CN105863192B - A kind of balcony guardrail - Google Patents

A kind of balcony guardrail Download PDF

Info

Publication number
CN105863192B
CN105863192B CN201610406283.9A CN201610406283A CN105863192B CN 105863192 B CN105863192 B CN 105863192B CN 201610406283 A CN201610406283 A CN 201610406283A CN 105863192 B CN105863192 B CN 105863192B
Authority
CN
China
Prior art keywords
sheer pole
column
cross tube
hole
positioning plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610406283.9A
Other languages
Chinese (zh)
Other versions
CN105863192A (en
Inventor
邓永莲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fengyang Yongyuan Electronic Technology Co., Ltd
Original Assignee
Suzhou Lianjing Machinery Engineering Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou Lianjing Machinery Engineering Technology Co Ltd filed Critical Suzhou Lianjing Machinery Engineering Technology Co Ltd
Priority to CN201610406283.9A priority Critical patent/CN105863192B/en
Publication of CN105863192A publication Critical patent/CN105863192A/en
Application granted granted Critical
Publication of CN105863192B publication Critical patent/CN105863192B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F11/00Stairways, ramps, or like structures; Balustrades; Handrails
    • E04F11/18Balustrades; Handrails
    • E04F11/181Balustrades
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F11/00Stairways, ramps, or like structures; Balustrades; Handrails
    • E04F11/18Balustrades; Handrails
    • E04F11/181Balustrades
    • E04F11/1812Details of anchoring to the wall or floor
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F11/00Stairways, ramps, or like structures; Balustrades; Handrails
    • E04F11/18Balustrades; Handrails
    • E04F11/1865Collapsible or portable balustrades

Abstract

The invention discloses a kind of balcony guardrail, with the cross tube and sheer pole be arrangeding in parallel up and down, there is the column of some spaced sets between the cross tube and sheer pole, male connection is provided with the top of the column, bottom is polished rod, the bottom surface of the cross tube is provided with the internal thread coordinated with column tip male thread joint screw thread and connects hole, and the top surface of the sheer pole is provided with connects the spacing hole that hole is corresponding and coordinates with column bottom polished rod embedded with internal thread on cross tube;The bottom of the sheer pole is provided with elastic supporting member for supporting optical member, is provided at both ends with symmetrical guide positioning plate;The one side that sheer pole is corresponded in the guide positioning plate is provided with guide groove, and cooperation is slided up and down between the sheer pole and guide groove, and guide groove is provided with positioning hole in the guide positioning plate of both sides up and down.Its column of this balcony guardrail is changed once damaging to disassemble, and safeguards and maintenance cost compares bottom, easy for installation, sound construction, be easy to promote the use of.

Description

A kind of balcony guardrail
Technical field
The present invention relates to civil engineering field, more particularly to a kind of balcony guardrail.
Background technology
Civil engineering generally refers to civil engineering, and civil engineering refers to the meter of the relevant infrastructure of all He Shui, soil, culture Draw, build and repair.The civil engineering said now mostly typically refers exclusively to small Civil Specialities, including house, public building, structures etc. Once build.In fields such as house, public building, structures, designer can be provided with balcony or balcony etc., for convenience It is glass guardrail or aluminum alloy guardrail mostly daylighting, these balconies or balcony or installs aluminum alloy guardrail additional again on the inside of glass guardrail, And this balcony guardrail plays safety protection function, therefore, also used in other regions.
Balcony guardrail is balcony to outer peripheral beautification and protective equipment, by welding or is assembled by alloy pipe. 0.5 meter away from ground or so of common low windowsill, if be close to, interior wall increases by 0.4 meter of guardrail or fence reaches the anti-of code requirement certainly Shield measure.If windowsill table top is too big, such as bay window, child often station looked into the distance on windowsill, and user also must station arrive Window is opened on windowsill, at this moment, the guardrail being attached on windowsill should highly reach 0.9 meter in itself.
But be all that now guardrail is welded or assembled when installing guardrail in civil engineering at present, then by guardrail Both ends are fixed on metope or other stationary planes, and bottom is fixed with ground, is firmly installed.But the balcony guardrail after installing Can not be dismantled again, once column therein damage, it has not been convenient to change, even and if this balcony guardrail dismounting after, it is also difficult to Secondary use again, maintenance cost are high.
The content of the invention
The technical problem to be solved by the invention is to provide a kind of convenient balcony guardrail dismantled and changed.
In order to solve the above-mentioned technical problem, the present invention is achieved by the following technical solutions:A kind of balcony guardrail, has The cross tube and sheer pole be arrangeding in parallel up and down, there is the column of some spaced sets between the cross tube and sheer pole, Male connection is provided with the top of the column, bottom is polished rod, and the bottom surface of the cross tube is provided with column top outside The internal thread that nipple screw thread coordinates connects hole, and the top surface of the sheer pole is provided with that to connect hole with internal thread on cross tube corresponding And the spacing hole coordinated with column bottom polished rod embedded;The bottom of the sheer pole is provided with elastic supporting member for supporting optical member, and both ends are set There is symmetrical guide positioning plate;The one side that sheer pole is corresponded in the guide positioning plate is provided with guide groove, the lower horizontal stroke Cooperation is slided up and down between bar and guide groove, guide groove is provided with positioning hole in the guide positioning plate of both sides up and down.
Preferably, the elastic supporting member for supporting optical member is made up of support column, pilot sleeve and spring;Insert the end of the support column It is connected in pilot sleeve, spring is arranged on the bottom of support column, and the bottom surface surrounding of the support column is provided with outside flange and led To block, it is slidably matched between the flange guide pad and pilot sleeve, stop collar is provided with outside the support column above it, it is described Stop collar is connected to the top outer of pilot sleeve, prevents support column from departing from pilot sleeve, and the bottom four of the pilot sleeve It is provided with outside expanding surface week, fixing hole is provided with the expanding surface.
Preferably, the bottom surface of the sheer pole is provided with connects hole with the support of embedded cooperation at the top of support column.
Preferably, it is to be threadedly coupled between the stop collar and pilot sleeve.
Preferably, the spacing between the cross tube both ends is longer than the spacing between the guide positioning plate of sheer pole both ends.
Compared with prior art, the present invention is advantageous in that:Its column of this balcony guardrail is once damaged and can torn open Unload down and changed, safeguard and maintenance cost compares bottom, easy for installation, sound construction, be easy to promote the use of.
Brief description of the drawings
The present invention is further described below in conjunction with the accompanying drawings.
Fig. 1 is a kind of balcony guardrail external structure schematic diagram of the present invention;
Fig. 2 is a kind of balcony guardrail overlooking the structure diagram of the present invention;
Fig. 3 is the structure sectional view of A-A in Fig. 2;
Fig. 4 is the partial enlarged drawing of B in Fig. 3.
In figure:1st, cross tube;2nd, sheer pole;3rd, column;4th, guide positioning plate;5th, guide groove;6th, positioning hole;7th, elasticity branch Support member;71st, support column;72nd, pilot sleeve;73rd, spring;74th, stop collar;75th, flange guide pad;76th, fixing hole;8th, internal thread Connect hole;9th, male connection;10th, spacing hole;11st, support connects hole.
Embodiment
The present invention will be described in detail with reference to the accompanying drawings and detailed description.
A kind of balcony guardrail shown in Fig. 1, Fig. 2 and Fig. 3, there is the cross tube 1 and sheer pole 2 be arrangeding in parallel up and down, it is described There is the column 3 of some spaced sets, the top of the column 3 is provided with male connection between cross tube 1 and sheer pole 2 9, bottom is polished rod, and the bottom surface of the cross tube 1 is provided with the internal thread coordinated with the screw thread of 3 tip male thread joint of column 9 and connect Hole 8, the top surface of the sheer pole 2 are provided with that to connect hole 8 with internal thread on cross tube 1 corresponding and inserted with the bottom polished rod of column 3 embedding The spacing hole 10 that formula coordinates;The bottom of the sheer pole 2 is provided with elastic supporting member for supporting optical member 7, is provided at both ends with symmetrical guiding Location-plate 4;The one side that sheer pole 2 is corresponded in the guide positioning plate 4 is provided with guide groove 5, the sheer pole 2 and guide groove 5 Between slide up and down cooperation, be provided with positioning hole 6 in the guide positioning plate 4 of guide groove both sides about 5;In order to ensure that installation is steady Gu the spacing between the both ends of cross tube 1 is longer than the spacing between the both ends guide positioning plate 4 of sheer pole 2.
As shown in figure 4, the elastic supporting member for supporting optical member 7 is made up of support column 71, pilot sleeve 72 and spring 73;In order to facilitate branch Installed between dagger 71 and sheer pole 2, the bottom surface of the sheer pole 2 is provided with the support with the embedded cooperation in the top of support column 71 Hole 11 is connect, the end of the support column 71 is plugged in pilot sleeve 72, and spring 73 is arranged on the bottom of support column 71, the branch The bottom surface surrounding of dagger 71 is provided with outside flange guide pad 75, is slided between the flange guide pad 75 and pilot sleeve 72 Coordinate, be provided with stop collar 74 outside the support column 71 above it, the stop collar 74 is connected to outside the top of pilot sleeve 72 Side, prevent support column 71 from departing from pilot sleeve 72, and the bottom surrounding of the pilot sleeve 72 is provided with outside expanding surface, should Fixing hole 76 is provided with expanding surface, in order to facilitate installing and dismantling, the stop collar between support column 71 and pilot sleeve 72 It is to be threadedly coupled between 74 and pilot sleeve 72.
During installation, now the both ends of cross tube 1 are fixed in mounting surface, then two pieces are directed to location-plate 4 and are symmetrically mounted on On symmetrical mounting surface, guide positioning plate 4 is connected by bolt through positioning hole 6 with mounting surface, while the both ends of sheer pole 2 In the symmetrical guide groove 5 of two pieces of guide positioning plates 4, the top of column 3 is then screwed in the internal thread of the bottom of cross tube 1 Connect in hole 8, sheer pole 2 jacked up upwards, the spacing hole 10 on cross tube 2 with the end of column 3 is embedded in it together with, then will Elastic supporting member for supporting optical member 7 is arranged on the bottom of sheer pole 2, and the wherein support column 71 in elastic supporting member for supporting optical member 7 inserts the branch embedded in the bottom surface of sheer pole 2 Support is connect in hole 11, and pilot sleeve 71 is fixed on the ground by bolt through fixing hole 76 in elastic supporting member for supporting optical member 7, completes installation, Due to the effect of the spring 73 in pilot sleeve 71, it promotes support column 71 upward, so that 72 upward top pressure of sheer pole, makes to stand Post 3 is fixed between cross tube 1 and sheer pole 2.To dismantle column 3, sheer pole 2 is pressed down on, sheer pole 2 props up in elasticity It is downward under the compression of the inner spring 73 of support member 7, the bottom of column 3 is departed from the spacing hole 10 on sheer pole 2, then rotating to tear open The column 3 unloaded, the male connection 9 at the top of it is connect hole 8 with the internal thread on cross tube 1 and separate.
Its column 3 of this balcony guardrail can be disassembled and changed once damaging, and safeguard and maintenance cost compares Bottom, easy for installation, sound construction, it is easy to promote the use of.
It is emphasized that:It the above is only presently preferred embodiments of the present invention, not the present invention made any formal Limitation, every any simple modification, equivalent change and modification for being made to above example of technical spirit according to the present invention, In the range of still falling within technical solution of the present invention.

Claims (5)

1. a kind of balcony guardrail, there is the cross tube be arrangeding in parallel up and down(1)And sheer pole(2), the cross tube(1)With lower horizontal stroke Bar(2)Between have some spaced sets column(3), it is characterised in that:The column(3)Top be provided with external screw thread Joint(9), bottom is polished rod, the cross tube(1)Bottom surface be provided with and column(3)Tip male thread joint(9)Screw thread is matched somebody with somebody The internal thread of conjunction connects hole(8), the sheer pole(2)Top surface be provided with and cross tube(1)Upper internal thread connects hole(8)It is corresponding and With column(3)The spacing hole that bottom polished rod embedded coordinates(10);The sheer pole(2)Bottom be provided with elastic supporting member for supporting optical member (7), it is provided at both ends with symmetrical guide positioning plate(4);The guide positioning plate(4)Upper corresponding sheer pole(2)One side It is provided with guide groove(5), the sheer pole(2)With guide groove(5)Between slide up and down cooperation, guide groove(5)Upper and lower both sides Guide positioning plate(4)On be provided with positioning hole(6).
2. balcony guardrail according to claim 1, it is characterised in that:The elastic supporting member for supporting optical member(7)By support column(71), lead To sleeve(72)And spring(73)Composition;The support column(71)End be plugged on pilot sleeve(72)It is interior, spring(73)If Put in support column(71)Bottom, the support column(71)Bottom surface surrounding be provided with outside flange guide pad(75), it is described Flange guide pad(75)With pilot sleeve(72)Between be slidably matched, the support column above it(71)Outside is provided with stop collar (74), the stop collar(74)It is connected to pilot sleeve(72)Top outer, prevent support column(71)Depart from pilot sleeve (72), and the pilot sleeve(72)Bottom surrounding be provided with outside expanding surface, be provided with fixing hole on the expanding surface (76).
3. balcony guardrail according to claim 2, it is characterised in that:The sheer pole(2)Bottom surface be provided with and support Post(71)The support of the embedded cooperation in top connects hole(11).
4. balcony guardrail according to claim 2, it is characterised in that:The stop collar(74)With pilot sleeve(72)Between For threaded connection.
5. balcony guardrail according to claim 1, it is characterised in that:The cross tube(1)Spacing between both ends is longer than Sheer pole(2)Both ends guide positioning plate(4)Between spacing.
CN201610406283.9A 2016-06-12 2016-06-12 A kind of balcony guardrail Active CN105863192B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610406283.9A CN105863192B (en) 2016-06-12 2016-06-12 A kind of balcony guardrail

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610406283.9A CN105863192B (en) 2016-06-12 2016-06-12 A kind of balcony guardrail

Publications (2)

Publication Number Publication Date
CN105863192A CN105863192A (en) 2016-08-17
CN105863192B true CN105863192B (en) 2018-01-09

Family

ID=56677330

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610406283.9A Active CN105863192B (en) 2016-06-12 2016-06-12 A kind of balcony guardrail

Country Status (1)

Country Link
CN (1) CN105863192B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107288280A (en) * 2017-08-22 2017-10-24 长兴华煜金属制品科技有限公司 A kind of balcony guardrail
KR101858666B1 (en) * 2017-11-10 2018-05-17 주식회사 종합건축사사무소가전 Window constructions for high-rise apartment houses

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100927156B1 (en) * 2009-05-22 2009-11-24 주식회사 건보엔지니어링종합건축사사무소 Multi-functional balcony railing
CN103362261A (en) * 2012-03-30 2013-10-23 周国民 Novel balcony guardrail
CN105317182A (en) * 2014-07-24 2016-02-10 无锡盛鸿金属科技有限公司 Balcony guardrail
CN204920045U (en) * 2015-08-18 2015-12-30 南通市达欣工程股份有限公司 Balcony guardrail
CN205712841U (en) * 2016-06-12 2016-11-23 苏州莲敬机械工程科技有限公司 Balcony guardrail

Also Published As

Publication number Publication date
CN105863192A (en) 2016-08-17

Similar Documents

Publication Publication Date Title
CN105220844A (en) With railing and the mounting method thereof of solar energy collector
CN107327097A (en) A kind of guardrail
CN105863192B (en) A kind of balcony guardrail
CN203808591U (en) Lifting cable bearing frame
CN204163398U (en) A kind of horizontal climbing form system device
CN205712841U (en) Balcony guardrail
CN104533102A (en) Temporary guard railing for stair
CN205502616U (en) Be applied to and face frontier defense guardrail in construction of large tracts of land floor template
CN112211384B (en) Scaffold for building site
CN108223924A (en) A kind of assembled vertical shaft air hose combined bracket
CN204728983U (en) A kind of adjustable elevator maintenance platform
CN204212531U (en) Limit maintenance tool is faced at a kind of hole
CN207245046U (en) A kind of guardrail
CN206625503U (en) A kind of steel house light shaft outer baffle
CN205116492U (en) Switching device of installation siphon riser on bright frame glass curtain wall
CN204435917U (en) Frontier defense protection unit is faced in a kind of building structure
CN203964214U (en) A kind of air conditioner mounting bracket
CN205276658U (en) Glass furred ceiling that can two -wayly install
CN203452369U (en) Tool type safeguard
CN209941751U (en) Novel stone well lid
CN212743462U (en) non-French window opening temporary enclosure structure fixing device assembly
CN219930761U (en) Noise reduction and insulation device for civil engineering foundation construction stage
CN204778118U (en) High security elevator cab rail guard
CN215717469U (en) A protection storehouse for borehole operation personnel defend high place and fall object
CN203113584U (en) Dust-free room heavy type keel

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20200929

Address after: 233100 No. 305 South Ring Road, Fucheng Town, Fengyang County, Chuzhou City, Anhui Province

Patentee after: Fengyang Yongyuan Electronic Technology Co., Ltd

Address before: Guo Xiang Street Wuzhong Economic Development Zone in Suzhou City, Jiangsu province 215100 Suzhou Antique City building 11 room 217

Patentee before: SUZHOU LIANJING MECHANICAL ENGINEERING TECHNOLOGY Co.,Ltd.