CN201730053U - Symmetric concrete casting device for box girder over water - Google Patents

Symmetric concrete casting device for box girder over water Download PDF

Info

Publication number
CN201730053U
CN201730053U CN2010201597089U CN201020159708U CN201730053U CN 201730053 U CN201730053 U CN 201730053U CN 2010201597089 U CN2010201597089 U CN 2010201597089U CN 201020159708 U CN201020159708 U CN 201020159708U CN 201730053 U CN201730053 U CN 201730053U
Authority
CN
China
Prior art keywords
concrete
pump pipe
symmetric
casting
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010201597089U
Other languages
Chinese (zh)
Inventor
丁杰峰
吴杰
郭宏峰
梁毓赟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Construction Group Co Ltd
Original Assignee
Shanghai Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Construction Group Co Ltd filed Critical Shanghai Construction Group Co Ltd
Priority to CN2010201597089U priority Critical patent/CN201730053U/en
Application granted granted Critical
Publication of CN201730053U publication Critical patent/CN201730053U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model relates to a symmetric concrete casting device for a box girder over water. The symmetric concrete casting device comprises a concrete delivery pump and a concrete pump pipe, wherein, a large hopper and a bracket are arranged on a scow, the capacity of the large hopper is 8 cubic meters, and the height of the pump pipe can be adjusted through the bracket; the concrete pump pipe is vertically fixed on a tower body of a tower crane, and extends upwards to reach a bridge floor at a segment No.0; and the concrete pump pipe is divided into a left casting pipe and a right casting pipe through a three-way pump pipe connector, and the left casting pipe and the right casting pipe are symmetric left and right in the horizontal direction. The three-way pump pipe connector adopts a 90-degree three-way pump pipe connector. In the symmetric concrete casting device, the three-way pump pipe connector is arranged on the bridge floor, and the large hopper with the capacity of 8 cubic meters and the bracket through which the height of the pump pipe can be adjusted are arranged on the scow of 300 t. A three-way pump pipe can achieve the symmetric casting at two parts of concrete, the bracket for adjusting can adjust the position of the pump pipe when the water surface varies, and the large hopper is a measure for ensuring workability and timely supply of concrete. Therefore, the symmetric concrete casting device solves the problems that the symmetric casting at two ends of the box girder is difficult, the cost is high and so on in the Mekong river bridge engineering in Cambodia.

