CN107673185A - A kind of hanging apparatus and its hanging method of prefabricated assembled concrete Side fascia - Google Patents

A kind of hanging apparatus and its hanging method of prefabricated assembled concrete Side fascia Download PDF

Info

Publication number
CN107673185A
CN107673185A CN201710986463.3A CN201710986463A CN107673185A CN 107673185 A CN107673185 A CN 107673185A CN 201710986463 A CN201710986463 A CN 201710986463A CN 107673185 A CN107673185 A CN 107673185A
Authority
CN
China
Prior art keywords
side fascia
concrete side
prefabricated assembled
assembled concrete
hanging
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710986463.3A
Other languages
Chinese (zh)
Other versions
CN107673185B (en
Inventor
汪文通
周丹
汪刚强
陈铎升
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Xiao Yun Construction Co Ltd
Original Assignee
Zhejiang Xiao Yun Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Xiao Yun Construction Co Ltd filed Critical Zhejiang Xiao Yun Construction Co Ltd
Priority to CN201710986463.3A priority Critical patent/CN107673185B/en
Publication of CN107673185A publication Critical patent/CN107673185A/en
Application granted granted Critical
Publication of CN107673185B publication Critical patent/CN107673185B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C1/00Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
    • B66C1/10Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
    • B66C1/12Slings comprising chains, wires, ropes, or bands; Nets
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/162Handles to carry construction blocks

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses a kind of hanging apparatus and its hanging method of prefabricated assembled concrete Side fascia, solves the unstable problem of lifting of external wallboard in the prior art.Its drip irrigation device is a kind of hanging apparatus of prefabricated assembled concrete Side fascia, including horizontal hanging beam, it is fixed on the first chain sling of horizontal hanging beam lower end, the hanging apparatus of the prefabricated assembled concrete Side fascia also includes the hanging component for coordinating the first chain sling to sling prefabricated assembled concrete Side fascia, the hanging component includes being embedded in prefabricated assembled concrete Side fascia upper end in advance and supplies the first chain sling metal tube passed through and the support block being installed on the inside of metal tube tube wall, the support block has the support slot passed through for the first chain sling, the bottom surface of the support slot is downwardly convex cambered surface, the hanging component is no less than two groups, the hanging apparatus of the prefabricated assembled concrete Side fascia makes hoisting prefabricated assembly concrete Side fascia more securely.

Description

A kind of hanging apparatus and its hanging method of prefabricated assembled concrete Side fascia
Technical field
The invention belongs to hoisting technology field, the hanging apparatus of more particularly to a kind of prefabricated assembled concrete Side fascia and Its hanging method.
Background technology
Prefabrication construction is the mainstream development direction of the green emission-reduction technology of building trade.Wherein, it is prefabricated Assembly concrete Side fascia is the important component of prefabrication, main to standardize system using in prefabricated processing factory Make prefabricated panel, transport to job site the mode of integral installation construction that carries out afterwards, production is more convenient, and installs simple. But in the prior art, by being embedded with suspension ring in prefabricated assembled concrete Side fascia upper end, the chain sling of loop wheel machine, which passes through, to be hung After ring, prefabricated assembled concrete Side fascia is sling by the cooperation of chain sling and suspension ring, then is installed.But chain sling and hang Structural strength after ring coordinates has much room for improvement, and lifting prefabricated assembled concrete exterior wall certain potential safety hazard is present.
The content of the invention
First purpose of the present invention is to provide a kind of hanging apparatus of prefabricated assembled concrete Side fascia, reduces and hangs Fill the potential safety hazard of prefabricated assembled concrete Side fascia.
The present invention above-mentioned technical purpose technical scheme is that:
A kind of hanging apparatus of prefabricated assembled concrete Side fascia, including horizontal hanging beam, be fixed on the first of horizontal hanging beam lower end and hang Chain, the hanging apparatus of the prefabricated assembled concrete Side fascia also include coordinating the first chain sling by outside prefabricated assembled concrete The hanging component that wallboard is sling, the hanging component include being embedded in prefabricated assembled concrete Side fascia upper end in advance and hung for first Metal tube that chain passes through and the support block being installed on the inside of metal tube tube wall, the support block have what is passed through for the first chain sling Support slot, the bottom surface of the support slot is downwardly convex cambered surface, and the hanging component is no less than two groups.
By using above-mentioned technical proposal, the first chain sling offsets through metal tube and with the support slot of support block, works as lifting After device slings prefabricated assembled concrete Side fascia, the bottom surface of the first chain sling and support slot offsets.Above-mentioned lifting mode energy Enough more traditional chain slings and suspension ring fit structure intensity are higher, firmly install Du Genggao.Meanwhile the bottom surface of support slot is convex downwards The cambered surface risen, makes the first chain sling more uniform to the support force of support block and prefabricated assembled concrete Side fascia, and increase is pre- The stationarity of assembly concrete Side fascia lifting processed.
As a further improvement on the present invention, the support block coordinates with metal tube to be detachable, the metal tube tube wall Inner top side is provided with buckling groove, and the bottom of the buckling groove is provided with the fixture block being caught in buckling groove.
By using above-mentioned technical proposal, the detachable cooperation of support block and metal tube, can be supported by reusing Block, reduce the manufacturing cost of each prefabricated assembled concrete Side fascia.Meanwhile metal tube and support block pass through buckling groove and card The mating connection installation of block, this mounting means is simple and convenient, and above-mentioned fit structure bears the first chain sling in support block It is more stable during support force.
As a further improvement on the present invention, both ends of the support block in support slot are provided with and the first chain sling phase The support roller supported.
By using above-mentioned technical proposal, when the first chain sling is lifting by crane prefabricated assembled concrete Side fascia, support roller The first chain can be facilitated to be slid in support block, abrasion of first chain sling to support block is reduced, so as to extend making for support block Use the life-span.
As a further improvement on the present invention, first chain sling is arranged rubber sleeve, is provided with the outside of the rubber sleeve First friction burr, the bottom surface of the support slot are provided with the second friction burr to be cooperated with the first friction burr.
By using above-mentioned technical proposal, rubber sleeve is sheathed on the outside of the first chain sling, when the first chain sling lifts by crane, can be subtracted Few abrasion of first chain sling to support block and metal tube.Meanwhile after the lifting of prefabricated assembled concrete Side fascia, outside rubber sleeve The cooperation of first friction burr of side and the second friction burr of support groove bottom, rubber sleeve is under the extruding of the first chain sling, rubber Relative friction will not occur between gum cover and support block, reduce the probability slid between the first chain sling and support block, have Improve to effect the stability of lifting.
As a further improvement on the present invention, the lateral wall of the metal tube is circumferentially provided with along metal tube length direction cloth The deep floor put, the bottom of the metal tube, which also has, strengthens base, and the reinforcement base includes horizontally disposed reinforcement bottom Plate.
By using above-mentioned technical proposal, the deep floor and reinforcement base of metal tube strengthen metal tube and prefabrication and assembly construction Cooperation intensity between formula concrete external wall panel, metal tube are not easy to come off from prefabricated assembled concrete Side fascia.Add simultaneously The setting of strong floor strengthens the bend resistance ability of metal tube.
As a further improvement on the present invention, the hanging apparatus of the prefabricated assembled concrete Side fascia is additionally provided with two Group tilt adjustments component, the tilt adjustments component include adjustment motor, for adjusting motor-driven reel, being embedded in prefabricated dress in advance Suspension ring and one end with formula concrete external wall panel upper surface are fixed on the second chain sling that the reel other end is installed on suspension ring, described The both sides of prefabricated assembled concrete Side fascia upper surface are provided with suspension ring.
By using above-mentioned technical proposal, except the cooperation of the first chain sling and metal tube, prefabricated assembled concrete exterior wall The hanging apparatus of plate adds the cooperation of the second chain sling and suspension ring again, adds the lifting dress of prefabricated assembled concrete Side fascia The stability of hoisting prefabricated assembly concrete Side fascia is put, adds security performance.Meanwhile tilt adjustments component passes through adjustment Motor adjusts the length of the second chain sling, so as to adjust the levelness of prefabricated assembled concrete Side fascia upper surface, ensure that pre- The steady lifting of assembly concrete Side fascia processed.
As a further improvement on the present invention, two adjustment motors are located at the upper end both sides of horizontal hanging beam respectively, described The both ends of horizontal hanging beam are respectively arranged with support bar and the balancing disk being sheathed in support bar.
By using above-mentioned technical proposal, by adjusting the weight of the balancing disk on horizontal hanging beam supported on both sides bar, can adjust Save the poised state of horizontal hanging beam.
As a further improvement on the present invention, the lower surface of the horizontal hanging beam is provided with flexible gag lever post, the prefabricated dress The position-limiting tube for flexible gag lever post insertion is also embedded with formula concrete external wall panel upper surface.
By using above-mentioned technical proposal, the cooperation of position-limiting tube and flexible gag lever post, it can effectively alleviate prefabrication and assembly construction Formula concrete external wall panel rocks, and ensure that the lifting stability of prefabricated assembled concrete Side fascia.
Second object of the present invention is to provide a kind of lifting applied to above-mentioned prefabricated assembled concrete Side fascia and filled The hanging method put, the hanging method can effectively improve the security performance of prefabricated assembled concrete Side fascia lifting.
The present invention above-mentioned technical purpose technical scheme is that:
A kind of hanging method of hanging apparatus applied to above-mentioned prefabricated assembled concrete Side fascia, it is described prefabricated assembled mixed The hanging apparatus for coagulating native Side fascia is installed on loop wheel machine, and the hanging apparatus of the loop wheel machine control prefabricated assembled concrete Side fascia moves Dynamic, the prefabricated assembled concrete Side fascia is provided with the installation through-hole for metal tube installation, and the metal tube is installed on The middle part of through hole is filled, the length of the metal tube is less than the thickness of prefabricated assembled concrete Side fascia, comprised the following steps:
S1, after horizontal hanging beam is sling, the weight of the balancing disk of both sides is adjusted, make horizontal hanging beam keep level state;
S2, support block is installed in metal tube, and by the first chain sling below horizontal hanging beam through outside prefabricated assembled concrete The metal tube of wallboard, the first chain sling are located in the support slot of support block, and the both ends of the first chain sling are both secured into horizontal hanging beam;
S3, the second chain sling of tilt adjustments component is withheld using second and consolidated with the suspension ring of prefabricated assembled concrete Side fascia It is fixed;
S4, in the root of assembly concrete Side fascia cushion pad is placed, loop wheel machine is upward by prefabricated assembled concrete Side fascia Sling to apart from 200~300mm of ground, check whether the first chain sling, the second chain sling are reliable, check tower crane performance, check prefabricated Whether assembly concrete Side fascia has pollution and breakage;
S5, the flexible gag lever post on horizontal hanging beam inserted in the position-limiting tube of prefabricated assembled concrete Side fascia upper surface;
Assembly concrete Side fascia is continued up lifting, then the arm of uniform rotation loop wheel machine by S6, loop wheel machine, by assembled coagulation Native Side fascia is lifted to above installation site;
Adjustment motor operation on S7, horizontal hanging beam, made by the length for adjusting two second chain slings outside prefabricated assembled concrete The upper surface of wallboard is horizontal;
S8, loop wheel machine control prefabricated assembled concrete Side fascia decline, and staff enters to prefabricated assembled concrete Side fascia Row installation is fixed;
S9, the first chain sling is dismantled from installation through-hole, and support block is dismantled from metal tube, pacified in the both sides of installation through-hole The warming plate that dress covers installation through-hole, and fluid sealant and weather-resistant glue, institute are smeared in the gap of warming plate and installation through-hole State warming plate and be provided with the fixation projection to be offseted with metal tube madial wall;
S10, the second chain sling dismantled from suspension ring, the hanging apparatus of loop wheel machine control prefabricated assembled concrete Side fascia resets
In summary, the invention has the advantages that:
1st, in hanging component becket and the first chain sling cooperation, the support slot and support slot that the support block in becket is set The setting of bottom surface structure, the setting of tilt adjustments component, the cooperation of stretch gag lever post and position-limiting tube, said structure is more traditional to be hung The setting structure fastness of chain and suspension ring is higher, makes the security performance in hoisting prefabricated assembly concrete Side fascia higher, has Reduce the probability that prefabricated assembled concrete Side fascia comes off from hanging apparatus to effect;
2nd, in metal tube deep floor and strengthen base setting, be effectively improved outside metal tube and prefabricated assembled concrete The cooperation intensity of wallboard, while also improve the bend resistance ability of metal tube;
3rd, support block and metal tube coordinate to be detachable, on the premise of the basic function of hanging component is met, are effectively reduced The manufacturing cost of prefabricated assembled concrete Side fascia.
Brief description of the drawings
Fig. 1 is tower crane, the hanging apparatus of prefabricated assembled concrete Side fascia and prefabricated assembled concrete Side fascia Cooperation schematic diagram;
Fig. 2 is the cooperation signal of the hanging apparatus and prefabricated assembled concrete Side fascia of prefabricated assembled concrete Side fascia Figure;
Fig. 3 is the enlarged drawing at A in Fig. 2;
Fig. 4 is the enlarged drawing at B in Fig. 2;
Fig. 5 is the exploded perspective view of hanging component;
Fig. 6 is the diagrammatic cross-section of support block;
Fig. 7 is the structural representation of horizontal hanging beam and the part being installed on horizontal hanging beam;
Fig. 8 is the enlarged drawing at C in Fig. 7;
Fig. 9 is the enlarged drawing at D in Fig. 7;
Figure 10 is the exploded perspective view after prefabricated assembled concrete Side fascia installation.
In figure:1st, tower crane;2nd, horizontal hanging beam;21st, through hole is lifted;22nd, support bar;23rd, balancing disk;24th, fastening plate;25th, it is solid Determine ring;3rd, the first chain sling;31st, rubber sleeve;311st, the first friction burr;32nd, first withhold;41st, metal tube;411st, ribs Plate;412nd, base is strengthened;4121st, bottom plate is strengthened;4122nd, connecting plate;413rd, mounting blocks;4131st, buckling groove;42nd, support block; 421st, fixture block;422nd, wear-resistant pad;423rd, support slot;4231st, the second friction burr;424th, support roller;51st, motor is adjusted;52nd, roll up Cylinder;53rd, suspension ring;54th, the second chain sling;56th, second withhold;61st, stretch gag lever post;62nd, position-limiting tube;7th, prefabricated assembled concrete Side fascia;71st, installation through-hole;72nd, warming plate;721st, fixed projection.
Embodiment
The present invention is described in further detail below in conjunction with accompanying drawing.
As shown in figure 1, a kind of hanging apparatus of prefabricated assembled concrete Side fascia, mainly including horizontal hanging beam 2, be fixed on First chain sling 3 of the horizontal lower end of hanging beam 2, the hanging component being installed on prefabricated assembled concrete Side fascia 7, pass through hanging component Mutual cooperation with the first chain sling 3, which can be realized, slings prefabricated assembled concrete Side fascia 7.Above-mentioned prefabricated assembled coagulation The hanging apparatus of native Side fascia is installed on loop wheel machine, and in the present embodiment, loop wheel machine is tower crane 1, and controls prefabrication and assembly construction by tower crane 1 The movement of the hanging apparatus of formula concrete external wall panel.
As shown in Figure 1 and Figure 5, hanging component includes being embedded in the upper end of prefabricated assembled concrete Side fascia 7 in advance and for first Metal tube 41 that chain sling 3 passes through and the support block 42 being removably mounted on the inside of the tube wall of metal tube 41.
The lateral wall of metal tube 41 is circumferentially provided with the deep floor 411 arranged along the length direction of metal tube 41, metal tube 41 bottom, which also has, strengthens base 412.Wherein, strengthening base 412 includes horizontally disposed reinforcement bottom plate 4121 and connection Connecting plate 4122 between reinforcement bottom plate 4121 and the lateral wall of metal tube 41.In the present embodiment, the number of deep floor 411 For 5.
The madial wall upper end of metal tube 41 is provided with mounting blocks 413, the length side of the bottom surfaces of mounting blocks 413 along metal tube 41 To being provided with buckling groove 4131.Wherein, buckling groove 4131 is T-shaped buckling groove.
The upper end of support block 42 is provided with the fixture block 421 to be cooperated with buckling groove 4131.Wherein, the upper end of fixture block 421 Face is additionally provided with wear-resistant pad 422.Coordinated by the sliding between buckling groove 4131 and fixture block 421, metal can be effectively realized Detachable cooperation between pipe 41 and support block 42.
As shown in Figure 2, Figure 5 and Figure 6, the lower surface of support block 42 is provided with the support slot 423 being put into for the first chain sling 3, Wherein, the bottom surface of support slot 423 is along the length direction arrangement of support block 42 and downwardly convex cambered surface.Support block 42 is supporting Both ends in groove 423 are provided with the support roller 424 to be offseted with the first chain sling 3.The setting of support roller 424 can facilitate first to hang For chain 3 during lifting, the first chain sling 3 reduces abrasion between the two when being slid in support block 42.
As shown in Fig. 6, Fig. 7 and Fig. 8, the bottom surface of support slot 423 is additionally provided with the second friction burr 4231.First chain sling 3 Rubber sleeve 31 is arranged, the outside of rubber sleeve 31 is provided with the first friction burr 311 to be cooperated with the second friction burr 4231.
As shown in Fig. 2, Fig. 4 and Fig. 7, the hanging apparatus of prefabricated assembled concrete Side fascia is additionally provided with two groups of inclinations and adjusted Whole group part, tilt adjustments component include adjustment motor 51, the reel 52 driven for adjustment motor 51, are embedded in prefabricated assembled mix in advance The suspension ring 53 and one end for coagulating the native upper surface of Side fascia 7 are fixed on the second chain sling 54 that the other end of reel 52 is installed on suspension ring 53, The both sides of the upper surface of prefabricated assembled concrete Side fascia 7 are provided with suspension ring 53.
