CN206033024U - Pipeline hoist and mount mould - Google Patents

Pipeline hoist and mount mould Download PDF

Info

Publication number
CN206033024U
CN206033024U CN201621077744.4U CN201621077744U CN206033024U CN 206033024 U CN206033024 U CN 206033024U CN 201621077744 U CN201621077744 U CN 201621077744U CN 206033024 U CN206033024 U CN 206033024U
Authority
CN
China
Prior art keywords
pipeline
vertical plate
hanging hole
lifting
cylindrical drum
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621077744.4U
Other languages
Chinese (zh)
Inventor
张宪柱
朱峰
方义勇
邵世军
阚积宝
栗祥
邵娜
葛明阳
韩冬
王波
陈前廷
孙加瑞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Original Assignee
First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd filed Critical First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority to CN201621077744.4U priority Critical patent/CN206033024U/en
Application granted granted Critical
Publication of CN206033024U publication Critical patent/CN206033024U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The utility model belongs to the technical field of pipeline lifting device, in particular to pipeline hoist and mount mould. This pipeline hoist and mount mould includes the open cylinder section of thick bamboo that sets up in a top, is equipped with a hangers in a cylinder section of thick bamboo in the middle part of the diapire, the hangers includes the vertical board that the interior diapire of a bottom and a cylinder section of thick bamboo linked firmly, is equipped with one and runs through the hanging hole that vertical board both sides face set up in the middle part of vertical board. This pipeline hoist and mount mould can utilize the current reservation entrance to a cave, need not destroy finished product ground, and is easy -to -use, has improved work efficiency greatly.

Description

A kind of lifting pipeline mould
(1) technical field
This utility model belongs to lifting pipeline equipment technical field, more particularly to a kind of lifting pipeline mould.
(2) background technology
Lifting pipeline is one of main contents of construction, and greatly, danger is high for workload.Traditional method be from lower and On lift successively.As relevant unit marches into the arena late, or later stage function is situations such as change, in the pipe well for having completed, floor Pour, pipeline can only be installed from reserved sleeve pipe, cannot such as be welded in narrow and small pipe well, in addition it is also necessary to punch and pound Wall;As casing space is limited, lifting is added apart from long, pipeline is easily rocked, it is impossible to make pipeline smoothly alignment sleeve, often Layer is required for manually carrying out righting, and workman follows and runs behind pipeline, and workload is big, if Construction of High-rise, in lifting engineering Workman needs to start and then pipeline successively righting alignment reserved opening from one layer, and physical demandss are big, and normal mounting method cannot expire Foot.
(3) content of the invention
This utility model is in order to make up the deficiencies in the prior art, there is provided a kind of pipeline rational in infrastructure, convenient and practical hangs Die-filling tool, it is possible to use existing reserved opening, it is without destroying finished product ground, easy-to-use, work efficiency is substantially increased, is solved Determine problems of the prior art.
This utility model is achieved by the following technical solution:
A kind of lifting pipeline mould, including the cylindrical drum that an open top end is arranged, is provided with one in the middle part of cylindrical drum inner bottom wall Hangers, the hangers include the vertical plate that a bottom is connected with cylindrical drum inner bottom wall, are provided with one through vertical in the middle part of vertical plate The hanging hole that plate two sides are arranged.
It is relative on the vertical plate two sides below hanging hole to be provided with two right-angled trapezium plates arranged perpendicular to vertical plate.
1/3-2/3 of the height of the vertical plate for cylindrical drum height.
The hanging hole is oval hanging hole.
The beneficial effects of the utility model are:Common lifting pipeline is carried out before ground construction in pipe well, under And on lifted successively, after lifting fixes one section, pipeline is lifted by crane to top in space from the side, then is directed at fixed welding. The lifting pipeline mould is little to the construction space needed in pipe well, can carry out, using hole to be provided after the completion of pipe well ground construction Mouthful can be lifted, without destroy finished product ground, it is easy-to-use, and the lifting pipeline mould hangers two sides be provided with by The top of the two right-angled trapezium plate compositions being oppositely arranged is sharp cone distal structure, is easy to align with pipeline, lifts efficiency high.
(4) illustrate
Below in conjunction with the accompanying drawings this utility model is further described.
Fig. 1 is structural representation of the present utility model;
Fig. 2 is Fig. 1 side structure schematic views;
Fig. 3 is Fig. 1 overlooking the structure diagrams;
Fig. 4 is Fig. 1 dimensional structure diagrams.
In figure, 1 cylindrical drum, 2 vertical plates, 3 hanging holes, 4 right-angled trapezium plates.
(5) specific embodiment
For can clearly illustrate the technical characterstic of this programme, below by specific embodiment, and its accompanying drawing is combined, to this reality It is described in detail with new.
As shown in accompanying drawing 1-4, the lifting pipeline mould pipeline die hoisting includes the cylindrical drum 1 that an open top end is arranged, A hangers is provided with the middle part of 1 inner bottom wall of cylindrical drum, and the hangers includes the vertical plate 2 that a bottom is connected with 1 inner bottom wall of cylindrical drum, A hanging hole 3 arranged through vertical plate two sides is provided with the middle part of vertical plate 2.
It is relative on 2 two sides of vertical plate below hanging hole 3 to be provided with two right-angled trapezium plates 4 arranged perpendicular to vertical plate.
1/3-2/3 of the height of the vertical plate 2 for 1 height of cylindrical drum.
The hanging hole 3 is oval hanging hole.
Operation principle:Pipe well pipeline can be carried out lifting, fix, welds by the lifting pipeline mould from bottom to top successively.Tool Body running process is:First hoist engine is installed in top layer, an electric block is set at two layers, hanger is welded to into pipeline first In mouthful, then lifting correction is carried out to pipeline using the sling hanger of pipeline opening of electric block, after pipeline is hanging at one layer, by which Bottom squat the lifting pipeline mould cylindrical drum 1 in, the bottom of pipeline opening is just sheathed on outside two right-angled trapezium plates 4, will From in pipeline from the top down through to ttom of pipe, the hanging hole 3 of the lifting pipeline mould in connection is lifted by crane the steel wire rope of hoist engine, will Pipeline is hung to three layers, carries out temporary weld and fix on three layers of fixed support.Second pipe is lifted by crane with identical method afterwards Second pipeline is hung to two layers by road, to connecting first pipeline after weld.By two pipeline entirety after the completion of to be welded It is hung to top layer.
Rock in view of steel wire rope during hoist engine load-bearing and lifting, rise every time.
Hanging hole 3 is set to oval hanging hole, increased the size of hanging hole horizontal direction, facilitates steel wire rope bottom hook and is somebody's turn to do The connection of lifting grinding tool.
The pipeline mouth of pipe big little makings lifting pipeline mould for lifting as needed, it is ensured that cylindrical tube with diameter greater than needing Outer diameter tube to be lifted;The bottom outer end of the conical plate that guarantee is made up of two right-angled trapezium plates is slightly less than internal diameter of the pipeline, so as to Pipeline is made to be easy to align with pipeline when lifting using the die hoisting.
This utility model does not describe part in detail, is the known technology of those skilled in the art of the present technique.Finally illustrate, with Upper embodiment is only unrestricted to illustrate the technical solution of the utility model, although with reference to preferred embodiment to this utility model It has been described in detail, it will be understood by those within the art that, the technical solution of the utility model can be repaiied Change or equivalent, without deviating from the objective and scope of technical solutions of the utility model, which all should be covered in this utility model Right in the middle of.

