CN106402225B - 端部接触式少片抛物线型主副簧弧高的设计方法 - Google Patents
端部接触式少片抛物线型主副簧弧高的设计方法 Download PDFInfo
- Publication number
- CN106402225B CN106402225B CN201610907514.4A CN201610907514A CN106402225B CN 106402225 B CN106402225 B CN 106402225B CN 201610907514 A CN201610907514 A CN 201610907514A CN 106402225 B CN106402225 B CN 106402225B
- Authority
- CN
- China
- Prior art keywords
- mrow
- msub
- spring
- msubsup
- mfrac
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16F—SPRINGS; SHOCK-ABSORBERS; MEANS FOR DAMPING VIBRATION
- F16F3/00—Spring units consisting of several springs, e.g. for obtaining a desired spring characteristic
- F16F3/02—Spring units consisting of several springs, e.g. for obtaining a desired spring characteristic with springs made of steel or of other material having low internal friction
- F16F3/023—Spring units consisting of several springs, e.g. for obtaining a desired spring characteristic with springs made of steel or of other material having low internal friction composed only of leaf springs
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/10—Geometric CAD
- G06F30/17—Mechanical parametric or variational design
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Geometry (AREA)
- General Engineering & Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Computational Mathematics (AREA)
- Mechanical Engineering (AREA)
- Mathematical Analysis (AREA)
- Mathematical Optimization (AREA)
- Pure & Applied Mathematics (AREA)
- Computer Hardware Design (AREA)
- Evolutionary Computation (AREA)
- Springs (AREA)
- Other Investigation Or Analysis Of Materials By Electrical Means (AREA)
Abstract
本发明涉及端部接触式少片抛物线型主副簧弧高的设计方法,属于悬架钢板弹簧技术领域。本发明可根据主副簧的结构参数、弹性模量、额定载荷及在额定载荷下的剩余切线弧高设计要求值,对端部接触式少片抛物线型变截面主副簧的初始切线弧高进行设计。通过样机加载变形试验测试可知,本发明所提供的端部接触式少片抛物线型主副簧弧高的设计方法是正确的,可得到准确可靠的主副簧初始切线弧高设计值,为端部接触式少片抛物线型主副簧的设计及CAD软件开发奠定了可靠的技术基础。利用该方法可提高产品设计水平、质量和性能及车辆行驶平顺性,同时,降低产品设计和试验测试费用,加快产品开发速度。
Description
技术领域
本发明涉及车辆悬架钢板弹簧,特别是端部接触式少片抛物线型主副簧弧高的设计方法。
背景技术
随着汽车节能化、舒适化、轻量化、安全化的快速发展,少片变截面钢板弹簧因具有重量轻,材料利用率高,片间无摩擦或摩擦小,振动噪声低,使用寿命长等优点,日益受到车辆悬架专家、生产企业及车辆制造企业的高度关注,并且在车辆悬架系统中得到了广泛应用。通常为了满足加工工艺、应力强度、刚度及吊耳厚度的设计要求,会将少片变截面钢板弹簧加工为抛物线型、斜线型、根部加强型、端部加强型、两端加强型等不同结构形式,且由于少片变截面钢板弹簧第1片弹簧的受力较为复杂,不仅承受垂向载荷,同时还承受扭转载荷和纵向载荷,因此,实际所设计的第1片弹簧的端部平直段的厚度和长度,大于其他各片弹簧端部平直段的厚度和长度,即大都采用端部非等构的少片变截面钢板弹簧,以满足第1片弹簧受力复杂的要求,此外,为了满足不同载荷下的刚度设计要求,通常将少片变截面钢板弹簧设计为端部接触式少片抛物线型变截面主副簧形式。然而,由于端部接触式少片抛物线型变截面主副簧的结构及接触类型复杂,对其进行分析计算非常困难,据所查资料可知,目前国内外一直未曾给出可靠的端部接触式少片抛物线型主副簧弧高的设计方法。随着车辆行驶速度及其对平顺性要求的不断提高,对端部接触式少片抛物线型变截面主副簧提出了更高的要求,因此,必须建立一种准确、可靠的端部接触式少片抛物线型主副簧弧高的设计方法,为端部接触式少片抛物线型变截面主副簧的弧高设计奠定可靠的技术基础,满足车辆行业快速发展、车辆行驶平顺性及端部接触式少片抛物线型变截面主副簧的设计要求,提高产品设计水平、质量和性能,满足车辆行驶平顺性的设计要求;同时,降低设计及试验费用,加快产品开发速度。
发明内容
针对上述现有技术中存在的缺陷,本发明所要解决的技术问题是提供一种简便、可靠的端部接触式少片抛物线型主副簧弧高的设计方法,其设计流程图,如图1所示。端部接触式少片抛物线型变截面主副簧为对称结构,主副簧的一半对称结构可看作为悬臂梁,即对称中心线为根部固定端,主簧的端部受力点和副簧的触点分别作为主簧端点和副簧端点,一半对称结构的主副簧的结构示意图,如图2所示,其中包括,主簧1,根部垫片2,副簧3,端部垫片4。主簧1每片的一半长度为LM,是由根部平直段、抛物线段和端部平直段三段所构成,每片主簧的根部平直段的厚度为h2M,每片主簧安装间距的一半为l3,每片主簧的宽度为b;主簧1各片的端部平直段非等构,即第1片主簧的端部平直段的厚度和长度,大于其他各片主簧端部平直段的厚度和长度,各片主簧的端部平直段的厚度和长度分别为h1Mi和l1Mi,i=1,2,…,m,m为主簧片数;每片主簧的中间变截面为抛物线段,各片主簧的抛物线段的厚度比为βi=h1Mi/h2M,每片主簧的抛物线段的根部到主簧端点的距离为l2M=LM-l3,各片主簧的抛物线段的端部到主簧端点的距离l1Mi=l2Mβi 2,各片弹簧弧高是在端部上表面水平切线与弹簧中心上表面的垂直距离,即各片弹簧切线弧高;装配夹紧后各片主簧的初始切线弧高为HMci;主簧1的各片根部平直段及与副簧3的根部平直段之间设有根部垫片2,主簧1各片的端部平直段设有端部垫片4,端部垫片4的材料为碳纤维复合材料,用来降低弹簧工作时所产的摩擦噪声;副簧3每片的一半长度为LA,是由根部平直段、抛物线段和端部平直段三段所构成,每片副簧的根部平直段的厚度为h2A,每片副簧安装间距的一半为l3,每片副簧的宽度为b;各片副簧的端部平直段的厚度和长度分别为h1Aj和l1Aj,j=1,2,…,n,n为副簧片数;每片副簧的中间变截面为抛物线段,各片副簧的抛物线段的厚度比为βAj=h1Aj/h2A,每片副簧的抛物线段的根部到副簧端点的距离为l2A=LA-l3,各片副簧的抛物线段的端部到副簧端点的距离l1Aj=l2AβAj 2,装配夹紧后各片副簧端部上表面水平切线与副簧中心上表面的垂直距离HAcj,即各片副簧的初始切线弧高为HAcj;主簧1的第m片端部平直段与副簧3的端部触点之间设有主、副簧间隙δ;当载荷大于副簧起作用载荷时,副簧与主簧端部平直段内某点相接触,副簧与主簧接触点到主簧端点的距离为l0;当主副簧端部接触之后,主副簧各片端部受力不相同,且与副簧相接触的主簧除了受端点力之外,还在接触点处承受副簧的支撑力。在主副簧的结构参数、弹性模量、额定载荷及在额定载荷下的剩余切线弧高设计要求值给定情况下,对端部接触式少片抛物线型变截面主副簧的初始切线弧高进行设计。
