CN106400740A - Novel plugging method and device used after dike breaking - Google Patents

Novel plugging method and device used after dike breaking Download PDF

Info

Publication number
CN106400740A
CN106400740A CN201610850838.9A CN201610850838A CN106400740A CN 106400740 A CN106400740 A CN 106400740A CN 201610850838 A CN201610850838 A CN 201610850838A CN 106400740 A CN106400740 A CN 106400740A
Authority
CN
China
Prior art keywords
truss
breach
hawser
anchor
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610850838.9A
Other languages
Chinese (zh)
Other versions
CN106400740B (en
Inventor
陈明
卢思捷
卢文波
董恒
王高辉
严鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan University WHU
Original Assignee
Wuhan University WHU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan University WHU filed Critical Wuhan University WHU
Priority to CN201610850838.9A priority Critical patent/CN106400740B/en
Publication of CN106400740A publication Critical patent/CN106400740A/en
Application granted granted Critical
Publication of CN106400740B publication Critical patent/CN106400740B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • E02B3/10Dams; Dykes; Sluice ways or other structures for dykes, dams, or the like
    • E02B3/106Temporary dykes
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A10/00TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
    • Y02A10/11Hard structures, e.g. dams, dykes or breakwaters

Abstract

The invention discloses a novel plugging method and device used after dike breaking. The device comprises iron anchors, a steel wire rope and trusses; each truss is provided with a connecting rope with a hook, and the iron anchors are used for pulling the two ends of the steel wire rope and fixed to dike heads at the two ends of a crevasse; and the trusses are connected to the steel wire rope through the hooks, and thrown into the crevasse to form a basic water blocking framework together with the steel wire rope. The method is characterized in that the device is put into the crevasse to form the water blocking framework, and then building stones are thrown into the crevasse for plugging. By means of the method and device, the preparation work is less, construction is simple, and plugging is rapid.

Description

A kind of method and device of blocking up after new dyke breaking
Technical field
The present invention relates to flood control works technical field, in particular to block up method and dress after a kind of new dyke breaking Put.
Technical background
Dyke building is to resist a kind of flood measure, and therefore it is widely deployed and prevents in water conservancy In big vast engineering.But it is subject to economic condition, impact the problems such as historical reasons, China's existing dike has that levee body condition is poor, levee body Multiple hidden danger such as material and construction quality difference.When dyke is attacked by flood, flood exceedes the defensive ability/resistance ability of dyke, or Gao Shui Position flood soaks dyke for a long time and occurs rescuing and protecting and improper all can cause to burst.
Due to a variety of causes, it is very difficult to eliminate dyke breaking phenomenon, and the existing tradition of China technology of blocking up mainly has Native stone is blocked up, gabion is blocked up, the method for attacking and occupying of driving piles is blocked up, shipwreck is blocked up and the special bags of willow branches, framed by bamboo, for building dykes work method of attacking and occupying is blocked up, but all by breach The depth of water, flow velocity, drop, the condition such as soil property limit.These technology enforcement difficulties are big, preparation is many, low construction efficiency, operation Personnel hazard's coefficient is high, expend substantial amounts of manpower and materials, and constructs that time-consuming, leads to submergence ratio big, people's life and wealth Produce loss big.
Content of the invention
The present invention is aiming at the deficiencies in the prior art, there is provided a kind of preparation and construction are all simple, quickly new Method and device of blocking up after type dyke breaking.
To achieve these goals, the method for blocking up after the new dyke breaking designed by the present invention, its special character exists In comprising the following steps:
A robs to build wraps up in head;
B processes anchor, hawser and some truss according to breach width, wherein:Described anchor is used for holding hawser two ends simultaneously It is fixed on the dike head of breach two ends;Described truss is connected on hawser, is together formed with hawser in the breach that is used for jettisoninging Basic dash skeleton is it is preferable that truss is made using steel pipe or reinforcing bar;
C jettisonings anchor fixation respectively so that the hawser being connected on two anchors is tightened simultaneously on the dike head at breach two ends It is across above breach;
D truss is fixed on hawser and jettisonings in breach;
E is toward first jettisoninging vegetation bundle truss upstream side, then throwing earth and stone material, until filling up breach, completes work of blocking up.
Preferably, the distance away from dike head for the described anchor is 1 ~ 10m.
Further, fix anchor in described step c to refer specifically to first anchor is fixed on dike head, then increase at anchor position If steel-pipe pile, and fill block stone throwing ballast.Increase the stability of whole water blocking process.
Yet further, described truss is disposed with 2 ~ 5 rows along breach direction, increases the stability of whole dash skeleton.
A kind of plugging device after new dyke breaking, it is characterized in that:Including anchor, hawser and truss, institute State and the connecting rope with hook is provided with truss, described anchor is used for holding hawser two ends and being fixed on breach two ends dike head On;Described truss is connected on hawser by hook, and described purlin is used for jettisoninging in breach and together being formed substantially with hawser Dash skeleton.
Further, described truss includes the center of circle multiple circular frameworks on the same line, and described circular framework is by even Extension bar is fixed, and described circular framework is provided with many interception bars, and described interception bar and circular framework are at grade and edge Even circumferential is arranged, described each interception bar meets at circle centre position, and its end is circumferentially outer to be in divergent shape distribution, intercepts bar and intersects at The center of circle and with weld or riveting etc. method be fixed on circle centre position.This truss is conducive to keeping stable in water, and in breach Play a gear effect.
Further, described truss is provided with two kinds of sizes of size, and described small size truss is located at the side that meets water, described big Size truss small size truss downstream.Described setting structure makes truss form more closely knit retaining structure in breach, favorably In gear vegetation bundle and an earth and stone material.
Preferably, described circular framework is provided with 2 ~ 10.
Yet further, described circular framework spacing is 0.6 ~ 1m.
Yet further, described circular framework is fixed by 2 ~ 6 connecting rods, described large-sized truss intercept bar length 3 ~ 6m, undersized truss intercepts bar length 2 ~ 3m.
Yet further, a diameter of 0.5m ~ 3m of described circular framework, circular framework diameter of section is 20mm ~ 100mm.
It is an advantage of the current invention that:
1st, anchor, hawser, truss are collectively forming supporting file skeleton, and anchor, truss are embedded in riverbed, retaining structure stability Well it is not easy to be washed away by water.
2nd, vegetation bundle will not directly be flushed away under the protection of dash skeleton, thus being formed preliminary together with dash skeleton Water-retaining structure, can effectively intercept the earth and stone material jettisoninged in burst, thus reaching purpose of quickly blocking up.
3rd, preparation is less, and construction is simple, is easy to workmen's operation, improves efficiency of construction, and closure speed is fast.
Brief description
Fig. 1 be a kind of new dyke breaking after plugging device structural representation in the application.
Fig. 2 is anchor and hawser attachment structure schematic diagram.
Fig. 3 is the truss structure schematic diagram with hook.
Fig. 4 is the left view of Fig. 3.
Fig. 5 is the girder three-dimensional illustraton of model with hook.
Fig. 6 is hook three-dimensional model diagram.
In figure:Anchor 1, hook 2, hawser 3, truss 4, circular framework 4.1, connecting rod 4.2, intercept bar 4.3, connecting rope 5, dike head 6, the direction of arrow is water (flow) direction.
Specific embodiment
The present invention is described in further detail with specific embodiment below in conjunction with the accompanying drawings:
Method of blocking up after new dyke breaking shown in figure, comprises the following steps:
A robs to build wraps up in head, prevents from bursting to expand further;
B processes anchor 1, hawser 3 and some truss 4 according to breach width, wherein:Described anchor 1 is used for holding 3 liang of hawser Hold and be fixed on breach two ends dike head 6;Truss 4 is connected on hawser 3, in the breach that is used for jettisoninging with hawser 3 together Form basic dash skeleton;
C jettisoning on the dike head 6 at breach two ends respectively anchor 1 and fixing so that the hawser 3 being connected on two anchors 1 stretches tight Tight and be across above breach;
D truss 4 is fixed on hawser 3 and jettisonings in breach;
Toward first jettisoninging vegetation bundle truss 4 upstream side, vegetation bundle forms preliminary water-retaining structure together with dash skeleton to e, then toward certainly Throwing earth and stone material at mouthful, until filling up breach, the earth and stone material that can effectively intercept throwing of preliminary water-retaining structure, thus rapidly Complete work of blocking up.
Before throwing earth and stone material, vegetation bundle of first jettisoninging toward in breach, vegetation bundle will not direct quilt under the protection of supporting file skeleton Washing away, thus forming preliminary water-retaining structure together with supporting file skeleton, reaching purpose of blocking up.Fix anchor 1 in step c to refer specifically to First anchor 1 is fixed on dike head 6, then sets up steel-pipe pile at anchor 1 position, and fill block stone throwing ballast.Truss 4 is along breach direction cloth It is equipped with multiple rows of, generally arranges 2 ~ 5 rows, size is different between row and row, the arrangement of multiple rows of truss 4 increases interdiction capability, So that block up being more prone to, during operation, first the major diameter processing truss 4 is jettisoninged in breach with loop wheel machine, then by minor diameter Truss 4 is jettisoninged in breach, and generally, major diameter truss is located at the downstream of minor diameter truss, and truss 4 passes through to link up with 2 even It is connected to hawser 3, due to truss 4 self gravitation, flow action, the part steel pipe of truss 4 is embedded in riverbed, with hawser 3 Together form basic dash skeleton.Preferably, truss is made using steel pipe or reinforcing bar, the distance away from dike head 6 for the anchor be 1 ~ 10m.
The plugging device after new dyke breaking according to above method making of blocking up, including anchor 1, hawser 3 and Truss 4, truss 4 is provided with the connecting rope 5 with hook 2, and anchor 1 is used for holding hawser 3 two ends and being fixed on breach two ends On dike head 6;Truss 4 passes through to link up with and 2 is connected on hawser 3, and truss 4 is used for jettisoninging in breach and together being formed with hawser 3 Basic dash skeleton, truss 4 is typically provided with 2 ~ 5 rows.
Wherein, truss 4 includes the center of circle multiple circular frameworks 4.1 on the same line, and circular framework 4.1 is by connecting rod 4.2 is fixing, and circular framework 4.1 is provided with many interception bars 4.3, intercept bar 4.3 and circular framework 4.1 at grade and Circumferentially it is evenly arranged, intercepts bar 4.3 and intersect at circle centre position, its end is circumferentially outer to be in divergent shape distribution, intercepts bar and intersects It is fixed on circle centre position in the center of circle and with the method such as welding or riveting.Truss 4 is provided with two kinds of sizes of size, small size truss position In the side that meets water, large scale truss small size truss downstream.Preferably, the interception bar on each circular framework 4.1 is provided with 2 ~ 5 Root, circular framework 4.1 spacing is 0.6 ~ 1m.Large-sized truss intercepts bar length 3 ~ 6m, and undersized truss intercepts bar length 2 ~ 3m. A diameter of 0.5m ~ 3m of circular framework 4.1, the section of circular framework 4.1 is also circle, and diameter of section is 20mm ~ 100mm.
Certain river levee to be attacked due to flood, causes the crevasse that 30m is wide, a width of 6m of dyke, depth of water 1.5m at breach, and this is stifled Vocal imitation skill specific embodiments are as follows:
1st, rob to build and wrap up in head, prevent from bursting to expand further.
2nd, anchor 1, hawser 3 and truss 4 are processed according to breach width.Hawser 3 length is 34m, and two ends are not connected to On anchor 1, truss 4 first makes circular framework 4.1 by steel pipe, and circular framework 4.1 arranges 6 altogether, in each circular framework 4.1 Make interception bar by 3 steel pipes, fixing as connecting rod 4.2 by 3 steel pipes each other.Major diameter truss intercepts the long 4m of bar, Circular framework 4.1 diameter takes 1m, and interval takes 1m;Minor diameter truss intercepts the long 2m of bar 4.2, and circular framework 4.1 diameter takes 0.5m, Every taking 0.7m.
3rd, first jettisoning above dike head 6 one end an anchor 1, after anchor 1 is fixed on riverbed, then in other end dike head 6 Another anchor 1 is jettisoninged so that the hawser 3 being connected on two anchors 1 is fixed on above breach in top, and in anchor 1 Steel-pipe pile is set up in position, and fill block stone throwing ballast, fixes anchor 1 further.
4th, first the major diameter processing truss 4 is jettisoninged in breach with loop wheel machine, then minor diameter truss 4 is jettisoninged to breach In, truss 4 passes through hook 2 and is connected to hawser 3, and due to truss 4 self gravitation, flow action, the part steel pipe of truss 4 embeds To in riverbed, together form basic dash skeleton with hawser 3.
5th, jettisoning vegetation bundle toward in burst in dash skeleton upstream, dash skeleton makes vegetation bundle not washed away by current, formed Preliminary water-retaining structure.
6th, from dike head 6 toward breach position progressively throwing earth and stone material, make earth and stone material fill up breach, so far block up and complete.

Claims (9)

1. a kind of method of blocking up after new dyke breaking is it is characterised in that comprise the following steps:
A robs to build wraps up in head, prevents from bursting to expand further;
B processes anchor, hawser and some truss according to breach width, wherein:Described anchor is used for holding hawser two ends simultaneously It is fixed on the dike head of breach two ends;Described truss is connected on hawser, is together formed with hawser in the breach that is used for jettisoninging Basic dash skeleton;
C jettisonings anchor fixation respectively so that the hawser being connected on two anchors is tightened simultaneously on the dike head at breach two ends It is across above breach;
D truss is fixed on hawser and jettisonings in breach;
E is toward first jettisoninging vegetation bundle truss upstream side, then throwing earth and stone material, until filling up breach, completes work of blocking up.
2. after new dyke breaking according to claim 1 block up method it is characterised in that:Anchor is fixed in step c Refer specifically to first anchor is fixed on dike head, then set up steel-pipe pile at anchor position, and fill block stone throwing ballast.
3. after new dyke breaking according to claim 2 block up method it is characterised in that:Described truss is along breach side To being disposed with 2 ~ 5 rows.
4. the plugging device after a kind of new dyke breaking it is characterised in that:Including anchor, hawser and truss, described truss On be provided with the connecting rope with hook, described anchor is used for holding hawser two ends and being fixed on breach two ends dike head;Described Truss is connected on hawser by hook, and described purlin is used for jettisoninging in breach and together forms basic dash bone with hawser Frame.
5. the plugging device after new dyke breaking according to claim 4 it is characterised in that:Described truss includes the center of circle Multiple circular frameworks on the same line, described circular framework is fixed by connecting rod, and described circular framework is provided with many Intercept bar, described interception bar and circular framework are evenly arranged at grade and circumferentially, described interception bar meets at circle centre position, Its end is circumferentially outer to be in divergent shape distribution.
6. the plugging device after new dyke breaking according to claim 5 it is characterised in that:Described truss is provided with greatly Little two kinds of sizes, described small size truss is located at the side that meets water, described large scale truss small size truss downstream.
7. the plugging device after new dyke breaking according to claim 6 it is characterised in that:Described circular framework spacing For 0.6 ~ 1m.
8. the plugging device after new dyke breaking according to claim 7 it is characterised in that:Described circular framework by 2 ~ 6 connecting rods are fixed, and described large-sized truss intercepts bar length 3 ~ 6m, and undersized truss intercepts bar length 2 ~ 3m.
9. the plugging device after new dyke breaking according to claim 8 it is characterised in that:Described circular framework straight Footpath is 0.5m ~ 3m, and circular framework section is also circle, and diameter of section is 20mm ~ 100mm.
CN201610850838.9A 2016-09-23 2016-09-23 A kind of method and device of blocking up after dyke breaking Active CN106400740B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610850838.9A CN106400740B (en) 2016-09-23 2016-09-23 A kind of method and device of blocking up after dyke breaking

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610850838.9A CN106400740B (en) 2016-09-23 2016-09-23 A kind of method and device of blocking up after dyke breaking

Publications (2)

Publication Number Publication Date
CN106400740A true CN106400740A (en) 2017-02-15
CN106400740B CN106400740B (en) 2019-06-11

Family

ID=57997336

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610850838.9A Active CN106400740B (en) 2016-09-23 2016-09-23 A kind of method and device of blocking up after dyke breaking

Country Status (1)

Country Link
CN (1) CN106400740B (en)

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107938605A (en) * 2017-12-29 2018-04-20 郑州玄机器人有限公司 One kind supports fixed breach plugging device and method
CN107938604A (en) * 2017-12-29 2018-04-20 郑州玄机器人有限公司 A kind of breach method for blocking using the closure skeleton that bursts
CN107988996A (en) * 2017-12-29 2018-05-04 郑州玄机器人有限公司 One kind moves anti-wire type breach plugging device, method
CN108005022A (en) * 2017-12-29 2018-05-08 郑州玄机器人有限公司 A kind of hanging extension breach plugging device, method
CN108005021A (en) * 2017-12-29 2018-05-08 郑州玄机器人有限公司 One kind supports anti-wire type breach plugging device, method
CN108035319A (en) * 2017-12-29 2018-05-15 郑州玄机器人有限公司 The fixed telescopic breach plugging device of one kind, method
CN108118665A (en) * 2017-12-29 2018-06-05 郑州玄机器人有限公司 A kind of breach plugging device and method using fixed tower
CN108203969A (en) * 2017-12-29 2018-06-26 郑州玄机器人有限公司 The flexible board-like breach plugging device of one kind, method
CN108661011A (en) * 2018-07-18 2018-10-16 扬州大学 A kind of collapsible breach plugging device and its application process
CN109281287A (en) * 2017-12-29 2019-01-29 郑州玄机器人有限公司 It is a kind of to use breach plugging device, the method for fixing tower
CN109322285A (en) * 2018-11-05 2019-02-12 吕震伟 Breach plugging system and method for blocking
CN114960548A (en) * 2022-07-04 2022-08-30 刘柱法 Block-robbing method for dike breach
CN114960554A (en) * 2022-07-04 2022-08-30 赵良然 Embankment plugging system
CN115030090A (en) * 2022-06-14 2022-09-09 河南黄河勘测规划设计研究院有限公司 River breach rapid blockage-preventing system based on blocking self-closing
CN115125902A (en) * 2022-06-14 2022-09-30 河南黄河勘测规划设计研究院有限公司 Blocking self-closing-based rapid blockage-preventing method for river breach

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2372368Y (en) * 1998-08-19 2000-04-05 王新云 Plugging iron cage
CN1077941C (en) * 1999-12-14 2002-01-16 张平顺 Technique for closing up dam (or dike) breach with quickly arranged frame
US7431533B1 (en) * 2007-06-05 2008-10-07 Entech Corporation Floating levee sheet
CN202416253U (en) * 2011-12-26 2012-09-05 华北水利水电学院 Waste-tire emergency cage and waste-tire emergency cage combined dike
CN102518084B (en) * 2011-12-26 2015-07-29 华北水利水电学院 Junked tire speedily carry out rescue work cage combination dike

Cited By (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109281287A (en) * 2017-12-29 2019-01-29 郑州玄机器人有限公司 It is a kind of to use breach plugging device, the method for fixing tower
CN107938604A (en) * 2017-12-29 2018-04-20 郑州玄机器人有限公司 A kind of breach method for blocking using the closure skeleton that bursts
CN107988996A (en) * 2017-12-29 2018-05-04 郑州玄机器人有限公司 One kind moves anti-wire type breach plugging device, method
CN108005022A (en) * 2017-12-29 2018-05-08 郑州玄机器人有限公司 A kind of hanging extension breach plugging device, method
CN108005021A (en) * 2017-12-29 2018-05-08 郑州玄机器人有限公司 One kind supports anti-wire type breach plugging device, method
CN108035319A (en) * 2017-12-29 2018-05-15 郑州玄机器人有限公司 The fixed telescopic breach plugging device of one kind, method
CN108118665A (en) * 2017-12-29 2018-06-05 郑州玄机器人有限公司 A kind of breach plugging device and method using fixed tower
CN108203969A (en) * 2017-12-29 2018-06-26 郑州玄机器人有限公司 The flexible board-like breach plugging device of one kind, method
CN107938605A (en) * 2017-12-29 2018-04-20 郑州玄机器人有限公司 One kind supports fixed breach plugging device and method
CN108661011A (en) * 2018-07-18 2018-10-16 扬州大学 A kind of collapsible breach plugging device and its application process
CN108661011B (en) * 2018-07-18 2023-11-24 扬州大学 Folding type breach plugging device and application method thereof
CN109322285A (en) * 2018-11-05 2019-02-12 吕震伟 Breach plugging system and method for blocking
CN115030090A (en) * 2022-06-14 2022-09-09 河南黄河勘测规划设计研究院有限公司 River breach rapid blockage-preventing system based on blocking self-closing
CN115125902A (en) * 2022-06-14 2022-09-30 河南黄河勘测规划设计研究院有限公司 Blocking self-closing-based rapid blockage-preventing method for river breach
CN115125902B (en) * 2022-06-14 2024-02-23 河南黄河勘测规划设计研究院有限公司 Method for rapidly blocking river breach based on blocking self-closing
CN114960548A (en) * 2022-07-04 2022-08-30 刘柱法 Block-robbing method for dike breach
CN114960554A (en) * 2022-07-04 2022-08-30 赵良然 Embankment plugging system
CN114960548B (en) * 2022-07-04 2024-01-26 刘柱法 Blocking method for dike breach

Also Published As

Publication number Publication date
CN106400740B (en) 2019-06-11

Similar Documents

Publication Publication Date Title
CN106400740B (en) A kind of method and device of blocking up after dyke breaking
CN207878485U (en) A kind of slope anchorage structure based on SNS soft protecting nets
CN206667270U (en) Slope protection net mounting structure
CN206706668U (en) It is a kind of to be used to catching up with fish into the device into fish pass
CN107059782B (en) The extensible fence of assembled for crevasse quick blocking
CN109881634A (en) A kind of flood season dike breach rapid rescue method shut off using geosynthetics
CN108104058A (en) A kind of dykes and dams flood crevasse plugging device and its method for blocking
CN107059786A (en) A kind of movable embankment protection floats wall
CN108293932B (en) Copper alloy woven mesh connection method
CN111560917A (en) Detachable rapid breach repairing structure
CN110409373A (en) A kind of flood-fighting net device and its application and application method
CN203007977U (en) Composite protective structure for reinforced net-plane stopping wall
CN109505302A (en) A kind of high precipitous rock slope vegetation type ecological bag fixer
CN207193885U (en) A kind of flood fighting barricade
CN103588085B (en) Special lifting appliance for dual-I-shaped water-permeable framework
CN206608209U (en) Draining blind pipe exports erecting device on a kind of tunnel inside lining abutment wall
CN103598127B (en) Method of fitting large fishing tackle net between two shores
CN110424329A (en) A kind of dyke is quickly blocked up specific stub net anti-impact equipment and the application method of speedily carrying out rescue work
CN203545448U (en) Special lifting appliance for dual-I-shaped water permeable framework
CN202755360U (en) Front stiffening pile of anchoring part
CN202899082U (en) System for defining riverbed mainstream by placing piles
CN2576792Y (en) Anti-flood anchored curtain-sheet
CN109338989A (en) A method of quick blocking of fighting flood and relieve victims embankment bursts
CN107558438A (en) A kind of flood fighting barricade and its construction method
CN106906795A (en) Elasticity closure container and piping method for blocking

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant