CN106677590B - A kind of construction site temporary electricity assembled support switching device - Google Patents

A kind of construction site temporary electricity assembled support switching device Download PDF

Info

Publication number
CN106677590B
CN106677590B CN201611159421.4A CN201611159421A CN106677590B CN 106677590 B CN106677590 B CN 106677590B CN 201611159421 A CN201611159421 A CN 201611159421A CN 106677590 B CN106677590 B CN 106677590B
Authority
CN
China
Prior art keywords
support tube
socket
fixed
fastening bolt
babinet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201611159421.4A
Other languages
Chinese (zh)
Other versions
CN106677590A (en
Inventor
陆怀谷
乔永洁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changzhou Power Supply Branch Jiangsu Electric Power Co Ltd
State Grid Corp of China SGCC
State Grid Jiangsu Electric Power Co Ltd
Original Assignee
Changzhou Power Supply Branch Jiangsu Electric Power Co Ltd
State Grid Corp of China SGCC
State Grid Jiangsu Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changzhou Power Supply Branch Jiangsu Electric Power Co Ltd, State Grid Corp of China SGCC, State Grid Jiangsu Electric Power Co Ltd filed Critical Changzhou Power Supply Branch Jiangsu Electric Power Co Ltd
Priority to CN201611159421.4A priority Critical patent/CN106677590B/en
Publication of CN106677590A publication Critical patent/CN106677590A/en
Application granted granted Critical
Publication of CN106677590B publication Critical patent/CN106677590B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/02Structures made of specified materials
    • E04H12/08Structures made of specified materials of metal
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/22Sockets or holders for poles or posts
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/22Sockets or holders for poles or posts
    • E04H12/2238Sockets or holders for poles or posts to be placed on the ground
    • E04H12/2246Sockets or holders for poles or posts to be placed on the ground filled with water, sand or the like
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F21LIGHTING
    • F21VFUNCTIONAL FEATURES OR DETAILS OF LIGHTING DEVICES OR SYSTEMS THEREOF; STRUCTURAL COMBINATIONS OF LIGHTING DEVICES WITH OTHER ARTICLES, NOT OTHERWISE PROVIDED FOR
    • F21V17/00Fastening of component parts of lighting devices, e.g. shades, globes, refractors, reflectors, filters, screens, grids or protective cages
    • F21V17/10Fastening of component parts of lighting devices, e.g. shades, globes, refractors, reflectors, filters, screens, grids or protective cages characterised by specific fastening means or way of fastening
    • F21V17/12Fastening of component parts of lighting devices, e.g. shades, globes, refractors, reflectors, filters, screens, grids or protective cages characterised by specific fastening means or way of fastening by screwing
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F21LIGHTING
    • F21VFUNCTIONAL FEATURES OR DETAILS OF LIGHTING DEVICES OR SYSTEMS THEREOF; STRUCTURAL COMBINATIONS OF LIGHTING DEVICES WITH OTHER ARTICLES, NOT OTHERWISE PROVIDED FOR
    • F21V21/00Supporting, suspending, or attaching arrangements for lighting devices; Hand grips
    • F21V21/10Pendants, arms, or standards; Fixing lighting devices to pendants, arms, or standards
    • F21V21/108Arms
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F21LIGHTING
    • F21VFUNCTIONAL FEATURES OR DETAILS OF LIGHTING DEVICES OR SYSTEMS THEREOF; STRUCTURAL COMBINATIONS OF LIGHTING DEVICES WITH OTHER ARTICLES, NOT OTHERWISE PROVIDED FOR
    • F21V33/00Structural combinations of lighting devices with other articles, not otherwise provided for
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G1/00Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
    • H02G1/02Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for overhead lines or cables

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Materials Engineering (AREA)
  • Wood Science & Technology (AREA)
  • Non-Portable Lighting Devices Or Systems Thereof (AREA)
  • Suspension Of Electric Lines Or Cables (AREA)
  • Arrangement Of Elements, Cooling, Sealing, Or The Like Of Lighting Devices (AREA)

Abstract

The present invention provides a kind of construction site temporary electricity assembled support switching device, including pedestal, socket support tube, electronic box hanger, screw rod, porcelain insulator and light holder support;Pedestal includes babinet, backing plate, fixed support tube, reinforcing rib, earth stud and the first fastening bolt;Socket support tube with fixed support tube socket simultaneously fix by bolt;Electronic box hanger includes casing, hanging rod, end and the second fastening bolt;Casing with the socket of socket support tube simultaneously fix by bolt;2 porcelain insulators are fixedly mounted on screw rod, and screw rod is fixed on socket support tube;Light holder support includes socket pipe, mounting plate and third fastening bolt;Socket pipe with the socket of socket support tube simultaneously fix by bolt.The multiple functions such as temporary electricity fixed track usage plan in construction is supported switching by the present invention, illuminator is fixed, electronic box is hung, earth point is arranged are integrated in one, erected on site and property easy to use, safe are good, and each component assembling and convenient disassembly are easy to carry about with one and are transported with transition.

Description

A kind of construction site temporary electricity assembled support switching device
The application is application No. is 201510355153.2, and the applying date is on June 24th, 2015, and invention and created name is The divisional application of the application for a patent for invention of " construction site temporary electricity assembled supports switching device ".
Technical field
The present invention relates to Electricity on Construction Site to assist Work tool, and in particular to a kind of construction site is for interim Electricity consumption fixed track usage plan support switching, the assembled that illuminator is fixed, electronic box is hung support switching device.
Background technology
Construction site node of largely constructing needs electricity consumption, as electric tool needs to power, needs to set up headlamp Tool etc..Common construction site, due to lack specification, effective stringer, in addition temporary electricity wire hanging bracket, shine There is no corresponding unified regulation in the industries such as bright frame, thus in construction site temporary electricity implementation process, overhead transmission line Holder, lighting lamp bracket, electronic box holder etc. are varied, and often install, connect everywhere, to construction temporary electricity Bring security risk.
Invention content
The purpose of the present invention is:There is provided that one kind is easy to install, multiple functional, safety is good, easy to carry and transition transport And it can effectively meet the construction site temporary electricity assembled support switching device of construction site temporary electricity needs.
The technical scheme is that:The construction site temporary electricity assembled of the present invention supports switching device, It is structurally characterized in that:Including pedestal, socket support tube, electronic box hanger, screw rod, porcelain insulator and light holder support;
Above-mentioned pedestal includes babinet, backing plate, fixed support tube, reinforcing rib, earth stud and the first fastening bolt;Babinet For the quadrangle box part of upper end opening;Backing plate is rectangular plate body part, and backing plate is fixed at the upper surface of the bottom plate of babinet On;Fixed support tube is hollow round tube piece, and fixed support tube is fixedly connected by its lower end with the middle part upper surface of backing plate; Reinforcing rib is equipped with 2 to 8, and one end of each reinforcing rib is fixedly connected with fixed support tube;The other end of each reinforcing rib and babinet Inner wall is fixedly connected;Earth stud is arranged on fixed support tube and positioned at the top of the upper surface of babinet;First fastening bolt It is movably disposed in the top of fixed support tube;
Socket support tube is hollow round tube piece;The top for being socketed support tube is equipped with screw rod mounting hole;Socket support Pipe is inserted into the fixed support tube of pedestal by its lower end and is fixed by the first fastening bolt from the top down;
Electronic box hanger includes casing, hanging rod, end and the second fastening bolt;Casing is hollow round tube piece;Hanging rod To be bent into L-shaped body of rod part, hanging rod is fixedly mounted on the left side central portion wall body of casing;End is fixed at a left side for hanging rod Upper lateral part;The right side central in casing is arranged in second fastening bolt;Casing is socketed on the tube wall of socket support tube and by the Two fastening bolts are fixed;
Screw rod is arranged 1, and screw rod, which is passed through to be socketed after the screw rod mounting hole of support tube by its middle part, is fixed at socket branch On stay tube;The left and right ends of screw rod are protruding;
Porcelain insulator is provided with 2, which is fixedly mounted on screw rod, and positioned at a left side for socket support tube Right both sides;
Light holder support includes socket pipe, mounting plate and third fastening bolt;Socket pipe is hollow round tube piece;Socket Pipe is equipped with third fastening bolt;Mounting plate is rectangular plate body part, and mounting plate is equipped with the connection bolt of upward and downward perforation Hole;Socket pipe is fixedly connected by the upper end with the middle part lower face of mounting plate;The upper end of the lower part of socket pipe and socket support tube Portion is fixed after socket-connecting by third fastening bolt;
