CN104912373A - Assembly type supporting switching device for temporary power consumption at construction site - Google Patents
Assembly type supporting switching device for temporary power consumption at construction site Download PDFInfo
- Publication number
- CN104912373A CN104912373A CN201510355153.2A CN201510355153A CN104912373A CN 104912373 A CN104912373 A CN 104912373A CN 201510355153 A CN201510355153 A CN 201510355153A CN 104912373 A CN104912373 A CN 104912373A
- Authority
- CN
- China
- Prior art keywords
- socket
- fastening bolt
- tube
- casing
- pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H12/00—Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
- E04H12/02—Structures made of specified materials
- E04H12/08—Structures made of specified materials of metal
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H12/00—Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
- E04H12/22—Sockets or holders for poles or posts
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H12/00—Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
- E04H12/22—Sockets or holders for poles or posts
- E04H12/2238—Sockets or holders for poles or posts to be placed on the ground
- E04H12/2246—Sockets or holders for poles or posts to be placed on the ground filled with water, sand or the like
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F21—LIGHTING
- F21V—FUNCTIONAL FEATURES OR DETAILS OF LIGHTING DEVICES OR SYSTEMS THEREOF; STRUCTURAL COMBINATIONS OF LIGHTING DEVICES WITH OTHER ARTICLES, NOT OTHERWISE PROVIDED FOR
- F21V17/00—Fastening of component parts of lighting devices, e.g. shades, globes, refractors, reflectors, filters, screens, grids or protective cages
- F21V17/10—Fastening of component parts of lighting devices, e.g. shades, globes, refractors, reflectors, filters, screens, grids or protective cages characterised by specific fastening means or way of fastening
- F21V17/12—Fastening of component parts of lighting devices, e.g. shades, globes, refractors, reflectors, filters, screens, grids or protective cages characterised by specific fastening means or way of fastening by screwing
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F21—LIGHTING
- F21V—FUNCTIONAL FEATURES OR DETAILS OF LIGHTING DEVICES OR SYSTEMS THEREOF; STRUCTURAL COMBINATIONS OF LIGHTING DEVICES WITH OTHER ARTICLES, NOT OTHERWISE PROVIDED FOR
- F21V21/00—Supporting, suspending, or attaching arrangements for lighting devices; Hand grips
- F21V21/10—Pendants, arms, or standards; Fixing lighting devices to pendants, arms, or standards
- F21V21/108—Arms
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F21—LIGHTING
- F21V—FUNCTIONAL FEATURES OR DETAILS OF LIGHTING DEVICES OR SYSTEMS THEREOF; STRUCTURAL COMBINATIONS OF LIGHTING DEVICES WITH OTHER ARTICLES, NOT OTHERWISE PROVIDED FOR
- F21V33/00—Structural combinations of lighting devices with other articles, not otherwise provided for
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02G—INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
- H02G1/00—Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
- H02G1/02—Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for overhead lines or cables
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- General Engineering & Computer Science (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- Chemical & Material Sciences (AREA)
- Materials Engineering (AREA)
- Wood Science & Technology (AREA)
- Non-Portable Lighting Devices Or Systems Thereof (AREA)
- Suspension Of Electric Lines Or Cables (AREA)
- Arrangement Of Elements, Cooling, Sealing, Or The Like Of Lighting Devices (AREA)
Abstract
The invention provides an assembly type supporting switching device for temporary power consumption at a construction site. The assembly type supporting switching device comprises a base, a socket supporting tube, an electric box holder, a screw, insulated porcelain bottles and a lamp holder bracket, wherein the base comprises a box body, a gasket, a fixed supporting tube, a reinforcing rib, a grounding bolt and a first fastening bolt; the socket supporting tube and the fixed supporting tube are in socket connection and are fixed by a bolt; the electric box holder comprises a sleeve, a hanging rod, an end socket and a second fastening bolt; the sleeve and the socket supporting tube are in socket connection and are fixed by a bolt; the two insulated porcelain bottles are fixedly mounted on the screw, and the screw is fixedly arranged on the socket supporting tube; the lamp holder bracket comprises a socket tube, a mounting plate and a third fastening bolt; and the socket tube and the socket supporting tube are in socket connection and are fixed by a bolt. According to the assembly type supporting switching device, various functions of temporary power-consumption line overhead supporting and switching, illuminating lamp fixing, electric box erecting, earth joint setting and the like are integrated, so that the assembly type supporting switching device is convenient to erect and use at the site, and good in safety; and various parts are convenient to assemble and disassemble for being easy to carry and realize transition transportation.
Description
Technical field
The present invention relates to Electricity on Construction Site and assist Work tool, be specifically related to the assembling that a kind of construction site is transferred for the support of temporary electricity fixed track usage plan, lighting is fixed, electronic box hangs and support switching device.
Background technology
The a large amount of construction node of construction site needs electricity consumption, as electric tools needs power supply, needs erection lighting etc.Common construction site, owing to lacking specification, effective stringer, in addition corresponding unified regulation is not had in the industry such as temporary electricity wire hanging bracket, illuminating frame, thus in construction site temporary electricity implementation process, overhead wire support, lighting lamp bracket, electronic box support etc. are varied, and install everywhere often, connect, potential safety hazard is brought to building operations temporary electricity.
Summary of the invention
The object of the invention is: provide a kind of and be easy to install, multiple functional, safety good, be easy to carry and transition transport and effectively can meet the construction site temporary electricity assembling support switching device of construction site temporary electricity needs.
Technical scheme of the present invention is: construction site temporary electricity assembling of the present invention supports switching device, and its design feature is: comprise pedestal, socket stay pipe, electronic box hanger, screw rod, porcelain insulator and light holder support;
Above-mentioned pedestal comprises casing, backing plate, fixed support tube, reinforcing rib, earth stud and the first fastening bolt; Casing is the quadrangle box part of upper end open; Backing plate is rectangular plate body part, and backing plate is fixedly installed on the upper surface of the base plate of casing; Fixed support tube is the circular tube piece of hollow, and fixed support tube is fixedly connected with the upper surface, middle part of backing plate by its lower end; Reinforcing rib is provided with 2 to 8, and one end of each reinforcing rib is fixedly connected with fixed support tube; The other end of each reinforcing rib is fixedly connected with the inwall of casing; Earth stud to be arranged on fixed support tube and to be positioned at the top of the upper surface of casing; First fastening bolt is arranged on the top of fixed support tube movably;
Socket stay pipe is the circular tube piece of hollow; The top of socket stay pipe is provided with screw rod installing hole; Fixed by the first fastening bolt in socket stay pipe is inserted pedestal from the top down fixed support tube by its lower end;
Electronic box hanger comprises sleeve pipe, peg, termination and the second fastening bolt; Sleeve pipe is the circular tube piece of hollow; Peg is the body of rod part being bent into L shape, and peg is fixedly mounted on the left side central portion wall body of sleeve pipe; Termination is fixedly installed on the left upper portion of peg; Second fastening bolt is arranged on the right side central of sleeve pipe; Casing pipe sleeve be connected on socket stay pipe tube wall on and fixed by the second fastening bolt;
Screw rod arranges 1, and screw rod is socketed on stay pipe by the middle part of it through being fixedly installed on after the screw rod installing hole of socket stay pipe; The two ends, left and right of screw rod are protruding;
Porcelain insulator is provided with 2, and these 2 porcelain insulators are fixedly mounted on screw rod, and is positioned at the left and right sides of socket stay pipe;
Light holder support comprises socketed pipe, installing plate and the 3rd fastening bolt; Socketed pipe is the circular tube piece of hollow; Socketed pipe is provided with the 3rd fastening bolt; Installing plate is rectangular plate body part, and installing plate is provided with the through link bolt hole of upward and downward; Socketed pipe is fixedly connected with the lower surface, middle part of installing plate by its upper end; Fixed by the 3rd fastening bolt after the bottom of socketed pipe and the upper end of socket stay pipe socket-connect.
Further scheme is: the material of the casing of above-mentioned pedestal is 3mm steel plate; Casing is of a size of 300mm × 300mm × 210mm; The material of backing plate is the steel plate that 5mm is thick; To on the upper surface of base plate being weldingly fixed on casing about backing plate, and backing plate is positioned at the sagittal middle part of the base plate of casing.
