CN206916690U - One kind flood control triangle steel structure - Google Patents

One kind flood control triangle steel structure Download PDF

Info

Publication number
CN206916690U
CN206916690U CN201720274327.7U CN201720274327U CN206916690U CN 206916690 U CN206916690 U CN 206916690U CN 201720274327 U CN201720274327 U CN 201720274327U CN 206916690 U CN206916690 U CN 206916690U
Authority
CN
China
Prior art keywords
cross bar
flood control
triangle steel
control triangle
flood
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720274327.7U
Other languages
Chinese (zh)
Inventor
周流群
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201720274327.7U priority Critical patent/CN206916690U/en
Application granted granted Critical
Publication of CN206916690U publication Critical patent/CN206916690U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

The utility model discloses one kind flood control triangle steel structure,Including connecting pole,Pillar,Cross bar,Totally-enclosed steel plate and connecting hole,One end of cross bar is provided with connecting pole,The other end of cross bar is provided with connecting hole,The quantity of cross bar is three,The both ends of three cross bars are respectively provided with connecting pole and connecting hole,Three cross bar is parallel to each other and is triangularly arranged,This flood control triangle steel Stability Analysis of Structures,Reliably,Firmly,Support force,Compressive resistance and anti-impact force are very strong,Impact and the seepage of flood great power can effectively be stopped,This flood control triangle steel structure is durable in use,It is hardly damaged,It can be dismounted and combined according to the condition of a disaster during use,Increase dykes and dams height,Width and length,Flexibility is high,It is easy to use,This flood control triangle steel is simple and light,It is fast to dismount speed,Efficiency high,Can effectively save manpower,Material resources and financial resources,And to ecology without destruction,It is environmentally safe,Repeatedly recycled after recyclable,Flood control resultses are very notable.

Description

One kind flood control triangle steel structure
Technical field
Flood protection device technical field is the utility model is related to, is specially a kind of flood control triangle steel structure.
Background technology
China is that natural calamity effect is one of serious country, and wherein floods cause the economic loss of billions of members every year, Floods can also destroy ecology, pollute environment, bring more stealthy economic losses, many cities along the river of China are for a long time by flood Direct threat, but the harm for efficiently controlling there is presently no method flood ensures the safety of people's life and property, Therefore, a kind of flood control triangle steel structure need to be designed, its effect is to improve the height of flood control dam rapidly when the full dike of flood Degree, stop the full dike of flood and spread unchecked, protect the safety of downstream people's life's property.
The content of the invention
The technical problems to be solved in the utility model is to overcome the defects of existing, there is provided one kind flood control triangle steel structure, This flood control triangle steel structure, sturdy and durable, stability is strong, and reliability is big, and erection installation group speed is fast, efficiency high, saves Human and material resources and financial resources, ecology, nonpollution environment are not destroyed, it is dismantled and assembled to be used repeatedly, suitable for river, river, lake, sea Flood control, effectively can be solved the problems, such as in background technology.
To achieve the above object, the utility model provides following technical scheme:One kind flood control triangle steel structure, including even Post, pillar, cross bar, totally-enclosed steel plate and connecting hole are connect, one end of the cross bar is provided with connecting pole, and the other end of cross bar is set There is connecting hole.
As a kind of optimal technical scheme of the present utility model, the quantity of the cross bar is three, the both ends of three cross bars Connecting pole and connecting hole are respectively provided with, three cross bars are parallel to each other and are triangularly arranged, uniformly set on the side of cross bar Pillar is equipped with, totally-enclosed steel plate, the length of the totally-enclosed steel plate and the length phase of cross bar are provided between two of which cross bar Together.
As a kind of optimal technical scheme of the present utility model, the profile of the pillar is triangular in shape, three of triangle Angle is connected with three cross bars respectively.
It is identical with the aperture of connecting hole as a kind of optimal technical scheme of the present utility model, the diameter of the connecting pole.
Compared with prior art, the beneficial effects of the utility model are:This flood control triangle steel Stability Analysis of Structures, reliable, jail Gu support force, compressive resistance and anti-impact force are very strong, impact and the seepage of flood great power, triangle knot can be effectively stopped The stability of structure is high, durable in use, is hardly damaged, and can also be dismounted during use and combined according to the condition of a disaster, increase dykes and dams height, width and Length, flexibility is high, and easy to use, this flood control triangle steel is simple and light, and dismounting speed is fast, efficiency high, can effectively save About human and material resources and financial resources, and to ecology without destruction, environmentally safe, multiple after recyclable to recycle, flood control resultses ten Divide notable.
Brief description of the drawings
Fig. 1 is the utility model structure diagram.
In figure:1 connecting pole, 2 pillars, 3 cross bars, 4 totally-enclosed steel plates, 5 connecting holes.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is carried out Clearly and completely describing, it is clear that described embodiment is only the utility model part of the embodiment, rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made The every other embodiment obtained, belong to the scope of the utility model protection.
Referring to Fig. 1, the utility model provides a kind of technical scheme:One kind flood control triangle steel structure, including connecting pole 1st, pillar 2, cross bar 3, totally-enclosed steel plate 4 and connecting hole 5, one end of cross bar 3 are provided with connecting pole 1, and the other end of cross bar 3 is set There is connecting hole 5, the diameter of connecting pole 1 is identical with the aperture of connecting hole 5, and connecting pole 1 and connecting hole 5 are used to connect two flood controls three Angular steel construction, it is upper one flood control triangle steel structure in connecting pole 1 insert it is next flood control triangle steel structure in company Hole 5 is connect, realizes the connection of two flood control triangle steel structures, the quantity of cross bar 3 is three, and the both ends of three cross bars 3 are respectively Connecting pole 1 and connecting hole 5 are provided with, three cross bars 3 are parallel to each other and are triangularly arranged, and cross bar 3 is the skeleton of total, Cross bar 3 is used to fix totally-enclosed steel plate 4, and pillar 2 is evenly arranged with the side of cross bar 3, and the profile of pillar 2 is triangular in shape, and three Three angular angles are connected with three cross bars 3 respectively, and pillar 2 is used to support three cross bars 3, to strengthen this flood control triangle steel knot The support force and stability of structure, totally-enclosed steel plate 4, the length and cross bar of totally-enclosed steel plate 4 are provided between two of which cross bar 3 3 length is identical, and totally-enclosed steel plate 4 is used to stop flood, prevents flood from dropping.
When in use:When the full dike of flood, multiple flood control triangle steel constructions are passed through connecting pole 1 and the head and the tail phase of connecting hole 5 Connection, combination are arranged on embankment, the quick height for improving flood control dam, are collapsed with stopping caused dykes and dams after the full dike of flood, Utilize the weight of the support force and stability, also steel construction itself of pillar 2 triangular in shape in its triangle steel structure of controlling flood With the pressure of water, the one side where totally-enclosed steel plate 4 is stopped into flood, to prevent flood seepage, can also be increased at any time according to the condition of a disaster Add the height and length of its dykes and dams, firm great wall of steel together has quickly been constructed littoral.
This flood control triangle steel Stability Analysis of Structures, reliable, firmly, support force, compressive resistance and anti-impact force are very strong, can be effective Impact and the seepage of flood great power are stopped, the stability of triangular structure is high, durable in use, is hardly damaged, during use also It can be dismounted and combined according to the condition of a disaster, increase dykes and dams height, width and length, flexibility is high, easy to use, this flood control triangle steel knot Structure is simply light, and dismounting speed is fast, efficiency high, the effectively save human and material resources of energy and financial resources, and to ecology without destruction, to ring Border is pollution-free, is repeatedly recycled after recyclable, flood control resultses are very notable.
While there has been shown and described that embodiment of the present utility model, for the ordinary skill in the art, It is appreciated that these embodiments can be carried out with a variety of changes in the case where not departing from principle of the present utility model and spirit, repaiied Change, replace and modification, the scope of the utility model are defined by the appended claims and the equivalents thereof.

Claims (3)

1. one kind flood control triangle steel structure, including connecting pole(1), pillar(2), cross bar(3), totally-enclosed steel plate(4)And connection Hole(5), it is characterised in that:The cross bar(3)One end be provided with connecting pole(1), cross bar(3)The other end be provided with connecting hole (5), the connecting pole(1)Diameter and connecting hole(5)Aperture it is identical.
A kind of 2. flood control triangle steel structure according to claim 1, it is characterised in that:The cross bar(3)Quantity be Three, three cross bars(3)Both ends be respectively provided with connecting pole(1)And connecting hole(5), three cross bars(3)Be parallel to each other and It is triangularly arranged, cross bar(3)Side on be evenly arranged with pillar(2), two of which cross bar(3)Between be provided with it is totally-enclosed Steel plate(4), the totally-enclosed steel plate(4)Length and cross bar(3)Length it is identical.
A kind of 3. flood control triangle steel structure according to claim 2, it is characterised in that:The pillar(2)Profile be in Triangle, three angles of triangle respectively with three cross bars(3)Connection.
CN201720274327.7U 2017-03-21 2017-03-21 One kind flood control triangle steel structure Expired - Fee Related CN206916690U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720274327.7U CN206916690U (en) 2017-03-21 2017-03-21 One kind flood control triangle steel structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720274327.7U CN206916690U (en) 2017-03-21 2017-03-21 One kind flood control triangle steel structure

Publications (1)

Publication Number Publication Date
CN206916690U true CN206916690U (en) 2018-01-23

Family

ID=61310596

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720274327.7U Expired - Fee Related CN206916690U (en) 2017-03-21 2017-03-21 One kind flood control triangle steel structure

Country Status (1)

Country Link
CN (1) CN206916690U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110557993A (en) * 2019-09-02 2019-12-13 黑龙江八一农垦大学 Novel prefabricated steel rectangular pieces of land in a field ridge in standardized farmland

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110557993A (en) * 2019-09-02 2019-12-13 黑龙江八一农垦大学 Novel prefabricated steel rectangular pieces of land in a field ridge in standardized farmland

Similar Documents

Publication Publication Date Title
CN205576836U (en) Can increase quick anti -flood wall of formula
CN203174851U (en) Connecting mechanism for limiting lower string cable of string beam
CN103498452B (en) The slit structure of high steep Narrow Valleys outlet structure escape works
CN206916690U (en) One kind flood control triangle steel structure
CN202208904U (en) Semi-mobile combined flood-control dam
CN205591208U (en) Take linear type steel sheet pile of guard plate
CN109881627A (en) Medicining wave structure and its installation method
CN213267750U (en) Protector for hydraulic engineering upstream gate
CN206766279U (en) A kind of hydraulic engineering dredger guard rail
CN113089571A (en) Assembled water-permeable energy-dissipating tetrahedral embankment plugging member and construction method thereof
CN205116095U (en) Chain concrete slab piece
CN210395238U (en) Combined reinforced dam for channel flood control project
CN210857104U (en) Flood control retaining baffle
CN204589959U (en) Boundary, river section floating thing shock resistance blocking apparatus
CN111560917A (en) Detachable rapid breach repairing structure
CN206581219U (en) A kind of flood fighting triangle round steel structure
CN204023490U (en) A kind of reinforcement type stereoscopic member
CN203270531U (en) Steel trash blocking device of hydropower station reservoir area
CN105274964A (en) Reinforced type stereoscopic member
CN206090460U (en) But fast assembly's flood control device
CN214168931U (en) Water retaining device for hydraulic and hydroelectric engineering
CN203820285U (en) Double-I-shaped permeable frame transporter
CN203430707U (en) Wind protection device for blade rear edges of wind driven generator
CN201738285U (en) Detachable umbrella-shaped circular baffle plate
CN202543948U (en) Support device for excavation of deep foundation pit of piping trench of urban main road

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180123

Termination date: 20210321

CF01 Termination of patent right due to non-payment of annual fee