The reinforcing rib of above-mentioned pedestal is equipped with 4, and one end of 4 reinforcing ribs is located at fixed support tube in babinet Lower weld;The other end of 4 reinforcing ribs is welded with the inner wall of babinet, and 4 reinforcing ribs are propped up in babinet with fixation It is in cross centered on stay tube.
Set-up mode of first fastening bolt of above-mentioned pedestal on fixed support tube is the wall body in fixed support tube On open up bolt hole, WELD NUTS on the wall body of the fixed support tube at bolt hole;First fastening bolt and fixed support tube Wall body on the nut of bolt hole and welding that opens up match;Setting of second fastening bolt of electronic box hanger on casing Set-up mode of the set-up mode with the first fastening bolt of mode and the third fastening bolt of light holder support on socket pipe It is identical;
Completely dress is used for counterweight and the defensive yellow ground that disappears to the babinet of above-mentioned pedestal when in use.
Further embodiment is:The material of the babinet of above-mentioned pedestal is 3mm steel plates;The size of babinet be 300mm × 300mm×210mm;The material of backing plate is the steel plate of 5mm thickness;Backing plate or so is to the upper surface for the bottom plate for being weldingly fixed on babinet On, and backing plate is located at the sagittal middle part of the bottom plate of babinet.
Further embodiment is:The fixed support tube of above-mentioned pedestal is the stainless steel tube of diameter 60mm, length 1.2m;Set Connect the stainless steel tube that support tube is diameter 50mm, length 2m;The casing of electronic box hanger be diameter 60mm, length 100mm it is stainless Steel pipe;The socket pipe of light holder support is the stainless steel tube of diameter 60mm, length 100mm;The mounting plate of light holder support be 350mm × The steel plate of 60mm × 5mm sizes.
Further embodiment is:The tip height of above-mentioned socket support tube can be adjusted in 2.0m between 3.0m;Electronic box The height of hanger can be adjusted in 1.2m between 2.6m.
The present invention has the effect of positive:(1)The construction site temporary electricity assembled support switching dress of the present invention Set, by the design of structure, by temporary electricity fixed track usage plan support switching in construction, illuminator is fixed, electronic box is hung, The multiple functions such as earth point setting are integrated in one, and erected on site and property easy to use, safe are good.(2)The construction of the present invention Live temporary electricity assembled supports switching device, and critical piece is detachable, needs in use, can be in construction field side Just it is assembled, then can easily be dismantled each component after use, easy to carry and transition transport.
Description of the drawings
Fig. 1 is the structural diagram of the present invention;
Fig. 2 is the structural schematic diagram of the pedestal in Fig. 1;
Fig. 3 is the vertical view of Fig. 2;
Fig. 4 is the structural schematic diagram of the electronic box hanger in Fig. 1;
Fig. 5 is the vertical view of Fig. 4;
Fig. 6 is the structural schematic diagram of the light holder support in Fig. 1;
Fig. 7 is the upward view of Fig. 6.
Reference numeral in above-mentioned attached drawing is as follows:
Pedestal 1, babinet 11, backing plate 12, fixed support tube 13, reinforcing rib 14, earth stud 15, the first fastening bolt 16,
It is socketed support tube 2,
Electronic box hanger 3, casing 31, hanging rod 32, end 33, the second fastening bolt 34,
Screw rod 4,
Porcelain insulator 5,
Light holder support 6, socket pipe 61, mounting plate 62, link bolt hole 62-1, third fastening bolt 63.
Specific implementation mode
The present invention will be further described in detail below with reference to the accompanying drawings and specific embodiments.
(Embodiment 1)
See Fig. 1, the construction site temporary electricity assembled of the present embodiment supports switching device, mainly by pedestal 1, Support tube 2, electronic box hanger 3, screw rod 4, porcelain insulator 5 and light holder support 6 is socketed to form.
Referring to Fig. 2 and Fig. 3, pedestal 1 is mainly by babinet 11, backing plate 12, fixed support tube 13, reinforcing rib 14, earth stud 15 and first fastening bolt 16 form.
Babinet 11 is the quadrangle box part of upper end opening;The material of babinet 11 is steel plate.In the present embodiment, the ruler of babinet 11 It is very little preferably to use long 300mm × wide 300mm × high 210mm;Steel plate thickness preferably uses 3mm.Backing plate 12 is rectangular plate body Part preferably uses the steel plate of 5mm thickness in 12 the present embodiment of backing plate;Backing plate 12 or so is to the upper of the bottom plate for being weldingly fixed on babinet 11 On end face, and backing plate 12 is located at the sagittal middle part of the bottom plate of babinet 11.Fixed support tube 13 is hollow round tube piece, In the present embodiment, fixed support tube 13 preferably uses diameter 60mm, length for the stainless steel tube of 1.2m;Fixed support tube 13 is by it The middle part upper surface vertical welding of lower end and backing plate 12;Reinforcing rib 14 is equipped with 2 to 8, in the present embodiment, and reinforcing rib 14 is preferably adopted With 4, one end of 4 reinforcing ribs 14 is located at the lower weld in babinet 11 with fixed support tube 13;4 reinforcing ribs 14 The other end welded with babinet 11, and 4 reinforcing ribs 14 in the babinet 11 by fixed support tube 13 centered on be in " ten " word Shape.Earth stud 15 is movably disposed in the top of the upper surface on fixed support tube 13 and positioned at babinet 11, earth stud 15 are used to be grounded when using, to protect Electrical Safety;First fastening bolt 16 is movably disposed in the upper of fixed support tube 13 Portion;The set-up mode of first fastening bolt 16 is:Bolt hole is opened up on the top tube wall of fixed support tube 13, at bolt hole Tube wall on WELD NUTS, the nut of the bolt hole and welding that open up in the first fastening bolt 16 and fixed support tube 13 matches It closes.First fastening bolt 16 preferably uses butterfly bolt.
Socket support tube 2 is hollow round tube piece, in the present embodiment, socket support tube 2 preferably use diameter 50mm, Length is the stainless steel tube of 2m;The top for being socketed support tube 2 is equipped with screw rod mounting hole.When assembly, socket support tube 2 is by its lower end It is inserted into the fixed support tube 13 of pedestal 1 from the top down, the tip height for being socketed support tube 2 can be in 2.0m to freedom between 3.0m It adjusts, the socket adjustment of support tube 2 is connected by the first fastening bolt 16 of pedestal 1 with the fixation of fixed support tube 13 after determining height It connects.
Referring to Fig. 4 and Fig. 5, electronic box hanger 3 is mainly made of casing 31, hanging rod 32, end 33 and the second fastening bolt 34.
Casing 31 is hollow round tube piece, in the present embodiment, casing 31 preferably use diameter 60mm, length for The stainless steel tube of 100mm;The material of hanging rod 32 is stainless steel, and hanging rod 32 is to be bent into L-shaped body of rod part, and hanging rod 32 is by its right end It is welded on the left side central portion of casing 31;The top of hanging rod 32 is fixedly installed end 33;Second fastening bolt 34 is arranged in casing 31 right side central;Second fastening bolt, 34 set-up mode is to open up bolt hole on the tube wall of casing 31, is welded at bolt hole Connect nut;Second fastening bolt 34 preferably uses butterfly bolt.When assembly, electronic box hanger 3 is socketed in socket branch by its casing 31 On the tube wall of stay tube 2;Electronic box hanger 3 is fixed on by socket support tube 2 by the second fastening bolt 34 after adjusting to suitable position On;The height of electronic box hanger 3 can be in 1.2m to freely being adjusted between 2.6m.For hanging temporary electricity end when electronic box hanger 3 uses Hold case.
Still see that Fig. 1, screw rod 4 are arranged 1, the fixation after the screw rod mounting hole of socket support tube 2 is set screw rod 4 by its middle part It sets on socket support tube 2;The left and right ends of screw rod 4 are protruding.
Porcelain insulator 5 is provided with 2, which is fixedly mounted on screw rod 4, and positioned at socket support tube 2 The left and right sides.Porcelain insulator 5 is used for the electric wire of temporary electricity when using, cable is hung.
Referring to Fig. 6 and Fig. 7, light holder support 6 is mainly made of socket pipe 61, mounting plate 62 and third fastening bolt 63.
Socket pipe 61 is hollow round tube piece, in the present embodiment, socket pipe 61 preferably use diameter 60mm, length for The stainless steel tube of 100mm;Socket pipe 61 is equipped with third fastening bolt 63, and the set-up mode of third fastening bolt 63 is to be socketed Bolt hole is opened up on the tube wall of pipe 61, the WELD NUTS at bolt hole;Mounting plate 62 is rectangular plate body part, on mounting plate 62 Link bolt hole 62-1 equipped with the perforation of 2 upward and downwards;In the present embodiment, mounting plate 62 preferably use size for long 350mm × The steel plate of wide 60mm × thickness 5mm;Socket pipe 61 is welded by the upper end and the middle part lower face of mounting plate 62.When assembly, lamp holder branch Frame 6 is fixed after being socket-connected by the lower part of its socket pipe 61 and the upper end of socket support tube 2 by third fastening bolt 63.It uses When, light holder support 6 is used to be fixedly mounted the illuminator of construction site and is placed in illuminator when illuminator is installed On mounting plate 62, illuminator is fixedly mounted on mounting plate with bolt by 2 link bolt hole 62-1 on mounting plate 62 Above 62 upper surface.
The construction site temporary electricity assembled of the present embodiment supports switching device, dedicated for facing in construction When electricity consumption transfer, by temporary electricity fixed track usage plan support switching, that illuminator is fixed, electronic box is hung, earth point is arranged etc. is more Kind function is integrated in one, convenient, efficient, energy-saving and environmental protection.And it can easily be assembled in construction field when in use, be made Then easily each component can be dismantled after, easy to carry and transition transport.In use, being filled in the babinet 11 of pedestal 1 Yellow ground, as the counterweight of pedestal 1 to increase stability, while can also to make fire-fighting fire extinguishing spare for yellow ground.
Above example is the explanation rather than limitation of the present invention to the specific implementation mode of the present invention, related technology The technical staff in field without departing from the spirit and scope of the present invention, can also make various transformation and variation and obtain To corresponding equivalent technical solution, therefore all equivalent technical solutions should be included into the patent protection model of the present invention It encloses.

Claims (1)

1. a kind of construction site temporary electricity assembled supports switching device, it is characterised in that:Including pedestal(1), socket Support tube(2), electronic box hanger(3), screw rod(4), porcelain insulator(5)And light holder support(6);
The pedestal(1)Including babinet(11), backing plate(12), fixed support tube(13), reinforcing rib(14), earth stud(15) With the first fastening bolt(16);Babinet(11)For the quadrangle box part of upper end opening;Backing plate(12)For rectangular plate body part, pad Plate(12)It is fixed at babinet(11)Bottom plate upper surface on;Fixed support tube(13)For hollow round tube piece, Gu Determine support tube(13)By its lower end and backing plate(12)Middle part upper surface be fixedly connected;Reinforcing rib(14)Equipped with 4, each reinforcing rib (14)One end and fixed support tube(13)It is fixedly connected;Each reinforcing rib(14)The other end and babinet(11)Inner wall fix connect It connects;Earth stud(15)It is arranged in fixed support tube(13)Above and it is located at babinet(11)Upper surface top;First fastening spiral shell Bolt(16)It is movably disposed in fixed support tube(13)Top;
It is socketed support tube(2)For hollow round tube piece;It is socketed support tube(2)Top be equipped with screw rod mounting hole;Socket branch Stay tube(2)Pedestal is inserted by its lower end from the top down(1)Fixed support tube(13)It is interior and by the first fastening bolt(16)It is fixed;
Electronic box hanger(3)Including casing(31), hanging rod(32), end(33)With the second fastening bolt(34);Casing(31)For in Empty round tube piece;Hanging rod(32)To be bent into L-shaped body of rod part, hanging rod(32)It is fixedly mounted on casing(31)Left side in On portion's wall body;End(33)It is fixed at hanging rod(32)Left upper portion;Second fastening bolt(34)It is arranged in casing(31) Right side central;Casing(31)It is socketed in socket support tube(2)Tube wall on and pass through the second fastening bolt(34)It is fixed;
Screw rod(4)Setting 1, screw rod(4)Socket support tube is passed through by its middle part(2)Screw rod mounting hole after be fixed at set Connect support tube(2)On;Screw rod(4)Left and right ends it is protruding;
Porcelain insulator(5)2 are provided with, 2 porcelain insulators(5)It is fixedly mounted on screw rod(4)On, and positioned at socket support tube (2)The left and right sides;
Light holder support(6)Including socket pipe(61), mounting plate(62)With third fastening bolt(63);Socket pipe(61)It is hollow Round tube piece;Socket pipe(61)It is equipped with third fastening bolt(63);Mounting plate(62)For rectangular plate body part, mounting plate (62)It is equipped with the link bolt hole of upward and downward perforation(62-1);Socket pipe(61)By the upper end and mounting plate(62)Middle part under End face is fixedly connected;Socket pipe(61)Lower part with socket support tube(2)Upper end socket-connect after by third fastening bolt (63)It is fixed;
The pedestal(1)4 reinforcing ribs(14)One end and fixed support tube(13)Positioned at babinet(11)Interior lower part Welding;4 reinforcing ribs(14)The other end and babinet(11)Inner wall welding, and 4 reinforcing ribs(14)In babinet (11)It is interior with fixed support tube(13)Centered on be in cross;
The pedestal(1)The first fastening bolt(16)In fixed support tube(13)On set-up mode be in fixed support tube (13)Wall body on open up bolt hole, the fixed support tube at bolt hole(13)Wall body on WELD NUTS;First fastening spiral shell Bolt(16)With fixed support tube(13)Wall body on the nut of bolt hole and welding that opens up match;Electronic box hanger(3)'s Second fastening bolt(34)In casing(31)On set-up mode and light holder support(6)Third fastening bolt(63)It is being socketed Pipe(61)On set-up mode with the first fastening bolt(16)Set-up mode it is identical;
The pedestal(1)Babinet(11)Full dress is used for counterweight and the defensive yellow ground that disappears when in use.
CN201611159421.4A 2015-06-24 2015-06-24 A kind of construction site temporary electricity assembled support switching device Active CN106677590B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611159421.4A CN106677590B (en) 2015-06-24 2015-06-24 A kind of construction site temporary electricity assembled support switching device

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201611159421.4A CN106677590B (en) 2015-06-24 2015-06-24 A kind of construction site temporary electricity assembled support switching device
CN201510355153.2A CN104912373B (en) 2015-06-24 2015-06-24 Assembly type supporting switching device for temporary power consumption at construction site

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
CN201510355153.2A Division CN104912373B (en) 2015-06-24 2015-06-24 Assembly type supporting switching device for temporary power consumption at construction site

Publications (2)

Publication Number Publication Date
CN106677590A CN106677590A (en) 2017-05-17
CN106677590B true CN106677590B (en) 2018-11-02

Family

ID=54081769

Family Applications (4)

Application Number Title Priority Date Filing Date
CN201611160204.7A Active CN106801534B (en) 2015-06-24 2015-06-24 The construction site temporary electricity assembled support switching device easily installed
CN201611159421.4A Active CN106677590B (en) 2015-06-24 2015-06-24 A kind of construction site temporary electricity assembled support switching device
CN201611159424.8A Active CN106760874B (en) 2015-06-24 2015-06-24 The construction site temporary electricity assembled of easy transition supports switching device
CN201510355153.2A Active CN104912373B (en) 2015-06-24 2015-06-24 Assembly type supporting switching device for temporary power consumption at construction site

Family Applications Before (1)

Application Number Title Priority Date Filing Date
CN201611160204.7A Active CN106801534B (en) 2015-06-24 2015-06-24 The construction site temporary electricity assembled support switching device easily installed

Family Applications After (2)

Application Number Title Priority Date Filing Date
CN201611159424.8A Active CN106760874B (en) 2015-06-24 2015-06-24 The construction site temporary electricity assembled of easy transition supports switching device
CN201510355153.2A Active CN104912373B (en) 2015-06-24 2015-06-24 Assembly type supporting switching device for temporary power consumption at construction site

Country Status (1)

Country Link
CN (4) CN106801534B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110029858A (en) * 2019-04-04 2019-07-19 浙江德宝通讯科技股份有限公司 Autonomous lifting and basis adjustment adapt to the communication pole of height
CN110565952A (en) * 2019-09-12 2019-12-13 上海建工一建集团有限公司 electric box installation device and installation method

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003232143A (en) * 2002-02-05 2003-08-22 Attaka Morinokuni Kara:Kk Supporting structure of column material and standing signboard
KR20060045202A (en) * 2004-11-12 2006-05-17 윤명렬 A precast structure for pillar
CN201439930U (en) * 2009-08-04 2010-04-21 浙江海天建设集团有限公司 Movable lamp rack
CN103321471A (en) * 2013-07-11 2013-09-25 常熟市保得利电力通讯设备有限公司 Temporary telegraph pole
CN203571610U (en) * 2013-11-28 2014-04-30 马秀超 Multifunctional vertical rod for construction
CN203891551U (en) * 2014-05-29 2014-10-22 天津市津通电力铁塔制造有限公司 Portable communication tower
CN203980191U (en) * 2014-07-14 2014-12-03 中建安装工程有限公司 Construction site lamp bracket
CN204313161U (en) * 2014-11-26 2015-05-06 陈丹燕 The working pin-connected panel temporary lighting device in a kind of construction site

Family Cites Families (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2091497U (en) * 1991-05-04 1991-12-25 张兆坤 Cylinder radio receiving antenna frame
JP2003018731A (en) * 2001-06-28 2003-01-17 Souki Kk Telescopic power pole and cable installation method
US7098864B2 (en) * 2003-05-23 2006-08-29 Creative Design And Machining, Inc. Temporary cellular antenna site
CN1629437A (en) * 2003-12-18 2005-06-22 唐春芳 Safety electricity pylon
CN201043360Y (en) * 2007-05-31 2008-04-02 西安航天复合材料研究所 Composite-material telegraph pole
JP2009002097A (en) * 2007-06-25 2009-01-08 Chugoku Electric Power Co Inc:The Electric pole with side ditch
CN201874292U (en) * 2010-05-13 2011-06-22 山西省电力公司太原供电分公司 Brick type bracing wire
CN102966258B (en) * 2012-11-30 2015-06-17 湖州电力局 Temporary supporting crossarm for live working
CN103334628B (en) * 2013-06-18 2015-08-26 浙江巨匠钢业有限公司 A kind of Portable lifting formula communication tower
CN204130682U (en) * 2014-10-24 2015-01-28 安徽电信规划设计有限责任公司 A kind of Novel belt lightning rod antenna tower
CN204326664U (en) * 2014-11-19 2015-05-13 国家电网公司 A kind of Multifunctional City electric pole
CN204782190U (en) * 2015-06-24 2015-11-18 江苏省电力公司常州供电公司 On --spot interim power consumption assembled of construction supports switching device

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003232143A (en) * 2002-02-05 2003-08-22 Attaka Morinokuni Kara:Kk Supporting structure of column material and standing signboard
KR20060045202A (en) * 2004-11-12 2006-05-17 윤명렬 A precast structure for pillar
CN201439930U (en) * 2009-08-04 2010-04-21 浙江海天建设集团有限公司 Movable lamp rack
CN103321471A (en) * 2013-07-11 2013-09-25 常熟市保得利电力通讯设备有限公司 Temporary telegraph pole
CN203571610U (en) * 2013-11-28 2014-04-30 马秀超 Multifunctional vertical rod for construction
CN203891551U (en) * 2014-05-29 2014-10-22 天津市津通电力铁塔制造有限公司 Portable communication tower
CN203980191U (en) * 2014-07-14 2014-12-03 中建安装工程有限公司 Construction site lamp bracket
CN204313161U (en) * 2014-11-26 2015-05-06 陈丹燕 The working pin-connected panel temporary lighting device in a kind of construction site

Also Published As

Publication number Publication date
CN106801534B (en) 2018-11-23
CN106760874A (en) 2017-05-31
CN106677590A (en) 2017-05-17
CN104912373B (en) 2017-01-25
CN104912373A (en) 2015-09-16
CN106760874B (en) 2018-10-30
CN106801534A (en) 2017-06-06

Similar Documents

Publication Publication Date Title
CN205743670U (en) A kind of Telescopic herringbone ladder
CN106677590B (en) A kind of construction site temporary electricity assembled support switching device
CN103057836A (en) Transportation fixed support of transformer wire outlet device
CN110994510A (en) Electric power erection device for bridge road
CN208462181U (en) A kind of support device of electrical cabinet
CN204782190U (en) On --spot interim power consumption assembled of construction supports switching device
CN206634590U (en) A kind of roller devices carried for furniture
CN206126783U (en) Detachable work platform
CN210326560U (en) Power distribution cabinet mounting structure
CN203336518U (en) Combined type metal halide lamp overhead support
CN105226543B (en) A kind of portable oil-filled electric equipment respirator dismantling device
CN203812831U (en) Drop-out fuse fuse pipe safety suspension device
CN207761420U (en) A kind of power engineering installation protection fence
CN207230414U (en) A kind of municipal warning lamp easy to fixation
CN207895923U (en) A kind of safe composite material cross arm insulator
CN206111074U (en) High -tension voltage tower overhauls device
CN205724413U (en) A kind of distribution box
CN206090711U (en) Fire hydrant cabinet
CN204379844U (en) A kind of ultraviolet ray disinfector being convenient to replacing fluorescent tube
CN205730031U (en) A kind of hanging rack for safety belt
CN203773899U (en) Novel road construction warning board
CN203176920U (en) Building high-altitude safety lighting lamp
CN209248100U (en) It is a kind of for fixing the holding pole device of optical cable fiber-dividing box
CN204256258U (en) Roof separation indicator observation device
CN211499215U (en) Mounting fixture for glass products

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: No. 27, front street, Changzhou Municipal Bureau, Jiangsu Province, Jiangsu

Applicant after: STATE GRID JIANGSU ELECTRIC POWER Co.,Ltd. CHANGZHOU POWER SUPPLY BRANCH

Applicant after: STATE GRID JIANGSU ELECTRIC POWER Co.,Ltd.

Applicant after: State Grid Corporation of China

Address before: No. 27, front street, Changzhou Municipal Bureau, Jiangsu Province, Jiangsu

Applicant before: STATE GRID CHANG ZHOU CURRENT SUPPLY COMPANY OF JIANGSU ELECTRIC POWER Co.

Applicant before: STATE GRID JIANGSU ELECTRIC POWER Co.

Applicant before: State Grid Corporation of China

Address after: No. 27, front street, Changzhou Municipal Bureau, Jiangsu Province, Jiangsu

Applicant after: STATE GRID CHANG ZHOU CURRENT SUPPLY COMPANY OF JIANGSU ELECTRIC POWER Co.

Applicant after: STATE GRID JIANGSU ELECTRIC POWER Co.

Applicant after: State Grid Corporation of China

Address before: No. 27, Tianning District Bureau, front street, Changzhou, Jiangsu Province

Applicant before: CHANG ZHOU CURRENT SUPPLY COMPANY OF JIANGSU ELECTRIC POWER Co.

Applicant before: JIANGSU ELECTRIC POWER Co.

Applicant before: State Grid Corporation of China

CB02 Change of applicant information
CB03 Change of inventor or designer information

Inventor after: Lu Huaigu

Inventor after: Qiao Yongjie

Inventor before: Qiao Yongjie

Inventor before: Lu Huaigu

Inventor before: Jin Zhihui

CB03 Change of inventor or designer information
GR01 Patent grant
GR01 Patent grant