CN207660236U - The quick connection hanging piece structure of wall - Google Patents

The quick connection hanging piece structure of wall Download PDF

Info

Publication number
CN207660236U
CN207660236U CN201721767466.XU CN201721767466U CN207660236U CN 207660236 U CN207660236 U CN 207660236U CN 201721767466 U CN201721767466 U CN 201721767466U CN 207660236 U CN207660236 U CN 207660236U
Authority
CN
China
Prior art keywords
angle steel
wallboard
wall
connecting seat
outrigger
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721767466.XU
Other languages
Chinese (zh)
Inventor
沈爱华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Harbin University of Commerce
Original Assignee
Harbin University of Commerce
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Harbin University of Commerce filed Critical Harbin University of Commerce
Priority to CN201721767466.XU priority Critical patent/CN207660236U/en
Application granted granted Critical
Publication of CN207660236U publication Critical patent/CN207660236U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

A kind of quick connection hanging piece structure of wall, including:Wall, angle steel is installed, support angle steel, cantilever angle steel, outrigger, fastening bolt, connecting seat, fastening nut, connecting pole, wallboard and wallboard gland, angle steel is equipped with by fastening bolt on wall, often locate installation angle steel top position with cantilever Bolted angle connection, the position of the other end of cantilever angle steel is connect with support angle steel, the position often located between support angle steel is equipped with outrigger by fastening bolt, the centre position of outrigger is equipped with connecting pole, connecting seat is equipped with by fastening nut on connecting pole, connecting seat is connect with wallboard gland, wallboard gland is mounted on wallboard.Utility model device can carry out Fast Installation decorative wall panels in outer surface of wall, pass through distinctive connection structure, the working efficiency of installation wallboard can be made to improve, and great convenience can all be brought to subsequent maintenance and replacement wallboard, so as to improve working efficiency.

