CN205668777U - A kind of fish-collecting box vertical-lift and horizontal movement system - Google Patents
A kind of fish-collecting box vertical-lift and horizontal movement system Download PDFInfo
- Publication number
- CN205668777U CN205668777U CN201620563261.9U CN201620563261U CN205668777U CN 205668777 U CN205668777 U CN 205668777U CN 201620563261 U CN201620563261 U CN 201620563261U CN 205668777 U CN205668777 U CN 205668777U
- Authority
- CN
- China
- Prior art keywords
- fish
- collecting box
- horizontal movement
- hoist engine
- trolley
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P70/00—Climate change mitigation technologies in the production process for final industrial or consumer products
- Y02P70/10—Greenhouse gas [GHG] capture, material saving, heat recovery or other energy efficient measures, e.g. motor control, characterised by manufacturing processes, e.g. for rolling metal or metal working
Landscapes
- Revetment (AREA)
Abstract
The utility model discloses a kind of fish-collecting box vertical-lift and horizontal movement system, including vertical support frame, vertical support frame top is provided with top cover, being provided with cross-brace framework in the middle part of vertical support frame, cross-brace frame mid portion has mobile breach, and mobile breach two side roof part is provided with hoist engine track, hoist engine track is provided with transfer trolley, being provided with hoist engine on transfer trolley, hoist engine bottom is connected with hoist cable, and hoist cable end is provided with lifting suspension member;Upper mounting plate surface is provided with bottom framework, and lower platform and bottom framework top are mounted on trolley track, and trolley track is provided with transfer trolley, and transfer trolley is provided with the fish-collecting box matching with described lifting suspension member.The utility model effectively alleviates the adverse effect to aquatic ecological environment for the water resources and hydropower development, provides strong science and technology support, economic, social, obvious environment benefit for building environmental type Hydraulic and Hydro-Power Engineering.
Description
Technical field
The utility model relates to Hydraulic and Hydro-Power Engineering environmental protection technical field, is specifically related to a kind of fish-collecting box vertical-lift
With horizontal movement system.
Background technology
The dam site upstream and downstream fish communication channel that water resources and hydropower development relates to intercepts and fish gene communicating questions is
It is built and runs environmental problem main and the most in the urgent need to address, to this end, competent administrative department for environmental protection is general all
The protection fish relating to for water resources and hydropower development and degree of susceptibility situation, it is proposed that dam site upstream and downstream fish pass structure is built
If, run and the requirement of correlative study, the fish that crosses such as fish pass, fish lock, fish lift, transporting something containerized fish system or various combination mode is arranged
Execute, to the Sustainable Healthy Development of feasible region, river basin ecological environment.
At present, low water head Hydraulic and Hydro-Power Engineering cross fish technology and correlative study development is more ripe and application example relatively
Many, but the fish problem of crossing of the big drop of high water head reservoir dam, distance always is worldwide technological puzzle, high dam big storehouse mistake
A lot of key problems of fish technology are not yet studied and are solved, and technology maturation, excessively fish effect are preferable and convenient to operate, enforcement
Example is less, wherein, with regard to the big drop in the big storehouse of high dam, distance fish-collecting box vertical-lift and level transhipment upper dam, cross dam
Problem, is more a lack of more effective method.
Therefore, from environmental protection angle, the research strong operability of novelty, effective big drop, distance fish gathering
Case vertical-lift and the upper dam of level transhipment, excessively dam technology, construction environmental type Hydraulic and Hydro-Power Engineering is imperative and accords with
Close needs of promoting a conservation culture.
Utility model content
The utility model aims to provide a kind of fish-collecting box vertical-lift and horizontal movement system, to reach effectively to alleviate water conservancy
The adverse effect to aquatic ecological environment for the hydroelectric project exploitation, it is ensured that Hydraulic and Hydro-Power Engineering economy, environment and social benefit have both,
Realize building the purpose of environmental type Hydraulic and Hydro-Power Engineering.
The utility model is achieved by following technical solution:
A kind of fish-collecting box vertical-lift and horizontal movement system, including be separately mounted on lower platform and the upper mounting plate of dam
Four vertical support frame, vertical support frame top is provided with top cover, is provided with cross-brace framework in the middle part of vertical support frame,
Cross-brace frame mid portion has mobile breach, and mobile breach two side roof part is provided with hoist engine track, hoist engine track sets
Having transfer trolley, transfer trolley being provided with hoist engine, hoist engine bottom is connected with hoist cable, and hoist cable end is provided with lifting and hangs
Part;Described upper mounting plate surface is provided with bottom framework, and lower platform and bottom framework top are mounted on trolley track, and trolley track is provided with
Transfer trolley, transfer trolley is provided with the fish-collecting box matching with described lifting suspension member.
Described transfer trolley top middle portion has groove, and described fish-collecting box is arranged in this groove, is provided with in transfer trolley
Motor, transfer trolley both sides are arranged on trolley track by castor.
Described fish-collecting box is open design, and casing is stainless steel and its length, width and height are 1.0-2.0m, casing four sides
Side plate thickness is 5-15mm, and base plate thickness is 10-20mm, and water storage height is the 3/5-4/5 of box height, and top is open layer.
Described trolley track end is provided with crash bearer, the long 0.3m of crash bearer, wide 0.3m, high 0.5m, installs inside crash bearer
There is the anticollision steel plate that 6.0mm is thick.
Described vertical support frame has on 4 and wherein two lower platforms being arranged on dam, and other two are arranged on the end
On framework.
Described vertical support frame, cross-brace framework, top cover, bottom framework are reinforced concrete structure.
Described hoist engine track two ends are mounted on abutment pier, the long 0.3m of abutment pier, wide 0.3m, high 0.5m.
The degree of depth of described groove is 20-30cm, and long and width is 1.6m, and groove inner bottom surface and sidewall are provided with 2-4cm
Thick electro-insulating rubber isolation cushion.
The nominal drive speed of described transfer trolley is 20-30m/min, and the nominal rated speed of hoist engine is 8-15m/min.
The beneficial effects of the utility model are:
Compared with prior art, fish-collecting box vertical-lift and the horizontal movement system that the utility model provides, according to high dam
Big storehouse project playout is actual, requires in conjunction with the upper dam under the conditions of the big drop of fish-collecting box downstream, distance, dam excessively, by arranging
A kind of fish-collecting box vertical-lift and horizontal movement system, carry out big drop, under the conditions of distance to high dam great Ku downstream fish-collecting box
Quick, stable promote with transhipment upper dam, cross dam, thus reach the big storehouse of high dam and swim across fish up and down and realize what fish gene exchanged
Purpose, alleviates the adverse effect to aquatic ecological environment for the water resources and hydropower development with effective, for building environmental type water conservancy
Hydroelectric project provides strong science and technology support, economic, social, obvious environment benefit.
Brief description
Fig. 1 is longitudinal profile schematic diagram of the present utility model;
Fig. 2 is horizontal section schematic diagram of the present utility model;
Fig. 3 is fish-collecting box level transhipment structural representation in the utility model;
In figure: 1-lifts suspension member;The open layer of 2-;3-fish-collecting box;4-hoist cable;5-hoist engine;6-hoist engine track;7-limit
Pier;8-transfer trolley;9-castor;10-groove;11-motor;12-crash bearer;13-trolley track;14-crash bearer;15-is vertical
Support frame;16-top cover;17-lower platform;18-upper mounting plate, 19-moves breach, 20-cross-brace framework, 21-bottom framework.
