CN201713215U - Flange pipe hanger - Google Patents
Flange pipe hanger Download PDFInfo
- Publication number
- CN201713215U CN201713215U CN 201020255885 CN201020255885U CN201713215U CN 201713215 U CN201713215 U CN 201713215U CN 201020255885 CN201020255885 CN 201020255885 CN 201020255885 U CN201020255885 U CN 201020255885U CN 201713215 U CN201713215 U CN 201713215U
- Authority
- CN
- China
- Prior art keywords
- flange
- shackle
- flanged pipe
- hanger
- lug
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Load-Engaging Elements For Cranes (AREA)
Abstract
Description
【技术领域】【Technical field】
本实用新型涉及吊具,尤其涉及一种用于吊装法兰管的吊具。The utility model relates to a sling, in particular to a sling used for hoisting a flange pipe.
【背景技术】【Background technique】
电力输电线路的大跨越铁塔及其他行业高塔,现在都越来越多的采用钢管塔结构,即铁塔主肢或下部材料都为钢管结构,通过钢管两端的法兰进行对接。一端或两端设置有法兰的钢管称为法兰管材,简称为法兰管,法兰管的结构如图1A和1B中所示。Large-span iron towers of power transmission lines and high towers in other industries are now increasingly adopting steel pipe tower structures, that is, the main limbs or lower parts of iron towers are made of steel pipe structures, and are connected through flanges at both ends of the steel pipes. A steel pipe with flanges at one or both ends is called a flanged pipe, or a flanged pipe for short. The structure of the flanged pipe is shown in FIGS. 1A and 1B .
当钢管材料在铁塔中处于水平状态时,用普通吊带即可实现简单吊装就位。When the steel pipe material is in a horizontal state in the iron tower, it can be easily hoisted in place with ordinary slings.
当钢管材料在铁塔中处于接近垂直状态时,有两种传统吊装方法。When the steel pipe material is in a nearly vertical state in the iron tower, there are two traditional hoisting methods.
一种是吊带(或钢丝绳)绑扎法,详情如图2中所示。这种吊装方法有两个明显的缺点。首先,在管材的重力作用下,上下两个法兰平面不处于水平状态,该管材与下节管材对接就位时,操作比较困难。其次,吊带与上法兰板棱边接触,容易受到毛刺或锋利边缘的划伤,甚至完全被切断,因此存在很大安全隐患。One is the sling (or wire rope) binding method, as shown in Figure 2 for details. This lifting method has two obvious disadvantages. First of all, under the action of gravity of the pipe, the planes of the upper and lower flanges are not in a horizontal state, and it is difficult to operate when the pipe is in place with the next pipe. Secondly, the sling is in contact with the edge of the upper flange, and is easily scratched by burrs or sharp edges, or even completely cut off, so there is a great potential safety hazard.
另一种是普通吊具法,普通的吊具由圆钢加工而成,其结构如图3A中所示。使用这种普通吊具吊装作业时,用螺栓将吊具成对固定在法兰板上的螺栓孔上,再通过卸扣及吊带挂到吊车吊钩下,其使用方法如图4中所示。The other is the ordinary spreader method. The ordinary spreader is processed from round steel, and its structure is shown in Fig. 3A. When using this kind of ordinary spreader for hoisting operations, use bolts to fix the spreader in pairs on the bolt holes on the flange plate, and then hang it under the hook of the crane through the shackle and the sling. The method of use is shown in Figure 4. .
普通吊具吊装方法,虽然使管材上下法兰平面在水平状态,使管材基本垂直,方便了就位,但也有一个明显的缺点。就是在管材重力作用下,吊具在下端会受力弯曲,如图3B中所示。由于管材直径不同,法兰管末端的法兰板上螺栓孔的分布直径的大小也不一样,使得该吊具在吊装不同的法兰管时弯曲角度(即图3B中所示的a角度)总在变化,时大时小。这相当于不断的正反弯折吊具杆,使吊具强度极速下降,因此存在很大安全隐患。Ordinary hoisting method, although the upper and lower flange planes of the pipe are in a horizontal state, so that the pipe is basically vertical, which is convenient for positioning, but it also has an obvious shortcoming. That is, under the action of the gravity of the pipe, the lower end of the hanger will be bent under force, as shown in FIG. 3B . Due to the different diameters of the pipes, the size of the distribution diameter of the bolt holes on the flange plate at the end of the flange pipe is also different, so that the bending angle of the spreader when hoisting different flange pipes (that is, the angle a shown in Figure 3B) Always changing, big and small. This is equivalent to continuously bending the spreader rod forwards and backwards, causing the strength of the spreader to decrease rapidly, so there is a great potential safety hazard.
【实用新型内容】【Content of utility model】
有鉴于此,有必要提供一种安全性高的法兰管吊具。In view of this, it is necessary to provide a flanged pipe spreader with high safety.
一种用于吊装法兰管材的法兰管吊具,所述法兰管吊具包括吊耳、卸扣及螺母,所述吊耳包括主体、凸耳及螺杆,所述凸耳及螺杆分别从所述主体向相向的方向延伸出所述凸耳和所述螺杆,所述凸耳可枢转地与所述卸扣连接,所述螺杆可穿过法兰管的法兰孔并用所述螺母锁紧。A flange pipe hanger for hoisting flange pipes, the flange pipe hanger includes lifting lugs, shackles and nuts, the lifting lugs include a main body, lugs and screw rods, and the lugs and screw rods are respectively The lug and the screw rod extend from the main body in opposite directions, the lug is pivotally connected with the shackle, the screw rod can pass through the flange hole of the flange pipe and use the Nut locked.
优选地,所述凸耳上开设有与卸扣连接的安装孔。Preferably, the lug is provided with a mounting hole connected with the shackle.
优选地,所述主体的直径大于所述螺杆的直径。Preferably, the diameter of the body is larger than the diameter of the screw.
优选地,所述法兰管吊具还包括吊索,所述吊索连接二个所述卸扣。Preferably, the flange pipe hanger further includes a sling, and the sling connects the two shackles.
优选地,所述法兰管吊具还包括吊钩,所述吊钩钩挂在所述吊索的中间。Preferably, the flange pipe hanger further includes a hook, and the hook is hooked in the middle of the sling.
本实用新型采用特殊设计的吊具,使得吊具的吊耳与卸扣之间的角度可以自动调整,从而吊装不同尺寸的法兰管时都能保证法兰管的竖直,便于安装就位,也提高了作业的安全性。The utility model adopts a specially designed sling, so that the angle between the lifting lug and the shackle of the sling can be automatically adjusted, so that the flange pipes of different sizes can be hoisted to ensure that the flange pipes are vertical and easy to install. , also improves the safety of the operation.
【附图说明】【Description of drawings】
图1A为法兰管的主视图。Fig. 1A is a front view of a flanged pipe.
图1B为法兰管的侧视图。Figure 1B is a side view of the flanged tube.
图2为采用吊绳来吊装法兰管的示意图。Fig. 2 is a schematic diagram of hoisting the flange pipe with a sling.
图3A为普通吊具的示意图。Fig. 3A is a schematic diagram of a common spreader.
图3B为吊具的另一状态的示意图。Fig. 3B is a schematic diagram of another state of the sling.
图4为采用图3中的吊具来吊装法兰管的示意图。Fig. 4 is a schematic diagram of hoisting the flange pipe by using the sling in Fig. 3 .
图5A为本实用新型的法兰管吊具的吊耳的主视图。Fig. 5A is a front view of the lifting lug of the flange pipe hanger of the present invention.
图5B为图5A中的吊耳的侧视图。Fig. 5B is a side view of the lifting lug in Fig. 5A.
图5C为图5A中的吊耳的俯视图。Fig. 5C is a top view of the lifting lug in Fig. 5A.
图6为图5中的吊耳与卸扣相配合的示意图。Fig. 6 is a schematic diagram of cooperation between the lifting lug and the shackle in Fig. 5 .
图7为采用图5中的法兰管吊具吊装法兰管的示意图。Fig. 7 is a schematic diagram of hoisting the flange pipe by using the flange pipe spreader in Fig. 5 .
【具体实施方式】【Detailed ways】
为更好地理解本实用新型,以下将结合附图对实用新型的实施例进行详细的说明。In order to better understand the utility model, the embodiments of the utility model will be described in detail below in conjunction with the accompanying drawings.
如图5至图7中所示,本实用新型的法兰管吊具包括吊耳10、卸扣20、垫片30、螺母40及吊索50。As shown in FIGS. 5 to 7 , the flange pipe hanger of the present invention includes a
请参阅图5A至图5C,吊耳10包括主体12以及分别自主体12向上和向下延伸而出的凸耳14和螺杆16。凸耳14上设有固定孔142,可以与卸扣20连接(如图6中所示),卸扣20可相对吊耳10转动一定的角度。螺杆16的直径小于主体12的直径。Referring to FIG. 5A to FIG. 5C , the
请参阅图7,在使用该吊耳10吊装法兰管70时,先将吊耳10的螺杆16插入法兰管70的两个对称的法兰孔中,再通过垫片30和螺母40将吊耳10与法兰管70连接起来,然后用吊索50将两个吊耳10上的卸扣20连起来。最后,用吊钩60将吊索50的吊起。卸扣20与吊耳10之间的角度会随着吊索50的绷紧而自动调整。Please refer to Fig. 7, when using the
在使用法兰管吊具进行吊装的过程中,法兰管70可始终保持竖直状态,便于安装就位。吊耳10的螺杆16紧紧固定在法兰管70的法兰孔上后,因为其螺杆16部分长度短,在法兰管70的重力作用下,螺杆16部分不会发现弯曲变形。During the hoisting process using the flange pipe spreader, the
当法兰管70的法兰板尺寸变化时,与吊耳10连接的卸扣20会自动调整其倾斜角度,吊耳10承载能力没有受到削弱,施工安全从而得到了有力保障。When the size of the flange plate of the
以上所述实施例仅表达了本实用新型的几种实施方式,其描述较为具体和详细,但并不能因此而理解为对本实用新型专利范围的限制。应当指出的是,对于本领域的普通技术人员来说,在不脱离本实用新型构思的前提下,还可以做出若干变形和改进,这些都属于本实用新型的保护范围。因此,本实用新型专利的保护范围应以所附权利要求为准。The above-mentioned embodiments only express several implementations of the utility model, and the description thereof is relatively specific and detailed, but it should not be construed as limiting the patent scope of the utility model. It should be noted that those skilled in the art can make several modifications and improvements without departing from the concept of the present invention, and these all belong to the protection scope of the present invention. Therefore, the scope of protection of the utility model patent should be based on the appended claims.
Claims (5)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201020255885 CN201713215U (en) | 2010-07-09 | 2010-07-09 | Flange pipe hanger |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201020255885 CN201713215U (en) | 2010-07-09 | 2010-07-09 | Flange pipe hanger |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201713215U true CN201713215U (en) | 2011-01-19 |
Family
ID=43459215
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201020255885 Expired - Fee Related CN201713215U (en) | 2010-07-09 | 2010-07-09 | Flange pipe hanger |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201713215U (en) |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102153016A (en) * | 2011-04-22 | 2011-08-17 | 四川电力送变电建设公司 | Lifting appliance for flange connection steel pipe |
CN102515019A (en) * | 2011-12-31 | 2012-06-27 | 河北拓安管业有限公司 | Fixing device for steel pipes with lap joint flanges and method for coating plastics on steel pipes by aid of fixing device |
CN104609295A (en) * | 2015-01-29 | 2015-05-13 | 韩文强 | Sling for pipeline hoisting and using method thereof |
CN105781218A (en) * | 2016-03-24 | 2016-07-20 | 中铁十局集团有限公司 | Hoisting construction method for steel column in construction of protective support for existing overcrossing railway |
CN110040624A (en) * | 2019-04-10 | 2019-07-23 | 中联重科股份有限公司 | Lifting appliance, lifting system and lifting method |
CN110104545A (en) * | 2019-04-30 | 2019-08-09 | 哈电集团(秦皇岛)重型装备有限公司 | A kind of tube sheet component hoisting and overturning tooling and hoisting and overturning method |
CN110553927A (en) * | 2019-10-09 | 2019-12-10 | 中国船舶科学研究中心(中国船舶重工集团公司第七0二研究所) | Adjustable torsion load coordination loading system |
CN110884993A (en) * | 2019-12-05 | 2020-03-17 | 中国水利水电第七工程局有限公司 | Auxiliary system for rolling large-scale round tiles of thin-wall steel pipes |
CN111071912A (en) * | 2020-01-03 | 2020-04-28 | 中国十七冶集团有限公司 | Portable device for assisting in transporting and installing small-space pipeline |
JP2022043660A (en) * | 2020-09-04 | 2022-03-16 | 東芝プラントシステム株式会社 | Hanging jig |
-
2010
- 2010-07-09 CN CN 201020255885 patent/CN201713215U/en not_active Expired - Fee Related
Cited By (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102153016A (en) * | 2011-04-22 | 2011-08-17 | 四川电力送变电建设公司 | Lifting appliance for flange connection steel pipe |
CN102515019A (en) * | 2011-12-31 | 2012-06-27 | 河北拓安管业有限公司 | Fixing device for steel pipes with lap joint flanges and method for coating plastics on steel pipes by aid of fixing device |
CN102515019B (en) * | 2011-12-31 | 2013-07-31 | 河北拓安管业有限公司 | Fixing device for steel pipes with lap joint flanges and method for coating plastics on steel pipes by aid of fixing device |
CN104609295A (en) * | 2015-01-29 | 2015-05-13 | 韩文强 | Sling for pipeline hoisting and using method thereof |
CN105781218A (en) * | 2016-03-24 | 2016-07-20 | 中铁十局集团有限公司 | Hoisting construction method for steel column in construction of protective support for existing overcrossing railway |
CN105781218B (en) * | 2016-03-24 | 2018-08-17 | 中铁十局集团有限公司 | The construction method for hanging of steel column in upper spanning existing railway protective stent construction |
CN110040624A (en) * | 2019-04-10 | 2019-07-23 | 中联重科股份有限公司 | Lifting appliance, lifting system and lifting method |
CN110104545A (en) * | 2019-04-30 | 2019-08-09 | 哈电集团(秦皇岛)重型装备有限公司 | A kind of tube sheet component hoisting and overturning tooling and hoisting and overturning method |
CN110553927A (en) * | 2019-10-09 | 2019-12-10 | 中国船舶科学研究中心(中国船舶重工集团公司第七0二研究所) | Adjustable torsion load coordination loading system |
CN110884993A (en) * | 2019-12-05 | 2020-03-17 | 中国水利水电第七工程局有限公司 | Auxiliary system for rolling large-scale round tiles of thin-wall steel pipes |
CN111071912A (en) * | 2020-01-03 | 2020-04-28 | 中国十七冶集团有限公司 | Portable device for assisting in transporting and installing small-space pipeline |
JP2022043660A (en) * | 2020-09-04 | 2022-03-16 | 東芝プラントシステム株式会社 | Hanging jig |
JP7080938B2 (en) | 2020-09-04 | 2022-06-06 | 東芝プラントシステム株式会社 | Hanging jig |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201713215U (en) | Flange pipe hanger | |
CN203201216U (en) | Vertical rod centralizer | |
CN202072387U (en) | Flange connection type steel pipe hanger | |
CN206569904U (en) | A kind of suspender for lifting steel plate | |
CN203806962U (en) | Cable terminal head lifting fixture | |
CN203845679U (en) | Release-preventing lifting hook | |
CN103879929B (en) | A kind of auxiliary device for the transport of heavy caliber cable coil and using method thereof | |
CN205973449U (en) | Jack -up handling rigging of buffering pulley | |
CN206014242U (en) | A kind of aid for lifting insulator | |
CN206599363U (en) | Vertical transferring apparatus | |
CN203295025U (en) | Clamping tool for hoisting single H beam | |
CN104283156A (en) | A wire lifter for distribution lines | |
CN204675626U (en) | Insulator fast-assembling suspender | |
CN204490327U (en) | Joist steel hoisting clamp | |
CN205985971U (en) | Special link plate structure of unwrapping wire coaster | |
CN206255766U (en) | A kind of metal saw saw blade special hanger | |
CN204185151U (en) | A kind of light-duty Simple door-type single-beam crane | |
CN202561404U (en) | Hoisting device | |
CN209740482U (en) | Heavy pipeline hoisting device and hoisting system | |
CN203474207U (en) | Tower material hoisting tool of steel tube tower | |
CN205104848U (en) | Cable corner hangs coaster | |
CN203976285U (en) | With the matching used allocated radio lifting of two electric poles guide chain | |
CN204118597U (en) | A kind of line lifter for distribution line | |
CN211338516U (en) | Chemical equipment lifting beam | |
CN204022273U (en) | Pipe clamp |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
ASS | Succession or assignment of patent right |
Owner name: STATE ELECTRIC NET CROP. Effective date: 20130117 |
|
C41 | Transfer of patent application or patent right or utility model | ||
C56 | Change in the name or address of the patentee | ||
CP01 | Change in the name or title of a patent holder |
Address after: Yang Yuansheng 430063 Hubei province Wuhan city Wuchang District Road No. 5 Patentee after: HUBEI ELECTRIC POWER TRANSMISSION & DISTRIBUTION ENGINEERING Co. Address before: Yang Yuansheng 430063 Hubei province Wuhan city Wuchang District Road No. 5 Patentee before: Hubei Electric Power Transmission & Distribution Engineering Co.,Ltd. |
|
TR01 | Transfer of patent right |
Effective date of registration: 20130117 Address after: Yang Yuansheng 430063 Hubei province Wuhan city Wuchang District Road No. 5 Patentee after: HUBEI ELECTRIC POWER TRANSMISSION & DISTRIBUTION ENGINEERING Co. Patentee after: State Grid Corporation of China Address before: Yang Yuansheng 430063 Hubei province Wuhan city Wuchang District Road No. 5 Patentee before: HUBEI ELECTRIC POWER TRANSMISSION & DISTRIBUTION ENGINEERING Co. |
|
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20110119 Termination date: 20170709 |