CN103628414A - Distribution system and distribution method for ultrahigh double-width cast-in-place concrete beam - Google Patents

Distribution system and distribution method for ultrahigh double-width cast-in-place concrete beam Download PDF

Info

Publication number
CN103628414A
CN103628414A CN201310672031.7A CN201310672031A CN103628414A CN 103628414 A CN103628414 A CN 103628414A CN 201310672031 A CN201310672031 A CN 201310672031A CN 103628414 A CN103628414 A CN 103628414A
Authority
CN
China
Prior art keywords
width
concrete
continuous beam
material distributing
distributing machine
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310672031.7A
Other languages
Chinese (zh)
Other versions
CN103628414B (en
Inventor
邱琼海
王立忠
于祥君
姜江华
徐乐乐
周加思
刘胜光
黄令庆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Major Bridge Engineering Group Co Ltd MBEC
2nd Engineering Co Ltd of MBEC
Original Assignee
China Railway Major Bridge Engineering Group Co Ltd MBEC
2nd Engineering Co Ltd of MBEC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Major Bridge Engineering Group Co Ltd MBEC, 2nd Engineering Co Ltd of MBEC filed Critical China Railway Major Bridge Engineering Group Co Ltd MBEC
Priority to CN201310672031.7A priority Critical patent/CN103628414B/en
Publication of CN103628414A publication Critical patent/CN103628414A/en
Application granted granted Critical
Publication of CN103628414B publication Critical patent/CN103628414B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention discloses a distribution system and a distribution method for an ultrahigh double-width cast-in-place concrete beam. The distribution system comprises a concrete high-pressure trailer pump, concrete conveying pump pipes, continuous beam construction bracket vertical posts, a second-width pier top distributor embedded part, a first-width continuous beam top distributor embedded part, a distributor, a first-width continuous beam, first-width pier bodies, a first-width pier body, second-width continuous beams and construction segmentation lines. The distribution system and the distribution method have the advantages that concrete is poured into beam bodies under coverage through the distributor after concrete is pumped to pier tops or beam surfaces through the high-pressure trailer pump, and continuous and rapid pouring of beam body concrete is realized along with the rotation of distribution rods, so that time for detaching, connecting and moving the pump pipes in a concrete pouring process is shortened, high workability and continuity of concrete are ensured, the concrete performance is ensured, and the construction quality risk is lowered. Meanwhile, due to the use of the distributor, manual arrangement on a high-altitude operation field is reduced, the working efficiency is increased, and the manual safety is enhanced. The distribution system and the distribution method have the advantages of small investment, low cost, convenience in construction and high popularization value.

Description

A kind of superelevation double width Cast-in-situ Beam concrete distributing system and distributing method
Technical field
What the present invention relates to is a kind of superelevation double width Cast-in-situ Beam concrete distributing system and distributing method, it is applicable to when carrying out the concrete pouring construction of high pier shaft double width cast-in-situ continuous beam, by concrete ground pump reasonable Arrangement respective beam across below on construction plant, concrete delivery pump pipe is along pier shaft or bracket upright post trend, guaranteeing that pump line is connected to is always arranged in Dun Ding or the material distributing machine place at casting beams partition wall place, carries out the material of beam body concrete cloth to be poured by material distributing machine.Belong to technical field of bridge construction.
Background technology
In the concrete continuous beam construction of existing bridge, have that pier shaft height is higher, bridge floor amplitude is wider, the situation of automotive pump cloth insufficient height, the conventional form that adopts pump line direct cloth of beam body concrete construction is carried out cloth by tearing open, connect with the form of mobile and horizontal pump line at ground pump pumping of concrete to fine strain of millet face.According to conventional method construction, each concreting time is long, and construction inconvenience, adds the repeatedly relay of the high pump line of pier, and concrete workability is lost larger, while tear open, the connecting pump tube intermittent time easily causes plugging, beam body concrete pouring quality cannot guarantee.
Summary of the invention
What the present invention proposed is a kind of superelevation double width Cast-in-situ Beam concrete distributing system and distributing method, its object is intended to overcome the existing above-mentioned defect of prior art, concrete drags pump to be pumped to after Dun Ding or beam face by high pressure, by being arranged in the material distributing machine of Dun Ding or top surface of the beam, beam body in coverage is carried out to concrete perfusion, rotation along with boom, realize the continuous of beam body concrete, Quick pouring, therefore shortened in concreting process and torn open, the time of connecting pump tube and mobile pump line, guarantee that concrete has good workability, guarantee the continuity of concreting, thereby guaranteed concrete performance, reduced construction quality risk.Meanwhile, the use of material distributing machine machinery, reduces the on-the-spot human configuration of work high above the ground, also people's safety when increasing work efficiency.
Technical Solving of the present invention: superelevation double width Cast-in-situ Beam concrete distributing system, its structure is that High Pressure Reinforced Concrete drags pump to be arranged in the bottom of the first width pier shaft, one end of concrete delivery pump pipe connects High Pressure Reinforced Concrete and drags pump, the other end of concrete delivery pump pipe connects the material distributing machine of continuous beam concreting, for guaranteeing the safety and stablization of concrete delivery pump pipe, concrete delivery pump pipe is fixed in Construction of continuous beam bracket upright post, while pouring into a mould the first width continuous beam, material distributing machine is arranged in the end face of the second width pier shaft, by the second width pier top material distributing machine built-in fitting, material distributing machine is fixed, while pouring into a mould the second width continuous beam, material distributing machine is arranged in the first width continuous beam end face, by the first width continuous beam back material distributing machine built-in fitting, material distributing machine is fixed, construction segmented line, divides according to designing requirement, determines the scope of concrete once-cast, and the cloth Radius A of material distributing machine is to decide according to the beam body width of the first width continuous beam, the second width continuous beam.
Superelevation double width Cast-in-situ Beam concrete distributing method, comprises the steps:
1) according to advance planning, in pier shaft or bracket upright post, concrete delivery pump pipe is set and adheres to, in order to fixing concrete delivery pump pipe, at the second width continuous beam Dun Ding and the first width continuous beam partition wall top, arrange material distributing machine built-in fitting;
2) in the bottom of the first width pier shaft layout High Pressure Reinforced Concrete, drag pump, by concrete delivery pump pipe, concrete pump is delivered to the material distributing machine at the second width continuous beam Dun Ding place, complete the first width beam concrete pouring construction;
3) material distributing machine is moved to the first position, width continuous beam partition wall top of casting complete, the concrete delivery pump pipe of simultaneously transferring, by concrete delivery pump pipe, concrete pump is delivered to the material distributing machine of the first position, width continuous beam partition wall top, completed the second width beam body concrete pouring construction;
4) material distributing machine replaces layout according to Construction of continuous beam direction, thereby completes the concrete distributing construction of the first width continuous beam, the second width continuous beam.
Advantage of the present invention: concrete of the present invention drags pump to be pumped to after Dun Ding or beam face by high pressure; by being arranged in the material distributing machine of Dun Ding or top surface of the beam; beam body in coverage is carried out to concrete perfusion; rotation along with boom; realize continuous, the Quick pouring of beam body concrete; therefore shortened in concreting process, tear open, time of connecting pump tube and mobile pump line; guarantee that concrete has good workability; guarantee the continuity of concreting; thereby guaranteed concrete performance, reduced construction quality risk.Meanwhile, the use of material distributing machine machinery, reduces the on-the-spot human configuration of work high above the ground, also people's safety when increasing work efficiency.Less input in the present invention, and cost is lower, and easy construction has larger promotional value.
Accompanying drawing explanation
Accompanying drawing 1 is a kind of superelevation double width Cast-in-situ Beam concrete distributing system schematic diagram.
Accompanying drawing 2 is that the first width Construction of continuous beam material distributing machine is arranged schematic diagram.
Accompanying drawing 3 is that the second width Construction of continuous beam material distributing machine is arranged schematic diagram.
In figure, 1 for to drag pump for the High Pressure Reinforced Concrete of pumping of concrete, 2 is concrete delivery pump pipe, connects the high material distributing machine to Dun Ding or back place, and 3 is Construction of continuous beam bracket upright post, 4 is the second width pier top material distributing machine built-in fitting, 5 is the first width continuous beam back material distributing machine built-in fitting, and 6 is the material distributing machine for continuous beam concreting, and 7 is first width continuous beams, 8 is second width pier shafts, 9 is second width continuous beams, the 10th, and construction segmented line, A is the cloth radius of material distributing machine.
The specific embodiment
Superelevation double width Cast-in-situ Beam concrete distributing system, its structure is that High Pressure Reinforced Concrete drags pump 1 to be arranged in the bottom of the first width pier shaft 8, one end of concrete delivery pump pipe 2 connects High Pressure Reinforced Concrete and drags pump 1, the other end of concrete delivery pump pipe 2 connects the material distributing machine 6 of continuous beam concreting, for guaranteeing the safety and stablization of concrete delivery pump pipe 2, concrete delivery pump pipe 2 is fixed in Construction of continuous beam bracket upright post 3, while pouring into a mould the first width continuous beam 7, material distributing machine 6 is arranged in the end face of the second width pier shaft 8, by the second width pier top material distributing machine built-in fitting 4, material distributing machine 6 is fixing; While pouring into a mould the second width continuous beam 9, material distributing machine 6 is arranged in the first width continuous beam 7 end faces, by the first width continuous beam back material distributing machine built-in fitting 5, material distributing machine 6 is fixing; Construction segmented line 10, divides according to designing requirement, determines the scope of concrete once-cast, and the cloth Radius A of material distributing machine is to decide according to the beam body width (existing) of the first width continuous beam 7, the second width continuous beam 9.
Superelevation double width Cast-in-situ Beam concrete distributing method, comprises the steps:
1) according to advance planning, in pier shaft or bracket upright post 3, concrete delivery pump pipe 2 is set and adheres to, in order to fixing concrete delivery pump pipe 2, at the second width continuous beam 9 Dun Ding and the first width continuous beam 7 partition walls tops, arrange material distributing machine built-in fittings 5;
2) in the bottom of the first width pier shaft 8 layout High Pressure Reinforced Concrete, drag pump 1, by concrete delivery pump pipe 2, concrete pump is delivered to the material distributing machine 6 at the second width continuous beam 9 Dun Ding places, complete the first width beam 7 concrete pouring constructions;
3) material distributing machine 6 is moved to the first width continuous beam 7 positions, partition wall top of casting complete, the concrete delivery pump pipe 2 of simultaneously transferring, by concrete delivery pump pipe 2, concrete pump is delivered to the material distributing machine 6 of the first width continuous beam 7 positions, partition wall top, completed the second width beam body 9 concrete pouring constructions;
4) material distributing machine 6 replaces layout according to Construction of continuous beam direction, thereby completes the concrete distributing construction of the first width continuous beam 7, the second width continuous beam 9.
The second described width pier shaft 8 end faces and the first width beam 7 end face partition wall end faces are to arrange respectively material distributing machine 6 according to construction order, beam body concrete carries out cloth by material distributing machine 6, completes the first width continuous beam 7, the second width continuous beam 9 double width continuous beam concrete pouring constructions.
Described with the segmented sequence of construction of continuous beam, material distributing machine is alternately follow-up forward successively, completes the perfusion of the first width continuous beam 7, second width continuous beam 9 two each beam sections body concretes of width bridge.

Claims (4)

1. superelevation double width Cast-in-situ Beam concrete distributing system, it is characterized in that High Pressure Reinforced Concrete drags pump to be arranged in the bottom of the first width pier shaft, one end of concrete delivery pump pipe connects High Pressure Reinforced Concrete and drags pump, the other end of concrete delivery pump pipe connects the material distributing machine of continuous beam concreting, for guaranteeing the safety and stablization of concrete delivery pump pipe, concrete delivery pump pipe is fixed in Construction of continuous beam bracket upright post, while pouring into a mould the first width continuous beam, material distributing machine is arranged in the end face of the second width pier shaft, by the second width pier top material distributing machine built-in fitting, material distributing machine is fixed; While pouring into a mould the second width continuous beam, material distributing machine is arranged in the first width continuous beam end face, by the first width continuous beam back material distributing machine built-in fitting, material distributing machine is fixed; Construction segmented line, divides according to designing requirement, determines the scope of concrete once-cast, and the cloth Radius A of material distributing machine is to decide according to the beam body width of the first width continuous beam, the second width continuous beam.
2. superelevation double width Cast-in-situ Beam concrete distributing method as claimed in claim 1, is characterized in that the method comprises the steps:
1) according to advance planning, in pier shaft or bracket upright post, concrete delivery pump pipe is set and adheres to, in order to fixing concrete delivery pump pipe, at the second width continuous beam Dun Ding and the first width continuous beam partition wall top, arrange material distributing machine built-in fitting;
2) in the bottom of the first width pier shaft layout High Pressure Reinforced Concrete, drag pump, by concrete delivery pump pipe, concrete pump is delivered to the material distributing machine at the second width continuous beam Dun Ding place, complete the first width beam concrete pouring construction;
3) material distributing machine is moved to the first position, width continuous beam partition wall top of casting complete, the concrete delivery pump pipe of simultaneously transferring, by concrete delivery pump pipe, concrete pump is delivered to the material distributing machine of the first position, width continuous beam partition wall top, completed the second width beam body concrete pouring construction;
4) material distributing machine replaces layout according to Construction of continuous beam direction, thereby completes the concrete distributing construction of the first width continuous beam, the second width continuous beam.
3. superelevation double width Cast-in-situ Beam concrete distributing method according to claim 2, it is characterized in that described the second width pier shaft end face and the first width top surface of the beam partition wall end face are to arrange respectively material distributing machine according to construction order, beam body concrete carries out cloth by material distributing machine, completes the first width continuous beam, the second width continuous beam double width continuous beam concrete pouring construction.
4. superelevation double width Cast-in-situ Beam concrete distributing method according to claim 2, it is characterized in that described with the segmented sequence of construction of continuous beam, material distributing machine is alternately follow-up forward successively, completes the perfusion of the first width continuous beam, second width continuous beam two each beam sections body concretes of width bridge.
CN201310672031.7A 2013-12-12 2013-12-12 A kind of superelevation double width Cast-in-situ Beam concrete distributing system and distributing method Active CN103628414B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310672031.7A CN103628414B (en) 2013-12-12 2013-12-12 A kind of superelevation double width Cast-in-situ Beam concrete distributing system and distributing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310672031.7A CN103628414B (en) 2013-12-12 2013-12-12 A kind of superelevation double width Cast-in-situ Beam concrete distributing system and distributing method

Publications (2)

Publication Number Publication Date
CN103628414A true CN103628414A (en) 2014-03-12
CN103628414B CN103628414B (en) 2015-11-18

Family

ID=50209841

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310672031.7A Active CN103628414B (en) 2013-12-12 2013-12-12 A kind of superelevation double width Cast-in-situ Beam concrete distributing system and distributing method

Country Status (1)

Country Link
CN (1) CN103628414B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106382416A (en) * 2016-10-24 2017-02-08 中冶建工集团有限公司 Method for fixing pump pipes during concrete pumping and casting of upper parts of bridges
CN108396633A (en) * 2018-02-02 2018-08-14 中铁四局集团第二工程有限公司 Across the valley suspension bridge pumping beam body concrete construction method of one kind and device
CN111411594A (en) * 2020-04-03 2020-07-14 中国电建集团成都勘测设计研究院有限公司 Continuous rigid frame bridge filled with concrete

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004124374A (en) * 2002-09-30 2004-04-22 Sumitomo Metal Ind Ltd Placing method of concrete for composite floor slab
JP3534190B2 (en) * 2002-01-11 2004-06-07 オリエンタル建設株式会社 Ready-mixed concrete placement method and placement equipment for buildings
CN201520942U (en) * 2009-06-11 2010-07-07 北京建研机械科技有限公司 Moving die carrier spreader for resolving problems of cast-in-site beam concrete construction
CN201730053U (en) * 2010-04-15 2011-02-02 上海建工(集团)总公司 Symmetric concrete casting device for box girder over water
CN202518822U (en) * 2012-02-15 2012-11-07 三一重工股份有限公司 Bottom frame for concrete trailer pump and concrete trailer pump
CN202658902U (en) * 2012-07-02 2013-01-09 中联重科股份有限公司 Hoisting and spreading dual-purpose type concrete spreader
CN203237956U (en) * 2013-05-15 2013-10-16 胡远刚 Tower crane with trailer pump

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3534190B2 (en) * 2002-01-11 2004-06-07 オリエンタル建設株式会社 Ready-mixed concrete placement method and placement equipment for buildings
JP2004124374A (en) * 2002-09-30 2004-04-22 Sumitomo Metal Ind Ltd Placing method of concrete for composite floor slab
CN201520942U (en) * 2009-06-11 2010-07-07 北京建研机械科技有限公司 Moving die carrier spreader for resolving problems of cast-in-site beam concrete construction
CN201730053U (en) * 2010-04-15 2011-02-02 上海建工(集团)总公司 Symmetric concrete casting device for box girder over water
CN202518822U (en) * 2012-02-15 2012-11-07 三一重工股份有限公司 Bottom frame for concrete trailer pump and concrete trailer pump
CN202658902U (en) * 2012-07-02 2013-01-09 中联重科股份有限公司 Hoisting and spreading dual-purpose type concrete spreader
CN203237956U (en) * 2013-05-15 2013-10-16 胡远刚 Tower crane with trailer pump

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
甘中南等: "如何选购混凝土泵送设备", 《工程机械与维修》 *
郭瑞等: "厦漳跨海大桥现浇箱梁支架整体横移技术", 《世界桥梁》 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106382416A (en) * 2016-10-24 2017-02-08 中冶建工集团有限公司 Method for fixing pump pipes during concrete pumping and casting of upper parts of bridges
CN106382416B (en) * 2016-10-24 2018-07-20 中冶建工集团有限公司 Bridge superstructure concrete pumps the pump line fixing means poured
CN108396633A (en) * 2018-02-02 2018-08-14 中铁四局集团第二工程有限公司 Across the valley suspension bridge pumping beam body concrete construction method of one kind and device
CN111411594A (en) * 2020-04-03 2020-07-14 中国电建集团成都勘测设计研究院有限公司 Continuous rigid frame bridge filled with concrete

Also Published As

Publication number Publication date
CN103628414B (en) 2015-11-18

Similar Documents

Publication Publication Date Title
CN101864959B (en) Method for tunneling construction of main structure of underground station
CN105927249B (en) A kind of construction method for pouring tunnel double-lining self-compacting concrete
CN104564102B (en) A kind of tunnel lining concrete grouting device
CN103215893A (en) Method for prefabricated assembly of middle-divided sections of large-sized capping beam and assembly structure of middle-divided sections of large-sized capping beam
CN103195450A (en) Hydraulic tunnel inverted arch operation trolley and inverted arch construction method
CN104532845A (en) Deep foundation pit super-thick concrete bottom plate pouring system and construction method
CN108104825A (en) A kind of shield tunnel tunnel bottom backfills assembly construction method
CN103628414A (en) Distribution system and distribution method for ultrahigh double-width cast-in-place concrete beam
CN208293405U (en) A kind of abutment of linking deck type suspension bridge and the sidewalk that bankets
CN202659247U (en) Back templates and combined steel die for tunnel inverted arch construction
CN204080649U (en) The supporting shelf bracket of a kind of cantilever bridge No. 0 block
CN105736012A (en) Concrete grouting device for tunnel lining
CN204267046U (en) A kind of tunnel lining concrete grouting device
CN104594637A (en) Novel concrete distributing cart
CN206448166U (en) A kind of vertical prestressing mud jacking pipeline docking facilities
CN203639832U (en) Ultrahigh double-amplitude cast-in-place beam concrete distribution system
CN207630230U (en) Precast beam combined steel structure mortar leakage prevention pedestal
CN206418775U (en) A kind of arm support and concrete spraying machine
CN105908631B (en) A kind of built-in type steel reinforced concrete joint portion mud jacking filling device and construction method
CN206233115U (en) A kind of supporting bracket of bridge construction
CN206338075U (en) A kind of anti-internal water pressure composite shield section of jurisdiction
CN202577129U (en) Negative moment beam bellows connector device for continuous beam bridge
CN204875881U (en) Foundation pile is from counter -force balance test integrated device
CN208605183U (en) What a kind of middle hole method zero distance passed through existing subway station underpins system
CN209604020U (en) A kind of shield duct piece semi-ring assembling part counterforce device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant