CN204782190U - On --spot interim power consumption assembled of construction supports switching device - Google Patents

On --spot interim power consumption assembled of construction supports switching device Download PDF

Info

Publication number
CN204782190U
CN204782190U CN201520438590.6U CN201520438590U CN204782190U CN 204782190 U CN204782190 U CN 204782190U CN 201520438590 U CN201520438590 U CN 201520438590U CN 204782190 U CN204782190 U CN 204782190U
Authority
CN
China
Prior art keywords
pipe
fastening bolt
casing
fixed support
support tube
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201520438590.6U
Other languages
Chinese (zh)
Inventor
乔永洁
陆怀谷
金志惠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Jiangsu Electric Power Co Ltd
Changzhou Power Supply Co of Jiangsu Electric Power Co
Original Assignee
State Grid Corp of China SGCC
State Grid Jiangsu Electric Power Co Ltd
Changzhou Power Supply Co of Jiangsu Electric Power Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Jiangsu Electric Power Co Ltd, Changzhou Power Supply Co of Jiangsu Electric Power Co filed Critical State Grid Corp of China SGCC
Priority to CN201520713093.2U priority Critical patent/CN205063502U/en
Priority to CN201520438590.6U priority patent/CN204782190U/en
Application granted granted Critical
Publication of CN204782190U publication Critical patent/CN204782190U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Non-Portable Lighting Devices Or Systems Thereof (AREA)
  • Suspension Of Electric Lines Or Cables (AREA)

Abstract

The utility model provides an on - -spot interim power consumption assembled of construction supports switching device, including the base, cup joint stay tube, electronic box stores pylon, screw rod, insulating vase and lamp stand support, the base includes box, backing plate, fixed stay pipe, strengthening rib, grounded bolt and a fastening bolt, it connects and the bolt fastening with the fixed stay pipe box to cup joint the stay tube, the electronic box stores pylon includes sleeve pipe, peg, end and the 2nd fastening bolt, the sleeve pipe with cup joint the stay tube and cup joint and the bolt fastening, 2 individual insulating vase fixed mounting is on the screw rod, and the screw rod is fixed to be set up on cup jointing the stay tube, the lamp stand support includes socket pipe, mounting panel and the 3rd fastening bolt, socket pipe with cup joint the stay tube and cup joint and the bolt fastening. The utility model discloses lamps and lanterns are fixed, the electronic box is hung and is established, the ground point sets up multiple functions collection in an organic whole with the built on stilts support of interim power consumption circuit is transferred, is thrown light on in the construction, and convenient to use is set up at the scene, the security is good, the transportation that each parts is assembled and the dismantlement convenience is easily carried and is cut to.

Description

A kind of construction site temporary electricity assembling supports switching device
Technical field
The utility model relates to Electricity on Construction Site and assists Work tool, is specifically related to the assembling that a kind of construction site is transferred for the support of temporary electricity fixed track usage plan, lighting is fixed, electronic box hangs and supports switching device.
Background technology
The a large amount of construction node of construction site needs electricity consumption, as electric tools needs power supply, needs erection lighting etc.Common construction site, owing to lacking specification, effective stringer, in addition corresponding unified regulation is not had in the industry such as temporary electricity wire hanging bracket, illuminating frame, thus in construction site temporary electricity implementation process, overhead wire support, lighting lamp bracket, electronic box support etc. are varied, and install everywhere often, connect, potential safety hazard is brought to building operations temporary electricity.
Utility model content
The purpose of this utility model is: provide a kind of and be easy to install, multiple functional, safety good, be easy to carry and transition transport and effectively can meet the construction site temporary electricity assembling support switching device of construction site temporary electricity needs.
The technical solution of the utility model is: construction site temporary electricity assembling of the present utility model supports switching device, and its design feature is: comprise pedestal, socket stay pipe, electronic box hanger, screw rod, porcelain insulator and light holder support;
Above-mentioned pedestal comprises casing, backing plate, fixed support tube, reinforcing rib, earth stud and the first fastening bolt; Casing is the quadrangle box part of upper end open; Backing plate is rectangular plate body part, and backing plate is fixedly installed on the upper surface of the base plate of casing; Fixed support tube is the circular tube piece of hollow, and fixed support tube is fixedly connected with the upper surface, middle part of backing plate by its lower end; Reinforcing rib is provided with 2 to 8, and one end of each reinforcing rib is fixedly connected with fixed support tube; The other end of each reinforcing rib is fixedly connected with the inwall of casing; Earth stud to be arranged on fixed support tube and to be positioned at the top of the upper surface of casing; First fastening bolt is arranged on the top of fixed support tube movably;
Socket stay pipe is the circular tube piece of hollow; The top of socket stay pipe is provided with screw rod installing hole; Fixed by the first fastening bolt in socket stay pipe is inserted pedestal from the top down fixed support tube by its lower end;
Electronic box hanger comprises sleeve pipe, peg, termination and the second fastening bolt; Sleeve pipe is the circular tube piece of hollow; Peg is the body of rod part being bent into L shape, and peg is fixedly mounted on the left side central portion wall body of sleeve pipe; Termination is fixedly installed on the left upper portion of peg; Second fastening bolt is arranged on the right side central of sleeve pipe; Casing pipe sleeve be connected on socket stay pipe tube wall on and fixed by the second fastening bolt;
Screw rod arranges 1, and screw rod is socketed on stay pipe by the middle part of it through being fixedly installed on after the screw rod installing hole of socket stay pipe; The two ends, left and right of screw rod are protruding;
Porcelain insulator is provided with 2, and these 2 porcelain insulators are fixedly mounted on screw rod, and is positioned at the left and right sides of socket stay pipe;
Light holder support comprises socketed pipe, installing plate and the 3rd fastening bolt; Socketed pipe is the circular tube piece of hollow; Socketed pipe is provided with the 3rd fastening bolt; Installing plate is rectangular plate body part, and installing plate is provided with the through link bolt hole of upward and downward; Socketed pipe is fixedly connected with the lower surface, middle part of installing plate by its upper end; Fixed by the 3rd fastening bolt after the bottom of socketed pipe and the upper end of socket stay pipe socket-connect.
Further scheme is: the material of the casing of above-mentioned pedestal is 3mm steel plate; Casing is of a size of 300mm × 300mm × 210mm; The material of backing plate is the steel plate that 5mm is thick; To on the upper surface of base plate being weldingly fixed on casing about backing plate, and backing plate is positioned at the sagittal middle part of the base plate of casing.
Further scheme is: the fixed support tube of above-mentioned pedestal is the stainless steel tube of diameter 60mm, length 1.2m; Socket stay pipe is the stainless steel tube of diameter 50mm, length 2m; The sleeve pipe of electronic box hanger is the stainless steel tube of diameter 60mm, length 100mm; The socketed pipe of light holder support is the stainless steel tube of diameter 60mm, length 100mm; The installing plate of light holder support is the steel plate of 350mm × 60mm × 5mm size.
Further scheme is: the reinforcing rib of above-mentioned pedestal is provided with 4, and one end of these 4 reinforcing ribs is all positioned at the lower weld of casing with fixed support tube; The other end of these 4 reinforcing ribs all welds with the inwall of casing, and these 4 reinforcing ribs are cross in casing centered by fixed support tube.
Further scheme is: the tip height of above-mentioned socket stay pipe can regulate between 2.0m to 3.0m; The height of electronic box hanger can regulate between 1.2m to 2.6m.
Further scheme is: the set-up mode of the first fastening bolt on fixed support tube of above-mentioned pedestal is offer bolt hole on the wall body of fixed support tube, WELD NUTS on the wall body of the fixed support tube at bolt hole place; First fastening bolt matches with the nut of the bolt hole that the wall body of fixed support tube is offered and welding; The set-up mode of 3rd fastening bolt on socketed pipe of set-up mode on sleeve pipe of the second fastening bolt of electronic box hanger and light holder support is all identical with the set-up mode of the first fastening bolt.
Further scheme also has: the casing of above-mentioned pedestal is full in use to be filled for counterweight and the defensive yellow ground that disappears.
The utility model has positive effect: (1) construction site temporary electricity of the present utility model assembling supports switching device, by the design of structure, temporary electricity fixed track usage plan in building operations is supported switching, lighting is fixed, electronic box hangs, earth point is arranged etc., and several functions is integrated in one, erected on site and property easy to use, safe good.(2) construction site temporary electricity assembling of the present utility model supports switching device, its critical piece is detachable, when needing to use, can assemble easily in construction field, then easily each parts can be dismantled after finishing using, be easy to carry and transition transport.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the structural representation of the pedestal in Fig. 1;
Fig. 3 is the top view of Fig. 2;
Fig. 4 is the structural representation of the electronic box hanger in Fig. 1;
Fig. 5 is the top view of Fig. 4;
Fig. 6 is the structural representation of the light holder support in Fig. 1;
Fig. 7 is the upward view of Fig. 6.
Reference numeral in above-mentioned accompanying drawing is as follows:
Pedestal 1, casing 11, backing plate 12, fixed support tube 13, reinforcing rib 14, earth stud 15, the first fastening bolt 16,
Socket stay pipe 2,
Electronic box hanger 3, sleeve pipe 31, peg 32, termination 33, the second fastening bolt 34,
Screw rod 4,
Porcelain insulator 5,
Light holder support 6, socketed pipe 61, installing plate 62, link bolt hole 62-1, the 3rd fastening bolt 63.
Detailed description of the invention
Below in conjunction with the drawings and specific embodiments, the utility model is described in further detail.
(embodiment 1)
See Fig. 1, the construction site temporary electricity assembling of the present embodiment supports switching device, and it forms primarily of pedestal 1, socket stay pipe 2, electronic box hanger 3, screw rod 4, porcelain insulator 5 and light holder support 6.
See Fig. 2 and Fig. 3, pedestal 1 forms primarily of casing 11, backing plate 12, fixed support tube 13, reinforcing rib 14, earth stud 15 and the first fastening bolt 16.
Casing 11 is the quadrangle box part of upper end open; The material of casing 11 is steel plate.In the present embodiment, the size of casing 11 preferably adopts long 300mm × wide 300mm × high 210mm; Steel plate thickness preferably adopts 3mm.Backing plate 12 is rectangular plate body part, preferably adopts the steel plate that 5mm is thick in backing plate 12 the present embodiment; Backing plate about 12 is on the upper surface of base plate being weldingly fixed on casing 11, and backing plate 12 is positioned at the sagittal middle part of the base plate of casing 11.Fixed support tube 13 is the circular tube piece of hollow, and in the present embodiment, fixed support tube 13 preferably adopts diameter 60mm, length is the stainless steel tube of 1.2m; Fixed support tube 13 is by upper surface, the middle part vertical welding of its lower end and backing plate 12; Reinforcing rib 14 is provided with 2 to 8, and in the present embodiment, reinforcing rib 14 preferably adopts 4, and one end of these 4 reinforcing ribs 14 is all positioned at the lower weld of casing 11 with fixed support tube 13; The other end of these 4 reinforcing ribs 14 all welds with casing 11, and these 4 reinforcing ribs 14 are " ten " font in casing 11 centered by fixed support tube 13.Earth stud 15 to be arranged on movably on fixed support tube 13 and to be positioned at the top of the upper surface of casing 11, is used for ground connection, to protect Electrical Safety when earth stud 15 uses; First fastening bolt 16 is arranged on the top of fixed support tube 13 movably; The set-up mode of the first fastening bolt 16 is: on the top tube wall of fixed support tube 13, offer bolt hole, WELD NUTS on the tube wall at bolt hole place, and the first fastening bolt 16 matches with the nut of the bolt hole that fixed support tube 13 is offered and welding.First fastening bolt 16 preferably adopts butterfly bolt.
Socket stay pipe 2 is the circular tube piece of hollow, and in the present embodiment, socket stay pipe 2 preferably adopts diameter 50mm, length is the stainless steel tube of 2m; The top of socket stay pipe 2 is provided with screw rod installing hole.During assembling, socket stay pipe 2 inserts in the fixed support tube 13 of pedestal 1 by its lower end from the top down, socket stay pipe 2 tip height can between 2.0m to 3.0m free adjustment, socket stay pipe 2 adjustment determine height after be fixedly connected with fixed support tube 13 by the first fastening bolt 16 of pedestal 1.
See Fig. 4 and Fig. 5, electronic box hanger 3 forms primarily of sleeve pipe 31, peg 32, termination 33 and the second fastening bolt 34.
Sleeve pipe 31 is the circular tube piece of hollow, and in the present embodiment, sleeve pipe 31 preferably adopts diameter 60mm, length is the stainless steel tube of 100mm; The material of peg 32 is stainless steel, and peg 32 is for being bent into the body of rod part of L shape, and peg 32 is welded on the left side central portion of sleeve pipe 31 by its right-hand member; The top of peg 32 is fixedly installed termination 33; Second fastening bolt 34 is arranged on the right side central of sleeve pipe 31; Second fastening bolt 34 set-up mode is offer bolt hole on the tube wall of sleeve pipe 31, in bolt hole place WELD NUTS; Second fastening bolt 34 preferably adopts butterfly bolt.During assembling, electronic box hanger 3 is socketed on the tube wall of socket stay pipe 2 by its sleeve pipe 31; By the second fastening bolt 34, electronic box hanger 3 is fixed on socket stay pipe 2 after being adjusted to correct position; The height of electronic box hanger 3 can between 1.2m to 2.6m free adjustment.Electronic box hanger 3 is used for when using hanging temporary electricity tail end box.
Still see Fig. 1, screw rod 4 arranges 1, and screw rod 4 is socketed on stay pipe 2 by the middle part of it through being fixedly installed on after the screw rod installing hole of socket stay pipe 2; The two ends, left and right of screw rod 4 are protruding.
Porcelain insulator 5 is provided with 2, and these 2 porcelain insulators 5 are fixedly mounted on screw rod 4, and is positioned at the left and right sides of socket stay pipe 2.Hanging of the electric wire of temporary electricity when porcelain insulator 5 is for using, cable.
See Fig. 6 and Fig. 7, light holder support 6 forms primarily of socketed pipe 61, installing plate 62 and the 3rd fastening bolt 63.
Socketed pipe 61 is the circular tube piece of hollow, and in the present embodiment, socketed pipe 61 preferably adopts diameter 60mm, length is the stainless steel tube of 100mm; The set-up mode that socketed pipe 61 is provided with the 3rd fastening bolt the 63, three fastening bolt 63 is offer bolt hole on the tube wall of socketed pipe 61, in bolt hole place WELD NUTS; Installing plate 62 is rectangular plate body part, and installing plate 62 is provided with the through link bolt hole 62-1 of 2 upward and downwards; In the present embodiment, installing plate 62 preferably adopts the steel plate being of a size of long 350mm × wide 60mm × thick 5mm; Socketed pipe 61 is welded with the lower surface, middle part of installing plate 62 by its upper end.During assembling, light holder support 6 is fixed by the 3rd fastening bolt 63 after being socket-connected with the upper end of socket stay pipe 2 by the bottom of its socketed pipe 61.During use, light holder support 6 is for fixedly mounting the lighting of construction site, when lighting is installed, lighting is placed on installing plate 62, above the upper surface by the link bolt hole 62-1 bolt of 2 on installing plate 62 lighting being fixedly mounted on installing plate 62.
The construction site temporary electricity assembling of the present embodiment supports switching device, be specifically designed to temporary electricity switching in building operations, the several functions such as temporary electricity fixed track usage plan is supported switching by it, lighting is fixed, electronic box hangs, earth point is arranged are integrated in one, convenient, efficient, energy-saving and environmental protection.And it can be assembled easily in construction field in use, then can be dismantled by each parts easily after finishing using, be easy to carry and transition transport.During use, fill yellow ground in the casing 11 of pedestal 1, as the counterweight of pedestal 1 to increase stability, also can to make fire-fighting fire extinguishing for subsequent use for yellow ground simultaneously.
Above embodiment is the explanation to detailed description of the invention of the present utility model; but not to restriction of the present utility model; person skilled in the relevant technique is not when departing from spirit and scope of the present utility model; can also make various conversion and change and obtain corresponding equivalent technical scheme, therefore all equivalent technical schemes all should be included into scope of patent protection of the present utility model.

Claims (7)

1. construction site temporary electricity assembling supports a switching device, it is characterized in that: comprise pedestal (1), socket stay pipe (2), electronic box hanger (3), screw rod (4), porcelain insulator (5) and light holder support (6);
Described pedestal (1) comprises casing (11), backing plate (12), fixed support tube (13), reinforcing rib (14), earth stud (15) and the first fastening bolt (16); The quadrangle box part that casing (11) is upper end open; Backing plate (12) is rectangular plate body part, and backing plate (12) is fixedly installed on the upper surface of the base plate of casing (11); The circular tube piece that fixed support tube (13) is hollow, fixed support tube (13) is fixedly connected with by the upper surface, middle part of its lower end with backing plate (12); Reinforcing rib (14) is provided with 2 to 8, and one end of each reinforcing rib (14) is fixedly connected with fixed support tube (13); The other end of each reinforcing rib (14) is fixedly connected with the inwall of casing (11); Earth stud (15) is arranged on fixed support tube (13) and goes up and the top being positioned at the upper surface of casing (11); First fastening bolt (16) is arranged on the top of fixed support tube (13) movably;
The circular tube piece that socket stay pipe (2) is hollow; The top of socket stay pipe (2) is provided with screw rod installing hole; The fixed support tube (13) that socket stay pipe (2) inserts pedestal (1) from the top down by its lower end is interior and fixing by the first fastening bolt (16);
Electronic box hanger (3) comprises sleeve pipe (31), peg (32), termination (33) and the second fastening bolt (34); The circular tube piece that sleeve pipe (31) is hollow; Peg (32) is for being bent into the body of rod part of L shape, and peg (32) is fixedly mounted on the left side central portion wall body of sleeve pipe (31); Termination (33) is fixedly installed on the left upper portion of peg (32); Second fastening bolt (34) is arranged on the right side central of sleeve pipe (31); Sleeve pipe (31) be socketed in socket stay pipe (2) tube wall on and by the second fastening bolt (34) fix;
Screw rod (4) arranges 1, and screw rod (4) is socketed on stay pipe (2) by the middle part of it through being fixedly installed on after the screw rod installing hole of socket stay pipe (2); The two ends, left and right of screw rod (4) are protruding;
Porcelain insulator (5) is provided with 2, and these 2 porcelain insulators (5) are fixedly mounted on screw rod (4), and is positioned at the left and right sides of socket stay pipe (2);
Light holder support (6) comprises socketed pipe (61), installing plate (62) and the 3rd fastening bolt (63); The circular tube piece that socketed pipe (61) is hollow; Socketed pipe (61) is provided with the 3rd fastening bolt (63); Installing plate (62) is provided with the through link bolt hole of upward and downward (62-1) for rectangular plate body part, installing plate (62); Socketed pipe (61) is fixedly connected with by the lower surface, middle part of its upper end with installing plate (62); Fixed by the 3rd fastening bolt (63) after the bottom of socketed pipe (61) and the upper end of socket stay pipe (2) socket-connect.
2. construction site temporary electricity assembling according to claim 1 supports switching device, it is characterized in that: the material of the casing (11) of described pedestal (1) is 3mm steel plate; Casing (11) is of a size of 300mm × 300mm × 210mm; The material of backing plate (12) is the steel plate that 5mm is thick; Backing plate (12) left and right is on the upper surface of base plate being weldingly fixed on casing (11), and backing plate (12) is positioned at the sagittal middle part of the base plate of casing (11).
3. construction site temporary electricity assembling according to claim 1 supports switching device, it is characterized in that: the stainless steel tube that the fixed support tube (13) of described pedestal (1) is diameter 60mm, length 1.2m; The stainless steel tube that socket stay pipe (2) is diameter 50mm, length 2m; The stainless steel tube that the sleeve pipe (31) of electronic box hanger (3) is diameter 60mm, length 100mm; The stainless steel tube that the socketed pipe (61) of light holder support (6) is diameter 60mm, length 100mm; The steel plate that the installing plate (62) of light holder support (6) is 350mm × 60mm × 5mm size.
4. construction site temporary electricity assembling according to claim 1 supports switching device, it is characterized in that: the reinforcing rib (14) of described pedestal (1) is provided with 4, one end of these 4 reinforcing ribs (14) is all positioned at the lower weld of casing (11) with fixed support tube (13); The other end of these 4 reinforcing ribs (14) all welds with the inwall of casing (11), and these 4 reinforcing ribs (14) are cross in casing (11) centered by fixed support tube (13).
5. construction site temporary electricity assembling according to claim 1 supports switching device, it is characterized in that: the tip height of described socket stay pipe (2) can regulate between 2.0m to 3.0m; The height of electronic box hanger (3) can regulate between 1.2m to 2.6m.
6. construction site temporary electricity assembling according to claim 1 supports switching device, it is characterized in that: the set-up mode of the first fastening bolt (16) on fixed support tube (13) of described pedestal (1) is offer bolt hole on the wall body of fixed support tube (13), WELD NUTS on the wall body of the fixed support tube (13) at bolt hole place; First fastening bolt (16) matches with the nut of the bolt hole that the wall body of fixed support tube (13) is offered and welding; The set-up mode of 3rd fastening bolt (63) on socketed pipe (61) of set-up mode on sleeve pipe (31) of second fastening bolt (34) of electronic box hanger (3) and light holder support (6) is all identical with the set-up mode of the first fastening bolt (16).
7. construction site temporary electricity assembling according to claim 1 supports switching device, it is characterized in that: the casing (11) of described pedestal (1) is full in use to be filled for counterweight and the defensive yellow ground that disappears.
CN201520438590.6U 2015-06-24 2015-06-24 On --spot interim power consumption assembled of construction supports switching device Withdrawn - After Issue CN204782190U (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201520713093.2U CN205063502U (en) 2015-06-24 2015-06-24 Interim power consumption assembled in job site supports switching device
CN201520438590.6U CN204782190U (en) 2015-06-24 2015-06-24 On --spot interim power consumption assembled of construction supports switching device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520438590.6U CN204782190U (en) 2015-06-24 2015-06-24 On --spot interim power consumption assembled of construction supports switching device

Related Child Applications (1)

Application Number Title Priority Date Filing Date
CN201520713093.2U Division CN205063502U (en) 2015-06-24 2015-06-24 Interim power consumption assembled in job site supports switching device

Publications (1)

Publication Number Publication Date
CN204782190U true CN204782190U (en) 2015-11-18

Family

ID=54522259

Family Applications (2)

Application Number Title Priority Date Filing Date
CN201520438590.6U Withdrawn - After Issue CN204782190U (en) 2015-06-24 2015-06-24 On --spot interim power consumption assembled of construction supports switching device
CN201520713093.2U Expired - Fee Related CN205063502U (en) 2015-06-24 2015-06-24 Interim power consumption assembled in job site supports switching device

Family Applications After (1)

Application Number Title Priority Date Filing Date
CN201520713093.2U Expired - Fee Related CN205063502U (en) 2015-06-24 2015-06-24 Interim power consumption assembled in job site supports switching device

Country Status (1)

Country Link
CN (2) CN204782190U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104912373A (en) * 2015-06-24 2015-09-16 江苏省电力公司常州供电公司 Assembly type supporting switching device for temporary power consumption at construction site

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104912373A (en) * 2015-06-24 2015-09-16 江苏省电力公司常州供电公司 Assembly type supporting switching device for temporary power consumption at construction site

Also Published As

Publication number Publication date
CN205063502U (en) 2016-03-02

Similar Documents

Publication Publication Date Title
CN205743670U (en) A kind of Telescopic herringbone ladder
CN205296906U (en) Filling station's lightweight steel construction awning support
CN106838790B (en) Self-powered lantern fixing device
CN103057836A (en) Transportation fixed support of transformer wire outlet device
CN204782190U (en) On --spot interim power consumption assembled of construction supports switching device
CN110994510A (en) Electric power erection device for bridge road
CN106760874B (en) The construction site temporary electricity assembled of easy transition supports switching device
CN202546549U (en) Illuminating lamp for building construction site
CN207426625U (en) Movable multi-angle cable telescopic hanging rack
CN203242970U (en) Cable accessory auxiliary installing tool
KR100843058B1 (en) High Voltage Cable Supporter
CN203336518U (en) Combined type metal halide lamp overhead support
CN105804633A (en) Auxiliary device and multifunctional climb ladder with same
CN202602133U (en) Multifunctional portable climbing pole
CN205029217U (en) Overhaul test device
CN204155751U (en) High-power transformer sleeve pipe installation and repairing frock
CN203812831U (en) Drop-out fuse fuse pipe safety suspension device
CN203150833U (en) Universal hook for ground lead
CN207230414U (en) A kind of municipal warning lamp easy to fixation
CN216131803U (en) A novel lighting fixture for job site illumination
CN207377261U (en) A kind of safe enclosing of road bridge construction
CN204835412U (en) Wire and cable of transformer substation assembled hoist and mount laying device
CN214576125U (en) Support column for power equipment
CN208901168U (en) A kind of Landscape Lamp
CN213043371U (en) Prevent dragging ground cable support

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20151118

Effective date of abandoning: 20170125

AV01 Patent right actively abandoned