Description

The symmetrical on the water concreting device of case beam
Technical field
The utility model relates to a kind of building concrete and builds device, and especially a kind of case beam concreting symmetry waterborne is built device.
Background technology
Cambodia's Mekong Bridge Project is the domestic maximum cross a river bridge of Cambodia.It is striden the footpath and is combined as 30m * 6+95m+3 * 170m+95m+30m * 6.The long 1066m of bridge.Main bridge superstructure adopts single box single chamber pre-stressed box fine strain of millet, 7 meters of case fine strain of millet bottom width, 13.5 meters of top widths.The case deck-molding is carried out the transition to the deck-molding 4m of closure segment gradually by 0# piece 10.70m height.Box girder construction is except that 0# piece, closure segment, and all the other 22 sections adopt Hanging Basket symmetry cantilever pouring.The Mekong current are breathed heavily urgency, and the annual height of water is up to more than the 10m.This brings very big difficulty to construction.Case beam 0# block concrete is built and is adopted concrete mixing ship waterborne, if continue to use mixer ship waterborne, not only economic cost costliness.And in case beam two ends symmetry cast also difficulty.
Summary of the invention
The utility model is to provide a kind of case beam symmetrical on the water concreting device, is used to solve Cambodia's Mekong Bridge Project case beam two ends symmetry cast difficulty, the technical problem of expense costliness.
For achieving the above object, the technical solution adopted in the utility model is: the symmetrical on the water concreting device of a kind of case beam, comprise concrete pump, and the concrete pump line, refute and arrange that a capacity is 8m the side 3Big hopper and the carriage that can regulate pump line height, the concrete pump line is vertically fixed on the body of the tower of tower crane, and extends upwardly to the bridge floor of 0# piece, is divided into the depositing that the left and right symmetry of horizontal direction is built by the threeway pump pipe union.
The threeway pump pipe union is 90 degree threeway pump pipe unions.
Refute and be placed with loop wheel machine, concrete pump, a 200KW generator, four hoist engines the side.
The beneficial effects of the utility model are:
The utility model is refuted in 300t side and is arranged that a capacity is 8m by the threeway pump pipe union is set at bridge floor 3Big hopper and the carriage that can regulate pump line height.The threeway pump line can be divided into concrete two port and claim cast, and bracket can be adjusted the position of pump line when the water surface changes, and big hopper is to guarantee a concrete workability and a measure of supply in time.Therefore, the utility model has solved Cambodia's Mekong Bridge Project case beam two ends symmetry cast difficulty, problems such as expense costliness.
Description of drawings
Fig. 1 is the schematic diagram that big hopper is refuted in 300t side;
Fig. 2 is a symmetry cast floor map;
Fig. 3 is an A place enlarged drawing among Fig. 2;
Fig. 4 is that flat board is refuted dress small powder bucket schematic diagram.
The specific embodiment
Below in conjunction with specific embodiment, further set forth embodiment of the present utility model.Should be understood that these embodiment only to be used to the utility model is described and be not used in and limit the scope of the invention.Should be understood that in addition those skilled in the art can make various changes or modifications the utility model after the content of having read the utility model instruction, these equivalent form of values fall within the application's appended claims institute restricted portion equally.
As Fig. 1, shown in 2, the symmetrical on the water concreting device of case beam of the present utility model comprises concrete pump, concrete pump line 4, and refute and arrange that a capacity is 8m the side 3Big hopper and the carriage that can regulate pump line height, concrete pump line 4 is vertically fixed on the body of the tower 5 of tower crane, and extends upwardly to the bridge floor of 0# piece, is divided into the depositing that the left and right symmetry of horizontal direction is built by the threeway pump pipe union.
The threeway pump pipe union is 90 degree threeway pump pipe unions.
Refute and be placed with loop wheel machine, concrete pump, a 200KW generator, four hoist engines the side.
Use the symmetrical on the water concreting technology of the utility model, may further comprise the steps:
1. case beam concrete is made on the coast
Stir in the facilities of mix storied building that the C50 concrete of case beam is provided with on the coast, put into 2m 3The little hopper of concrete;
2. water transportation
2m 3The little hopper of concrete → 5t forklift transport little hopper → 100t loop wheel machine and little hopper is hung in harbour place flat board refute (see figure 4) → tugboat and flat board is refuted sail to the 300t side that rests in the place of building and refute 1 limit → 50t loop wheel machine lifting small powder bucket material is put into a capacity is 8m 3 Big hopper 2 in (Fig. 1).
3. pumping of concrete symmetry cast
Big hopper Open valve makes concrete material that material enters in the hopper of concrete pump, the concrete pump pumping of concrete by chute 3, by the homemade threeway in 0# piece bridge floor place, with cast place that is pumped into of concrete symmetry.(seeing Fig. 2,3)
The key of whole technology of the present utility model is to be provided with the threeway pump pipe union at bridge floor, refutes in 300t side and arranges on 1 that a capacity is 8m 3 Big hopper 2 and the carriage 5 that can regulate pump line height.The threeway pump line can be divided into concrete two port and claim to pour into a mould bracket can be adjusted pump line 4 when the water surface changes position.Big hopper 2 is to guarantee a concrete workability and a measure of supply in time.Concrete pump line 4 vertical direction are fixed on the body of the tower 5 of tower crane, become horizontal direction and make the concrete symmetry be divided into two directions by tee junction by 90 degree threeway pump pipe unions to the bridge floor of 0# piece and build and see.
Refute and arrange following capital equipment 300t side:
A model SCC500D loop wheel machine, a concrete pump, a capacity are 8m 3The travel(l)ing rest of big hopper, 200KW generator, four hoist engines and a transfer pump line height.

Claims (3)

1. the symmetrical on the water concreting device of case beam comprises concrete pump, concrete pump line (4), and refute (1) and arrange that upward a capacity is 8m the side 3Big hopper and the carriage that can regulate pump line height, it is characterized in that: described concrete pump line (4) is vertically fixed on the body of the tower (5) of tower crane, and extend upwardly to the bridge floor of 0# piece, be divided into the depositing that the left and right symmetry of horizontal direction is built by the threeway pump pipe union.
2. the symmetrical on the water concreting device of case beam according to claim 1 is characterized in that: described threeway pump pipe union is 90 degree threeway pump pipe unions.
3. the symmetrical on the water concreting device of case beam according to claim 1 is characterized in that: described side refutes and is placed with loop wheel machine, concrete pump, a 200KW generator, four hoist engines.
CN2010201597089U 2010-04-15 2010-04-15 Symmetric concrete casting device for box girder over water Expired - Fee Related CN201730053U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010201597089U CN201730053U (en) 2010-04-15 2010-04-15 Symmetric concrete casting device for box girder over water

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010201597089U CN201730053U (en) 2010-04-15 2010-04-15 Symmetric concrete casting device for box girder over water

Publications (1)

Publication Number Publication Date
CN201730053U true CN201730053U (en) 2011-02-02

Family

ID=43521210

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010201597089U Expired - Fee Related CN201730053U (en) 2010-04-15 2010-04-15 Symmetric concrete casting device for box girder over water

Country Status (1)

Country Link
CN (1) CN201730053U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103628414A (en) * 2013-12-12 2014-03-12 中铁大桥局集团第二工程有限公司 Distribution system and distribution method for ultrahigh double-width cast-in-place concrete beam
CN107130603A (en) * 2017-06-30 2017-09-05 中交第航务工程局有限公司 It is a kind of to refute the construction method that assembling boom pours concrete waterborne using idle side

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103628414A (en) * 2013-12-12 2014-03-12 中铁大桥局集团第二工程有限公司 Distribution system and distribution method for ultrahigh double-width cast-in-place concrete beam
CN103628414B (en) * 2013-12-12 2015-11-18 中铁大桥局集团第二工程有限公司 A kind of superelevation double width Cast-in-situ Beam concrete distributing system and distributing method
CN107130603A (en) * 2017-06-30 2017-09-05 中交第航务工程局有限公司 It is a kind of to refute the construction method that assembling boom pours concrete waterborne using idle side
CN107130603B (en) * 2017-06-30 2019-10-11 中交第一航务工程局有限公司 It is a kind of to refute the construction method that assembling boom pours concrete waterborne using idle side

Similar Documents

Publication Publication Date Title
CN103362068B (en) The mounting method of prefabricated cushion cap
CN102767176A (en) Hoisting positioning construction method of pile foundation steel reinforcement cage
CN201807729U (en) Continuous casting tundish for reducing steel remaining quantity
CN209128866U (en) A kind of low-angle is inclined cross the bridge structure in river
CN201730053U (en) Symmetric concrete casting device for box girder over water
CN206635654U (en) A kind of barging device of underwater narrow-bore tunnel super long type prefabricated case beam
CN204456109U (en) A kind of steel pipe pile lifting piling construction tackling system
CN201685997U (en) Shipbuilding tooling utilizing floating dock
CN201648978U (en) Tied arch support of bridge location cast-in-situ prestressed concrete continuous beam
CN103722613A (en) Construction method for vertically casting and mounting four-foot hollow block in seawall wave resistance engineering
CN202865812U (en) Flow-isolating structure of ship-lock approach channels
CN207861722U (en) A kind of Simple water floating type gantry crane
CN202064291U (en) Traveling construction supporting pier with floating and sinking functions
CN209260667U (en) Side slope anti-scouring system
CN207597341U (en) A kind of modular assembly formula pile foundation wharfs structural system
CN207597486U (en) High luffing water level water source water fetching device
CN205276236U (en) Inverted -siphon formula two -way rectilinear ship lift of passing a bridge
CN206218146U (en) Offshore operation at sea platform
CN205668777U (en) A kind of fish-collecting box vertical-lift and horizontal movement system
CN206233088U (en) The trestle of traffic route during as excavation of foundation pit
CN205935875U (en) Underground ditch of unloading coal
CN205296164U (en) Fill ability of swimming slip form construction device
CN204780928U (en) Major diameter bored concrete pile concrete first set groundwater increment controlling means
CN102877476B (en) Positioning and constructing method of steel cofferdam
CN207812452U (en) Steel pipe total incapsulation concreting underwater pipeline stabilizing support construction

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110202

Termination date: 20130415