CN204155751U - High-power transformer sleeve pipe installation and repairing frock - Google Patents

High-power transformer sleeve pipe installation and repairing frock Download PDF

Info

Publication number
CN204155751U
CN204155751U CN201420695927.7U CN201420695927U CN204155751U CN 204155751 U CN204155751 U CN 204155751U CN 201420695927 U CN201420695927 U CN 201420695927U CN 204155751 U CN204155751 U CN 204155751U
Authority
CN
China
Prior art keywords
sleeve pipe
power transformer
oblique supporting
pipe installation
repairing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420695927.7U
Other languages
Chinese (zh)
Inventor
崔慧丽
莫文华
徐海林
宋长斌
卫书满
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Gezhouba Group Co Ltd
China Gezhouba Group Mechanical and Electrical Construction Co Ltd
Original Assignee
China Gezhouba Group Co Ltd
China Gezhouba Group Mechanical and Electrical Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Gezhouba Group Co Ltd, China Gezhouba Group Mechanical and Electrical Construction Co Ltd filed Critical China Gezhouba Group Co Ltd
Priority to CN201420695927.7U priority Critical patent/CN204155751U/en
Application granted granted Critical
Publication of CN204155751U publication Critical patent/CN204155751U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Housings And Mounting Of Transformers (AREA)

Abstract

A kind of high-power transformer sleeve pipe installation and repairing frock, four oblique supporting legs and the crosspiece of at least one piece of horizontal arrangement be arranged between four oblique supporting legs are welded into pyramid support, and four oblique supporting legs and ground are 45 ~ 60 0angle is arranged, pyramid cantilever tip is welded with end face platform; End face Platform center offers flange hole, and flange hole diameter and bushing shell for transformer central flange match, and the end face platform outside flange hole offers multiple bolt connecting hole; Each oblique supporting leg bottom welding has support baseboard.The high-power transformer sleeve pipe installation and repairing frock that the utility model provides, can solve the cleaning in a pre-installation of big-and-middle-sized oil-immersed power transformer, drying, test stage hold flimsy problem, sound construction, easy to use, economical and practical.