Description

The quick connection hanging piece structure of wall
Technical field
The utility model is related to a kind of quick connection hanging piece structures of wall.
Background technology
The exterior walls such as general existing building constructions need for beauty, can all decorate some dalles and be covered in wall On surface, when installing wallboard, it will usually the construction of the large area of wall is carried out using traditional dry hanging technology, it is such to apply Work mode can carry out the fixation to wallboard using a large amount of bolt and screw, cannot play the efficiency quickly connected, and this The connection structure of kind mode cannot largely carry out later stage modification wallboard, bring prodigious difficulty to the service work in later stage, tear open It unloads and its inconvenient, to which the economic waste of a part can be caused.
Invention content
Utility model device is a kind of quick connection hanging piece structure of wall.Fast Installation dress can be carried out in outer surface of wall Decorations wallboard can be such that the working efficiency of installation wallboard improves by distinctive connection structure, and to subsequent maintenance and replacement wall Plate can all bring great convenience, so as to improve working efficiency.
The technical solution adopted in the utility model is:A kind of quick connection hanging piece structure of wall, including:Wall, established angle Steel, support angle steel, cantilever angle steel, outrigger, fastening bolt, connecting seat, fastening nut, connecting pole, wallboard and wallboard are fixed Head.
Angle steel is equipped with by fastening bolt on the wall, often locate installation angle steel top position with cantilever angle steel Connection, the position of the other end of cantilever angle steel are connect with support angle steel, often locate the position between support angle steel by fastening spiral shell Bolt is equipped with outrigger, and the centre position of outrigger is equipped with connecting pole, and company is equipped with by fastening nut on connecting pole Joint chair, connecting seat are connect with wallboard gland, and wallboard gland is mounted on wallboard.
The beneficial effects of the utility model:
1. the connecting frame structure of the device entirety of the utility model design is using angle steel lead frame structure, such Frame structure light quality, and there is certain structural strength, steel angle profile is also easy to get very much, is one generally used Kind profile structure.
2. the device frame of the utility model design is installed using the type of attachment of part welding, a part uses Bolt pattern carries out fastening installation, and such connection type can be dismantled, and subsequent maintenance and modification is facilitated to use.
3. the device of the utility model design, using the form quickly connected, passes through company at connection structure position Cross fluting on joint chair is fastenedly connected seat, and the type of attachment with the zigzag connecting pole on wallboard when mounted only need to be by wall Connection structure on plate is aligned with the connection structure on frame, strength in carried out on wallboard pressing installation can be completed.
4. structure of the device of the utility model design on connecting seat, can carry out telescopic adjustment, by connecting pole Internal thread can carry out carrying out high high adjustment to connecting seat, so as to ensure the flatness of wallboard when mounted.
5. the locking nut structure that the device of the utility model design is installed on connecting seat, can lock connecting seat It is tight to adjust, prevent connecting seat from loose phenomenon occurring on connecting pole, it is unstable after causing wallboard to be installed.
Description of the drawings
Fig. 1 is the utility model product overall structure diagram.
Fig. 2 is that the utility model product removes wallboard external structure schematic diagram.
Fig. 3 is schematic enlarged-scale view at A in Fig. 2.
Fig. 4 is schematic enlarged-scale view at B in Fig. 2.
Fig. 5 is panel structure schematic diagram.
Fig. 6 is wallboard gland cross-sectional view of the structure at C in Fig. 5.
Specific implementation mode
Present embodiment is described further according to Fig. 1, Fig. 2, Fig. 3, Fig. 4, Fig. 5, Fig. 6.
A kind of quick connection hanging piece structure of wall, including:It is wall 1, installation angle steel 2, support angle steel 3, cantilever angle steel 4, outer Side stand 5, fastening bolt 6, connecting seat 7, fastening nut 8, connecting pole 9, wallboard 10 and wallboard gland 11.
Angle steel 2 is equipped with by fastening bolt 6 on the wall 1, the top position for the installation angle steel 2 often located is and cantilever Angle steel 4 connects, and the position of the other end of cantilever angle steel 4 is connect with support angle steel 3, and the position often located between support angle steel 3 is logical It crosses fastening bolt 6 and outrigger 5 is installed, the centre position of outrigger 5 is equipped with connecting pole 9, passes through fastening on connecting pole 9 Nut 8 is equipped with connecting seat 7, and connecting seat 7 is connect with wallboard gland 11, and wallboard gland 11 is mounted on wallboard 10.
When mounted, the size distance that graphometric square cun is designed between installation angle steel 2, and design wallboard can be first directed to 10 size, to meet the installation size of practical wall area.When installing wallboard 10, the wallboard above it need to only be fixed First 11 position and the position of connecting seat 7 are to after just, strength makes wallboard gland 11 be completely disposed at connection in the surface of wallboard 10 In seat 7, also it can be pre-adjusted the distance of stretch out and draw back of connecting seat 7, by loosening fastening nut 8 to adjust the flat of wallboard 10 Whole degree.Such fast joint structure can also be dismantled, and by other tools, strength applies draw outward on wallboard 10 Power, you can wallboard 10 is removed, the work such as other maintenance walls are carried out, it is very convenient.
The above of the present apparatus describes the specific of the utility model by reference to Fig. 1, Fig. 2, Fig. 3, Fig. 4, Fig. 5, Fig. 6 Embodiment, it will be understood by a person skilled in the art that, the utility model product is not limited to embodiment described above, without departing from Various modifications may be made in the case of the spirit of the utility model, it is described modification should also be included in the scope of the utility model it It is interior.The scope of the utility model should be limited by appended claims and its equivalent.

Claims (1)

1. a kind of quick connection hanging piece structure of wall, including:Wall (1), installation angle steel (2), support angle steel (3), cantilever angle steel (4), outrigger (5), fastening bolt (6), connecting seat (7), fastening nut (8), connecting pole (9), wallboard (10) and wallboard are solid Determine head (11), it is characterised in that:
Installation angle steel (2), the top position for the installation angle steel (2) often located are equipped with by fastening bolt (6) on the wall (1) It is connect with cantilever angle steel (4), the position of the other end of cantilever angle steel (4) is connect with support angle steel (3), often locates support angle steel (3) position between is equipped with outrigger (5) by fastening bolt (6), and the centre position of outrigger (5) is equipped with company Connect column (9), connecting seat (7) be equipped with by fastening nut (8) on connecting pole (9), connecting seat (7) with wallboard gland (11) even It connects, wallboard gland (11) is mounted on wallboard (10).
CN201721767466.XU 2017-12-18 2017-12-18 The quick connection hanging piece structure of wall Expired - Fee Related CN207660236U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721767466.XU CN207660236U (en) 2017-12-18 2017-12-18 The quick connection hanging piece structure of wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721767466.XU CN207660236U (en) 2017-12-18 2017-12-18 The quick connection hanging piece structure of wall

Publications (1)

Publication Number Publication Date
CN207660236U true CN207660236U (en) 2018-07-27

Family

ID=62941585

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721767466.XU Expired - Fee Related CN207660236U (en) 2017-12-18 2017-12-18 The quick connection hanging piece structure of wall

Country Status (1)

Country Link
CN (1) CN207660236U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110952736A (en) * 2018-09-27 2020-04-03 北新集团建材股份有限公司 Production method of decorative plate for dry hanging installation
CN110952747A (en) * 2018-09-27 2020-04-03 北新集团建材股份有限公司 Sliding adjustment type decorative plate dry hanging installation structure and installation method thereof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110952736A (en) * 2018-09-27 2020-04-03 北新集团建材股份有限公司 Production method of decorative plate for dry hanging installation
CN110952747A (en) * 2018-09-27 2020-04-03 北新集团建材股份有限公司 Sliding adjustment type decorative plate dry hanging installation structure and installation method thereof
CN110952747B (en) * 2018-09-27 2021-02-19 北新集团建材股份有限公司 Sliding adjustment type decorative plate dry hanging installation structure and installation method thereof

Similar Documents

Publication Publication Date Title
CN207660236U (en) The quick connection hanging piece structure of wall
CN207582778U (en) A kind of suspended ceiling mounting structure
CN101200961A (en) Variable angle connecting overlap-connected components and construction method for ceiling of continuous curve surface
CN206545386U (en) Sheet metal forming formwork drops in a kind of toilet
CN204492134U (en) Be convenient to the height scaffolding installed
CN209339555U (en) A kind of construction scaffold
CN207863476U (en) A kind of reinforcing aluminum alloy mould plate pulling-on piece system diagonal brace
CN206987409U (en) A kind of portable high-altitude robot welding wind-proof shed
CN206530077U (en) A kind of support frame
CN201347595Y (en) Adjustable overlap connection claw of point-fixed curtain wall
CN206071019U (en) A kind of adjustable construction movable Scaffold
CN209891688U (en) High building quick-building safe construction foot rest
CN206211471U (en) Electric construction system is faced in job site
CN207499397U (en) A kind of scaffold for building convenient for connection
CN219993016U (en) Plastering shovel matched with plastering wall surface
CN216457767U (en) Dust device is used in building engineering construction
CN205855788U (en) A kind of adjustment structure of the most Height Adjustable suspension hook
CN213979829U (en) Scaffold frame capable of being rapidly disassembled and assembled and scaffold
CN211736159U (en) Keel device for wall decoration plate
CN216664816U (en) Steel construction of building interior wall dry-hanging granite plate
CN217151174U (en) Construction is with convenient to detach's supplementary installation device of scaffold frame
CN215107937U (en) A quick linking device of railing for railing engineering
CN210239024U (en) Up-down leveling device for assembled decoration wall surface
CN211369495U (en) Support base convenient to disassemble for building
CN210086793U (en) Recyclable combined wall connecting piece

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180727

Termination date: 20181218

CF01 Termination of patent right due to non-payment of annual fee