为解决上述技术问题,本发明所提供的端部接触式少片抛物线型主副簧弧高的设计方法,其特征在于采用以下设计步骤:
(1)端部接触式少片抛物线型钢板弹簧主、副簧端点变形系数的计算:
I步骤:端点受力情况下的各片主簧端点变形系数的计算:
根据少片抛物线型变截面钢板弹簧主簧的一半长度LM,宽度b,安装间距的一半l3,抛物线根部到主簧端点的距离l2M,弹性模量E,第i片主簧的抛物线段的厚度比βi,其中,i=1,2,…,m,m为主簧片数,对端点受力情况下的各片主簧在端点处的变形系数Gx-Di进行计算,即
II步骤:端点受力情况下的第m片主簧在副簧接触点处变形系数的计算:
根据少片抛物线型变截面钢板弹簧主簧的一半长度LM,宽度b,安装间距的一半l3,抛物线根部到主簧端点的距离l2M,弹性模量E,第m片主簧的抛物线段的厚度比βm,副簧与主簧接触点到主簧端点的距离l0,对端点受力情况下的第m片主簧在端部平直段与副簧接触点处的变形系数Gx-CD进行计算,即
III步骤:主副簧接触点处受力情况下的第m片主簧端点变形系数的计算:
根据少片抛物线型变截面钢板弹簧主簧的一半长度LM,宽度b,安装间距的一半l3,抛物线根部到主簧端点的距离l2M,弹性模量E,第m片主簧的抛物线段的厚度比βm,副簧与主簧接触点到主簧端点的距离l0,对主副簧接触点处受力情况下的第m片主簧在端点位置处的变形系数Gx-Dzm进行计算,即
IV步骤:主副簧接触点处受力情况下的第m片主簧在副簧接触点处变形系数的计算:
根据少片抛物线型变截面钢板弹簧主簧的一半长度LM,宽度b,安装间距的一半l3,抛物线根部到主簧端点的距离l2M,弹性模量E,第m片主簧的抛物线段的厚度比βm,副簧与主簧接触点到主簧端点的距离l0,对主副簧接触点处受力情况下的第m片主簧在端部平直段与副簧接触点处的变形系数Gx-CDz进行计算,即
V步骤:端点受力情况下的各片副簧端点变形系数的计算:
根据少片抛物线型变截面钢板弹簧副簧的一半长度LA,宽度b,安装间距的一半l3,抛物线根部到副簧端点的距离l2A,弹性模量E,第j片副簧的抛物线段的厚度比βAj,其中,j=1,2,…,n,n为副簧片数,对端点受力情况下的各片副簧在端点位置处的变形系数Gx-DAj进行计算,即
其中,n片副簧叠加后的变形系数Gx-DAT为
(2)端部接触式少片抛物线型钢板弹簧主、副簧各片夹紧刚度的计算:
A步骤:副簧接触之前的各片主簧夹紧刚度KMi的计算:
根据主簧根部厚度h2M,及步骤(1)的I步骤中计算得到的Gx-Di,确定副簧接触之前的各片主簧在夹紧状态下的一半刚度KMi,即
其中,m为主簧片数;
B步骤:副簧接触之后的各片主簧夹紧刚度KMAi的计算:
根据主簧根部厚度h2M,副簧根部厚度h2A,步骤(1)的I步骤中计算得到的Gx-Di、II步骤中计算得到的Gx-CD、III步骤中计算得到的Gx-Dzm、IV步骤中计算得到的Gx-CDz、及V步骤中计算得到的Gx-DAT,确定主副簧接触之后的各片主簧在夹紧状态下的一半刚度KMAi,即
其中,m为主簧片数;
C步骤:各片副簧夹紧刚度KAj的计算:
根据副簧根部厚度h2A,及步骤(1)的V步骤中计算得到的Gx-DAj,确定各片副簧在夹紧状态下的一半刚度KAj,即
其中,n为副簧片数;
(3)额定载荷下的抛物线型钢板弹簧主、副簧端部变形的计算:
i步骤:副簧起作用时的一半载荷PK的计算:
根据主簧根部厚度h2M,接触点处的主副簧间隙δ,主簧片数m,步骤(1)的II步骤中计算得到的Gx-CD,及步骤(2)的A步骤中确定的KMi,确定副簧起作用时的一半载荷PK,即
ii步骤:主簧端部变形的计算:
根据少片抛物线型变截面钢板弹簧主簧所受的一半额定载荷P,主簧片数m,i步骤中计算得到的PK,及步骤(2)的A步骤中确定的KMi、B步骤中确定的KMAi,对额定载荷下的主簧的端部变形fMD进行计算,即
iii步骤:副簧端部变形的计算:
根据少片抛物线型变截面钢板弹簧主簧所受的一半额定载荷P,主簧根部厚度h2M,副簧根部厚度h2A,主簧片数m,副簧片数n,i步骤中确定的PK,步骤(1)的II步骤中计算得到的Gx-CD、IV步骤中计算得到的Gx-CDz、V步骤中计算得到的Gx-DAT,及步骤(2)的B步骤中确定的KMAi、C步骤中确定的KAj,对额定载荷下的副簧的端部变形fAD进行计算,即
(4)端部接触式少片抛物线型钢板弹簧主、副簧初始切线弧高的设计:
a步骤:主簧初始切线弧高的设计:
根据额定载荷下的剩余切线弧高设计要求值Hm,及步骤(3)的ii步骤中计算得到的fMD,确定各片主簧的初始切线弧高,即
HMci=Hm+fMD,i=1,2,…,m;
其中,m为主簧片数;
b步骤:副簧初始切线弧高的设计:
根据额定载荷下的剩余切线弧高设计要求值Hm,及步骤(3)的iii步骤中计算得到的fAD,确定各片副簧的初始切线弧高,即
HAcj=Hm+fAD,j=1,2,…,n;
其中,n为副簧片数。
本发明比现有技术具有的优点
由于端部接触式少片抛物线型变截面主副簧的结构及接触类型复杂,对其进行分析计算非常困难,据所查资料可知,目前国内外一直未曾给出可靠的端部接触式少片抛物线型主副簧弧高的设计方法。本发明可根据主副簧的结构参数、弹性模量、额定载荷及在额定载荷下的剩余切线弧高设计要求值,对端部接触式少片抛物线型变截面主副簧的初始切线弧高进行设计。通过样机加载变形试验测试可知,本发明所提供的端部接触式少片抛物线型主副簧弧高的设计方法是正确的,可得到准确可靠的初始切线弧高设计值,为端部接触式少片抛物线型变截面主副簧的设计及CAD软件开发奠定了可靠的技术基础;同时,利用该方法,可提高产品设计水平、产品质量和车辆行驶平顺性;同时,还可降低设计和试验测试费用,加快产品开发速度。
附图说明
为了更好地理解本发明,下面结合附图做进一步的说明。
图1是端部接触式少片抛物线型主副簧弧高的设计流程图;
图2是端部接触式少片抛物线型变截面主副簧的一半的结构示意图。
具体实施方案
下面通过实施例对本发明作进一步详细说明。
实施例:某端部接触式少片抛物线型变截面主副簧由2片主簧和1片副簧组成,即主簧片数m=2,副簧片数n=1,其中,各片主簧参数为:一半长度LM=575mm,宽度b=60mm,根部平直段的厚度h2M=11mm,安装间距的一半l3=55mm,抛物线段的根部到主簧端点的距离l2M=LM-l3=520mm,弹性模量E=200GPa,第1片主簧的端部平直段的厚度h1M1=7mm,抛物线段的厚度比β1=h1M1/h2M=0.64,第2片主簧的端部平直段的厚度h1M2=6mm,抛物线段的厚度比β2=h1M2/h2M=0.55;副簧参数为:一半长度LA=525mm,宽度b=60mm,根部平直段的厚度h2A=14mm,安装间距的一半l3=55mm,抛物线段的根部到副簧端点的距离l2A=LA-l3=470mm,第1片副簧的端部平直段的厚度h1A1=8mm,抛物线段的厚度比βA1=h1A1/h2A=0.57;副簧与主簧的接触点位于主簧端部平直段内,且接触点到主簧端点的距离l0=50mm,主、副簧之间的间隙δ=34.04mm。该弹簧额定载荷的一半P=2800N,钢板弹簧在额定载荷下的剩余切线弧高设计要求值Hm=26mm,对该端部接触式少片抛物线型变截面主副簧的弧高进行设计。
本发明实例所提供的端部接触式少片抛物线型主副簧弧高的设计方法,其设计流程如图1所示,具体步骤如下:
(1)端部接触式少片抛物线型钢板弹簧主、副簧端点变形系数的计算:
I步骤:端点受力情况下的各片主簧端点变形系数的计算:
根据少片抛物线型变截面钢板弹簧主簧的一半长度LM=575mm,宽度b=60mm,安装间距的一半l3=55mm,抛物线根部到主簧端点的距离l2M=520mm,弹性模量E=200GPa,第1片主簧的抛物线段的厚度比β1=0.64,第2片主簧的抛物线段的厚度比β2=0.55,对端点受力情况下的第1片、第2片主簧在端点处的变形系数Gx-D1、Gx-D2进行计算,即
II步骤:端点受力情况下的第2片主簧在副簧接触点处变形系数的计算:
根据少片抛物线型变截面钢板弹簧主簧的一半长度LM=575mm,宽度b=60mm,安装间距的一半l3=55mm,抛物线根部到主簧端点的距离l2M=520mm,弹性模量E=200GPa,第2片主簧的抛物线段的厚度比β2=0.55,副簧与主簧接触点到主簧端点的距离l0=50mm,对端点受力情况下的第2片主簧在端部平直段与副簧接触点处的变形系数Gx-CD进行计算,即
III步骤:主副簧接触点处受力情况下的第2片主簧端点变形系数的计算:
根据少片抛物线型变截面钢板弹簧主簧的一半长度LM=575mm,宽度b=60mm,安装间距的一半l3=55mm,抛物线根部到主簧端点的距离l2M=520mm,弹性模量E=200GPa,第2片主簧的抛物线段的厚度比β2=0.55,副簧与主簧接触点到主簧端点的距离l0=50mm,对主副簧接触点处受力情况下的第2片主簧在端点位置处的变形系数Gx-Dz2进行计算,即
IV步骤:主副簧接触点处受力情况下的第2片主簧在副簧接触点处变形系数的计算:
根据少片抛物线型变截面钢板弹簧主簧的一半长度LM=575mm,宽度b=60mm,安装间距的一半l3=55mm,抛物线根部到主簧端点的距离l2M=520mm,弹性模量E=200GPa,第2片主簧的抛物线段的厚度比β2=0.55,副簧与主簧接触点到主簧端点的距离l0=50mm,对主副簧接触点处受力情况下的第2片主簧在端部平直段与副簧接触点处的变形系数Gx-CDz进行计算,即
V步骤:端点受力情况下的各片副簧端点变形系数的计算:
根据少片抛物线型变截面钢板弹簧副簧的一半长度LA=525mm,宽度b=60mm,安装间距的一半l3=55mm,抛物线根部到弹簧端点的距离l2A=470mm,弹性模量E=200GPa,第1片副簧的抛物线段的厚度比βA1=0.57,对端点受力情况下的第1片副簧在端点位置处的变形系数Gx-DA1进行计算,即
其中,1片副簧叠加后的变形系数Gx-DAT为
(2)端部接触式少片抛物线型钢板弹簧主、副簧各片夹紧刚度的计算:
A步骤:副簧接触之前的各片主簧夹紧刚度KMi的计算:
根据主簧根部厚度h2M=11mm,及步骤(1)的I步骤中计算得到的Gx-D1=89.29mm4/N、Gx-D2=93.78mm4/N,确定副簧接触之前的第1片、第2片主簧在夹紧状态下的一半刚度KM1、KM2,即
B步骤:副簧接触之后的各片主簧夹紧刚度KMAi的计算:
根据主簧根部厚度h2M=11mm,副簧根部厚度h2A=14mm,步骤(1)的I步骤中计算得到的Gx-D1=89.29mm4/N、Gx-D2=93.78mm4/N、II步骤中计算得到的Gx-CD=77.28mm4/N、III步骤中计算得到的Gx-Dz2=77.28mm4/N、IV步骤中计算得到的Gx-CDz=64.85mm4/N、及V步骤中计算得到的Gx-DAT=69.24mm4/N,确定主副簧接触之后的第1片、第2片主簧在夹紧状态下的一半刚度KMA1、KMA2,即
C步骤:各片副簧夹紧刚度KAj的计算:
根据副簧根部厚度h2A=14mm,及步骤(1)的V步骤中计算得到的Gx-DA1=69.24mm4/N,确定第1片副簧在夹紧状态下的一半刚度KA1,即
(3)额定载荷下的抛物线型钢板弹簧主、副簧端部变形的计算:
i步骤:副簧起作用时的一半载荷PK的计算:
根据主簧根部厚度h2M=11mm,接触点处的主副簧间隙δ=34.04mm,主簧片数m=2,步骤(1)的II步骤中计算得到的Gx-CD=77.28mm4/N,及步骤(2)的A步骤中确定的KM1=14.91N/mm、KM2=14.19N/mm,确定副簧起作用时的一半载荷PK,即
ii步骤:主簧端部变形的计算:
根据少片抛物线型变截面钢板弹簧主簧所受的一半额定载荷P=2800N,主簧片数m=2,i步骤中计算得到的PK=1202.30N,及步骤(2)的A步骤中确定的KM1=14.91N/mm、KM2=14.19N/mm、B步骤中确定的KMA1=14.91N/mm、KMA2=40.20N/mm,对额定载荷下的主簧的端部变形fMD进行计算,即
iii步骤:副簧端部变形的计算:
根据少片抛物线型变截面钢板弹簧主簧所受的一半额定载荷P=2800N,主簧根部厚度h2M=11mm,副簧根部厚度h2A=14mm,主簧片数m=2,副簧片数n=1,i步骤中确定的PK=1202.30N,步骤(1)的II步骤中计算得到的Gx-CD=77.28mm4/N、IV步骤中计算得到的Gx-CDz=64.85mm4/N、V步骤中计算得到的Gx-DAT=69.24mm4/N,及步骤(2)的B步骤中确定的KMA1=14.91N/mm、KMA2=40.20N/mm、C步骤中确定的KA1=39.63N/mm,对额定载荷下的副簧的端部变形fAD进行计算,即
(4)端部接触式少片抛物线型钢板弹簧主、副簧初始切线弧高的设计:
a步骤:主簧初始切线弧高的设计:
根据额定载荷下的剩余切线弧高设计要求值Hm=26mm,及步骤(3)的ii步骤中计算得到的fMD=70.31mm,确定各片主簧的初始切线弧高,即
HMc1=Hm+fMD=96.31mm;
HMc2=Hm+fMD=96.31mm;
b步骤:副簧初始切线弧高的设计:
根据额定载荷下的剩余切线弧高设计要求值Hm=26mm,及步骤(3)的iii步骤中计算得到的fAD=23.09mm,确定各片副簧的初始切线弧高,即
HAc1=Hm+fAD=49.09mm;
HAc2=Hm+fAD=49.09mm。
通过样机试验测试可知,弹簧的切线弧高设计值是可靠的,可满足端部接触式少片抛物线型变截面主副簧在额定载荷下的剩余切线弧高的设计要求,结果表明该发明所提供的端部接触式少片抛物线型主副簧弧高的设计方法是正确的,参数设计值是准确可靠的。
Claims (1)
1.端部接触式少片抛物线型主副簧弧高的设计方法,其中,端部接触式少片抛物线型变截面钢板弹簧的一半对称结构由根部平直段、抛物线段和端部平直段3段构成,各片主簧的端部平直段是非同构的,即第1片主簧的端部平直段的厚度和长度,大于其他各片主簧端部平直段的厚度和长度,以满足第1片主簧复杂受力的要求;主簧端部平直段与副簧触点之间设有一定的主副簧间隙,以满足副簧起作用载荷的设计要求;各片弹簧弧高是在端部上表面水平切线与弹簧中心上表面的垂直距离,即各片弹簧切线弧高;在主副簧的结构参数、弹性模量、额定载荷及在额定载荷下的剩余切线弧高设计要求值给定情况下,对端部接触式少片抛物线型变截面钢板弹簧的主副簧的初始切线弧高进行设计,具体设计步骤如下:
(1)端部接触式少片抛物线型钢板弹簧主、副簧端点变形系数的计算:
I步骤:端点受力情况下的各片主簧端点变形系数的计算:
根据少片抛物线型变截面钢板弹簧主簧的一半长度LM,宽度b,安装间距的一半l3,抛物线根部到主簧端点的距离l2M,弹性模量E,第i片主簧的抛物线段的厚度比βi,其中,i=1,2,…,m,m为主簧片数,对端点受力情况下的各片主簧在端点处的变形系数Gx-Di进行计算,即
<mrow>
<msub>
<mi>G</mi>
<mrow>
<mi>x</mi>
<mo>-</mo>
<mi>D</mi>
<mi>i</mi>
</mrow>
</msub>
<mo>=</mo>
<mfrac>
<mrow>
<mn>4</mn>
<mo>&lsqb;</mo>
<msubsup>
<mi>l</mi>
<mrow>
<mn>2</mn>
<mi>M</mi>
</mrow>
<mn>3</mn>
</msubsup>
<mrow>
<mo>(</mo>
<mn>1</mn>
<mo>-</mo>
<msubsup>
<mi>&beta;</mi>
<mi>i</mi>
<mn>3</mn>
</msubsup>
<mo>)</mo>
</mrow>
<mo>+</mo>
<msup>
<mrow>
<mo>(</mo>
<msub>
<mi>L</mi>
<mi>M</mi>
</msub>
<mo>-</mo>
<msub>
<mi>l</mi>
<mn>3</mn>
</msub>
<mo>/</mo>
<mn>2</mn>
<mo>)</mo>
</mrow>
<mn>3</mn>
</msup>
<mo>&rsqb;</mo>
</mrow>
<mrow>
<mi>E</mi>
<mi>b</mi>
</mrow>
</mfrac>
<mo>;</mo>
</mrow>
II步骤:端点受力情况下的第m片主簧在副簧接触点处变形系数的计算:
根据少片抛物线型变截面钢板弹簧主簧的一半长度LM,宽度b,安装间距的一半l3,抛物线根部到主簧端点的距离l2M,弹性模量E,第m片主簧的抛物线段的厚度比βm,副簧与主簧接触点到主簧端点的距离l0,对端点受力情况下的第m片主簧在端部平直段与副簧接触点处的变形系数Gx-CD进行计算,即
<mfenced open = "" close = "">
<mtable>
<mtr>
<mtd>
<mrow>
<msub>
<mi>G</mi>
<mrow>
<mi>x</mi>
<mo>-</mo>
<mi>C</mi>
<mi>D</mi>
</mrow>
</msub>
<mo>=</mo>
<mfrac>
<mrow>
<mn>4</mn>
<msup>
<mrow>
<mo>(</mo>
<msub>
<mi>L</mi>
<mi>M</mi>
</msub>
<mo>-</mo>
<msub>
<mi>l</mi>
<mn>3</mn>
</msub>
<mo>/</mo>
<mn>2</mn>
<mo>)</mo>
</mrow>
<mn>3</mn>
</msup>
<mo>-</mo>
<mn>6</mn>
<msub>
<mi>l</mi>
<mn>0</mn>
</msub>
<msup>
<mrow>
<mo>(</mo>
<msub>
<mi>L</mi>
<mi>M</mi>
</msub>
<mo>-</mo>
<msub>
<mi>l</mi>
<mn>3</mn>
</msub>
<mo>/</mo>
<mn>2</mn>
<mo>)</mo>
</mrow>
<mn>2</mn>
</msup>
<mo>-</mo>
<mn>4</mn>
<msubsup>
<mi>l</mi>
<mrow>
<mn>2</mn>
<mi>M</mi>
</mrow>
<mn>3</mn>
</msubsup>
<mo>+</mo>
<mn>6</mn>
<msub>
<mi>l</mi>
<mn>0</mn>
</msub>
<msubsup>
<mi>l</mi>
<mrow>
<mn>2</mn>
<mi>M</mi>
</mrow>
<mn>2</mn>
</msubsup>
</mrow>
<mrow>
<mi>E</mi>
<mi>b</mi>
</mrow>
</mfrac>
<mo>+</mo>
<mfrac>
<mrow>
<mn>2</mn>
<msup>
<mrow>
<mo>(</mo>
<msub>
<mi>l</mi>
<mn>0</mn>
</msub>
<mo>-</mo>
<msub>
<mi>l</mi>
<mrow>
<mn>2</mn>
<mi>M</mi>
</mrow>
</msub>
<msubsup>
<mi>&beta;</mi>
<mi>m</mi>
<mn>2</mn>
</msubsup>
<mo>)</mo>
</mrow>
<mn>2</mn>
</msup>
<mrow>
<mo>(</mo>
<mn>2</mn>
<msub>
<mi>l</mi>
<mrow>
<mn>2</mn>
<mi>M</mi>
</mrow>
</msub>
<msubsup>
<mi>&beta;</mi>
<mi>m</mi>
<mn>2</mn>
</msubsup>
<mo>+</mo>
<msub>
<mi>l</mi>
<mn>0</mn>
</msub>
<mo>)</mo>
</mrow>
</mrow>
<mrow>
<msubsup>
<mi>Eb&beta;</mi>
<mi>m</mi>
<mn>3</mn>
</msubsup>
</mrow>
</mfrac>
<mo>-</mo>
</mrow>
</mtd>
</mtr>
<mtr>
<mtd>
<mrow>
<mfrac>
<mrow>
<mn>8</mn>
<msubsup>
<mi>l</mi>
<mrow>
<mn>2</mn>
<mi>M</mi>
</mrow>
<mn>2</mn>
</msubsup>
<mrow>
<mo>(</mo>
<msub>
<mi>&beta;</mi>
<mi>m</mi>
</msub>
<mo>-</mo>
<mn>1</mn>
<mo>)</mo>
</mrow>
<mrow>
<mo>(</mo>
<msub>
<mi>l</mi>
<mrow>
<mn>2</mn>
<mi>M</mi>
</mrow>
</msub>
<mo>-</mo>
<mn>3</mn>
<msub>
<mi>l</mi>
<mn>0</mn>
</msub>
<mo>+</mo>
<msub>
<mi>l</mi>
<mrow>
<mn>2</mn>
<mi>M</mi>
</mrow>
</msub>
<msubsup>
<mi>&beta;</mi>
<mi>m</mi>
<mn>2</mn>
</msubsup>
<mo>+</mo>
<msub>
<mi>l</mi>
<mrow>
<mn>2</mn>
<mi>M</mi>
</mrow>
</msub>
<msub>
<mi>&beta;</mi>
<mi>m</mi>
</msub>
<mo>)</mo>
</mrow>
</mrow>
<mrow>
<mi>E</mi>
<mi>b</mi>
</mrow>
</mfrac>
<mo>;</mo>
</mrow>
</mtd>
</mtr>
</mtable>
</mfenced>
III步骤:主副簧接触点处受力情况下的第m片主簧端点变形系数的计算:
根据少片抛物线型变截面钢板弹簧主簧的一半长度LM,宽度b,安装间距的一半l3,抛物线根部到主簧端点的距离l2M,弹性模量E,第m片主簧的抛物线段的厚度比βm,副簧与主簧接触点到主簧端点的距离l0,对主副簧接触点处受力情况下的第m片主簧在端点位置处的变形系数Gx-Dzm进行计算,即
<mfenced open = "" close = "">
<mtable>
<mtr>
<mtd>
<mrow>
<msub>
<mi>G</mi>
<mrow>
<mi>x</mi>
<mo>-</mo>
<mi>D</mi>
<mi>z</mi>
<mi>m</mi>
</mrow>
</msub>
<mo>=</mo>
<mfrac>
<mrow>
<mn>4</mn>
<msup>
<mrow>
<mo>(</mo>
<msub>
<mi>L</mi>
<mi>M</mi>
</msub>
<mo>-</mo>
<msub>
<mi>l</mi>
<mn>3</mn>
</msub>
<mo>/</mo>
<mn>2</mn>
<mo>)</mo>
</mrow>
<mn>3</mn>
</msup>
<mo>-</mo>
<mn>6</mn>
<msub>
<mi>l</mi>
<mn>0</mn>
</msub>
<msup>
<mrow>
<mo>(</mo>
<msub>
<mi>L</mi>
<mi>M</mi>
</msub>
<mo>-</mo>
<msub>
<mi>l</mi>
<mn>3</mn>
</msub>
<mo>/</mo>
<mn>2</mn>
<mo>)</mo>
</mrow>
<mn>2</mn>
</msup>
<mo>-</mo>
<mn>4</mn>
<msubsup>
<mi>l</mi>
<mrow>
<mn>2</mn>
<mi>M</mi>
</mrow>
<mn>3</mn>
</msubsup>
<mo>+</mo>
<mn>6</mn>
<msub>
<mi>l</mi>
<mn>0</mn>
</msub>
<msubsup>
<mi>l</mi>
<mrow>
<mn>2</mn>
<mi>M</mi>
</mrow>
<mn>2</mn>
</msubsup>
</mrow>
<mrow>
<mi>E</mi>
<mi>b</mi>
</mrow>
</mfrac>
<mo>+</mo>
<mfrac>
<mrow>
<mn>2</mn>
<msup>
<mrow>
<mo>(</mo>
<msub>
<mi>l</mi>
<mn>0</mn>
</msub>
<mo>-</mo>
<msub>
<mi>l</mi>
<mrow>
<mn>2</mn>
<mi>M</mi>
</mrow>
</msub>
<msubsup>
<mi>&beta;</mi>
<mi>m</mi>
<mn>2</mn>
</msubsup>
<mo>)</mo>
</mrow>
<mn>2</mn>
</msup>
<mrow>
<mo>(</mo>
<mn>2</mn>
<msub>
<mi>l</mi>
<mrow>
<mn>2</mn>
<mi>M</mi>
</mrow>
</msub>
<msubsup>
<mi>&beta;</mi>
<mi>m</mi>
<mn>2</mn>
</msubsup>
<mo>+</mo>
<msub>
<mi>l</mi>
<mn>0</mn>
</msub>
<mo>)</mo>
</mrow>
</mrow>
<mrow>
<msubsup>
<mi>Eb&beta;</mi>
<mi>m</mi>
<mn>3</mn>
</msubsup>
</mrow>
</mfrac>
<mo>-</mo>
</mrow>
</mtd>
</mtr>
<mtr>
<mtd>
<mrow>
<mfrac>
<mrow>
<mn>8</mn>
<msubsup>
<mi>l</mi>
<mrow>
<mn>2</mn>
<mi>M</mi>
</mrow>
<mn>2</mn>
</msubsup>
<mrow>
<mo>(</mo>
<msub>
<mi>&beta;</mi>
<mi>m</mi>
</msub>
<mo>-</mo>
<mn>1</mn>
<mo>)</mo>
</mrow>
<mrow>
<mo>(</mo>
<msub>
<mi>l</mi>
<mrow>
<mn>2</mn>
<mi>M</mi>
</mrow>
</msub>
<mo>-</mo>
<mn>3</mn>
<msub>
<mi>l</mi>
<mn>0</mn>
</msub>
<mo>+</mo>
<msub>
<mi>l</mi>
<mrow>
<mn>2</mn>
<mi>M</mi>
</mrow>
</msub>
<msubsup>
<mi>&beta;</mi>
<mi>m</mi>
<mn>2</mn>
</msubsup>
<mo>+</mo>
<msub>
<mi>l</mi>
<mrow>
<mn>2</mn>
<mi>M</mi>
</mrow>
</msub>
<msub>
<mi>&beta;</mi>
<mi>m</mi>
</msub>
<mo>)</mo>
</mrow>
</mrow>
<mrow>
<mi>E</mi>
<mi>b</mi>
</mrow>
</mfrac>
<mo>;</mo>
</mrow>
</mtd>
</mtr>
</mtable>
</mfenced>
IV步骤:主副簧接触点处受力情况下的第m片主簧在副簧接触点处变形系数的计算:
根据少片抛物线型变截面钢板弹簧主簧的一半长度LM,宽度b,安装间距的一半l3,抛物线根部到主簧端点的距离l2M,弹性模量E,第m片主簧的抛物线段的厚度比βm,副簧与主簧接触点到主簧端点的距离l0,对主副簧接触点处受力情况下的第m片主簧在端部平直段与副簧接触点处的变形系数Gx-CDz进行计算,即
<mfenced open = "" close = "">
<mtable>
<mtr>
<mtd>
<mrow>
<msub>
<mi>G</mi>
<mrow>
<mi>x</mi>
<mo>-</mo>
<mi>C</mi>
<mi>D</mi>
<mi>z</mi>
</mrow>
</msub>
<mo>=</mo>
<mfrac>
<mrow>
<mn>4</mn>
<mrow>
<mo>(</mo>
<msub>
<mi>L</mi>
<mi>M</mi>
</msub>
<mo>-</mo>
<msub>
<mi>l</mi>
<mn>3</mn>
</msub>
<mo>/</mo>
<mn>2</mn>
<mo>-</mo>
<msub>
<mi>l</mi>
<mrow>
<mn>2</mn>
<mi>M</mi>
</mrow>
</msub>
<mo>)</mo>
</mrow>
<mo>&lsqb;</mo>
<msup>
<mrow>
<mo>(</mo>
<msub>
<mi>L</mi>
<mi>M</mi>
</msub>
<mo>-</mo>
<msub>
<mi>l</mi>
<mn>3</mn>
</msub>
<mo>/</mo>
<mn>2</mn>
<mo>)</mo>
</mrow>
<mn>2</mn>
</msup>
<mo>-</mo>
<mn>3</mn>
<mrow>
<mo>(</mo>
<msub>
<mi>L</mi>
<mi>M</mi>
</msub>
<mo>-</mo>
<msub>
<mi>l</mi>
<mn>3</mn>
</msub>
<mo>/</mo>
<mn>2</mn>
<mo>)</mo>
</mrow>
<msub>
<mi>l</mi>
<mn>0</mn>
</msub>
<mo>+</mo>
<mrow>
<mo>(</mo>
<msub>
<mi>L</mi>
<mi>M</mi>
</msub>
<mo>-</mo>
<msub>
<mi>l</mi>
<mn>3</mn>
</msub>
<mo>/</mo>
<mn>2</mn>
<mo>)</mo>
</mrow>
<msub>
<mi>l</mi>
<mrow>
<mn>2</mn>
<mi>M</mi>
</mrow>
</msub>
<mo>+</mo>
<mn>3</mn>
<msubsup>
<mi>l</mi>
<mn>0</mn>
<mn>2</mn>
</msubsup>
<mo>-</mo>
<mn>3</mn>
<msub>
<mi>l</mi>
<mn>0</mn>
</msub>
<msub>
<mi>l</mi>
<mrow>
<mn>2</mn>
<mi>M</mi>
</mrow>
</msub>
<mo>+</mo>
<msubsup>
<mi>l</mi>
<mrow>
<mn>2</mn>
<mi>M</mi>
</mrow>
<mn>2</mn>
</msubsup>
<mo>&rsqb;</mo>
</mrow>
<mrow>
<mi>E</mi>
<mi>b</mi>
</mrow>
</mfrac>
<mo>-</mo>
</mrow>
</mtd>
</mtr>
<mtr>
<mtd>
<mrow>
<mfrac>
<mrow>
<mn>4</mn>
<msup>
<mrow>
<mo>(</mo>
<msub>
<mi>l</mi>
<mn>0</mn>
</msub>
<mo>-</mo>
<msub>
<mi>l</mi>
<mrow>
<mn>2</mn>
<mi>M</mi>
</mrow>
</msub>
<msubsup>
<mi>&beta;</mi>
<mi>m</mi>
<mn>2</mn>
</msubsup>
<mo>)</mo>
</mrow>
<mn>3</mn>
</msup>
</mrow>
<mrow>
<msubsup>
<mi>Eb&beta;</mi>
<mi>m</mi>
<mn>3</mn>
</msubsup>
</mrow>
</mfrac>
<mo>-</mo>
<mfrac>
<mrow>
<mn>12</mn>
<msub>
<mi>l</mi>
<mrow>
<mn>2</mn>
<mi>M</mi>
</mrow>
</msub>
</mrow>
<mrow>
<mi>E</mi>
<mi>b</mi>
</mrow>
</mfrac>
<mo>&lsqb;</mo>
<mn>4</mn>
<msub>
<mi>l</mi>
<mn>0</mn>
</msub>
<msub>
<mi>l</mi>
<mrow>
<mn>2</mn>
<mi>M</mi>
</mrow>
</msub>
<mrow>
<mo>(</mo>
<mn>1</mn>
<mo>-</mo>
<msub>
<mi>&beta;</mi>
<mi>m</mi>
</msub>
<mo>)</mo>
</mrow>
<mo>+</mo>
<mn>2</mn>
<msubsup>
<mi>l</mi>
<mn>0</mn>
<mn>2</mn>
</msubsup>
<mrow>
<mo>(</mo>
<mn>1</mn>
<mo>-</mo>
<mfrac>
<mn>1</mn>
<msub>
<mi>&beta;</mi>
<mi>m</mi>
</msub>
</mfrac>
<mo>)</mo>
</mrow>
<mo>+</mo>
<mfrac>
<mrow>
<mn>2</mn>
<msubsup>
<mi>l</mi>
<mrow>
<mn>2</mn>
<mi>M</mi>
</mrow>
<mn>2</mn>
</msubsup>
<mrow>
<mo>(</mo>
<msubsup>
<mi>&beta;</mi>
<mi>m</mi>
<mn>3</mn>
</msubsup>
<mo>-</mo>
<mn>1</mn>
<mo>)</mo>
</mrow>
</mrow>
<mn>3</mn>
</mfrac>
<mo>&rsqb;</mo>
<mo>;</mo>
</mrow>
</mtd>
</mtr>
</mtable>
</mfenced>
V步骤:端点受力情况下的各片副簧端点变形系数的计算:
根据少片抛物线型变截面钢板弹簧副簧的一半长度LA,宽度b,安装间距的一半l3,抛物线根部到副簧端点的距离l2A,弹性模量E,第j片副簧的抛物线段的厚度比βAj,其中,j=1,2,…,n,n为副簧片数,对端点受力情况下的各片副簧在端点位置处的变形系数Gx-DAj进行计算,即
<mrow>
<msub>
<mi>G</mi>
<mrow>
<mi>x</mi>
<mo>-</mo>
<mi>D</mi>
<mi>A</mi>
<mi>j</mi>
</mrow>
</msub>
<mo>=</mo>
<mfrac>
<mrow>
<mn>4</mn>
<mo>&lsqb;</mo>
<msubsup>
<mi>l</mi>
<mrow>
<mn>2</mn>
<mi>A</mi>
</mrow>
<mn>3</mn>
</msubsup>
<mrow>
<mo>(</mo>
<mn>1</mn>
<mo>-</mo>
<msubsup>
<mi>&beta;</mi>
<mrow>
<mi>A</mi>
<mi>j</mi>
</mrow>
<mn>3</mn>
</msubsup>
<mo>)</mo>
</mrow>
<mo>+</mo>
<msup>
<mrow>
<mo>(</mo>
<msub>
<mi>L</mi>
<mi>A</mi>
</msub>
<mo>-</mo>
<msub>
<mi>l</mi>
<mn>3</mn>
</msub>
<mo>/</mo>
<mn>2</mn>
<mo>)</mo>
</mrow>
<mn>3</mn>
</msup>
<mo>&rsqb;</mo>
</mrow>
<mrow>
<mi>E</mi>
<mi>b</mi>
</mrow>
</mfrac>
<mo>;</mo>
</mrow>
其中,n片副簧叠加后的变形系数Gx-DAT为
<mrow>
<msub>
<mi>G</mi>
<mrow>
<mi>x</mi>
<mo>-</mo>
<mi>D</mi>
<mi>A</mi>
<mi>T</mi>
</mrow>
</msub>
<mo>=</mo>
<mfrac>
<mn>1</mn>
<mrow>
<munderover>
<mo>&Sigma;</mo>
<mrow>
<mi>j</mi>
<mo>=</mo>
<mn>1</mn>
</mrow>
<mi>n</mi>
</munderover>
<mfrac>
<mn>1</mn>
<msub>
<mi>G</mi>
<mrow>
<mi>x</mi>
<mo>-</mo>
<mi>D</mi>
<mi>A</mi>
<mi>j</mi>
</mrow>
</msub>
</mfrac>
</mrow>
</mfrac>
<mo>;</mo>
</mrow>
(2)端部接触式少片抛物线型钢板弹簧主、副簧各片夹紧刚度的计算:
A步骤:副簧接触之前的各片主簧夹紧刚度KMi的计算:
根据主簧根部厚度h2M,及步骤(1)的I步骤中计算得到的Gx-Di,确定副簧接触之前的各片主簧在夹紧状态下的一半刚度KMi,即
<mrow>
<mtable>
<mtr>
<mtd>
<mrow>
<msub>
<mi>K</mi>
<mrow>
<mi>M</mi>
<mi>i</mi>
</mrow>
</msub>
<mo>=</mo>
<mfrac>
<msubsup>
<mi>h</mi>
<mrow>
<mn>2</mn>
<mi>M</mi>
</mrow>
<mn>3</mn>
</msubsup>
<msub>
<mi>G</mi>
<mrow>
<mi>x</mi>
<mo>-</mo>
<mi>D</mi>
<mi>i</mi>
</mrow>
</msub>
</mfrac>
<mo>,</mo>
</mrow>
</mtd>
<mtd>
<mrow>
<mi>i</mi>
<mo>=</mo>
<mn>1</mn>
<mo>,</mo>
<mn>2</mn>
<mo>,</mo>
<mn>...</mn>
<mo>,</mo>
<mi>m</mi>
</mrow>
</mtd>
</mtr>
</mtable>
<mo>;</mo>
</mrow>
其中,m为主簧片数;
B步骤:副簧接触之后的各片主簧夹紧刚度KMAi的计算:
根据主簧根部厚度h2M,副簧根部厚度h2A,步骤(1)的I步骤中计算得到的Gx-Di、II步骤中计算得到的Gx-CD、III步骤中计算得到的Gx-Dzm、IV步骤中计算得到的Gx-CDz、及V步骤中计算得到的Gx-DAT,确定主副簧接触之后的各片主簧在夹紧状态下的一半刚度KMAi,即
<mrow>
<msub>
<mi>K</mi>
<mrow>
<mi>M</mi>
<mi>A</mi>
<mi>i</mi>
</mrow>
</msub>
<mo>=</mo>
<mfenced open = "{" close = "">
<mtable>
<mtr>
<mtd>
<mrow>
<mfrac>
<msubsup>
<mi>h</mi>
<mrow>
<mn>2</mn>
<mi>M</mi>
</mrow>
<mn>3</mn>
</msubsup>
<msub>
<mi>G</mi>
<mrow>
<mi>x</mi>
<mo>-</mo>
<mi>D</mi>
<mi>i</mi>
</mrow>
</msub>
</mfrac>
<mo>,</mo>
</mrow>
</mtd>
<mtd>
<mrow>
<mi>i</mi>
<mo>=</mo>
<mn>1</mn>
<mo>,</mo>
<mn>2</mn>
<mo>,</mo>
<mn>...</mn>
<mo>,</mo>
<mi>m</mi>
<mo>-</mo>
<mn>1</mn>
</mrow>
</mtd>
</mtr>
<mtr>
<mtd>
<mrow>
<mfrac>
<mrow>
<msubsup>
<mi>h</mi>
<mrow>
<mn>2</mn>
<mi>M</mi>
</mrow>
<mn>3</mn>
</msubsup>
<mrow>
<mo>(</mo>
<msub>
<mi>G</mi>
<mrow>
<mi>x</mi>
<mo>-</mo>
<mi>D</mi>
<mi>A</mi>
<mi>T</mi>
</mrow>
</msub>
<msubsup>
<mi>h</mi>
<mrow>
<mn>2</mn>
<mi>M</mi>
</mrow>
<mn>3</mn>
</msubsup>
<mo>+</mo>
<msub>
<mi>G</mi>
<mrow>
<mi>x</mi>
<mo>-</mo>
<mi>C</mi>
<mi>D</mi>
<mi>z</mi>
</mrow>
</msub>
<msubsup>
<mi>h</mi>
<mrow>
<mn>2</mn>
<mi>A</mi>
</mrow>
<mn>3</mn>
</msubsup>
<mo>)</mo>
</mrow>
</mrow>
<mrow>
<msub>
<mi>G</mi>
<mrow>
<mi>x</mi>
<mo>-</mo>
<mi>D</mi>
<mi>m</mi>
</mrow>
</msub>
<mrow>
<mo>(</mo>
<msub>
<mi>G</mi>
<mrow>
<mi>x</mi>
<mo>-</mo>
<mi>D</mi>
<mi>A</mi>
<mi>T</mi>
</mrow>
</msub>
<msubsup>
<mi>h</mi>
<mrow>
<mn>2</mn>