Further scheme is: the fixed support tube of above-mentioned pedestal is the stainless steel tube of diameter 60mm, length 1.2m; Socket stay pipe is the stainless steel tube of diameter 50mm, length 2m; The sleeve pipe of electronic box hanger is the stainless steel tube of diameter 60mm, length 100mm; The socketed pipe of light holder support is the stainless steel tube of diameter 60mm, length 100mm; The installing plate of light holder support is the steel plate of 350mm × 60mm × 5mm size.
Further scheme is: the reinforcing rib of above-mentioned pedestal is provided with 4, and one end of these 4 reinforcing ribs is all positioned at the lower weld of casing with fixed support tube; The other end of these 4 reinforcing ribs all welds with the inwall of casing, and these 4 reinforcing ribs are cross in casing centered by fixed support tube.
Further scheme is: the tip height of above-mentioned socket stay pipe can regulate between 2.0m to 3.0m; The height of electronic box hanger can regulate between 1.2m to 2.6m.
Further scheme is: the set-up mode of the first fastening bolt on fixed support tube of above-mentioned pedestal is offer bolt hole on the wall body of fixed support tube, WELD NUTS on the wall body of the fixed support tube at bolt hole place; First fastening bolt matches with the nut of the bolt hole that the wall body of fixed support tube is offered and welding; The set-up mode of 3rd fastening bolt on socketed pipe of set-up mode on sleeve pipe of the second fastening bolt of electronic box hanger and light holder support is all identical with the set-up mode of the first fastening bolt.
Further scheme also has: the casing of above-mentioned pedestal is full in use to be filled for counterweight and the defensive yellow ground that disappears.
The present invention has positive effect: (1) construction site temporary electricity of the present invention assembling supports switching device, by the design of structure, temporary electricity fixed track usage plan in building operations is supported switching, lighting is fixed, electronic box hangs, earth point is arranged etc., and several functions is integrated in one, erected on site and property easy to use, safe good.(2) construction site temporary electricity assembling of the present invention supports switching device, its critical piece is detachable, when needing to use, can assemble easily in construction field, then easily each parts can be dismantled after finishing using, be easy to carry and transition transport.
Accompanying drawing explanation
Fig. 1 is structural representation of the present invention;
Fig. 2 is the structural representation of the pedestal in Fig. 1;
Fig. 3 is the top view of Fig. 2;
Fig. 4 is the structural representation of the electronic box hanger in Fig. 1;
Fig. 5 is the top view of Fig. 4;
Fig. 6 is the structural representation of the light holder support in Fig. 1;
Fig. 7 is the upward view of Fig. 6.
Reference numeral in above-mentioned accompanying drawing is as follows:
Pedestal 1, casing 11, backing plate 12, fixed support tube 13, reinforcing rib 14, earth stud 15, the first fastening bolt 16,
Socket stay pipe 2,
Electronic box hanger 3, sleeve pipe 31, peg 32, termination 33, the second fastening bolt 34,
Screw rod 4,
Porcelain insulator 5,
Light holder support 6, socketed pipe 61, installing plate 62, link bolt hole 62-1, the 3rd fastening bolt 63.
Detailed description of the invention
Below in conjunction with the drawings and specific embodiments, the present invention is further detailed explanation.
(embodiment 1)
See Fig. 1, the construction site temporary electricity assembling of the present embodiment supports switching device, and it forms primarily of pedestal 1, socket stay pipe 2, electronic box hanger 3, screw rod 4, porcelain insulator 5 and light holder support 6.
See Fig. 2 and Fig. 3, pedestal 1 forms primarily of casing 11, backing plate 12, fixed support tube 13, reinforcing rib 14, earth stud 15 and the first fastening bolt 16.