Two adjustment motors 51 are located at the horizontal upper end both sides of hanging beam 2 respectively, and two rollers are installed on the outside of adjustment motor 51 And rotation is controlled by adjustment motor 51.Horizontal hanging beam 2 is additionally provided with the lifting through hole 21 passed through for the second chain sling 54.Wherein, second Chain sling 54 is withheld 56 by second with suspension ring 53 and is connected.
The both ends of horizontal hanging beam 2 be respectively arranged with support bar 22, the balancing disk being sheathed in support bar 22 23 and with support The screw thread of bar 22 coordinates and balancing disk 23 is pressed on to the fastening plate 24 of the horizontal both sides of hanging beam 2.By adjusting balancing disk on support bar 22 23 weight, so that horizontal hanging beam 2 can ensure the poised state of itself in hoisting process.
As shown in figures 7 and 9, the lower surface of horizontal hanging beam 2 is symmetrically set with the retainer ring fixed for the first chain sling 3 Group, fixed ring group include the retainer ring 25 for being fixed on horizontal 2 lower surface of hanging beam two.Wherein, the chain sling 3 of retainer ring 25 and first passes through First, which withholds 32, is connected.
As shown in Fig. 2, Fig. 3 and Fig. 7, the lower surface of horizontal hanging beam 2 is also symmetrically set with two flexible gag lever posts 61, in advance The upper surface of assembly concrete Side fascia 7 processed is embedded with two position-limiting tubes 62 relative with flexible gag lever post 61.When horizontal hanging beam 2 will After prefabricated assembled concrete Side fascia 7 is sling, flexible gag lever post 61 is inserted in position-limiting tube 62, can be effectively reduced prefabricated Assembly concrete Side fascia 7 improves lifting stationarity and security performance in the shaking degree of hoisting process.
As shown in Figures 2 and 3, the upper end of prefabricated assembled concrete Side fascia 7 is provided with the installation installed for metal tube 41 Through hole 71, wherein, metal tube 41 is installed on the middle part of installation through-hole 71, and the length of metal tube 41 is less than prefabricated assembled concrete The thickness of Side fascia 7.In the present embodiment, prefabricated assembled concrete Side fascia 7 is rectangular weight external wall plate, prefabricated assembled mixed The upper end edge front/rear end center line for coagulating native Side fascia 7 is symmetrically arranged with two installation through-holes 71.
As shown in Figure 10, prefabricated assembled concrete Side fascia 7 is additionally provided with the warming plate 72 for covering installation through-hole 71, Warming plate 72 has the fixation projection 721 to be offseted with the inwall of metal tube 41.Warming plate 72 is attached to outside prefabricated assembled concrete After wallboard 7, fluid sealant and weather-resistant glue are smeared in the gap of warming plate 72 and installation through-hole 71.
With reference to Fig. 1 to Figure 10, a kind of lifting of hanging apparatus applied to above-mentioned prefabricated assembled concrete Side fascia Method, comprise the following steps:
S1, after horizontal hanging beam 2 is sling, the weight of the balancing disk 23 of both sides is adjusted, make the horizontal keep level state of hanging beam 2, make afterwards Balancing disk 23 is pressed on to the both sides of horizontal hanging beam 2 with fastening plate 24;
S2, support block 42 is installed in metal tube 41, and by the first chain sling 3 through prefabricated assembled concrete Side fascia 7 Metal tube 41, the first chain sling 3 are located in the support slot 423 of support block 42, the rubber sleeve 31 in the first chain sling 3 and support slot 423 Bottom surface offset, and the both ends of the first chain sling 3 are withheld 32 by first and are fixed in the retainer ring 25 of horizontal hanging beam 2;
S3, the second chain sling 54 of tilt adjustments component is withheld 56 using second hung with prefabricated assembled concrete Side fascia 7 Ring 53 is fixed;
S4, in the root of assembly concrete Side fascia cushion pad is placed, cushion pad can make thick rubber blanket or rigid foam material Flitch, loop wheel machine sling assembly concrete Side fascia to apart from 200~300mm of ground upwards, check the first chain sling 3, second Whether chain sling 54 is reliable, checks the performance of tower crane 1, checks whether assembly concrete Side fascia has pollution and breakage;
S5, the position-limiting tube 62 that the flexible gag lever post 61 on horizontal hanging beam 2 is inserted to the upper surface of prefabricated assembled concrete Side fascia 7 In;
Assembly concrete Side fascia is continued up lifting, then the arm of uniform rotation tower crane 1 by S6, tower crane 1, and assembled is mixed Native Side fascia is coagulated to lift to above installation site;
Adjustment motor 51 on S7, horizontal hanging beam 2 is run, and is made by the length for adjusting two second chain slings 54 outside assembly concrete The upper surface of wallboard is horizontal;
S8, loop wheel machine control prefabricated assembled concrete Side fascia 7 decline, and staff is by prefabricated assembled concrete Side fascia 7 Installation fixation is carried out to prefabricated assembled concrete Side fascia 7;
S9, first chain sling 3 is dismantled from installation through-hole 71, and support block 42 is dismantled from metal tube 41, in installation through-hole The 71 both sides installation warming plate 72 that covers installation through-hole 71, and smear in the gap of warming plate 72 and installation through-hole 71 close Sealing and weather-resistant glue, warming plate 72 are provided with the fixation projection 721 to be offseted with the madial wall of metal tube 41;
S10, the second chain sling 54 dismantled from suspension ring 53, the hanging apparatus of loop wheel machine control prefabricated assembled concrete Side fascia is answered Position.
This specific embodiment is only explanation of the invention, and it is not limitation of the present invention, people in the art Member can make the modification of no creative contribution to the present embodiment as needed after this specification is read, but as long as at this All protected in the right of invention by Patent Law.

Claims (9)

1. a kind of hanging apparatus of prefabricated assembled concrete Side fascia, including horizontal hanging beam (2), it is fixed on horizontal hanging beam (2) lower end The first chain sling (3), it is characterised in that:The hanging apparatus of the prefabricated assembled concrete Side fascia also includes coordinating first to hang The hanging component (4) that chain (3) slings prefabricated assembled concrete Side fascia (7), the hanging component (4) are pre- including being embedded in advance The metal tube (41) and be installed on metal tube that assembly concrete Side fascia (7) upper end processed and the first chain sling of confession (3) pass through (41) support block on the inside of tube wall (42), the support block (42) have the support slot (423) passed through for the first chain sling (3), institute The bottom surface for stating support slot (423) is downwardly convex cambered surface, and the hanging component (4) is no less than two groups.
A kind of 2. hanging apparatus of prefabricated assembled concrete Side fascia according to claim 1, it is characterised in that:It is described Support block (42) coordinates with metal tube (41) to be detachable, and metal tube (41) the tube wall inner top side is provided with buckling groove (4131), the bottom of the buckling groove (4131) is provided with the fixture block (421) being caught in buckling groove (4131).
A kind of 3. hanging apparatus of prefabricated assembled concrete Side fascia according to claim 2, it is characterised in that:It is described Both ends of the support block (42) in support slot (423) are provided with the support roller (424) to be offseted with the first chain sling (3).
A kind of 4. hanging apparatus of prefabricated assembled concrete Side fascia according to claim 3, it is characterised in that:It is described First chain sling (3) is arranged rubber sleeve (31), and the first friction burr (311), the branch are provided with the outside of the rubber sleeve (31) The bottom surface of support groove (423) is provided with the second friction burr (4231) to be cooperated with the first friction burr (311).
A kind of 5. hanging apparatus of prefabricated assembled concrete Side fascia according to claim 4, it is characterised in that:It is described The lateral wall of metal tube (41) is circumferentially provided with the deep floor (411) arranged along metal tube (41) length direction, the metal Managing the bottom of (41) also has reinforcement base (412), and the reinforcement base (412) includes horizontally disposed reinforcement bottom plate (4121)。
A kind of 6. hanging apparatus of prefabricated assembled concrete Side fascia according to claim 2, it is characterised in that:It is described The hanging apparatus of prefabricated assembled concrete Side fascia is additionally provided with two groups of tilt adjustments components, and the tilt adjustments component includes Adjustment motor (51), the reel (52) driven for adjustment motor (51), it is embedded in prefabricated assembled concrete Side fascia (7) upper end in advance The second chain sling (54) that reel (52) other end is installed on suspension ring (53) is fixed in the suspension ring (53) in face and one end, described prefabricated The both sides of assembly concrete Side fascia (7) upper surface are provided with suspension ring (53).
A kind of 7. hanging apparatus of prefabricated assembled concrete Side fascia according to claim 6, it is characterised in that:Two The adjustment motor (51) is located at the upper end both sides of horizontal hanging beam (2) respectively, and the both ends of the horizontal hanging beam (2) are respectively arranged with support Bar (22) and the balancing disk (23) being sheathed in support bar (22).
A kind of 8. hanging apparatus of prefabricated assembled concrete Side fascia according to claim 7, it is characterised in that:It is described The lower surface of horizontal hanging beam (2) is provided with flexible gag lever post (61), and prefabricated assembled concrete Side fascia (7) upper surface is also pre- It is embedded with the position-limiting tube (62) for flexible gag lever post (61) insertion.
9. a kind of hanging method of hanging apparatus applied to prefabricated assembled concrete Side fascia as claimed in claim 8, The hanging apparatus of the prefabricated assembled concrete Side fascia is installed on loop wheel machine, and the loop wheel machine is controlled outside prefabricated assembled concrete The hanging apparatus movement of wallboard, the prefabricated assembled concrete Side fascia (7) are provided with the installation for metal tube (41) installation Through hole (71), the metal tube (41) are installed on the middle part of installation through-hole (71), and the length of the metal tube (41) is less than prefabricated The thickness of assembly concrete Side fascia (7), it is characterised in that:Comprise the following steps:
S1, after horizontal hanging beam (2) is sling, the weight of the balancing disk (23) of both sides is adjusted, make horizontal hanging beam (2) keep level state;
S2, support block (42) is installed in metal tube (41), and by the first chain sling (3) below horizontal hanging beam (2) through prefabricated The metal tube (41) of assembly concrete Side fascia (7), the first chain sling (3) are located in the support slot (423) of support block (42), and And the both ends of the first chain sling (3) are both secured to horizontal hanging beam (2);
S3, the second chain sling (54) of tilt adjustments component withheld into (56) and prefabricated assembled concrete Side fascia using second (7) suspension ring (53) are fixed;
S4, in the root of assembly concrete Side fascia cushion pad is placed, loop wheel machine is by prefabricated assembled concrete Side fascia(7)To On sling to apart from 200~300mm of ground, checking that whether the first chain sling (3), the second chain sling (54) reliable, check tower crane (1) property Can, check prefabricated assembled concrete Side fascia(7)Whether pollution and breakage are had;
S5, by horizontal hanging beam (2) flexible gag lever post (61) insert prefabricated assembled concrete Side fascia (7) upper surface it is spacing Manage in (62);
Assembly concrete Side fascia is continued up lifting, then the arm of uniform rotation loop wheel machine by S6, loop wheel machine, by assembled coagulation Native Side fascia is lifted to above installation site;
Adjustment motor (51) operation on S7, horizontal hanging beam (2), makes prefabrication and assembly construction by the length for adjusting two second chain slings (54) Formula concrete external wall panel(7)Upper surface be horizontal;
S8, loop wheel machine control prefabricated assembled concrete Side fascia (7) decline, and staff is to prefabricated assembled concrete Side fascia (7) installation fixation is carried out;
S9, the first chain sling (3) is dismantled from installation through-hole (71), and support block (42) is dismantled from metal tube (41), The warming plate (72) that the both sides installation of installation through-hole (71) covers installation through-hole (71), and in warming plate (72) and installation through-hole (71) fluid sealant and weather-resistant glue are smeared in gap, the warming plate (72) is provided with to be offseted with metal tube (41) madial wall Fixed projection (721);
S10, the dismounting from suspension ring (53) by the second chain sling (54), the lifting dress of loop wheel machine control prefabricated assembled concrete Side fascia Put reset.
CN201710986463.3A 2017-10-20 2017-10-20 Hoisting device and hoisting method for prefabricated assembled concrete external wall panel Active CN107673185B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710986463.3A CN107673185B (en) 2017-10-20 2017-10-20 Hoisting device and hoisting method for prefabricated assembled concrete external wall panel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710986463.3A CN107673185B (en) 2017-10-20 2017-10-20 Hoisting device and hoisting method for prefabricated assembled concrete external wall panel

Publications (2)

Publication Number Publication Date
CN107673185A true CN107673185A (en) 2018-02-09
CN107673185B CN107673185B (en) 2023-08-01

Family

ID=61141817

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710986463.3A Active CN107673185B (en) 2017-10-20 2017-10-20 Hoisting device and hoisting method for prefabricated assembled concrete external wall panel

Country Status (1)

Country Link
CN (1) CN107673185B (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109019313A (en) * 2018-09-19 2018-12-18 缪心怡 A kind of comprehensive hoisting clamp of assembled architecture partition plate
CN109081239A (en) * 2018-09-19 2018-12-25 缪心怡 A kind of assembled architecture is built with partition plate handling transmission equipment
CN109823963A (en) * 2019-01-18 2019-05-31 广州城建职业学院 A kind of hanging device of assembled architecture prefabricated components
CN111877762A (en) * 2020-07-01 2020-11-03 上海建工集团股份有限公司 Movable automatic installation tool system for precast concrete wallboard
CN112374389A (en) * 2020-11-10 2021-02-19 天一建设发展有限公司 Assembled building high stability hoist and mount system
CN113802861A (en) * 2021-10-29 2021-12-17 广州城市职业学院 Steel structure assembly type wall plate movable suspension hoisting construction method
CN114046052A (en) * 2021-11-16 2022-02-15 上海萌砖节能材料科技有限公司 Wall hoisting method

Citations (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2439905A1 (en) * 1974-08-20 1976-03-04 Deha Baubedarf Kg Embedded lifting socket in prefabricated concrete component - has socket for conical lifting plug and rope protection flange
CN201006822Y (en) * 2007-04-18 2008-01-16 中国建筑一局(集团)有限公司 Plane type grandstand plate hanging special-purpose tool
CN201016082Y (en) * 2005-02-07 2008-02-06 中国石油化工股份有限公司胜利油田分公司桩西采油厂 Crane hanging component connecting mechanism
CN201334312Y (en) * 2008-12-04 2009-10-28 中铁大桥局股份有限公司 Hanger-rod protecting jacket for transportation of precast beam
CN101591890A (en) * 2008-06-05 2009-12-02 中铁大桥局股份有限公司 Hanging device of large-scale over-long box girder
CN102285582A (en) * 2011-06-08 2011-12-21 中冶建工集团有限公司 T-beam hoisting method
CN202609773U (en) * 2012-05-29 2012-12-19 中国海洋石油总公司 Bolt-type suspension point
CN203593526U (en) * 2013-09-13 2014-05-14 中交第二航务工程勘察设计院有限公司 Movable type hoisting device
CN104044991A (en) * 2014-05-29 2014-09-17 江苏通达动力科技股份有限公司 Thin-sheet roll material hoisting device
CN204778268U (en) * 2015-04-08 2015-11-18 郑州新大方重工科技有限公司 A special lifting device for hoist and mount of large -tonnage precast box girder
CN205294594U (en) * 2015-12-11 2016-06-08 上海建工材料工程有限公司 A auxiliary device for hoisting large -scale cast member
CN205675990U (en) * 2016-06-15 2016-11-09 北京城建建设工程有限公司 A kind of building prefabricated components hanging apparatus
CN206033024U (en) * 2016-09-23 2017-03-22 中建八局第一建设有限公司 Pipeline hoist and mount mould
CN206521203U (en) * 2017-03-07 2017-09-26 中建科技(北京)有限公司 Special hanger for lifting by crane prefabricated components
CN207375586U (en) * 2017-10-20 2018-05-18 浙江萧云建设有限公司 A kind of hanging apparatus of prefabricated assembled concrete Side fascia

Patent Citations (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2439905A1 (en) * 1974-08-20 1976-03-04 Deha Baubedarf Kg Embedded lifting socket in prefabricated concrete component - has socket for conical lifting plug and rope protection flange
CN201016082Y (en) * 2005-02-07 2008-02-06 中国石油化工股份有限公司胜利油田分公司桩西采油厂 Crane hanging component connecting mechanism
CN201006822Y (en) * 2007-04-18 2008-01-16 中国建筑一局(集团)有限公司 Plane type grandstand plate hanging special-purpose tool
CN101591890A (en) * 2008-06-05 2009-12-02 中铁大桥局股份有限公司 Hanging device of large-scale over-long box girder
CN201334312Y (en) * 2008-12-04 2009-10-28 中铁大桥局股份有限公司 Hanger-rod protecting jacket for transportation of precast beam
CN102285582A (en) * 2011-06-08 2011-12-21 中冶建工集团有限公司 T-beam hoisting method
CN202609773U (en) * 2012-05-29 2012-12-19 中国海洋石油总公司 Bolt-type suspension point
CN203593526U (en) * 2013-09-13 2014-05-14 中交第二航务工程勘察设计院有限公司 Movable type hoisting device
CN104044991A (en) * 2014-05-29 2014-09-17 江苏通达动力科技股份有限公司 Thin-sheet roll material hoisting device
CN204778268U (en) * 2015-04-08 2015-11-18 郑州新大方重工科技有限公司 A special lifting device for hoist and mount of large -tonnage precast box girder
CN205294594U (en) * 2015-12-11 2016-06-08 上海建工材料工程有限公司 A auxiliary device for hoisting large -scale cast member
CN205675990U (en) * 2016-06-15 2016-11-09 北京城建建设工程有限公司 A kind of building prefabricated components hanging apparatus
CN206033024U (en) * 2016-09-23 2017-03-22 中建八局第一建设有限公司 Pipeline hoist and mount mould
CN206521203U (en) * 2017-03-07 2017-09-26 中建科技(北京)有限公司 Special hanger for lifting by crane prefabricated components
CN207375586U (en) * 2017-10-20 2018-05-18 浙江萧云建设有限公司 A kind of hanging apparatus of prefabricated assembled concrete Side fascia

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109019313A (en) * 2018-09-19 2018-12-18 缪心怡 A kind of comprehensive hoisting clamp of assembled architecture partition plate
CN109081239A (en) * 2018-09-19 2018-12-25 缪心怡 A kind of assembled architecture is built with partition plate handling transmission equipment
CN109019313B (en) * 2018-09-19 2019-11-29 中庆建设有限责任公司 A kind of comprehensive hoisting clamp of assembled architecture partition plate
CN109823963A (en) * 2019-01-18 2019-05-31 广州城建职业学院 A kind of hanging device of assembled architecture prefabricated components
CN109823963B (en) * 2019-01-18 2020-02-07 广州城建职业学院 Hoisting equipment for prefabricated components of fabricated building
CN111877762A (en) * 2020-07-01 2020-11-03 上海建工集团股份有限公司 Movable automatic installation tool system for precast concrete wallboard
CN112374389A (en) * 2020-11-10 2021-02-19 天一建设发展有限公司 Assembled building high stability hoist and mount system
CN113802861A (en) * 2021-10-29 2021-12-17 广州城市职业学院 Steel structure assembly type wall plate movable suspension hoisting construction method
CN113802861B (en) * 2021-10-29 2022-11-25 广州城市职业学院 Steel structure assembly type wallboard movable suspension hoisting construction method
CN114046052A (en) * 2021-11-16 2022-02-15 上海萌砖节能材料科技有限公司 Wall hoisting method

Also Published As

Publication number Publication date
CN107673185B (en) 2023-08-01

Similar Documents

Publication Publication Date Title
CN107673185A (en) A kind of hanging apparatus and its hanging method of prefabricated assembled concrete Side fascia
CN207375586U (en) A kind of hanging apparatus of prefabricated assembled concrete Side fascia
CN210177780U (en) High light gauge steel of security
CN210763900U (en) Single-point hoisting balance adjusting device
CN109531802B (en) T-beam combined steel template mounting and dismounting structure and method
CN115490132A (en) Prefabricated component hoist device
CN214653048U (en) Special tool for indoor hoisting of elevator steel structure hoistway
CN207890861U (en) A kind of height-adjustable elevator main machine base
CN209799334U (en) lifting device for lifting scaffold
CN206636149U (en) The tier building built of small-sized crane is installed
CN206667773U (en) The climbing type concrete spreader being arranged in high-rise building elevator shaft
CN206530037U (en) A kind of elevating platform assembly for Construction of Silo
CN213653214U (en) Arch bridge construction is with arch rib hoist and mount frock
CN218754714U (en) Suspension device for mounting curtain wall board
CN219045295U (en) Lift shaft lifting type construction platform
CN217924767U (en) Hanging basket mounting structure
CN216810874U (en) Automatic lifting scaffold device for building construction
CN212002184U (en) Hanging basket device for decoration of outer vertical surface of high-rise building
CN216553119U (en) Assembled wall body based on cylinder
CN217377103U (en) Hoisting mechanism for large-scale UHPC mural painting
CN220201158U (en) Lifting device for building material detection
CN219507479U (en) Building engineering material lifting machine
CN215558540U (en) Movable hanging basket
CN109113321A (en) A kind of automatic leveling operating platform
CN108756198A (en) A kind of hoistway operation platform

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 315500 Building 8, Tongshan Yunting, Xiaowangmiao Street, Fenghua District, Ningbo City, Zhejiang Province

Applicant after: Xiaoyun Construction Co.,Ltd.

Address before: 315500 Building 8, Tongshan Yunting, Xiaowangmiao Street, Fenghua District, Ningbo City, Zhejiang Province

Applicant before: ZHEJIANG XIAOYUN CONSTRUCTION Co.,Ltd.

CB02 Change of applicant information
GR01 Patent grant
GR01 Patent grant