<mi>M</mi>
</mrow>
<mn>3</mn>
</msubsup>
<mo>+</mo>
<msub>
<mi>G</mi>
<mrow>
<mi>x</mi>
<mo>-</mo>
<mi>C</mi>
<mi>D</mi>
<mi>z</mi>
</mrow>
</msub>
<msubsup>
<mi>h</mi>
<mrow>
<mn>2</mn>
<mi>A</mi>
</mrow>
<mn>3</mn>
</msubsup>
<mo>)</mo>
</mrow>
<mo>-</mo>
<msub>
<mi>G</mi>
<mrow>
<mi>x</mi>
<mo>-</mo>
<mi>D</mi>
<mi>z</mi>
<mi>m</mi>
</mrow>
</msub>
<msub>
<mi>G</mi>
<mrow>
<mi>x</mi>
<mo>-</mo>
<mi>C</mi>
<mi>D</mi>
</mrow>
</msub>
<msubsup>
<mi>h</mi>
<mrow>
<mn>2</mn>
<mi>A</mi>
</mrow>
<mn>3</mn>
</msubsup>
</mrow>
</mfrac>
<mo>,</mo>
</mrow>
</mtd>
<mtd>
<mrow>
<mi>i</mi>
<mo>=</mo>
<mi>m</mi>
</mrow>
</mtd>
</mtr>
</mtable>
</mfenced>
<mo>;</mo>
</mrow>
其中,m为主簧片数;
C步骤:各片副簧夹紧刚度KAj的计算:
根据副簧根部厚度h2A,及步骤(1)的V步骤中计算得到的Gx-DAj,确定各片副簧在夹紧状态下的一半刚度KAj,即
<mrow>
<mtable>
<mtr>
<mtd>
<mrow>
<msub>
<mi>K</mi>
<mrow>
<mi>A</mi>
<mi>j</mi>
</mrow>
</msub>
<mo>=</mo>
<mfrac>
<msubsup>
<mi>h</mi>
<mrow>
<mn>2</mn>
<mi>A</mi>
</mrow>
<mn>3</mn>
</msubsup>
<msub>
<mi>G</mi>
<mrow>
<mi>x</mi>
<mo>-</mo>
<mi>D</mi>
<mi>A</mi>
<mi>j</mi>
</mrow>
</msub>
</mfrac>
<mo>,</mo>
</mrow>
</mtd>
<mtd>
<mrow>
<mi>j</mi>
<mo>=</mo>
<mn>1</mn>
<mo>,</mo>
<mn>2</mn>
<mo>,</mo>
<mn>...</mn>
<mo>,</mo>
<mi>n</mi>
</mrow>
</mtd>
</mtr>
</mtable>
<mo>;</mo>
</mrow>
其中,n为副簧片数;
(3)额定载荷下的抛物线型钢板弹簧主、副簧端部变形的计算:
i步骤:副簧起作用时的一半载荷PK的计算:
根据主簧根部厚度h2M,接触点处的主副簧间隙δ,主簧片数m,步骤(1)的II步骤中计算得到的Gx-CD,及步骤(2)的A步骤中确定的KMi,确定副簧起作用时的一半载荷PK,即
<mrow>
<msub>
<mi>P</mi>
<mi>K</mi>
</msub>
<mo>=</mo>
<mfrac>
<mrow>
<msubsup>
<mi>&delta;h</mi>
<mrow>
<mn>2</mn>
<mi>M</mi>
</mrow>
<mn>3</mn>
</msubsup>
<munderover>
<mo>&Sigma;</mo>
<mrow>
<mi>i</mi>
<mo>=</mo>
<mn>1</mn>
</mrow>
<mi>m</mi>
</munderover>
<msub>
<mi>K</mi>
<mrow>
<mi>M</mi>
<mi>i</mi>
</mrow>
</msub>
</mrow>
<mrow>
<msub>
<mi>G</mi>
<mrow>
<mi>x</mi>
<mo>-</mo>
<mi>C</mi>
<mi>D</mi>
</mrow>
</msub>
<msub>
<mi>K</mi>
<mrow>
<mi>M</mi>
<mi>m</mi>
</mrow>
</msub>
</mrow>
</mfrac>
<mo>;</mo>
</mrow>
ii步骤:主簧端部变形的计算:
根据少片抛物线型变截面钢板弹簧主簧所受的一半额定载荷P,主簧片数m,i步骤中计算得到的PK,及步骤(2)的A步骤中确定的KMi、B步骤中确定的KMAi,对额定载荷下的主簧的端部变形fMD进行计算,即
<mrow>
<msub>
<mi>f</mi>
<mrow>
<mi>M</mi>
<mi>D</mi>
</mrow>
</msub>
<mo>=</mo>
<mfrac>
<msub>
<mi>P</mi>
<mi>K</mi>
</msub>
<mrow>
<munderover>
<mo>&Sigma;</mo>
<mrow>
<mi>i</mi>
<mo>=</mo>
<mn>1</mn>
</mrow>
<mi>m</mi>
</munderover>
<msub>
<mi>K</mi>
<mrow>
<mi>M</mi>
<mi>i</mi>
</mrow>
</msub>
</mrow>
</mfrac>
<mo>+</mo>
<mfrac>
<mrow>
<mo>(</mo>
<mi>P</mi>
<mo>-</mo>
<msub>
<mi>P</mi>
<mi>K</mi>
</msub>
<mo>)</mo>
</mrow>
<mrow>
<munderover>
<mo>&Sigma;</mo>
<mrow>
<mi>i</mi>
<mo>=</mo>
<mn>1</mn>
</mrow>
<mi>m</mi>
</munderover>
<msub>
<mi>K</mi>
<mrow>
<mi>M</mi>
<mi>A</mi>
<mi>i</mi>
</mrow>
</msub>
</mrow>
</mfrac>
<mo>;</mo>
</mrow>
iii步骤:副簧端部变形的计算:
根据少片抛物线型变截面钢板弹簧主簧所受的一半额定载荷P,主簧根部厚度h2M,副簧根部厚度h2A,主簧片数m,副簧片数n,i步骤中确定的PK,步骤(1)的II步骤中计算得到的Gx-CD、IV步骤中计算得到的Gx-CDz、V步骤中计算得到的Gx-DAT,及步骤(2)的B步骤中确定的KMAi、C步骤中确定的KAj,对额定载荷下的副簧的端部变形fAD进行计算,即
<mrow>
<msub>
<mi>f</mi>
<mrow>
<mi>A</mi>
<mi>D</mi>
</mrow>
</msub>
<mo>=</mo>
<mfrac>
<mrow>
<msub>
<mi>K</mi>
<mrow>
<mi>M</mi>
<mi>A</mi>
<mi>m</mi>
</mrow>
</msub>
<msub>
<mi>G</mi>
<mrow>
<mi>x</mi>
<mo>-</mo>
<mi>C</mi>
<mi>D</mi>
</mrow>
</msub>
<msubsup>
<mi>h</mi>
<mrow>
<mn>2</mn>
<mi>A</mi>
</mrow>
<mn>3</mn>
</msubsup>
<mrow>
<mo>(</mo>
<mi>P</mi>
<mo>-</mo>
<msub>
<mi>P</mi>
<mi>K</mi>
</msub>
<mo>)</mo>
</mrow>
</mrow>
<mrow>
<munderover>
<mo>&Sigma;</mo>
<mrow>
<mi>j</mi>
<mo>=</mo>
<mn>1</mn>
</mrow>
<mi>n</mi>
</munderover>
<msub>
<mi>K</mi>
<mrow>
<mi>A</mi>
<mi>j</mi>
</mrow>
</msub>
<munderover>
<mo>&Sigma;</mo>
<mrow>
<mi>i</mi>
<mo>=</mo>
<mn>1</mn>
</mrow>
<mi>m</mi>
</munderover>
<msub>
<mi>K</mi>
<mrow>
<mi>M</mi>
<mi>A</mi>
<mi>i</mi>
</mrow>
</msub>
<mrow>
<mo>(</mo>
<msub>
<mi>G</mi>
<mrow>
<mi>x</mi>
<mo>-</mo>
<mi>D</mi>
<mi>A</mi>
<mi>T</mi>
</mrow>
</msub>
<msubsup>
<mi>h</mi>
<mrow>
<mn>2</mn>
<mi>M</mi>
</mrow>
<mn>3</mn>
</msubsup>
<mo>+</mo>
<msub>
<mi>G</mi>
<mrow>
<mi>x</mi>
<mo>-</mo>
<mi>C</mi>
<mi>D</mi>
<mi>z</mi>
</mrow>
</msub>
<msubsup>
<mi>h</mi>
<mrow>
<mn>2</mn>
<mi>A</mi>
</mrow>
<mn>3</mn>
</msubsup>
<mo>)</mo>
</mrow>
</mrow>
</mfrac>
<mo>;</mo>
</mrow>
(4)端部接触式少片抛物线型钢板弹簧主、副簧初始切线弧高的设计:
a步骤:主簧初始切线弧高的设计:
根据额定载荷下的剩余切线弧高设计要求值Hm,及步骤(3)的ii步骤中计算得到的fMD,确定各片主簧的初始切线弧高,即
HMci=Hm+fMD,i=1,2,…,m;
其中,m为主簧片数;
b步骤:副簧初始切线弧高的设计:
根据额定载荷下的剩余切线弧高设计要求值Hm,及步骤(3)的iii步骤中计算得到的fAD,确定各片副簧的初始切线弧高,即
HAcj=Hm+fAD,j=1,2,…,n;
其中,n为副簧片数。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610907514.4A CN106402225B (zh) | 2016-10-18 | 2016-10-18 | 端部接触式少片抛物线型主副簧弧高的设计方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610907514.4A CN106402225B (zh) | 2016-10-18 | 2016-10-18 | 端部接触式少片抛物线型主副簧弧高的设计方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106402225A CN106402225A (zh) | 2017-02-15 |
CN106402225B true CN106402225B (zh) | 2018-03-20 |
Family
ID=58012662
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610907514.4A Expired - Fee Related CN106402225B (zh) | 2016-10-18 | 2016-10-18 | 端部接触式少片抛物线型主副簧弧高的设计方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106402225B (zh) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112855818A (zh) * | 2020-12-31 | 2021-05-28 | 浙江伏牛钢板弹簧有限公司 | 少片不等长组合钢板弹簧及其刚度和挠度计算方法 |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS4914896Y1 (zh) * | 1969-08-01 | 1974-04-13 | ||
CN102734364A (zh) * | 2012-07-17 | 2012-10-17 | 山东理工大学 | 汽车钢板弹簧弧高与曲面形状的解析设计方法 |
CN105590009B (zh) * | 2016-03-15 | 2018-09-18 | 山东汽车弹簧厂淄博有限公司 | 非端部接触端部加强少片主副簧的副簧起作用载荷验算法 |
CN105808863B (zh) * | 2016-03-15 | 2018-12-04 | 滁州海川印刷包装有限公司 | 端部接触式少片变截面主副簧的副簧起作用载荷验算方法 |
CN105808888B (zh) * | 2016-04-14 | 2019-05-28 | 山东恒日悬架弹簧有限公司 | 端部接触式少片抛物线型变截面副簧根部厚度的设计方法 |
CN105740591A (zh) * | 2016-04-28 | 2016-07-06 | 王炳超 | 端部接触式少片斜线型主副簧各片强度的校核方法 |
-
2016
- 2016-10-18 CN CN201610907514.4A patent/CN106402225B/zh not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
CN106402225A (zh) | 2017-02-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106326605A (zh) | 非端部接触式少片抛物线型主副簧挠度的计算方法 | |
CN106295086A (zh) | 端部接触式少片抛物线型主副簧限位挠度的设计方法 | |
CN105653883B (zh) | 非端部接触式斜线型主副簧的副簧起作用载荷的验算方法 | |
CN106286660B (zh) | 端部非等构的少片根部加强型钢板弹簧弧高的设计方法 | |
CN106246778B (zh) | 端部非等构少片两端加强型板簧限位挠度的设计方法 | |
CN105956270A (zh) | 端部接触式少片端部加强型主副簧各片应力的计算方法 | |
CN105975663A (zh) | 端部接触式少片斜线型主副簧各片应力的计算方法 | |
CN106402225B (zh) | 端部接触式少片抛物线型主副簧弧高的设计方法 | |
CN105825008B (zh) | 非端部接触式少片变截面主副簧的副簧起作用载荷验算方法 | |
CN105912794B (zh) | 非端部接触式少片抛物线型主副簧各片应力的计算方法 | |
CN106446449B (zh) | 非端部接触式抛物线型板簧副簧起作用载荷设计方法 | |
CN106015414B (zh) | 端部接触式少片端部加强型变截面主副簧复合刚度的验算方法 | |
CN106402221B (zh) | 非端部接触式少片抛物线型主副簧弧高的设计方法 | |
CN106295087B (zh) | 端部非等构少片根部加强型板簧限位挠度的设计方法 | |
CN106402220B (zh) | 端部非等构的少片抛物线型钢板弹簧弧高的设计方法 | |
CN106372371B (zh) | 端部接触式少片抛物线型主副簧挠度的计算方法 | |
CN105956311A (zh) | 非端部接触式少片端部加强型副簧根部厚度的设计方法 | |
CN105889378B (zh) | 端部接触式少片端部加强型副簧根部厚度的设计方法 | |
CN105956308B (zh) | 非端部接触式少片端部加强型主副簧复合刚度的验算方法 | |
CN105912795A (zh) | 非端部接触式少片抛物线型主副簧端点力的确定方法 | |
CN106438798B (zh) | 端部非等构少片端部加强型板簧限位挠度的设计方法 | |
CN106641055A (zh) | 端部接触式抛物线型板簧副簧起作用载荷设计方法 | |
CN106649965A (zh) | 非端部接触式少片抛物线型主副簧限位挠度的设计方法 | |
CN105912801B (zh) | 非端部接触式少片根部加强型主副簧各片应力的计算方法 | |
CN105736615B (zh) | 非端部接触式少片端部加强型主副簧的副簧刚度设计方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180320 Termination date: 20201018 |
|
CF01 | Termination of patent right due to non-payment of annual fee |