Description

High-power transformer sleeve pipe installation and repairing frock
Technical field
The utility model relates to a kind of installation and repairing frock, and especially relating to is a kind of high-power transformer sleeve pipe installation and repairing frock.
Background technology
Big-and-middle-sized oil-immersed power transformer, because it is bulky, tonnage is heavier, normal adopts first disintegrating transportation, at the scene by annexes such as sleeve pipe, conservator, coolers and transformer body is assembled, the mounting means of rear injection insulating oil.
Along with the increase of hydroelectric project generatortransformer unit capacity, the raising of main transformer grade of rated voltage, the installation of main transformer bushing and Detection job seem further important.Bushing shell for transformer structure is special, two ends are spindle, end is conductor, middle part is Flange Plane, porcelain screen is frangible, centre is marked with insulating oil, single casing wt reaches more than 2000kg, length reaches more than 3m, cleaning before installation, drying, inspection need a stabilized structure, electrical safety to support placement apart from enough frocks, and not having similar frock to occur at present, the cleaning before installation, drying, inspection easily damage big-and-middle-sized oil-immersed power transformer.
Summary of the invention
Technical problem to be solved in the utility model is to provide a kind of high-power transformer sleeve pipe installation and repairing frock, the cleaning in a pre-installation of big-and-middle-sized oil-immersed power transformer can be solved, drying, test stage hold flimsy problem, sound construction, easy to use, economical and practical.
For solving the problems of the technologies described above, the technical scheme that the utility model adopts is: a kind of high-power transformer sleeve pipe installation and repairing frock,
Article four, oblique supporting leg and the crosspiece of at least one piece of horizontal arrangement that is arranged between four oblique supporting legs are welded into pyramid support, and four oblique supporting legs and ground are 45 ~ 60 0angle is arranged, pyramid cantilever tip is welded with end face platform;
End face Platform center offers flange hole, and flange hole diameter and bushing shell for transformer central flange match, and the end face platform outside flange hole offers multiple bolt connecting hole;
Each oblique supporting leg bottom welding has support baseboard.
Oblique supporting leg is preferably the supporting leg that 50 × 50 or 63 × 63 angle steel are made.
Crosspiece is preferably the crosspiece that 50 × 50 or 63 × 63 angle steel are made.
The quantity of crosspiece is preferably two pieces.
The diameter of flange hole is preferably 550mm.
The diameter of bolt connecting hole is preferably 20mm.
The high-power transformer sleeve pipe installation and repairing frock that the utility model provides, beneficial effect is as follows:
1, pyramid support is welded into by oblique supporting leg and crosspiece, end face Platform center offers flange hole and bolt connecting hole, analogue transformer sleeve pipe actual installation can run operating state, be convenient to bushing shell for transformer and erect unsettled placement, uniform force, non-easy damaged; Guarantee device security, reduce onsite moving damage; When new installation or maintenance bushing shell for transformer, the unsettled vertical stable placement of retaining sleeve, to the conductor of sleeve pipe, porcelain screen and end shield end insulation not damaged, and sound construction, be conducive to the cleaning wiping before sleeve pipe installation, visual examination, dry moistureproof, wiring test, the quality that the installation of raising equipment, maintenance check.
2, be easy to staff's climbing stand, the convenient cleaning wiping dust greasy dirt etc. installing anterior cannula porcelain screen, end shield.
3, hypotenuse inclination angle is large, support structure firm, is conducive to casing safety and places.
4, when bushing shell for transformer is positioned over the utility model, upper and lower side conductor, porcelain screen is unsettled, is convenient to cleaning, wiring; Coordinate ventilation drying equipment, be convenient to ventilation moistureproof, dry; After completing cleaning, drying, test, with clean Polypropylence Sheet wrapping overlapping casing tube upper and lower part, be convenient to deposit, prepare stand-by in advance, save transformer and the straight line duration is installed.
5, multiple stage bushing shell for transformer is installed reusable, improve frock material turnover utilization rate, reduce investment outlay, the cleaning in a pre-installation of big-and-middle-sized oil-immersed power transformer can be solved, drying, test stage hold flimsy problem, sound construction, easy to use, economical and practical.
Accompanying drawing explanation
Below in conjunction with drawings and Examples, the utility model is described in further detail:
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the A direction view of the utility model Fig. 1.
Embodiment
As depicted in figs. 1 and 2, a kind of high-power transformer sleeve pipe installation and repairing frock,
Article four, oblique supporting leg 1 and the crosspiece 2 of two pieces of horizontal arrangement that is arranged between four oblique supporting legs 1 are welded into pyramid support, and four oblique supporting legs 1 are 45 ~ 60 with ground 0angle is arranged, pyramid cantilever tip is welded with end face platform 3;
End face platform 3 center offers flange hole 6, and flange hole 6 diameter and bushing shell for transformer central flange match, and the end face platform 3 outside flange hole 6 offers four bolt connecting holes, 5, four bolt connecting holes 5 and is circumferentially evenly arranged;
Each oblique supporting leg 1 bottom welding has support baseboard 4.
Oblique supporting leg 1 is the supporting leg that 50 × 50 or 63 × 63 angle steel are made.
Crosspiece 2 is the crosspiece that 50 × 50 or 63 × 63 angle steel are made.
The diameter of flange hole 6 is 550mm.
The diameter of bolt connecting hole 5 is 20mm.
End face platform 3 is square planar configuration.
During this use, bushing shell for transformer is vertically placed on end face platform 3, with bolt, sleeve pipe is fixed on pyramid support, retaining sleeve bottom is far from the safe distance of ground 300 ~ 600mm, and sleeve pipe conveniently can complete the installation and repairing operation work such as cleaning, drying, electrical test, visual examination and lifting colligation in this frock.
The utility model analogue transformer sleeve pipe actual installation can run operating state, when new installation or maintenance bushing shell for transformer, the unsettled vertical stable placement of retaining sleeve, to the conductor of sleeve pipe, porcelain screen and end shield end insulation not damaged, and sound construction, be conducive to the cleaning wiping before sleeve pipe installation, visual examination, dry moistureproof, wiring test, the quality that the installation of raising equipment, maintenance check.The utility model is specially adapted to the cleaning drying in a pre-installation of big-and-middle-sized oil-immersed power transformer sleeve pipe, quality examination and deposits.

Claims (6)

1. a high-power transformer sleeve pipe installation and repairing frock, is characterized in that:
Article four, oblique supporting leg (1) and the crosspiece (2) of at least one piece of horizontal arrangement that is arranged between four oblique supporting legs (1) are welded into pyramid support, and four oblique supporting legs (1) are 45 ~ 60 with ground 0angle is arranged, pyramid cantilever tip is welded with end face platform (3);
End face platform (3) center offers flange hole (6), and flange hole (6) diameter and bushing shell for transformer central flange match, and the end face platform (3) in flange hole (6) outside offers multiple bolt connecting hole (5);
Each oblique supporting leg (1) bottom welding has support baseboard (4).
2. high-power transformer sleeve pipe installation and repairing frock according to claim 1, is characterized in that: oblique supporting leg (1) is the supporting leg that 50 × 50 or 63 × 63 angle steel are made.
3. high-power transformer sleeve pipe installation and repairing frock according to claim 1, is characterized in that: crosspiece (2) is the crosspiece that 50 × 50 or 63 × 63 angle steel are made.
4. high-power transformer sleeve pipe installation and repairing frock according to claim 1, is characterized in that: the quantity of crosspiece (2) is two pieces.
5. high-power transformer sleeve pipe installation and repairing frock according to claim 1, is characterized in that: the diameter of flange hole (6) is 550mm.
6. high-power transformer sleeve pipe installation and repairing frock according to claim 1, is characterized in that: the diameter of bolt connecting hole (5) is 20mm.
CN201420695927.7U 2014-11-19 2014-11-19 High-power transformer sleeve pipe installation and repairing frock Expired - Fee Related CN204155751U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420695927.7U CN204155751U (en) 2014-11-19 2014-11-19 High-power transformer sleeve pipe installation and repairing frock

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420695927.7U CN204155751U (en) 2014-11-19 2014-11-19 High-power transformer sleeve pipe installation and repairing frock

Publications (1)

Publication Number Publication Date
CN204155751U true CN204155751U (en) 2015-02-11

Family

ID=52513849

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420695927.7U Expired - Fee Related CN204155751U (en) 2014-11-19 2014-11-19 High-power transformer sleeve pipe installation and repairing frock

Country Status (1)

Country Link
CN (1) CN204155751U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106898461A (en) * 2017-03-14 2017-06-27 国网福建省电力有限公司 Bushing shell for transformer tests special stand
CN107946025A (en) * 2017-12-20 2018-04-20 衢州杭甬变压器有限公司 A kind of power transformer enclosure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106898461A (en) * 2017-03-14 2017-06-27 国网福建省电力有限公司 Bushing shell for transformer tests special stand
CN107946025A (en) * 2017-12-20 2018-04-20 衢州杭甬变压器有限公司 A kind of power transformer enclosure

Similar Documents

Publication Publication Date Title
CN204155751U (en) High-power transformer sleeve pipe installation and repairing frock
CN106153985A (en) A kind of portable adjustable insulated platform
CN202817556U (en) Installation support for switch mechanism case
CN204380032U (en) A kind of lap belt hanger covering use at transformer tank
CN203895807U (en) Special-purpose safety belt high hanging support rack for isolating switch
CN103474905B (en) The device of auxiliary grounding wire installing
CN103332608B (en) GW6 disconnecting link porcelain knob is changed special pole and is hung
CN102943615B (en) Horizontal-buckling support insulating ladder
CN203571231U (en) Cable clamp capable of improving fixation effect
CN203284094U (en) Rod hanger special for GW6 knife switch porcelain column replacement
CN206401856U (en) A kind of anti-bird backplate and anti-bird cross-arm
CN205753130U (en) A kind of Novel switch cabinet operating handle device
CN205132991U (en) Become width of cloth dolly with can dismantle landing leg
CN204333854U (en) Steel tower T connects cable fixture
CN106677590B (en) A kind of construction site temporary electricity assembled support switching device
CN202988576U (en) Simple and easy chain hoist lifting support
CN206111074U (en) High -tension voltage tower overhauls device
CN206640241U (en) A kind of rod-type no-welding borehole cable crane span structure
CN205484430U (en) Transformer high -voltage testing support
CN206259651U (en) A kind of rural area fault maintenance activity device
CN204538530U (en) A kind of operating platform for high voltage side of transformer dress hanging earthing conductor
CN203582413U (en) Tool for replacing series compensation capacitors
CN203951101U (en) A kind of double electric pole aerial work platform
CN204287241U (en) 6-10KV lightning arrester site test support
CN208271688U (en) A kind of portable sleeve of main transformer bracket

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150211

Termination date: 20161119

CF01 Termination of patent right due to non-payment of annual fee