Casing 11 is the quadrangle box part of upper end open; The material of casing 11 is steel plate.In the present embodiment, the size of casing 11 preferably adopts long 300mm × wide 300mm × high 210mm; Steel plate thickness preferably adopts 3mm.Backing plate 12 is rectangular plate body part, preferably adopts the steel plate that 5mm is thick in backing plate 12 the present embodiment; Backing plate about 12 is on the upper surface of base plate being weldingly fixed on casing 11, and backing plate 12 is positioned at the sagittal middle part of the base plate of casing 11.Fixed support tube 13 is the circular tube piece of hollow, and in the present embodiment, fixed support tube 13 preferably adopts diameter 60mm, length is the stainless steel tube of 1.2m; Fixed support tube 13 is by upper surface, the middle part vertical welding of its lower end and backing plate 12; Reinforcing rib 14 is provided with 2 to 8, and in the present embodiment, reinforcing rib 14 preferably adopts 4, and one end of these 4 reinforcing ribs 14 is all positioned at the lower weld of casing 11 with fixed support tube 13; The other end of these 4 reinforcing ribs 14 all welds with casing 11, and these 4 reinforcing ribs 14 are " ten " font in casing 11 centered by fixed support tube 13.Earth stud 15 to be arranged on movably on fixed support tube 13 and to be positioned at the top of the upper surface of casing 11, is used for ground connection, to protect Electrical Safety when earth stud 15 uses; First fastening bolt 16 is arranged on the top of fixed support tube 13 movably; The set-up mode of the first fastening bolt 16 is: on the top tube wall of fixed support tube 13, offer bolt hole, WELD NUTS on the tube wall at bolt hole place, and the first fastening bolt 16 matches with the nut of the bolt hole that fixed support tube 13 is offered and welding.First fastening bolt 16 preferably adopts butterfly bolt.
Socket stay pipe 2 is the circular tube piece of hollow, and in the present embodiment, socket stay pipe 2 preferably adopts diameter 50mm, length is the stainless steel tube of 2m; The top of socket stay pipe 2 is provided with screw rod installing hole.During assembling, socket stay pipe 2 inserts in the fixed support tube 13 of pedestal 1 by its lower end from the top down, socket stay pipe 2 tip height can between 2.0m to 3.0m free adjustment, socket stay pipe 2 adjustment determine height after be fixedly connected with fixed support tube 13 by the first fastening bolt 16 of pedestal 1.
See Fig. 4 and Fig. 5, electronic box hanger 3 forms primarily of sleeve pipe 31, peg 32, termination 33 and the second fastening bolt 34.
Sleeve pipe 31 is the circular tube piece of hollow, and in the present embodiment, sleeve pipe 31 preferably adopts diameter 60mm, length is the stainless steel tube of 100mm; The material of peg 32 is stainless steel, and peg 32 is for being bent into the body of rod part of L shape, and peg 32 is welded on the left side central portion of sleeve pipe 31 by its right-hand member; The top of peg 32 is fixedly installed termination 33; Second fastening bolt 34 is arranged on the right side central of sleeve pipe 31; Second fastening bolt 34 set-up mode is offer bolt hole on the tube wall of sleeve pipe 31, in bolt hole place WELD NUTS; Second fastening bolt 34 preferably adopts butterfly bolt.During assembling, electronic box hanger 3 is socketed on the tube wall of socket stay pipe 2 by its sleeve pipe 31; By the second fastening bolt 34, electronic box hanger 3 is fixed on socket stay pipe 2 after being adjusted to correct position; The height of electronic box hanger 3 can between 1.2m to 2.6m free adjustment.Electronic box hanger 3 is used for when using hanging temporary electricity tail end box.
Still see Fig. 1, screw rod 4 arranges 1, and screw rod 4 is socketed on stay pipe 2 by the middle part of it through being fixedly installed on after the screw rod installing hole of socket stay pipe 2; The two ends, left and right of screw rod 4 are protruding.
Porcelain insulator 5 is provided with 2, and these 2 porcelain insulators 5 are fixedly mounted on screw rod 4, and is positioned at the left and right sides of socket stay pipe 2.Hanging of the electric wire of temporary electricity when porcelain insulator 5 is for using, cable.
See Fig. 6 and Fig. 7, light holder support 6 forms primarily of socketed pipe 61, installing plate 62 and the 3rd fastening bolt 63.
Socketed pipe 61 is the circular tube piece of hollow, and in the present embodiment, socketed pipe 61 preferably adopts diameter 60mm, length is the stainless steel tube of 100mm; The set-up mode that socketed pipe 61 is provided with the 3rd fastening bolt the 63, three fastening bolt 63 is offer bolt hole on the tube wall of socketed pipe 61, in bolt hole place WELD NUTS; Installing plate 62 is rectangular plate body part, and installing plate 62 is provided with the through link bolt hole 62-1 of 2 upward and downwards; In the present embodiment, installing plate 62 preferably adopts the steel plate being of a size of long 350mm × wide 60mm × thick 5mm; Socketed pipe 61 is welded with the lower surface, middle part of installing plate 62 by its upper end.During assembling, light holder support 6 is fixed by the 3rd fastening bolt 63 after being socket-connected with the upper end of socket stay pipe 2 by the bottom of its socketed pipe 61.During use, light holder support 6 is for fixedly mounting the lighting of construction site, when lighting is installed, lighting is placed on installing plate 62, above the upper surface by the link bolt hole 62-1 bolt of 2 on installing plate 62 lighting being fixedly mounted on installing plate 62.
The construction site temporary electricity assembling of the present embodiment supports switching device, be specifically designed to temporary electricity switching in building operations, the several functions such as temporary electricity fixed track usage plan is supported switching by it, lighting is fixed, electronic box hangs, earth point is arranged are integrated in one, convenient, efficient, energy-saving and environmental protection.And it can be assembled easily in construction field in use, then can be dismantled by each parts easily after finishing using, be easy to carry and transition transport.During use, fill yellow ground in the casing 11 of pedestal 1, as the counterweight of pedestal 1 to increase stability, also can to make fire-fighting fire extinguishing for subsequent use for yellow ground simultaneously.
Above embodiment is the explanation to the specific embodiment of the present invention; but not limitation of the present invention; person skilled in the relevant technique without departing from the spirit and scope of the present invention; can also make various conversion and change and obtain corresponding equivalent technical scheme, therefore all equivalent technical schemes all should be included into scope of patent protection of the present invention.
Claims (7)
1. construction site temporary electricity assembling supports a switching device, it is characterized in that: comprise pedestal (1), socket stay pipe (2), electronic box hanger (3), screw rod (4), porcelain insulator (5) and light holder support (6);
Described pedestal (1) comprises casing (11), backing plate (12), fixed support tube (13), reinforcing rib (14), earth stud (15) and the first fastening bolt (16); The quadrangle box part that casing (11) is upper end open; Backing plate (12) is rectangular plate body part, and backing plate (12) is fixedly installed on the upper surface of the base plate of casing (11); The circular tube piece that fixed support tube (13) is hollow, fixed support tube (13) is fixedly connected with by the upper surface, middle part of its lower end with backing plate (12); Reinforcing rib (14) is provided with 2 to 8, and one end of each reinforcing rib (14) is fixedly connected with fixed support tube (13); The other end of each reinforcing rib (14) is fixedly connected with the inwall of casing (11); Earth stud (15) is arranged on fixed support tube (13) and goes up and the top being positioned at the upper surface of casing (11); First fastening bolt (16) is arranged on the top of fixed support tube (13) movably;
The circular tube piece that socket stay pipe (2) is hollow; The top of socket stay pipe (2) is provided with screw rod installing hole; The fixed support tube (13) that socket stay pipe (2) inserts pedestal (1) from the top down by its lower end is interior and fixing by the first fastening bolt (16);
Electronic box hanger (3) comprises sleeve pipe (31), peg (32), termination (33) and the second fastening bolt (34); The circular tube piece that sleeve pipe (31) is hollow; Peg (32) is for being bent into the body of rod part of L shape, and peg (32) is fixedly mounted on the left side central portion wall body of sleeve pipe (31); Termination (33) is fixedly installed on the left upper portion of peg (32); Second fastening bolt (34) is arranged on the right side central of sleeve pipe (31); Sleeve pipe (31) be socketed in socket stay pipe (2) tube wall on and by the second fastening bolt (34) fix;
Screw rod (4) arranges 1, and screw rod (4) is socketed on stay pipe (2) by the middle part of it through being fixedly installed on after the screw rod installing hole of socket stay pipe (2); The two ends, left and right of screw rod (4) are protruding;
Porcelain insulator (5) is provided with 2, and these 2 porcelain insulators (5) are fixedly mounted on screw rod (4), and is positioned at the left and right sides of socket stay pipe (2);
Light holder support (6) comprises socketed pipe (61), installing plate (62) and the 3rd fastening bolt (63); The circular tube piece that socketed pipe (61) is hollow; Socketed pipe (61) is provided with the 3rd fastening bolt (63); Installing plate (62) is provided with the through link bolt hole of upward and downward (62-1) for rectangular plate body part, installing plate (62); Socketed pipe (61) is fixedly connected with by the lower surface, middle part of its upper end with installing plate (62); Fixed by the 3rd fastening bolt (63) after the bottom of socketed pipe (61) and the upper end of socket stay pipe (2) socket-connect.
2. construction site temporary electricity assembling according to claim 1 supports switching device, it is characterized in that: the material of the casing (11) of described pedestal (1) is 3mm steel plate; Casing (11) is of a size of 300mm × 300mm × 210mm; The material of backing plate (12) is the steel plate that 5mm is thick; Backing plate (12) left and right is on the upper surface of base plate being weldingly fixed on casing (11), and backing plate (12) is positioned at the sagittal middle part of the base plate of casing (11).
3. construction site temporary electricity assembling according to claim 1 supports switching device, it is characterized in that: the stainless steel tube that the fixed support tube (13) of described pedestal (1) is diameter 60mm, length 1.2m; The stainless steel tube that socket stay pipe (2) is diameter 50mm, length 2m; The stainless steel tube that the sleeve pipe (31) of electronic box hanger (3) is diameter 60mm, length 100mm; The stainless steel tube that the socketed pipe (61) of light holder support (6) is diameter 60mm, length 100mm; The steel plate that the installing plate (62) of light holder support (6) is 350mm × 60mm × 5mm size.
4. construction site temporary electricity assembling according to claim 1 supports switching device, it is characterized in that: the reinforcing rib (14) of described pedestal (1) is provided with 4, one end of these 4 reinforcing ribs (14) is all positioned at the lower weld of casing (11) with fixed support tube (13); The other end of these 4 reinforcing ribs (14) all welds with the inwall of casing (11), and these 4 reinforcing ribs (14) are cross in casing (11) centered by fixed support tube (13).
5. construction site temporary electricity assembling according to claim 1 supports switching device, it is characterized in that: the tip height of described socket stay pipe (2) can regulate between 2.0m to 3.0m; The height of electronic box hanger (3) can regulate between 1.2m to 2.6m.
6. construction site temporary electricity assembling according to claim 1 supports switching device, it is characterized in that: the set-up mode of the first fastening bolt (16) on fixed support tube (13) of described pedestal (1) is offer bolt hole on the wall body of fixed support tube (13), WELD NUTS on the wall body of the fixed support tube (13) at bolt hole place; First fastening bolt (16) matches with the nut of the bolt hole that the wall body of fixed support tube (13) is offered and welding; The set-up mode of 3rd fastening bolt (63) on socketed pipe (61) of set-up mode on sleeve pipe (31) of second fastening bolt (34) of electronic box hanger (3) and light holder support (6) is all identical with the set-up mode of the first fastening bolt (16).
7. construction site temporary electricity assembling according to claim 1 supports switching device, it is characterized in that: the casing (11) of described pedestal (1) is full in use to be filled for counterweight and the defensive yellow ground that disappears.
Priority Applications (4)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611159424.8A CN106760874B (en) | 2015-06-24 | 2015-06-24 | The construction site temporary electricity assembled of easy transition supports switching device |
CN201611159421.4A CN106677590B (en) | 2015-06-24 | 2015-06-24 | A kind of construction site temporary electricity assembled support switching device |
CN201510355153.2A CN104912373B (en) | 2015-06-24 | 2015-06-24 | Assembly type supporting switching device for temporary power consumption at construction site |
CN201611160204.7A CN106801534B (en) | 2015-06-24 | 2015-06-24 | The construction site temporary electricity assembled support switching device easily installed |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510355153.2A CN104912373B (en) | 2015-06-24 | 2015-06-24 | Assembly type supporting switching device for temporary power consumption at construction site |
Related Child Applications (3)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611160204.7A Division CN106801534B (en) | 2015-06-24 | 2015-06-24 | The construction site temporary electricity assembled support switching device easily installed |
CN201611159421.4A Division CN106677590B (en) | 2015-06-24 | 2015-06-24 | A kind of construction site temporary electricity assembled support switching device |
CN201611159424.8A Division CN106760874B (en) | 2015-06-24 | 2015-06-24 | The construction site temporary electricity assembled of easy transition supports switching device |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104912373A true CN104912373A (en) | 2015-09-16 |
CN104912373B CN104912373B (en) | 2017-01-25 |
Family
ID=54081769
Family Applications (4)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611160204.7A Active CN106801534B (en) | 2015-06-24 | 2015-06-24 | The construction site temporary electricity assembled support switching device easily installed |
CN201611159424.8A Active CN106760874B (en) | 2015-06-24 | 2015-06-24 | The construction site temporary electricity assembled of easy transition supports switching device |
CN201611159421.4A Active CN106677590B (en) | 2015-06-24 | 2015-06-24 | A kind of construction site temporary electricity assembled support switching device |
CN201510355153.2A Active CN104912373B (en) | 2015-06-24 | 2015-06-24 | Assembly type supporting switching device for temporary power consumption at construction site |
Family Applications Before (3)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611160204.7A Active CN106801534B (en) | 2015-06-24 | 2015-06-24 | The construction site temporary electricity assembled support switching device easily installed |
CN201611159424.8A Active CN106760874B (en) | 2015-06-24 | 2015-06-24 | The construction site temporary electricity assembled of easy transition supports switching device |
CN201611159421.4A Active CN106677590B (en) | 2015-06-24 | 2015-06-24 | A kind of construction site temporary electricity assembled support switching device |
Country Status (1)
Country | Link |
---|---|
CN (4) | CN106801534B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110565952A (en) * | 2019-09-12 | 2019-12-13 | 上海建工一建集团有限公司 | electric box installation device and installation method |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110029858A (en) * | 2019-04-04 | 2019-07-19 | 浙江德宝通讯科技股份有限公司 | Autonomous lifting and basis adjustment adapt to the communication pole of height |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2091497U (en) * | 1991-05-04 | 1991-12-25 | 张兆坤 | Cylinder radio receiving antenna frame |
JP2003018731A (en) * | 2001-06-28 | 2003-01-17 | Souki Kk | Telescopic power pole and cable installation method |
CN1629437A (en) * | 2003-12-18 | 2005-06-22 | 唐春芳 | Safety electricity pylon |
JP2009002097A (en) * | 2007-06-25 | 2009-01-08 | Chugoku Electric Power Co Inc:The | Electric pole with side ditch |
CN103321471A (en) * | 2013-07-11 | 2013-09-25 | 常熟市保得利电力通讯设备有限公司 | Temporary telegraph pole |
CN103334628A (en) * | 2013-06-18 | 2013-10-02 | 浙江巨匠钢业有限公司 | Portable lifting communication tower |
CN203891551U (en) * | 2014-05-29 | 2014-10-22 | 天津市津通电力铁塔制造有限公司 | Portable communication tower |
CN204130682U (en) * | 2014-10-24 | 2015-01-28 | 安徽电信规划设计有限责任公司 | A kind of Novel belt lightning rod antenna tower |
CN204326664U (en) * | 2014-11-19 | 2015-05-13 | 国家电网公司 | A kind of Multifunctional City electric pole |
CN204782190U (en) * | 2015-06-24 | 2015-11-18 | 江苏省电力公司常州供电公司 | On --spot interim power consumption assembled of construction supports switching device |
Family Cites Families (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2003232143A (en) * | 2002-02-05 | 2003-08-22 | Attaka Morinokuni Kara:Kk | Supporting structure of column material and standing signboard |
US7098864B2 (en) * | 2003-05-23 | 2006-08-29 | Creative Design And Machining, Inc. | Temporary cellular antenna site |
KR100645024B1 (en) * | 2004-11-12 | 2006-11-15 | 윤명렬 | a precast structure for pillar |
CN201043360Y (en) * | 2007-05-31 | 2008-04-02 | 西安航天复合材料研究所 | Composite-material telegraph pole |
CN201439930U (en) * | 2009-08-04 | 2010-04-21 | 浙江海天建设集团有限公司 | Movable lamp rack |
CN201874292U (en) * | 2010-05-13 | 2011-06-22 | 山西省电力公司太原供电分公司 | Brick type bracing wire |
CN102966258B (en) * | 2012-11-30 | 2015-06-17 | 湖州电力局 | Temporary supporting crossarm for live working |
CN203571610U (en) * | 2013-11-28 | 2014-04-30 | 马秀超 | Multifunctional vertical rod for construction |
CN203980191U (en) * | 2014-07-14 | 2014-12-03 | 中建安装工程有限公司 | Construction site lamp bracket |
CN204313161U (en) * | 2014-11-26 | 2015-05-06 | 陈丹燕 | The working pin-connected panel temporary lighting device in a kind of construction site |
-
2015
- 2015-06-24 CN CN201611160204.7A patent/CN106801534B/en active Active
- 2015-06-24 CN CN201611159424.8A patent/CN106760874B/en active Active
- 2015-06-24 CN CN201611159421.4A patent/CN106677590B/en active Active
- 2015-06-24 CN CN201510355153.2A patent/CN104912373B/en active Active
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2091497U (en) * | 1991-05-04 | 1991-12-25 | 张兆坤 | Cylinder radio receiving antenna frame |
JP2003018731A (en) * | 2001-06-28 | 2003-01-17 | Souki Kk | Telescopic power pole and cable installation method |
CN1629437A (en) * | 2003-12-18 | 2005-06-22 | 唐春芳 | Safety electricity pylon |
JP2009002097A (en) * | 2007-06-25 | 2009-01-08 | Chugoku Electric Power Co Inc:The | Electric pole with side ditch |
CN103334628A (en) * | 2013-06-18 | 2013-10-02 | 浙江巨匠钢业有限公司 | Portable lifting communication tower |
CN103321471A (en) * | 2013-07-11 | 2013-09-25 | 常熟市保得利电力通讯设备有限公司 | Temporary telegraph pole |
CN203891551U (en) * | 2014-05-29 | 2014-10-22 | 天津市津通电力铁塔制造有限公司 | Portable communication tower |
CN204130682U (en) * | 2014-10-24 | 2015-01-28 | 安徽电信规划设计有限责任公司 | A kind of Novel belt lightning rod antenna tower |
CN204326664U (en) * | 2014-11-19 | 2015-05-13 | 国家电网公司 | A kind of Multifunctional City electric pole |
CN204782190U (en) * | 2015-06-24 | 2015-11-18 | 江苏省电力公司常州供电公司 | On --spot interim power consumption assembled of construction supports switching device |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110565952A (en) * | 2019-09-12 | 2019-12-13 | 上海建工一建集团有限公司 | electric box installation device and installation method |
Also Published As
Publication number | Publication date |
---|---|
CN106760874A (en) | 2017-05-31 |
CN106677590B (en) | 2018-11-02 |
CN104912373B (en) | 2017-01-25 |
CN106801534A (en) | 2017-06-06 |
CN106677590A (en) | 2017-05-17 |
CN106760874B (en) | 2018-10-30 |
CN106801534B (en) | 2018-11-23 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103457214B (en) | Earth potential working non-bearing connecting clip | |
KR100899771B1 (en) | A fixing apparatus of jumper line | |
CN103368104B (en) | The insulating bar of earth potential working non-bearing connecting clip | |
CN104912373A (en) | Assembly type supporting switching device for temporary power consumption at construction site | |
CN103057836A (en) | Transportation fixed support of transformer wire outlet device | |
CN110994510A (en) | Electric power erection device for bridge road | |
CN204782190U (en) | On --spot interim power consumption assembled of construction supports switching device | |
KR101821152B1 (en) | Electric pole for easily adjusting height of power distribution line | |
KR100843058B1 (en) | High Voltage Cable Supporter | |
CN204089082U (en) | Lighting proof strip device | |
CN202074205U (en) | Stand of roof antenna lightning rod | |
CN204962186U (en) | LED display screen floor stand installs base | |
CN210326560U (en) | Power distribution cabinet mounting structure | |
CN203660456U (en) | Support apparatus for combined electrical apparatus branch bus wall bushing | |
CN203812831U (en) | Drop-out fuse fuse pipe safety suspension device | |
CN204155751U (en) | High-power transformer sleeve pipe installation and repairing frock | |
CN103457213B (en) | The wire clip body of earth potential working non-bearing connecting clip | |
CN201489946U (en) | Installation device of transformer on single-phase column | |
CN203367879U (en) | Insulating operating rod of earth potential working non-bearing-force connection wire clamp | |
CN105442873A (en) | Lightweight steel structure awning of gas station | |
CN206685862U (en) | A kind of mobile holder device for constructing tunnel illumination | |
CN216131803U (en) | A novel lighting fixture for job site illumination | |
CN205296908U (en) | Filling station's lightweight steel construction awning | |
CN208939453U (en) | A kind of aerial tool of assembled adjustable cable | |
CN213043371U (en) | Prevent dragging ground cable support |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |