CN106400740B - A kind of method and device of blocking up after dyke breaking - Google Patents
A kind of method and device of blocking up after dyke breaking Download PDFInfo
- Publication number
- CN106400740B CN106400740B CN201610850838.9A CN201610850838A CN106400740B CN 106400740 B CN106400740 B CN 106400740B CN 201610850838 A CN201610850838 A CN 201610850838A CN 106400740 B CN106400740 B CN 106400740B
- Authority
- CN
- China
- Prior art keywords
- truss
- breach
- blocking
- hawser
- anchor
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 230000000903 blocking effect Effects 0.000 title claims abstract description 41
- 238000000034 method Methods 0.000 title claims abstract description 26
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 27
- 239000004575 stone Substances 0.000 claims abstract description 15
- 239000000463 material Substances 0.000 claims description 11
- 229910000831 Steel Inorganic materials 0.000 claims description 10
- 239000010959 steel Substances 0.000 claims description 10
- 238000011144 upstream manufacturing Methods 0.000 claims description 4
- 239000004744 fabric Substances 0.000 claims description 2
- 238000010276 construction Methods 0.000 abstract description 7
- 238000002360 preparation method Methods 0.000 abstract description 4
- 230000009172 bursting Effects 0.000 abstract description 2
- 238000010586 diagram Methods 0.000 description 4
- 238000005516 engineering process Methods 0.000 description 2
- 230000005484 gravity Effects 0.000 description 2
- 230000003014 reinforcing effect Effects 0.000 description 2
- 238000003466 welding Methods 0.000 description 2
- 235000017166 Bambusa arundinacea Nutrition 0.000 description 1
- 235000017491 Bambusa tulda Nutrition 0.000 description 1
- 241001330002 Bambuseae Species 0.000 description 1
- 235000015334 Phyllostachys viridis Nutrition 0.000 description 1
- 241000124033 Salix Species 0.000 description 1
- 239000011425 bamboo Substances 0.000 description 1
- 210000000988 bone and bone Anatomy 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- -1 flow velocity Substances 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
- 230000001755 vocal effect Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B3/00—Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
- E02B3/04—Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
- E02B3/10—Dams; Dykes; Sluice ways or other structures for dykes, dams, or the like
- E02B3/106—Temporary dykes
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A10/00—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
- Y02A10/11—Hard structures, e.g. dams, dykes or breakwaters
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Environmental & Geological Engineering (AREA)
- Ocean & Marine Engineering (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Revetment (AREA)
Abstract
The invention discloses the method and devices of blocking up after a kind of anti-breach, and wherein device includes anchor, hawser and truss, the connecting rope with hook are provided on the truss, the anchor is for holding hawser both ends and being fixed on breach both ends dike head;The truss is connected on hawser by hook, and the purlin is formed together basic water blocking skeleton with hawser for jettisoninging into breach.This method is to form water blocking skeleton in bursting using device investment, then is blocked up toward breach throwing building stones, and preparation of the present invention is less, construction is simple blocks up quickly.
Description
Technical field
The present invention relates to flood control works technical fields, in particular to the method and device of blocking up after a kind of dyke breaking.
Technical background
Dyke building is to resist a kind of flood measure, therefore it is widely deployed and prevents in water conservancy
In big vast engineering.But by economic condition, influence the problems such as historical reasons, China's existing dike there are levee body conditions poor, levee body
A variety of hidden danger such as material and construction quality difference.When dyke is by the attack of flood, flood is more than the resilience or Gao Shui of dyke
Position flood, which impregnates dyke for a long time and occurs rescuing and protecting, improper can all cause to burst.
Due to various reasons, it is very difficult to eliminate dyke breaking phenomenon, the existing tradition in China technology of blocking up mainly has
Native stone is blocked up, gabion is blocked up, the method for attacking and occupying of driving piles is blocked up, shipwreck is blocked up and the special bags of willow branches, framed by bamboo, for building dykes work method of attacking and occupying is blocked up, but by breach at
The conditions limitation such as the depth of water, flow velocity, drop, soil property.These technology enforcement difficulties are big, have a lot of preparation work, construction efficiency is low, operation
Personnel hazard's coefficient is high, expends a large amount of manpower and material resources, and time-consuming for construction, causes submergence ratio big, people's life and wealth
It is big to produce loss.
Summary of the invention
The present invention provides a kind of preparation and simple, quick dike of constructing aiming at the deficiencies in the prior art
Method and device of blocking up after anti-breach.
To achieve the goals above, the method for blocking up after the dyke breaking designed by the present invention, is characterized in that, wraps
Include following steps:
A, which robs to build, wraps up in head;
B processes anchor, hawser and several truss according to breach width, in which: the anchor is for holding hawser two
It holds and is fixed on the dike head of breach both ends;The truss is connected on hawser, for jettisoninging into breach together with hawser
Form basic water blocking skeleton, it is preferable that truss is made of steel pipe or reinforcing bar;
C jettisonings on the dike head at breach both ends anchor and fixation respectively, so that the hawser being connected on two anchors is taut
Tightly and it is across breach top;
Truss is fixed on hawser and jettisonings into breach by d;
E first jettisonings vegetation beam toward truss upstream side, then throwing earth and stone material completes work of blocking up until fill up breachs.
Preferably, distance of the anchor away from dike head is 1~10m.
Further, anchor is fixed in the step c to refer specifically to that anchor is first fixed on dike head, then is increased at anchor position
If steel-pipe pile, and fill block stone throwing ballast.Increase the stability of entire water blocking process.
Still further, the truss is disposed with 2~5 rows along breach direction, increase the stability of entire water blocking skeleton.
A kind of plugging device after dyke breaking, is characterized in that including anchor, hawser and truss, the purlin
The connecting rope with hook is provided on frame, the anchor is for holding hawser both ends and being fixed on breach both ends dike head;Institute
It states truss to be connected on hawser by hook, the purlin is formed together basic water blocking bone with hawser for jettisoninging into breach
Frame.
Further, the truss includes the multiple circular frameworks of the center of circle on the same line, and the circular framework is by even
Extension bar is fixed, and is provided with more interception bars on the circular framework, and the interception bar and circular framework are in the same plane and edge
Even circumferential arrangement, each interception bar meet at the center point, and end is circumferentially outer to be distributed in divergent shape, intercept bar and intersect at
The center of circle and the center point is fixed on the methods of welding or riveting.This truss is conducive to keep stable in water, and in breach
Play the role of supporting and retaining system.
Further, the truss is provided with two kinds of sizes of size, and the small size truss is located at the side that meets water, described big
Size truss small size truss downstream.The setting structure makes truss form more closely knit retaining structure in breach, favorably
In supporting and retaining system vegetation beam and earth and stone material.
Preferably, the circular framework is provided with 2~10.
Still further, the circular framework spacing is 0.6~1m.
Still further, the circular framework is fixed by 2~6 connecting rods, large-sized truss intercept bar it is long by 3~
6m, the truss of small size intercept the long 2~3m of bar.
Still further, the diameter of the circular framework be 0.5m~3m, circular framework diameter of section be 20mm~
100mm。
The present invention has the advantages that
1, supporting file skeleton is collectively formed in anchor, hawser, truss, and anchor, truss are embedded into riverbed, and retaining structure is steady
It is qualitative good, it is not easy to be washed away by water.
2, vegetation beam will not be directly flushed away under the protection of water blocking skeleton, to be formed together with water blocking skeleton preliminary
Water-retaining structure can effectively intercept the earth and stone material jettisoninged into breach, to reach purpose of quickly blocking up.
3, preparation is less, construction is simple, is convenient for construction personnel's operation, improves construction efficiency, and closure speed is fast.
Detailed description of the invention
Structural schematic diagram of the Fig. 1 for the plugging device after a kind of dyke breaking in the application.
Fig. 2 is anchor and hawser attachment structure schematic diagram.
Fig. 3 is the truss structure schematic diagram with hook.
Fig. 4 is the left view of Fig. 3.
Fig. 5 is the girder three-dimensional illustraton of model with hook.
Fig. 6 is hook three-dimensional model diagram.
In figure: anchor 1, hook 2, hawser 3, truss 4, circular framework 4.1, connecting rod 4.2 intercept bar 4.3, connecting rope
5, dike head 6, arrow direction is water (flow) direction.
Specific embodiment
The present invention is described in further detail in the following with reference to the drawings and specific embodiments:
Method of blocking up after dyke breaking shown in figure, comprising the following steps:
A, which robs to build, wraps up in head, prevents breach further expansion;
B processes anchor 1, hawser 3 and several truss 4 according to breach width, in which: the anchor 1 is for holding steel wire
3 both ends of rope are simultaneously fixed on breach both ends dike head 6;Truss 4 is connected on hawser 3, for jettisoninging into breach and hawser 3
It is formed together basic water blocking skeleton;
C jettisonings on the dike head 6 at breach both ends anchor 1 and fixed respectively, so that being connected to the hawser on two anchors 1
3 tighten and are across breach top;
Truss 4 is fixed on hawser 3 and jettisonings into breach by d;
E first jettisonings vegetation beam toward 4 upstream side of truss, and vegetation beam and water blocking skeleton are formed together preliminary water-retaining structure, then
Throwing earth and stone material at toward breach, until filling up breach, the earth and stone material that can effectively intercept throwing of preliminary water-retaining structure, thus fastly
Work of blocking up is completed fastly.
Before throwing earth and stone material, first toward jettisoninging vegetation beam in breach, vegetation beam will not direct quilt under the protection of supporting file skeleton
It washes away, to be formed together preliminary water-retaining structure with supporting file skeleton, reaches purpose of blocking up.Anchor 1 is fixed in step c to refer specifically to
Anchor 1 is first fixed on dike head 6, then adds steel-pipe pile, and fill block stone throwing ballast at 1 position of anchor.Truss 4 is along breach direction cloth
It being equipped with multiple rows of, arranges 2~5 rows under normal circumstances, size is different between row and row, and the arrangement of multiple rows of truss 4 increases interdiction capability,
It is more easier so that blocking up, when operation, first the major diameter truss 4 processed is jettisoninged into breach with loop wheel machine, then by minor diameter
Truss 4 is jettisoninged into breach, and under normal circumstances, major diameter truss is located at the downstream of minor diameter truss, and truss 4 is connected by hook 2
It is connected to hawser 3, due to 4 self gravity of truss, flow action, the part steel pipe of truss 4 is embedded into riverbed, with hawser 3
It is formed together basic water blocking skeleton.Preferably, truss is made of steel pipe or reinforcing bar, and distance of the anchor away from dike head 6 be 1~
10m。
According to the plugging device after the dyke breaking of above method production of blocking up, including anchor 1, hawser 3 and truss
4, the connecting rope 5 with hook 2 is provided on truss 4, anchor 1 is for holding 3 both ends of hawser and being fixed on breach both ends dike head 6
On;Truss 4 is connected on hawser 3 by hook 2, and truss 4 is formed together basic gear with hawser 3 for jettisoninging into breach
Water skeleton, truss 4 are typically provided with 2~5 rows.
Wherein, truss 4 includes the multiple circular frameworks 4.1 of the center of circle on the same line, and circular framework 4.1 is by connecting rod
4.2 is fixed, and more interception bars 4.3 are provided on circular framework 4.1, intercept bar 4.3 and circular framework 4.1 in the same plane and
It is circumferentially evenly arranged, intercepts bar 4.3 and intersect at the center point, end is circumferentially outer to be distributed in divergent shape, intercepts bar intersection
The center point is fixed in the center of circle and with the methods of welding or riveting.Truss 4 is provided with two kinds of sizes of size, small size truss position
In the side that meets water, large scale truss small size truss downstream.Preferably, the interception bar on each circular framework 4.1 is provided with 2~5
Root, 4.1 spacing of circular framework are 0.6~1m.Large-sized truss intercepts the long 3~6m of bar, the truss of small size intercept bar it is long by 2~
3m.The diameter of circular framework 4.1 is 0.5m~3m, the section of circular framework 4.1 be also it is round, and diameter of section be 20mm~
100mm。
Certain river levee is attacked due to flood, causes the crevasse of 30m wide, and dyke width is 6m, depth of water 1.5m at breach, this is stifled
Vocal imitation skill specific embodiment is as follows:
1, it robs to build and wraps up in head, prevent breach further expansion.
2, anchor 1, hawser 3 and truss 4 are processed according to breach width.3 length of hawser is 34m, and both ends are not connected to
On anchor 1, first circular framework 4.1 is made by steel pipe in truss 4, and circular framework 4.1 is arranged 6 in total, in each circular framework 4.1
Interception bar is made by 3 steel pipes, it is fixed as connecting rod 4.2 by 3 steel pipes between each other.Major diameter truss intercepts the long 4m of bar,
4.1 diameter of circular framework takes 1m, and interval takes 1m;Minor diameter truss interception bar 4.3 is 2m long, and 4.1 diameter of circular framework takes 0.5m,
Every taking 0.7m.
3, it first jettisonings above 6 one end of dike head an anchor 1, after anchor 1 is fixed on riverbed, then in other end dike head 6
Top is jettisoninged another anchor 1, so that the hawser 3 being connected on two anchors 1 is fixed on breach top, and at anchor 1
Steel-pipe pile and fill block stone throwing ballast are added in position, further fix anchor 1.
4, first the major diameter truss 4 processed is jettisoninged into breach with loop wheel machine, then minor diameter truss 4 is jettisoninged to breach
In, truss 4 is connected to hawser 3 by hook 2, and due to 4 self gravity of truss, flow action, the part steel pipe of truss 4 is embedded in
Into riverbed, basic water blocking skeleton is formed together with hawser 3.
5, it jettisonings vegetation beam in water blocking skeleton upstream into bursting, water blocking skeleton washes away vegetation beam by water flow, is formed
Preliminary water-retaining structure.
6, from dike head 6 toward breach position gradually throwing earth and stone material, earth and stone material is made to fill up breach, completion of so far blocking up.
Claims (9)
1. a kind of method of blocking up after dyke breaking, which comprises the following steps:
A, which robs to build, wraps up in head, prevents breach further expansion;
B processes anchor, hawser and several truss according to breach width, in which: the anchor is for holding hawser both ends simultaneously
It is fixed on the dike head of breach both ends;The truss is connected on hawser, is formed together into breach with hawser for jettisoninging
Basic water blocking skeleton;The truss includes the multiple circular frameworks of the center of circle on the same line, and the circular framework is by connecting rod
It is fixed, be provided with more interception bars on the circular framework, the interceptions bar with circular framework in the same plane and circumferentially
It is evenly arranged, the interception bar meets at the center point, and end is circumferentially outer to be distributed in divergent shape;
C jettisonings on the dike head at breach both ends anchor and fixation respectively, so that the hawser being connected on two anchors is tightened simultaneously
It is across breach top;
Truss is fixed on hawser and jettisonings into breach by d;
E first jettisonings vegetation beam toward truss upstream side, then throwing earth and stone material completes work of blocking up until fill up breachs.
2. the method for blocking up after dyke breaking according to claim 1, it is characterised in that: it is specific to fix anchor in step c
Anchor is first fixed on dike head by finger, then adds steel-pipe pile, and fill block stone throwing ballast at anchor position.
3. the method for blocking up after dyke breaking according to claim 2, it is characterised in that: the truss is along breach direction cloth
It is equipped with 2~5 rows.
4. the device of a kind of method of blocking up after dyke breaking as described in claim 1, it is characterised in that: including anchor, steel
Silk rope and truss, the connecting rope of band hook is provided on the truss, and the anchor is used to hold hawser both ends and be fixed on
On the dike head of breach both ends;The truss is connected on hawser by hook, and the truss is for jettisoninging into breach and steel wire
Rope is formed together basic water blocking skeleton.
5. the device of the method for blocking up after dyke breaking according to claim 4, it is characterised in that: the truss includes circle
The multiple circular frameworks of the heart on the same line, the circular framework are fixed by connecting rod, are provided on the circular framework more
Root intercepts bar, and the interception bar is evenly arranged in the same plane and circumferentially with circular framework, and the interception bar meets at the center of circle
Place, end is circumferentially outer to be distributed in divergent shape.
6. the device of the method for blocking up after dyke breaking according to claim 5, it is characterised in that: the truss is provided with
Two kinds of sizes of size, the small size truss are located at the side that meets water, and the large scale truss is located at small size truss downstream.
7. the device of the method for blocking up after dyke breaking according to claim 6, it is characterised in that: between the circular framework
Away from for 0.6~1m.
8. the device of the method for blocking up after dyke breaking according to claim 7, it is characterised in that: the circular framework by
2~6 connecting rods are fixed, and large-sized truss intercepts the long 3~6m of bar, and the truss of small size intercepts the long 2~3m of bar.
9. the device of the method for blocking up after dyke breaking according to claim 8, it is characterised in that: the circular framework
Diameter is 0.5m~3m, and circular framework section is also circle, and diameter of section is 20mm~100mm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610850838.9A CN106400740B (en) | 2016-09-23 | 2016-09-23 | A kind of method and device of blocking up after dyke breaking |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610850838.9A CN106400740B (en) | 2016-09-23 | 2016-09-23 | A kind of method and device of blocking up after dyke breaking |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106400740A CN106400740A (en) | 2017-02-15 |
CN106400740B true CN106400740B (en) | 2019-06-11 |
Family
ID=57997336
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610850838.9A Expired - Fee Related CN106400740B (en) | 2016-09-23 | 2016-09-23 | A kind of method and device of blocking up after dyke breaking |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106400740B (en) |
Families Citing this family (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108203969A (en) * | 2017-12-29 | 2018-06-26 | 郑州玄机器人有限公司 | The flexible board-like breach plugging device of one kind, method |
CN108005022A (en) * | 2017-12-29 | 2018-05-08 | 郑州玄机器人有限公司 | A kind of hanging extension breach plugging device, method |
CN109281287A (en) * | 2017-12-29 | 2019-01-29 | 郑州玄机器人有限公司 | It is a kind of to use breach plugging device, the method for fixing tower |
CN108005021A (en) * | 2017-12-29 | 2018-05-08 | 郑州玄机器人有限公司 | One kind supports anti-wire type breach plugging device, method |
CN108118665A (en) * | 2017-12-29 | 2018-06-05 | 郑州玄机器人有限公司 | A kind of breach plugging device and method using fixed tower |
CN107988996A (en) * | 2017-12-29 | 2018-05-04 | 郑州玄机器人有限公司 | One kind moves anti-wire type breach plugging device, method |
CN108035319A (en) * | 2017-12-29 | 2018-05-15 | 郑州玄机器人有限公司 | The fixed telescopic breach plugging device of one kind, method |
CN107938605A (en) * | 2017-12-29 | 2018-04-20 | 郑州玄机器人有限公司 | One kind supports fixed breach plugging device and method |
CN107938604A (en) * | 2017-12-29 | 2018-04-20 | 郑州玄机器人有限公司 | A kind of breach method for blocking using the closure skeleton that bursts |
CN108661011B (en) * | 2018-07-18 | 2023-11-24 | 扬州大学 | Folding type breach plugging device and application method thereof |
CN109322285B (en) * | 2018-11-05 | 2020-08-28 | 吕震伟 | Breach plugging system and method |
CN115125902B (en) * | 2022-06-14 | 2024-02-23 | 河南黄河勘测规划设计研究院有限公司 | Method for rapidly blocking river breach based on blocking self-closing |
CN115030090B (en) * | 2022-06-14 | 2023-06-30 | 河南黄河勘测规划设计研究院有限公司 | Quick blockage system for river breach based on blocking self-closing |
CN114960554B (en) * | 2022-07-04 | 2024-06-07 | 赵良然 | Dyke plugging system |
CN114960548B (en) * | 2022-07-04 | 2024-01-26 | 刘柱法 | Blocking method for dike breach |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2372368Y (en) * | 1998-08-19 | 2000-04-05 | 王新云 | Plugging iron cage |
CN1253201A (en) * | 1999-12-14 | 2000-05-17 | 张平顺 | Technique for closing up dam (or dike) breach with quickly arranged frame |
US7431533B1 (en) * | 2007-06-05 | 2008-10-07 | Entech Corporation | Floating levee sheet |
CN102518084A (en) * | 2011-12-26 | 2012-06-27 | 华北水利水电学院 | Waste tyre rescue cage and waste tyre rescue cage combined dam |
CN202416253U (en) * | 2011-12-26 | 2012-09-05 | 华北水利水电学院 | Waste-tire emergency cage and waste-tire emergency cage combined dike |
-
2016
- 2016-09-23 CN CN201610850838.9A patent/CN106400740B/en not_active Expired - Fee Related
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2372368Y (en) * | 1998-08-19 | 2000-04-05 | 王新云 | Plugging iron cage |
CN1253201A (en) * | 1999-12-14 | 2000-05-17 | 张平顺 | Technique for closing up dam (or dike) breach with quickly arranged frame |
US7431533B1 (en) * | 2007-06-05 | 2008-10-07 | Entech Corporation | Floating levee sheet |
CN102518084A (en) * | 2011-12-26 | 2012-06-27 | 华北水利水电学院 | Waste tyre rescue cage and waste tyre rescue cage combined dam |
CN202416253U (en) * | 2011-12-26 | 2012-09-05 | 华北水利水电学院 | Waste-tire emergency cage and waste-tire emergency cage combined dike |
Also Published As
Publication number | Publication date |
---|---|
CN106400740A (en) | 2017-02-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106400740B (en) | A kind of method and device of blocking up after dyke breaking | |
CN207878485U (en) | A kind of slope anchorage structure based on SNS soft protecting nets | |
CN107059782B (en) | The extensible fence of assembled for crevasse quick blocking | |
CN206667270U (en) | Slope protection net mounting structure | |
CN108104058A (en) | A kind of dykes and dams flood crevasse plugging device and its method for blocking | |
CN104642225B (en) | Main framework for single-pipe round floating type large-scale deep water net cage | |
CN108293932A (en) | One Albatra metal mesh grid connection method | |
CN104674770A (en) | Hydraulic movable dam | |
CN111560917A (en) | Detachable rapid breach repairing structure | |
CN110424329A (en) | A kind of dyke is quickly blocked up specific stub net anti-impact equipment and the application method of speedily carrying out rescue work | |
CN208064242U (en) | One Albatra metal mesh grid bindiny mechanism | |
CN109338989A (en) | A method of quick blocking of fighting flood and relieve victims embankment bursts | |
CN207933975U (en) | A kind of high stability concrete structure for slope protection system | |
CN207346985U (en) | A kind of concrete prefabricated boom hoisting | |
CN110409373A (en) | A kind of flood-fighting net device and its application and application method | |
CN105064357A (en) | Embedding type anchoring device and anchoring method for pre-stressed anchor cable | |
CN103588085B (en) | Special lifting appliance for dual-I-shaped water-permeable framework | |
CN103598127B (en) | Method of fitting large fishing tackle net between two shores | |
CN114438965A (en) | Breach plugging device and rapid plugging method | |
CN204690702U (en) | A kind of hydraulic movable dam | |
CN203545448U (en) | Special lifting appliance for dual-I-shaped water permeable framework | |
CN202755360U (en) | Front stiffening pile of anchoring part | |
CN103609494B (en) | Connection method for seashore and netting gear net | |
CN106436649A (en) | Flow control technology and series equipment thereof | |
CN206916690U (en) | One kind flood control triangle steel structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190611 |