989323B (en) | 2017-05-12 | 2017-05-12 | Combined support for lamp installation and lamp installation method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106989323B (en) |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2012025210A1 (en) * | 2010-08-25 | 2012-03-01 | Steinberg Leuchtmittelwerke Gmbh | Lighting fixture, in particular wall and/or ceiling lighting fixture |
CN205174273U (en) * | 2015-10-28 | 2016-04-20 | 中建一局集团装饰工程有限公司 | Jib formula surface fluorescent fixture system |
CN206802866U (en) * | 2017-05-12 | 2017-12-26 | 陕西建工第三建设集团有限公司 | A kind of lamp installation sectional shelf-unit |
-
2017
- 2017-05-12 CN CN201710335482.XA patent/CN106989323B/en active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2012025210A1 (en) * | 2010-08-25 | 2012-03-01 | Steinberg Leuchtmittelwerke Gmbh | Lighting fixture, in particular wall and/or ceiling lighting fixture |
CN205174273U (en) * | 2015-10-28 | 2016-04-20 | 中建一局集团装饰工程有限公司 | Jib formula surface fluorescent fixture system |
CN206802866U (en) * | 2017-05-12 | 2017-12-26 | 陕西建工第三建设集团有限公司 | A kind of lamp installation sectional shelf-unit |
Also Published As
Publication number | Publication date |
---|---|
CN106989323B (en) | 2023-09-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104806822B (en) | The modularity installation method of integral riser | |
CN105443871B (en) | A kind of new suspension and support and construction technology for the connection of horizontal multi-pipeline counterpart | |
CN108193832A (en) | A kind of i-shape steel beam assembled connecting node and its construction method | |
CN206802866U (en) | A kind of lamp installation sectional shelf-unit | |
CN206346737U (en) | A kind of supporting major diameter curve pipe curtain | |
CN106989323A (en) | A kind of installation method of lamp installation sectional shelf-unit and light fixture | |
CN207365244U (en) | A kind of supporting structure for building | |
CN106437846B (en) | Down-hole pipe mounting assembly | |
CN209016567U (en) | A kind of assembly type cable bearer | |
CN206668315U (en) | Isolated blast water bottle canopy and system | |
CN209229137U (en) | One kind is for setting up line holder in pipe gallery | |
CN105317714B (en) | A kind of ceiling fan | |
CN207581233U (en) | A kind of easy pipe fitting lifting device | |
CN206722077U (en) | Assembling type steel structure is built | |
CN210713879U (en) | Steel column verticality adjusting device | |
CN206591634U (en) | A kind of assembling type steel structure beam-column node structure | |
CN105311771A (en) | Safety belt suspending device for upper construction of transformer | |
CN205953329U (en) | Pipe hoist device looses | |
CN108979285A (en) | A kind of sectional annular concrete electric pole and its installation method | |
CN209988990U (en) | Hoist and mount frame convenient to installation is dismantled | |
CN206748385U (en) | A kind of construction tool rack easy to use | |
CN105401598A (en) | Automatic formwork lowering system hoisting device and method for top-down construction | |
CN206678785U (en) | A kind of centre carries the tricycle rear axle attachment means of differential mechanism | |
CN106926207A (en) | A kind of construction tool rack easy to use | |
CN205479753U (en) | Pipeline combination gallows |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |