CN106382416A - Method for fixing pump pipes during concrete pumping and casting of upper parts of bridges - Google Patents
Method for fixing pump pipes during concrete pumping and casting of upper parts of bridges Download PDFInfo
- Publication number
- CN106382416A CN106382416A CN201610925715.7A CN201610925715A CN106382416A CN 106382416 A CN106382416 A CN 106382416A CN 201610925715 A CN201610925715 A CN 201610925715A CN 106382416 A CN106382416 A CN 106382416A
- Authority
- CN
- China
- Prior art keywords
- pump line
- bridge
- section
- casting
- fixation clamp
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L1/00—Laying or reclaiming pipes; Repairing or joining pipes on or under water
- F16L1/024—Laying or reclaiming pipes on land, e.g. above the ground
- F16L1/0243—Laying or reclaiming pipes on land, e.g. above the ground above ground
- F16L1/0246—Laying or reclaiming pipes on land, e.g. above the ground above ground at a certain height off the ground
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L3/00—Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets
- F16L3/24—Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets with a special member for attachment to profiled girders
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D2101/00—Material constitution of bridges
- E01D2101/20—Concrete, stone or stone-like material
- E01D2101/24—Concrete
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
The invention discloses a method for fixing pump pipes during concrete pumping and casting of upper parts of bridges. The method comprises the following steps of: mounting embedded parts at the early stage of reinforcement assembling and formwork supporting of a bridge pier stud, arranging attaching clamps on the embedded parts in a matched manner after casting forming is finished, and fixing a pump pipe through the attaching clamps so as to form a vertical section, arranged along the vertical direction of the bridge pier stud, of the pump pipe; after a central section of a bridge steel structure at the upper part of the bridge pier stud is cast, upwardly arranging the vertical section of the pump pipe on the surface of the central section; turning the pump pipe to horizontally extend leftwards or rightwards, and mounting a cushion block at the lower part of the pump pipe to form a horizontal section; on two sides of the central section, symmetrically casting a second section and a third section of the bridge steel structure at the upper part of the bridge pier stud; and correspondingly extending the horizontal section of the pump pipe to a proper discharging position. According to the method disclosed by the invention, the process time for the concrete pumping and casting of upper parts of bridges can be shortened, the rapid forming of the concrete pumping and casting of upper parts of bridges can be ensured, the construction security of the concrete pumping and casting can be improved, and a quality technical effect that the concrete pumping and casting of the upper parts of bridges is dense can be realized.
Description
Technical field
The present invention relates to the pump line fixing meanss that a kind of bridge superstructure concrete pumping pours, on more particularly, to a kind of bridge
The pump line fixing meanss that portion's Concrete In Structures pumping pours.
Background technology
The pump line fixing meanss that traditional bridge superstructure construction pumping pours, after typically performance of concrete column confined is formed,
Set up steel pipe scaffold in pier stud position or using the limited fixing pump line of walkway formation support, the scaffold steel that it adopts
Pipe amount is big, peace is torn the time-consuming, formation for delivery pump pipe open and need to be taken corresponding fixing meanss;, in construction, concrete pumping line is or not it
Easily Fast Installation connects and is formed, and need to be fixed using steel pipe scaffold built;When the scaffold construction load being formed becomes
During change, concrete pumping line occurs the unsafe condition of skew or strenuous vibration because being attached on scaffold;It is unfavorable for concrete pumping line
Assembling and disassembling, and longer in the activity time of work high above the ground, work efficiency is low;It is unfavorable for bridge superstructure concrete formation is poured
Build up the construction of type, this is mainly, and bridge superstructure concrete pumps the fixing construction technology of the pump line pouring and method needs to improve.
Content of the invention
For deficiency above-mentioned present in prior art, the invention provides what a kind of pumping of bridge superstructure concrete poured
The fixing construction technology of pump line is it is easy to the concrete of the bridge superstructure construction of design and construction pumps the fixing construction of the pump line pouring
Technical improvement method.
In order to solve above-mentioned technical problem, present invention employs following technical scheme;A kind of bridge superstructure concrete pumping
The pump line fixing meanss pouring, comprise the steps:
The pump line fixing meanss that the pumping of bridge superstructure concrete pours are it is characterised in that comprise the steps:
(1)According to technological requirement, in bridge pier column assembling reinforcement and formwork early stage, install by certain spacing, along short transverse
Built-in fitting, after pier stud concreting molding, form removal, is equipped with fixation clamp on each built-in fitting, clamping by fixation
Determine the pump line that concrete pumping pours, form the vertical section of the pump line being vertically arranged along bridge pier column;
(2)According to technological requirement, after pouring the central segment of bridge superstructure steel structure on bridge pier column top, pump line vertical
Section first extends upwardly beyond the height of described central segment, centrally disposed section surface;Pump line turn again to horizontal-extending, to the left or to
Right extension, pump line bottom is installed cushion block and is supported on bridge superstructure steel structure, forms horizontal segment;
(3)According to technological requirement, in central segment both sides, symmetrically pour bridge pier column top bridge superstructure steel structure second
Section;After second segment pours, in the side of two sections of second segments, symmetrically pour the 3rd section of bridge superstructure steel structure;...., until
Form continuous steel frame system on bridge pier column top;The length of corresponding second segment, the 3rd section or more multistage, corresponding extension pump line
Horizontal segment is to suitable unloading position.
Further feature is:Fixation clamp and pump line are to encircle design, and fixation clamp is enclosed in around pump line, fixation clamp with
The contact site of pump line is wrapped with adhesive tape.
On fixation clamp, movable clip block is set, movable clip block is provided with moveable hinge contact and dead bolt bore, activity folder
Block is connected on the miscellaneous part of fixation clamp by the articulated elements of moveable hinge contact and the latch of dead bolt bore.
Compared with prior art, pump line fixing meanss of the present invention have the advantage that:
1. the pump line fixing meanss that a kind of bridge superstructure concrete pumping of the present invention pours, are to wire-tie in bridge pier column
With formwork early stage, by certain spacing, built-in fitting is installed, in pier stud concreting molding, form removal, in each built-in fitting position
Put over-assemble pump line fixation clamp, fixation clamp over-assemble fix pump line, pour bridge upper steel structure 1. after, the horizontal-extending cloth of pump line
Pipeline section cushioning block is to unloading position;Symmetrically pour bridge upper steel structure 2.;Symmetrically pour steel structure 3.;Symmetrical casting concrete until
Formed bridge superstructure 1. -2. -3. ... .., form continuous steel frame system.
2. after the continuous steel frame System forming of bridge superstructure, can first remove pump line, then adopt artificial cutting torch protection
Property remove fixation clamp on pier stud, repeatable be assembled on the built-in fitting of next pier stud using the fixation clamp removed, turnover is made
Pump line is continuing with after installing.
The present invention improve after method, the bridge superstructure concrete activity time that pours of pumping can be shortened it is ensured that on bridge
The quick formation that portion's Concrete In Structures pumping pours, improves the working security that concrete pumping pours, and realizes the pumping of bridge superstructure concrete
Pour closely knit quality technology effect.Also dependent on the formation condition meeting different shape pier stud and reserved fixing embedded part form
Need, enrich existing bridge coping and bridge top rigidity T structure cradle construction scheme and engineering legislation.
Brief description
Fig. 1, the stringing schematic diagram for pump line fixing meanss of the present invention;
Fig. 2, be built-in fitting of the present invention(Part 4)With fixation clamp(Part 8)Attachment structure schematic diagram;
Fig. 3, built-in fitting of the present invention(Part 4)With fixation clamp(Part 8)Movable connection structure schematic diagram.
In accompanying drawing:1 bridge pier column, 2 bridge superstructure steel structure 3 steel structure construction hanging basket
4 built-in fitting, 5 pump line, 6 cushion block, 7 discharging opening, 8 fixation clamp 9 moveable hinge contact
10 dead bolt bore.
Specific embodiment
With reference to the accompanying drawings and detailed description the present invention is described in further detail.A kind of bridge superstructure
The pump line fixing meanss that concrete pumping pours, comprise the steps:
(1)According to technological requirement, in bridge pier column 1 assembling reinforcement and formwork early stage, by certain spacing, install along short transverse
Built-in fitting 4, after pier stud 1 concreting molding, form removal, is equipped with each built-in fitting 4(Install)Fixation clamp 8, leads to
Cross the pump line 5 that fixation clamp 8 fixing concrete pumping pours, form the vertical section being vertically arranged along bridge pier column 1;
(2)According to technological requirement, pour bridge pier column 1 top bridge superstructure steel structure 2 when, first pour bridge top knot
The central segment of structure steel structure 2(Region shown in figure label)Afterwards, the vertical section of pump line 5 first extends upwardly beyond the height of central segment,
Centrally disposed section surface;Pump line 5 turns again to horizontal-extending, extends to the left or to the right, and cushion block 6 is installed to discharging in pump line 5 bottom
Mouth 7, forms horizontal segment;
(3)According to technological requirement, in central segment both sides, symmetrically pour the second segment of bridge pier column 1 superstructure steel structure 2(In figure
Region shown in label);After second segment pours, in the side of this two sections of second segments, symmetrically pour the 3rd section(In figure label
Shown region);...., until forming continuous steel frame system on bridge pier column 1 top, form the bridge top meeting technological requirement
Structural steel structure 2.When pouring second segment, other more multistages after the 3rd section, or the 3rd section, accordingly extend pump line in the horizontal direction
5 horizontal segment, corresponding every section of length, corresponding suitable unloading position is so as to the casting position of corresponding every section of discharging opening 7, full
Foot pours needs.Steel structure construction hanging basket 3 is the appurtenances that construction needs.
In order to adapt to the needs of Specific construction, the vertical section of described pump line 5 is two, independently arranges, be respectively adopted
One group of built-in fitting 4 is installed with fixation clamp 8;So, every pump line 5 forms horizontal segment to the left or to the right respectively, more conducively symmetrically
Pour bridge pier column 1 top the second segment of firm structure, the 3rd section.
After the continuous steel frame System forming on bridge pier column 1 top, when needing to remove, first remove pump line 5 horizontal segment, then tear open
Except the fixation clamp 8 on pier stud, specifically adopt the fixation clamp 8 on artificial cutting torch protective demolition pier stud, repeat using dismounting
Fixation clamp 8 is assembled on the built-in fitting 4 of next pier stud, and in the vertical section removing pump line 5, the pump line 5 that can be used in turn just can continue
Continuous use.
The fixing corresponding improvement of pump line 5:Fixation clamp 8 and pump line 5 are to encircle design, and fixation clamp 8 is enclosed in around pump line 5,
Adhesive tape can be wrapped with the contact site of fixation clamp 8 and pump line 5, with antiskid, shock-absorbing;As vertical as possible for guaranteeing the pump line 5 that need to fix
And install convenient, fixation clamp 8 designed and produced using open laterally close fixing pump line 5;On fixation clamp 8, setting is lived
Dynamic fixture block, movable clip block is provided with moveable hinge contact 9 and dead bolt bore 10, and movable clip block passes through the hinge of moveable hinge contact 9
The latch of fitting and dead bolt bore 10 is connected on the miscellaneous part of fixation clamp 8(On adjacent fixture block), can achieve and install
It is firm that the attachment of the fixation clamp 8 on position and pump line 5 consolidates, and pump line 5 connect overall due to solid by certain spacing attachment
It is scheduled on bridge pier surface, forms its concrete pumping and pour bridge upper steel structure, stringing system is fixed in stable, complete high-altitude.
The fixing construction technology of pump line being poured using the bridge superstructure concrete pumping after improving and method, can shorten bridge
The activity time that the pumping of superstructure concrete pours, it is ensured that bridge superstructure concrete pumps the quick formation pouring, improves concrete pumping
The working security pouring, realizes the pumping of bridge superstructure concrete and pours closely knit quality technology effect.Its technological process is as follows:
(1)Erection sequence:1. bridge pier column 1 is wire-tiing and formwork early stage, installs the pier stud of built-in fitting 4 → 2. by certain spacing
1 concreting molding, form removal → 3. are in each built-in fitting position over-assemble pump line fixation clamp 8 → 4. in fixation clamp 8 over-assemble
Fixing pump line 5 → 5. pour bridge upper steel structure 1. → 6. the horizontal-extending cloth pipeline section cushioning block 6 of pump line 5 is to unloading position 7 → 7.
Symmetrically pour bridge upper steel structure 2. → 8. symmetrically pour steel structure 3. →.Symmetrical casting concrete is until form bridge superstructure
1. -2. -3. ... .. continuous steel frame system
(2)Dismounting order:1. the steel of bridge superstructure be configured to concrete strength confirm reach → 2. remove pump line 5 horizontal segment
→ be 3. assembled on the built-in fitting 4 of next pier stud using the fixation clamp 8 of the fixation clamp 8 on artificial cutting torch protective demolition pier stud → 4.
→ 5. the pump line being used in turn is arranged on fixation clamp 8 and is continuing with.
The fixing construction technology of pump line of the present invention and method, when can shorten the pumping of bridge superstructure concrete and pouring operation
Between it is ensured that the quick formation that pours of pumping of bridge superstructure concrete, improve the working security that concrete pumping pours, realize on bridge
Portion's Concrete In Structures pumping pours closely knit quality technology effect.
Above example only in order to technical scheme to be described and unrestricted, although with reference to preferred embodiment to this
Bright be described in detail, it will be understood by those within the art that, technical scheme can be modified
Or equivalent, the objective without deviating from technical solution of the present invention and scope, it all should cover the claim in the present invention
In the middle of scope.
Claims (3)
1. the pump line fixing meanss that the pumping of bridge superstructure concrete pours are it is characterised in that comprise the steps:
(1)According to technological requirement, in bridge pier column 1 assembling reinforcement and formwork early stage, install by certain spacing, along short transverse
Built-in fitting 4, after pier stud 1 concreting molding, form removal, is equipped with fixation clamp 8, by fixation on each built-in fitting 4
The pump line 5 that the fixing concrete pumping of folder 8 pours, forms the vertical section of the pump line 5 being vertically arranged along bridge pier column 1;
(2)According to technological requirement, after pouring the central segment of bridge superstructure steel structure 2 on bridge pier column 1 top, pump line 5 perpendicular
Straight section first extends upwardly beyond the height of described central segment, centrally disposed section surface;Pump line 5 turns again to horizontal-extending, to the left
Or extend to the right, pump line 5 bottom is installed cushion block 6 and is supported on bridge superstructure steel structure 2, forms horizontal segment;
(3)According to technological requirement, in central segment both sides, symmetrically pour bridge pier column 1 top bridge superstructure steel structure 2
Two-stage nitration;After second segment pours, in the side of two sections of second segments, symmetrically pour the 3rd section of bridge superstructure steel structure 2;....,
Until forming continuous steel frame system on bridge pier column 1 top;The length of corresponding second segment, the 3rd section or more multistage, corresponding extension
The horizontal segment of pump line 5 is to suitable unloading position.
2. bridge superstructure concrete according to claim 1 pumping pours pump line fixing meanss it is characterised in that:Fixing
Folder 8 and pump line 5 are to encircle design, and fixation clamp 8 is enclosed in around pump line 5, are wrapped with glue in the contact site of fixation clamp 8 and pump line 5
Bar.
3. bridge superstructure concrete according to claim 1 and 2 pumping pours pump line fixing meanss it is characterised in that:
On fixation clamp 8, movable clip block is set, movable clip block is provided with moveable hinge contact 9 and dead bolt bore 10, movable clip block leads to
Cross the movable articulated elements of pin joint 9 and the latch of dead bolt bore 10 is connected on the miscellaneous part of fixation clamp 8.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610925715.7A CN106382416B (en) | 2016-10-24 | 2016-10-24 | Bridge superstructure concrete pumps the pump line fixing means poured |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610925715.7A CN106382416B (en) | 2016-10-24 | 2016-10-24 | Bridge superstructure concrete pumps the pump line fixing means poured |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106382416A true CN106382416A (en) | 2017-02-08 |
CN106382416B CN106382416B (en) | 2018-07-20 |
Family
ID=57957030
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610925715.7A Active CN106382416B (en) | 2016-10-24 | 2016-10-24 | Bridge superstructure concrete pumps the pump line fixing means poured |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106382416B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108396633A (en) * | 2018-02-02 | 2018-08-14 | 中铁四局集团第二工程有限公司 | Across the valley suspension bridge pumping beam body concrete construction method of one kind and device |
CN110937117A (en) * | 2018-09-21 | 2020-03-31 | 空中客车德国运营有限责任公司 | Guide rail system for fixing a load in a cabin of a vehicle |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5585707A (en) * | 1978-12-18 | 1980-06-28 | Sapporo Sanki Kk | Pipe mounting apparatus |
CN103628685A (en) * | 2013-12-12 | 2014-03-12 | 深圳市鹏城建筑集团有限公司 | Method for preventing concrete lateral displacement of concrete pump pipe and concrete pump pipe strengthening device |
CN103628414A (en) * | 2013-12-12 | 2014-03-12 | 中铁大桥局集团第二工程有限公司 | Distribution system and distribution method for ultrahigh double-width cast-in-place concrete beam |
CN203640295U (en) * | 2013-12-12 | 2014-06-11 | 深圳市鹏城建筑集团有限公司 | Reinforcing device of concrete pump pipe in pipeline well |
CN204201297U (en) * | 2014-10-08 | 2015-03-11 | 广西建工集团第三建筑工程有限责任公司 | A kind of disappear rolling bearing device built on stilts for the horizontal pump line of ground pump |
-
2016
- 2016-10-24 CN CN201610925715.7A patent/CN106382416B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5585707A (en) * | 1978-12-18 | 1980-06-28 | Sapporo Sanki Kk | Pipe mounting apparatus |
CN103628685A (en) * | 2013-12-12 | 2014-03-12 | 深圳市鹏城建筑集团有限公司 | Method for preventing concrete lateral displacement of concrete pump pipe and concrete pump pipe strengthening device |
CN103628414A (en) * | 2013-12-12 | 2014-03-12 | 中铁大桥局集团第二工程有限公司 | Distribution system and distribution method for ultrahigh double-width cast-in-place concrete beam |
CN203640295U (en) * | 2013-12-12 | 2014-06-11 | 深圳市鹏城建筑集团有限公司 | Reinforcing device of concrete pump pipe in pipeline well |
CN204201297U (en) * | 2014-10-08 | 2015-03-11 | 广西建工集团第三建筑工程有限责任公司 | A kind of disappear rolling bearing device built on stilts for the horizontal pump line of ground pump |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108396633A (en) * | 2018-02-02 | 2018-08-14 | 中铁四局集团第二工程有限公司 | Across the valley suspension bridge pumping beam body concrete construction method of one kind and device |
CN110937117A (en) * | 2018-09-21 | 2020-03-31 | 空中客车德国运营有限责任公司 | Guide rail system for fixing a load in a cabin of a vehicle |
Also Published As
Publication number | Publication date |
---|---|
CN106382416B (en) | 2018-07-20 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109944170A (en) | Continuous beam with high-pier end bay Cast-in-Situ Segment and closure section integrated construction system and construction method | |
CN105113388B (en) | Formwork and bracket combining structure of vase pier of viaduct and application method | |
CN107044090B (en) | A kind of construction method of dual deck bridge | |
CN105350454B (en) | Steel arch rib outer wrapped concrete construction method for steel trussed arch bridge | |
CN110331668A (en) | A kind of back-cable-free cable-stayed bridge inclined in two-way V-shaped bridge tower construction method | |
CN109267491B (en) | Movable formwork and construction method thereof | |
CN206448176U (en) | The adjustable cast-in-place cantilever beam zero number section constructing device of bracket | |
CN108589535A (en) | A kind of reinforced concrete box girder construction method | |
KR20130036890A (en) | Tied arched p.s.c girder for bridge and construction method for bridge by it | |
CN208777149U (en) | Packaged type bridges pier stud super high strength concrete connection structure | |
CN111851317B (en) | Method for installing arch ring of arch bridge | |
CN106382416A (en) | Method for fixing pump pipes during concrete pumping and casting of upper parts of bridges | |
CN111893889A (en) | Main bridge closure section construction method | |
CN105442453A (en) | Construction method for suspension bridge tower crossbeam combination support | |
CN107142834B (en) | A kind of Through Steel pipe concrete tie-rod arch bridge abutment steel pipe location structure and its construction method | |
CN105088961A (en) | Side-span closure section and cast-in-place section combining construction method | |
CN106592446A (en) | Assembling construction method of precast segmental balanced cantilever with side-span wet joints | |
CN211815595U (en) | Lower tower column tension and compression structure for cable tower | |
CN206233107U (en) | The pump line fixed structure that concrete pumping is poured on bridge | |
CN208918266U (en) | One kind exempting from support formula steel plate post-cast strip template structure system | |
CN108797380B (en) | Suspension construction device and construction method for suspension irrigation continuous beam bracket | |
CN205577264U (en) | Location structure of girder iron muscle | |
KR101358879B1 (en) | Construction method for continuous bridge using confined concrete | |
CN106351128A (en) | Construction method of cable stayed bridge side span main beam | |
CN108867408B (en) | Cantilever pouring method for single-box single-chamber arch bridge arch ring |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |