CN208074278U - A kind of assembled vertical shaft air hose combined bracket - Google Patents

A kind of assembled vertical shaft air hose combined bracket Download PDF

Info

Publication number
CN208074278U
CN208074278U CN201820289330.0U CN201820289330U CN208074278U CN 208074278 U CN208074278 U CN 208074278U CN 201820289330 U CN201820289330 U CN 201820289330U CN 208074278 U CN208074278 U CN 208074278U
Authority
CN
China
Prior art keywords
crosspiece
anchor ear
air hose
main
pier
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820289330.0U
Other languages
Chinese (zh)
Inventor
汤浪洪
陈建忠
吕南东
方杰武
凌鑫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fifth Bureau Installation Engineering Co Ltd
Original Assignee
China Construction Fifth Bureau Installation Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fifth Bureau Installation Engineering Co Ltd filed Critical China Construction Fifth Bureau Installation Engineering Co Ltd
Priority to CN201820289330.0U priority Critical patent/CN208074278U/en
Application granted granted Critical
Publication of CN208074278U publication Critical patent/CN208074278U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Duct Arrangements (AREA)

Abstract

The utility model provides a kind of assembled vertical shaft air hose combined bracket, including band steel anchor ear, secondary crosspiece, main crosspiece, bracket upright post and anchor ear tapered end.Bracket upright post top is fixed at the bottom at main crosspiece both ends.Bracket upright post bottom is fixed on external floor.Secondary crosspiece is across on two or two or more main crosspieces.Secondary crosspiece and the movable setting of main crosspiece.Band steel anchor ear is fastened on around external vertical air hose, and the band steel anchor ear is locked by anchor ear tapered end and is arranged on secondary crosspiece.It is movable connection setting between secondary crosspiece and main crosspiece that the utility model passes through setting, so that adjusting size that can be careless when installing vertical air hose, the installation requirements for meeting the vertical air hose of different sizes, are bolted simultaneously so that are overhauled in the later stage more convenient.

Description

A kind of assembled vertical shaft air hose combined bracket
Technical field
The utility model is related to air hose installing areas, particularly, are related to a kind of assembled vertical shaft air hose combined bracket.
Background technology
In traditional vertical electromechanical air hose installation, the combined bracket of vertical duct is all utilized in prefabricated processing space or library After room welding fabrication, then installed to construction site.Vertical air hose combines suspension and support, and the main crosspiece of holder and branch sortie crosspiece are equal Using being welded to connect, welding job amount is very big.If there is deviation in fruit structure reserved opening, the secondary crosspiece of combined bracket with combine The relative position needs of holder are adjusted, and time crosspiece needs scene to be welded in this way, cause a large amount of fragmentary work in this way Industry, fragmentary operation work efficiency is low, and construction site weld job increases fire hazard.If pipeline maintenance dismounting is relatively large, some Position also needs to carry out fire operation.So that the maintenance process in installation needs a large amount of human resources, while the time is long, no The demand of enterprise can be met.
Therefore, it is necessary to design a kind of assembled vertical shaft air hose combined bracket, to meet the daily vertical shaft air hose peace of people The demand of dress.
Utility model content
The utility model aim is to provide a kind of assembled vertical shaft air hose combined bracket, to solve traditional vertical shaft air hose Holder is unable to assembled in situ, and fragmentary operation is more, there is technical issues that.
To achieve the above object, the utility model provides a kind of assembled vertical shaft air hose combined bracket, including band steel is embraced Hoop, secondary crosspiece, main crosspiece, bracket upright post and anchor ear tapered end;The bracket upright post top is fixed at the bottom at main crosspiece both ends Portion, the bracket upright post bottom are fixed on external floor;The secondary crosspiece is across in two or two or more masters On crosspiece, the secondary crosspiece and the movable setting of main crosspiece;The band steel anchor ear is fastened on around external vertical air hose, institute Band steel anchor ear is stated to lock and be arranged on secondary crosspiece by anchor ear tapered end.
The utility model further includes protection pier, and the protection pier is arranged between bracket upright post and floor, protects pier top portion It is fixedly connected with bracket upright post bottom, protection pier bottom portion is fixedly installed with floor, and the protection pier is set as rectangular pier body structure.
The utility model further includes that vertical duct sleeve closes pier, and vertical duct sleeve closes pier setting and surrounded in secondary crosspiece and main crosspiece Rectangular frame bottom;Vertical duct sleeve closes the pier shape structure that pier is set as protrusion, and vertical duct sleeve closes to be provided with vertically among pier Air hose hole, external vertical duct sleeve enter fixed setting in vertical wind pore.
The utility model further includes that holder central post described in holder central post is arranged in main crosspiece central bottom, the holder Neutral top end and main crosspiece are fixedly installed, holder central post) low side is fixedly installed with floor.
In said program, preferably main crosspiece is set as Two bors d's oeuveres " C " profile steel mechanism, and Two bors d's oeuveres " C " profile steel mechanism level is opened Mouth is set up;The secondary crosspiece is set as " C " profile steel mechanism structure, and " C " profile steel mechanism horizontal opening is set up.
In said program, it is arranged by fixing bolt between preferably main crosspiece and secondary crosspiece, secondary crosspiece both ends offer The bottom bolts cap sleeve of bolt hole, fixing bolt enters in Two bors d's oeuveres " C " profile steel mechanism, and the bolt body of rod of fixing bolt penetrates time crosspiece Bolt hole in, and be arranged by screw tightening.
In said program, preferably it is fixedly installed by anchor ear bolt between band steel anchor ear and secondary crosspiece, anchor ear bolt Nuts is inserted in " C " profile steel mechanism, and the bolt body of rod of anchor ear bolt penetrates in anchor ear tapered end to be arranged by screw tightening.
In said program, preferably two semicircular structures, semicircular structure and semicircular structure is arranged in band steel anchor ear Between one end be flexibly connected, the other end between semicircular structure and semicircular structure is fixedly installed by anchor ear tapered end, band steel anchor ear It is provided with elastoplastic glue-line.
The utility model has the advantages that:
It is movable connection setting between secondary crosspiece and main crosspiece that the utility model passes through setting, so that perpendicular in installation To adjusting size that can be careless when air hose, meet the installation requirements of the vertical air hose of different sizes, while solid by bolt It is fixed so that more convenient in later stage maintenance, secondary crosspiece and main crosspiece are set as " C " profile steel mechanism, and C-type steel mechanical property is good, section Rolled steel dosage is saved, reduces cost, C-type steel end can cover its section with special plastic end socket, and rack forming effect is good, reaches The effect electromechanical to decoration;Main crosspiece and time crosspiece material bolt are connected and fixed, and secondary crosspiece can be according to pipeline location in main cross Any position is fixed on shelves, and holder in-site installation is not necessarily to weld job, and construction efficiency is high, no fire hazard;Primary and secondary crosspiece can be with It takes and laterally and vertically arranges, met all kinds of installations at discharge pipe, it, can be in main crosspiece if main crosspiece span is excessive Between position add upright bar, to meet the mechanical requirements of C-type steel;If air-line system needs to overhaul, primary and secondary crosspiece need to only be connected Bolt, which is unscrewed, to be moved, then air-line system is disassembled, and after the completion of reparation, and can be reinstalled.
Other than objects, features and advantages described above, the utility model also has other purposes, feature and excellent Point.Below with reference to figure, the utility model is described in further detail.
Description of the drawings
The attached drawing constituted part of this application is used to provide a further understanding of the present invention, the utility model Illustrative embodiments and their description are not constituted improper limits to the present invention for explaining the utility model.In attached drawing In:
Fig. 1 is that the pipeline of the preferred embodiment in the utility model is vertically arranged side elevational view.
Fig. 2 is that the pipeline of the preferred embodiment in the utility model is vertically arranged front elevation view.
Fig. 3 is the pipeline transverse direction arrangement front elevation view of the preferred embodiment in the utility model.
Fig. 4 is the vertical alignment plane figure of pipeline of the preferred embodiment in the utility model.
Fig. 5 is the pipeline transverse direction alignment plane figure of the preferred embodiment in the utility model.
Figure label:The vertical air hoses of 1-;2- band steel anchor ears;3- crosspiece;The main crosspieces of 4-;5- bracket upright posts;6- anchor ears are locked Head;7- fixing bolts;8- protects pier, 9- holder central posts.
Specific implementation mode
The embodiments of the present invention are described in detail below in conjunction with attached drawing, but the utility model can be according to power Profit requires to limit and the multitude of different ways of covering is implemented.
A kind of assembled vertical shaft air hose combined bracket, as shown in Figs. 1-5, including band steel anchor ear 2, secondary crosspiece 3, main crosspiece 4, Bracket upright post 5 and anchor ear tapered end 6.Each vertical air hose 1 needs minimum twice crosspieces 3 and two main crosspieces 4, twice crosspieces 3 and two main crosspieces 4 constitute one can activity change four side rods of intermediate square box size so that being suitble to perpendicular in installation To fragmentary operation not many when air hose 1, while being arranged by fixing bolt 7 between main crosspiece 4 and secondary crosspiece 3,3 both ends of secondary crosspiece Bolt hole is offered, the bottom bolts cap sleeve of fixing bolt 7 enters in Two bors d's oeuveres " C " profile steel mechanism, and the bolt body of rod of fixing bolt 7 is worn In the bolt hole for entering time crosspiece 3, and it is arranged by screw tightening.Reduce welding procedure during the installation process, prevents because of weldering Pick up the accident of fire.
5 top of bracket upright post is fixed at the bottom at 4 both ends of main crosspiece.5 bottom of bracket upright post is fixed at outside Floor on.Secondary crosspiece 3 is across on two or two or more main crosspieces 4.Secondary crosspiece 3 and the 4 movable setting of main crosspiece.It is flat Steel hoop 2 is fastened on around external vertical air hose 1.Band steel anchor ear 2 is locked by anchor ear tapered end 6 and is arranged in secondary crosspiece 3 On.Further include protection pier 8, the protection pier 8 is arranged between bracket upright post 5 and floor, 8 top of protection pier and bracket upright post 5 Bottom is fixedly connected, and protection 8 bottom of pier is fixedly installed with floor, and the protection pier 8 is set as rectangular pier body structure.Protect pier 8 For the fixed setting between further protective cradle column 5 and floor.
Wherein, further include that vertical duct sleeve closes pier, vertical duct sleeve closes pier and is arranged to be surrounded in secondary crosspiece 3 and main crosspiece 4 Rectangular frame bottom.Vertical duct sleeve closes the pier shape structure that pier is set as protrusion, and vertical duct sleeve closes and is provided with vertical wind among pier Pore, external vertical air hose 1 are inserted in fixed setting in vertical wind pore.In order to enable the fixation of 4 bottom of main crosspiece is more steady, also Including holder central post 9, the setting of holder central post 9 is in 4 central bottom of main crosspiece, 9 top of holder central post and main crosspiece 4 Fixed setting, 9 low side of holder central post are fixedly installed with floor.The structure phase of the structure of holder central post 9 and bracket upright post 5 Seemingly, identical supporting role is played.
Main crosspiece 4 is set as Two bors d's oeuveres " C " profile steel mechanism, and Two bors d's oeuveres " C " profile steel mechanism horizontal opening is set up;Described time horizontal Shelves 3 are set as " C " profile steel mechanism structure, and " C " profile steel mechanism horizontal opening is set up.By solid between main crosspiece 4 and secondary crosspiece 3 Determine the setting of bolt 7,3 both ends of secondary crosspiece offer bolt hole, and the bottom bolts cap sleeve of fixing bolt 7 enters Two bors d's oeuveres " C " profile steel mechanism Interior, the bolt body of rod of fixing bolt 7 penetrates in the bolt hole of time crosspiece 3, and is arranged by screw tightening.Band steel anchor ear 2 with time It is fixedly installed by anchor ear bolt between crosspiece 3, the nuts of anchor ear bolt is inserted in " C " profile steel mechanism, the bolt of anchor ear bolt The body of rod penetrates in anchor ear tapered end 6 to be arranged by screw tightening.Band steel anchor ear 2 be arranged two semicircular structures, semicircular structure with One end is flexibly connected between semicircular structure, and the other end between semicircular structure and semicircular structure is set by the fixation of anchor ear tapered end 6 It sets, band steel anchor ear 2 is provided with elastoplastic glue-line.The column of combined bracket, main crosspiece use C using Two bors d's oeuveres C-type steel, secondary crosspiece Shaped steel.The bracket upright post of the combined bracket and main crosspiece using be welded to connect, main crosspiece and secondary crosspiece are connected by screw bolts, c-type Steel end can cover its section with special plastic end socket, achieve the effect that decoration is electromechanical.Main crosspiece and time crosspiece are C-type steel Between connection, without punching connection according to field condition, meeting time crosspiece can be arbitrary according to pipeline location on main crosspiece Sliding meets the various working condition requirements in scene.Vertical air hose 1 is embraced with 2 semicircle (or square) band steel anchor ears, semicircle (or Square) open end be connected with, be fixed on wind pipe wall with and with rivet, open end is set plus floor, will be with ribbed panel Linkage section freely-supported on secondary crosspiece, realize the vertical supporting of air hose and fixed with level.When more at discharge pipe in same pipe When well, main crosspiece span are excessive, supporting point can be increased among main crosspiece, vertical arrangement can also be changed into lateral arrangement, it is secondary Crosspiece can arbitrarily be arranged according to caliber and pipeline location.
The utility model is made of C-type steel, and combined bracket uses site assembly mounting, main crosspiece 4 and time crosspiece 3 logical It crosses and is bolted, prevented construction site weld job, reduce the fragmentary operation of welding, while decreasing fire hazard.It is secondary Crosspiece 3 can slide in main 4 direction of crosspiece of 4 upper edge of main crosspiece, to meet the installation of different tube diameters and Duo Gen pipelines.It is semicircle The rivet of (or square) band steel anchor ear 2 is fixed to form entirety with air hose, and the close segments of semicircle (or square) band steel anchor ear 2 use Anchor ear tapered end 6 with ribbing increases the forced area of band steel anchor ear 2 and time crosspiece 3, is buckled into time crosspiece 3 for one section using bolt One end is buckled in 6 top of anchor ear tapered end, and anchor ear tapered end 6 is fixed on time crosspiece, strength and stability when ensure that air hose installation. Assembled vertical shaft air hose combined bracket can be arranged to vertical and lateral 2 kinds of modes.The utility model is to be used for architectural engineering machine Vertical air hose installation, realizes the assembled in situ of vertical shaft air hose combined bracket in the building of electrical domain.
Installation process:
Bracket upright post 5 is welded on main crosspiece 4 in prefabricated processing space, the pedestal of 5 bottom of bracket upright post welding punching is applied Work scene squeezes into bracket upright post 5 in bearing hole with expansion bolt, and bearing column 5 and main crosspiece 4 are fixed on floor, will lead After crosspiece leveling, expansion bolt is tightened.Nut and gasket left-hand thread are become owner of in the C-type steel of crosspiece 5, the screw of nut is across secondary In the slot hole of the hole milling at 3 both ends of crosspiece, it is screwed on screw rod, wouldn't be tightened with nut on secondary crosspiece top;Air hose 1 is installed, it will Secondary crosspiece 3 slides onto 1 attachment of air hose from main crosspiece 5, and vertical air hose 1 is embraced with semicircle (or square) band steel anchor ear 2;It is with ribbing Anchor ear tapered end 2 semicircle (or square) band steel anchor ears 2 locked lock air hose 1, be used in combination rivet by semicircle (or square) Band steel anchor ear 2 is fixed on air hose 1, semicircle (or square) band steel anchor ear 2 and air hose 1 is become an entirety, and will be with ribbing Anchor ear tapered end fall the vertical supporting for realizing air hose in secondary crosspiece 3 and fixed with level.Secondary crosspiece 3 can be on main crosspiece 5 on Lower sliding, adapting to can be among main crosspiece 5 if main crosspiece 5 is long without the installation and fixation of caliber, different arrangement pipelines Support post 9 is added, different operating mode needs are met.According to pipe arrangement situation, 3 or more main crosspieces can be set, by secondary crosspiece 3 Sliding up and down, meets the needs of different operating modes on main crosspiece 5.
The above descriptions are merely preferred embodiments of the present invention, is not intended to limit the utility model, for this For the technical staff in field, various modifications and changes may be made to the present invention.It is all in the spirit and principles of the utility model Within, any modification, equivalent replacement, improvement and so on should be included within the scope of protection of this utility model.

Claims (8)

1. a kind of assembled vertical shaft air hose combined bracket, which is characterized in that including band steel anchor ear (2), secondary crosspiece (3), main crosspiece (4), bracket upright post (5) and anchor ear tapered end (6);Bracket upright post (5) top is fixed at the bottom at main crosspiece (4) both ends Portion, bracket upright post (5) bottom are fixed on external floor;The secondary crosspiece (3) across two or two with On main crosspiece (4) on, the secondary crosspiece (3) and main crosspiece (4) movable setting;The band steel anchor ear (2) is fastened on outside Vertical air hose (1) around, the band steel anchor ear (2) by anchor ear tapered end (6) lock and be arranged on secondary crosspiece (3).
2. a kind of assembled vertical shaft air hose combined bracket according to claim 1, which is characterized in that further include protection pier (8), the protection pier (8) is arranged in bracket upright post (5) between floor, solid with bracket upright post (5) bottom at the top of protection pier (8) Fixed connection, protection pier (8) bottom are fixedly installed with floor, and the protection pier (8) is set as rectangular pier body structure.
3. a kind of assembled vertical shaft air hose combined bracket according to claim 1, which is characterized in that further include vertical air hose Fitting pier, vertical duct sleeve close pier and the rectangular frame bottom surrounded in secondary crosspiece (3) and main crosspiece (4) are arranged;Vertical duct sleeve closes Pier is set as the pier shape structure of protrusion, and vertical duct sleeve closes and is provided with vertical wind pore among pier, external vertical air hose (1) set Enter fixed setting in vertical wind pore.
4. a kind of assembled vertical shaft air hose combined bracket according to claim 1, which is characterized in that further include holder neutrality Column (9) holder central post (9) setting is in main crosspiece (4) central bottom, holder central post (9) top and main crosspiece (4) it is fixedly installed, holder central post (9) low side is fixedly installed with floor.
5. a kind of assembled vertical shaft air hose combined bracket according to claim 1, which is characterized in that the main crosspiece (4) It is set as Two bors d's oeuveres " C " profile steel mechanism, Two bors d's oeuveres " C " profile steel mechanism horizontal opening is set up;The secondary crosspiece (3) is set as " C " Profile steel mechanism structure, " C " profile steel mechanism horizontal opening are set up.
6. a kind of assembled vertical shaft air hose combined bracket according to claim 5, which is characterized in that the main crosspiece (4) It is arranged by fixing bolt (7) between secondary crosspiece (3), secondary crosspiece (3) both ends offer bolt hole, the bottom of fixing bolt (7) Nuts is inserted in Two bors d's oeuveres " C " profile steel mechanism, and the bolt body of rod of fixing bolt (7) penetrates in the bolt hole of time crosspiece (3), and leads to Cross screw tightening setting.
7. a kind of assembled vertical shaft air hose combined bracket according to claim 5, which is characterized in that the band steel anchor ear (2) it is fixedly installed by anchor ear bolt between time crosspiece (3), the nuts of anchor ear bolt is inserted in " C " profile steel mechanism, anchor ear spiral shell The bolt body of rod of bolt penetrates in anchor ear tapered end (6) to be arranged by screw tightening.
8. a kind of assembled vertical shaft air hose combined bracket according to claim 7, which is characterized in that the band steel anchor ear (2) two semicircular structures are set, and one end is flexibly connected between semicircular structure and semicircular structure, semicircular structure and semicircle The interstructural other end is fixedly installed by anchor ear tapered end (6), and band steel anchor ear (2) is provided with elastoplastic glue-line.
CN201820289330.0U 2018-03-01 2018-03-01 A kind of assembled vertical shaft air hose combined bracket Expired - Fee Related CN208074278U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820289330.0U CN208074278U (en) 2018-03-01 2018-03-01 A kind of assembled vertical shaft air hose combined bracket

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820289330.0U CN208074278U (en) 2018-03-01 2018-03-01 A kind of assembled vertical shaft air hose combined bracket

Publications (1)

Publication Number Publication Date
CN208074278U true CN208074278U (en) 2018-11-09

Family

ID=64038389

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820289330.0U Expired - Fee Related CN208074278U (en) 2018-03-01 2018-03-01 A kind of assembled vertical shaft air hose combined bracket

Country Status (1)

Country Link
CN (1) CN208074278U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108223924A (en) * 2018-03-01 2018-06-29 中建五局工业设备安装有限公司 A kind of assembled vertical shaft air hose combined bracket
CN115012614A (en) * 2022-06-15 2022-09-06 中国五冶集团有限公司 Vertical exhaust pipe installation method
CN108223924B (en) * 2018-03-01 2024-07-05 中建五局安装工程有限公司 Assembled shaft air pipe joint support

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108223924A (en) * 2018-03-01 2018-06-29 中建五局工业设备安装有限公司 A kind of assembled vertical shaft air hose combined bracket
CN108223924B (en) * 2018-03-01 2024-07-05 中建五局安装工程有限公司 Assembled shaft air pipe joint support
CN115012614A (en) * 2022-06-15 2022-09-06 中国五冶集团有限公司 Vertical exhaust pipe installation method

Similar Documents

Publication Publication Date Title
CN204901084U (en) Prefabricated integration assembled sectional shelf -unit based on BIM
CN206555567U (en) A kind of antidetonation suspension and support
CN208074278U (en) A kind of assembled vertical shaft air hose combined bracket
CN203947756U (en) Exterior wall protective frame
CN108223924A (en) A kind of assembled vertical shaft air hose combined bracket
CN203663277U (en) Falling-prevention safety device for high-attitude air conditioner repair
CN102748535A (en) Fixed support device and operating method thereof
CN105863192B (en) A kind of balcony guardrail
CN108265861A (en) A kind of aluminium-plastic panel mounting connection structure
CN104912373B (en) Assembly type supporting switching device for temporary power consumption at construction site
CN210369867U (en) Overhanging type outer discharge frame protection device
CN209605296U (en) A kind of antirust air-conditioning outrigger facilitating installation
CN207960151U (en) A kind of protective fence of construction
CN207739733U (en) A kind of corner protective fence connector
CN206054920U (en) For the accessory of comprehensive suspension bracket
CN205956967U (en) Illuminating lamp bracket is used in construction
CN206503284U (en) A kind of semicircle vertex of a cone combines paulin room with curved surface top
CN216429112U (en) Adjustable faces limit protector
CN216480615U (en) Hanging bracket
CN109610798A (en) A kind of architectural engineering height-adjustable scaffold easy to remove
CN109296230A (en) A kind of pin-connected panel substation complete machine structure
CN108223924B (en) Assembled shaft air pipe joint support
CN212201562U (en) Municipal administration guardrail connection structure
CN213479389U (en) Conveniently maintain assembled for building pipe fitting of changing
CN2140926Y (en) Casing-lifting internal scaffolding combination scaffold

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181109

CF01 Termination of patent right due to non-payment of annual fee