Claims (4)

1. a kind of lifting pipeline mould, is characterized in that:Including the cylindrical drum that an open top end is arranged, in the middle part of cylindrical drum inner bottom wall A hangers is provided with, the hangers includes the vertical plate that a bottom is connected with cylindrical drum inner bottom wall, is provided with consistent in the middle part of vertical plate Wear the hanging hole of vertical plate two sides setting.
2. a kind of lifting pipeline mould according to claim 1, is characterized in that:On the vertical plate two sides below hanging hole It is relative to be provided with two right-angled trapezium plates arranged perpendicular to vertical plate.
3. a kind of lifting pipeline mould according to claim 1, is characterized in that:The height of the vertical plate is that cylindrical drum is high The 1/3-2/3 of degree.
4. a kind of lifting pipeline mould according to claim 1, is characterized in that:The hanging hole is oval hanging hole.
CN201621077744.4U 2016-09-23 2016-09-23 Pipeline hoist and mount mould Expired - Fee Related CN206033024U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621077744.4U CN206033024U (en) 2016-09-23 2016-09-23 Pipeline hoist and mount mould

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621077744.4U CN206033024U (en) 2016-09-23 2016-09-23 Pipeline hoist and mount mould

Publications (1)

Publication Number Publication Date
CN206033024U true CN206033024U (en) 2017-03-22

Family

ID=58296386

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621077744.4U Expired - Fee Related CN206033024U (en) 2016-09-23 2016-09-23 Pipeline hoist and mount mould

Country Status (1)

Country Link
CN (1) CN206033024U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107673185A (en) * 2017-10-20 2018-02-09 浙江萧云建设有限公司 A kind of hanging apparatus and its hanging method of prefabricated assembled concrete Side fascia

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107673185A (en) * 2017-10-20 2018-02-09 浙江萧云建设有限公司 A kind of hanging apparatus and its hanging method of prefabricated assembled concrete Side fascia
CN107673185B (en) * 2017-10-20 2023-08-01 萧云建设股份有限公司 Hoisting device and hoisting method for prefabricated assembled concrete external wall panel

Similar Documents

Publication Publication Date Title
CN201713215U (en) Flange pipe hanger
CN206033024U (en) Pipeline hoist and mount mould
CN203558702U (en) Lifting appliance for steel reinforcement cages
CN203474231U (en) Steel bar tower safety hoisting device
CN205367454U (en) Large -size formwork hoisting machine constructs
CN202564850U (en) Replacement and lifting tool for tubular bus pillar insulator
CN205772780U (en) Pre-buried lifting hole(eyelet) formula barrier board hanging apparatus
CN203924353U (en) Screw built-in fitting
CN206735614U (en) The grouting hanging apparatus of spheroidal graphite cast-iron push pipe
CN204162282U (en) A kind of large-diameter steel reinforced concrete drainage pipe special combination suspender
CN203877726U (en) Multi-hoisting-point hoisting beam for turning over and hoisting equipment
CN108222006A (en) A kind of square construction method of underground continuous wall
CN207312995U (en) One kind self-control bridge-collision-avoidance wall form hanging device
CN203699679U (en) Lifting appliance for lifting wire coil
CN102777036A (en) Air reverse mechanical joint construction method of super-long vertical reinforcement cage
CN205772790U (en) Circular spherical tank integral hoisting specific purpose tool
CN206395706U (en) A kind of fixture
CN205045702U (en) Heavy -calibre cement pipe material hoist of area upset function
CN203187370U (en) Inner mast hoisting device
CN205742952U (en) Elevator civil engineering mobile platform
CN205132926U (en) Special well word hoist of hydroelectric set tail water ell
CN207566738U (en) A kind of large-scale rectangular jacking pipe joints hanging apparatus
CN204624982U (en) The vertical overhead hoist of a kind of tubing
CN206599375U (en) A kind of door type steel structure hoisting instrument
CN208054723U (en) A kind of Pipe installing application c-type suspension hook

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170322