Detailed description of the invention
Below in conjunction with drawings and Examples, the technical solution of the utility model is described further, but required protection
Scope is not limited to described;
As Figure 1-3, fish-collecting box vertical-lift and the horizontal movement system that the utility model provides, including be respectively mounted
Four vertical support frame 15 on the lower platform 17 and upper mounting plate 18 of dam, vertical support frame 15 top is provided with top cover
16, it is provided with cross-brace framework 20 in the middle part of vertical support frame 15, in the middle part of cross-brace framework 20, have mobile breach 19, mobile
19 liang of side roof parts of breach are provided with hoist engine track 6, and hoist engine track 6 is provided with transfer trolley 8, and transfer trolley 8 is provided with
Hoist engine 5, hoist engine 5 bottom is connected with hoist cable 4, and hoist cable 4 end is provided with lifting suspension member 1;Described upper mounting plate 18 surface is provided with
Bottom framework 21, lower platform 17 and bottom framework 21 top are mounted on trolley track 13, and trolley track 13 is provided with transfer trolley 8,
Transfer trolley 8 is provided with the fish-collecting box 3 matching with described lifting suspension member 1.
Described transfer trolley 8 top middle portion has groove 10, and described fish-collecting box 3 is arranged in this groove 10, transfer trolley 8
Inside being provided with motor 11, transfer trolley 8 both sides are arranged on trolley track 13 by castor 9.
Described fish-collecting box 3 is open design, and casing is stainless steel and its length, width and height are 1.0-2.0m, casing four sides
Side plate thickness is 5-15mm, and base plate thickness is 10-20mm, and water storage height is the 3/5-4/5 of box height, and top is open layer 2.
Described trolley track 13 end is provided with crash bearer 14, the long 0.3m of crash bearer 14, wide 0.3m, high 0.5m, crash bearer 14
Inner side is provided with the thick anticollision steel plate of 6.0mm.
Described vertical support frame 15 has on 4 and wherein two lower platforms 17 being arranged on dam, other two settings
On bottom framework 21.
Described vertical support frame the 15th, cross-brace framework the 20th, top cover the 16th, bottom framework 21 is reinforced concrete structure.
Described hoist engine track 6 two ends are mounted on abutment pier 7, the long 0.3m of abutment pier 7, wide 0.3m, high 0.5m.
The degree of depth of described groove 10 is 20-30cm, and long and width is 1.6m, and groove 10 inner bottom surface and sidewall are provided with 2-
The thick electro-insulating rubber isolation cushion of 4cm.
The nominal drive speed of described transfer trolley 8 is 20-30m/min, and the nominal rated speed of hoist engine 5 is 8-15m/min.
Embodiment: Bei Panjiang Ma Maya one-level power station, Guizhou Province
(1) project profile
Ma Maya one-level power station is big (2) the type engineerings such as II, and for dam-type exploitation, its dam site is positioned at Guanling fauna and Xingren
The northern dish Jiang Ganliu of county's intersection, dam site above water catching area 16068.0km2, average annual flow 309.0m at dam site3/
s;Based on engineering development task is to generate electricity, shipping is taken second place, and takes into account guarantee downstream ecology environment, landscape water;The normal retaining of reservoir
Position 585.0m, corresponding storage capacity 1.365 hundred million m3, level of dead water 570.0m, regulate storage capacity 0.732 hundred million m3, there is day regulation performance;Power station
Installed capacity 558MW, it is ensured that exert oneself 97MW, Mean annual energy production 15.92 hundred million kW h;Main structures includes grinding coagulation
Gravity dam, diversion system, left bank underground power house and navigation structure composition.Ma Maya one-level power station Compacted Concrete Gravity Dam Section
Long 250.2m, crest elevation 592.0m, elevation 483.0m at the bottom of dam, maximum height of dam 109.0m, dam crest width 10.0m, dam base width
Degree 91.44m.
(2) fish object is crossed
Ma Maya one-level power station relates to section has fish mesh 9 section 9 subfamily 35 to belong to 48 kinds, wherein has " China animals on the brink of extinction
Red Data Book fish " fish of easily endangering: leaf knot fish, black former carp and long stern etc. 3 kinds, Pearl River system Endemic fish leaf knot fish, Wu Yuan
Carp, long stern, Met roller and long-tail etc. 5 kinds.5 kinds of fish such as leaf knot fish, black former carp, long stern, Met roller, long-tail are horse
Horse precipice one-level Dam Site upstream and downstream all has distribution, and has short distance migration phenomenon, and therefore, engineering emphasis is by above fish
As crossing dam warehouse-in object, to reach to realize the purpose of dam site upstream and downstream rare protection fish exchange.
(3) fish-collecting box system
The fish-collecting box vertical-lift of downstream, Ma Maya one-level power station and horizontal movement system lower platform 17 are arranged under dam
At the 518.0m elevation platform of trip left bank, distance axis of dam 86.0m, distance factory building draft tube deck 100.0m, upper mounting plate is laid in
At the elevation 580.0m platform of lower factory building roadside, fish-collecting box vertical-lift elevation 62.0m, fish-collecting box reaches the high 580.0m of upper mounting plate 18
It is transported to reservoir area by Automobile Transportation mode again after elevation to release.
Fish-collecting box 3 is open type, load 6.0t;Lifting suspension member 1 is steel structure support suspending hook pattern, load 8.0t;
Fish-collecting box 3 weight 6.0t;The long 1.5m of casing, wide 1.5m, high 2.0m, be stainless steel, and top is without cover plate, casing four wall and bottom
Take encapsulation process, casing four sides side plate thickness be 6.0mm, surrounding curb girder thickness be 20.0mm, box bottom thickness is
12.0mm, cross member thickness are 35.0mm;Open layer 2 height is 40.0cm, and reservoir bed height is 160.0cm.
Hoist engine 5 model is JM0.3 type, is arranged on the cross-brace framework 20 of 585.0m elevation, is with motor 10
Power, drives reel through elastic coupling, three grades of closed-end gear reduction boxes, dog couplings, uses electromagnetic braking, have
The features such as simple in construction, easy to operate, safe and reliable, efficiency is high, elevating capacity is big, lifting tonnage 12.0t, hoist engine 5 reel
On Φ 30 steel wire traction rope normal speed be 15.0m/min;Bottom hoist engine 5, the track castor of surrounding takes inverted U steel to tie
Structure directional wheel pattern, to overlap hoist engine moving track, its a diameter of 0.3m.Hoist engine track 6 uses carbon steel steel construction material
Material anchoring is laid, and uses i-beam track pattern, and to overlap castor 9, track two ends are with armored concrete abutment pier 7, and abutment pier 7 is long
0.3m, wide 0.3m, high 0.5m.
Transfer trolley 8 and trolley track 13 are all laid at lower platform the 17th, upper mounting plate 18, use motor 10 as power
Source, with diameter 0.3m inverted U steel construction direction-caster 9 bottom transfer trolley 8, trolley track 13 two ends are provided with reinforcing bar and mix
The crash bearer 14 of solidifying soil, the long 0.3m of crash bearer 14, wide 0.3m, high 0.5m, crash bearer 14 runs side by chassis and is provided with 6.0mm
Thick anticollision steel plate.Transfer trolley 8 is steel construction, and end face is square, and end face length and width are 2.0m, end face groove floor and
Being formed around electro-insulating rubber isolation cushion, isolation cushion thickness is 4.0cm, and depth of groove is 30.0cm, and groove length is with width
1.6m.Motor 10 nominal drive speed in transfer trolley 8 is 25.0m/min, during to guarantee load-carrying steadily, safety.Trolley rail
Road 13 uses the anchoring of carbon steel steel structure material to lay, and uses i-beam track pattern, to overlap castor 9.
Vertical support frame the 15th, the top cover of the fish-collecting box vertical-lift of Ma Maya one-level power station and horizontal movement system is the 16th,
Bottom framework 21 and cross-brace framework 20 structure are laid with upper mounting plate 18 respectively at lower platform 17.17 two vertical supportings of lower platform
The high 69.5m of framework 15, long 2.7m, wide 2.2m, embedded depth of foundation 5.0m;The high 7.5m of 18 two vertical support frame 15 of upper mounting plate, length
2.5m, wide 2.2m, embedded depth of foundation 1.5m;The long 130.0m of bottom framework 21, wide 2.2m, high 0.4m;Hoist engine track 6 and top cover are long
12.0m, wide 2.2m, high 0.7m.
Concrete using method is: carry out fish collection in fish-collecting box 3 is placed on waters, dam downstream;After collection completes
On the transfer trolley 8 being placed on fish-collecting box 3 on lower platform 17 and in the range of being delivered to vertical support frame 15;Hoist engine 5 end
The hoist cable 4 in portion extends and is connected the lifting suspension member 1 of hoist cable 4 end with fish-collecting box 3 top;Hoist engine 5 starts and receives hoist cable 4
Volume realizes the lifting of fish-collecting box 3 on runner;Hoist engine braking after fish-collecting box 3 bottom is higher than upper mounting plate 18, starts hoist engine
Transfer trolley 8 on track 6, transfer trolley 8 pulls fish-collecting box 3 to move to upper mounting plate 18 top;Hoist engine 5 unwrapping wire makes hoist cable 4
The fish-collecting box 3 of end declines and is installed on trolley track 13 transfer trolley 8 top installed;Transfer trolley 8 starts, internal
Motor 11 drives transfer trolley 8 to move to the direction away from vertical support frame 15;Pour the shoal of fish in fish-collecting box 3 on dam into
Swimming territory.
The fish-collecting box vertical-lift of Ma Maya one-level power station and horizontal movement system promote fish-collecting box height and reach 62.0m, turn
Long-distance 130.0m, under normal operation, fish-collecting box lifting, about 7 minutes vertical-lift time, fish-collecting box goes to conveyer table
Car, level about 8 minutes time of transhipment, hereafter being released after reservoir area by Automobile Transportation, total time does not surpasses half an hour, completely full again
Foot fish are temporary in fish-collecting box to be required, and has reached the purpose that downstream of hydro-power plant fish cross dam warehouse-in.
Claims (9)
1. a fish-collecting box vertical-lift and horizontal movement system, it is characterised in that: include the lower platform being separately mounted to dam
(17) four vertical support frame (15) and on upper mounting plate (18), vertical support frame (15) top is provided with top cover (16), perpendicular
Be provided with cross-brace framework (20) to support frame (15) middle part, cross-brace framework (20) middle part has mobile breach (19),
Mobile breach (19) two side roof part is provided with hoist engine track (6), and hoist engine track (6) is provided with transfer trolley (8), conveyer table
Being provided with hoist engine (5) on car (8), hoist engine (5) bottom is connected with hoist cable (4), and hoist cable (4) end is provided with lifting suspension member
(1);Described upper mounting plate (18) surface is provided with bottom framework (21), and lower platform (17) and bottom framework (21) top are mounted on trolley rail
Road (13), trolley track (13) is provided with transfer trolley (8), and transfer trolley (8) is provided with and matches with described lifting suspension member (1)
Fish-collecting box (3).
2. fish-collecting box vertical-lift according to claim 1 and horizontal movement system, it is characterised in that: described transfer trolley
(8) top middle portion has groove (10), and described fish-collecting box (3) is arranged in this groove (10), and transfer trolley is provided with motor in (8)
(11), transfer trolley (8) both sides are arranged on trolley track (13) by castor (9).
3. fish-collecting box vertical-lift according to claim 1 and horizontal movement system, it is characterised in that: described fish-collecting box
(3) being open design, casing is stainless steel and its length, width and height are 1.0-2.0m, and casing four sides side plate thickness is 5-
15mm, base plate thickness is 10-20mm, and water storage height is the 3/5-4/5 of box height, and top is open layer (2).
4. fish-collecting box vertical-lift according to claim 1 and horizontal movement system, it is characterised in that: described trolley track
(13) end is provided with crash bearer (14), the long 0.3m of crash bearer (14), wide 0.3m, high 0.5m, and crash bearer (14) inner side is provided with
The thick anticollision steel plate of 6.0mm.
5. fish-collecting box vertical-lift according to claim 1 and horizontal movement system, it is characterised in that: described vertical supporting
Framework (15) has on 4 and wherein two lower platforms (17) being arranged on dam, and other two are arranged on bottom framework (21).
6. fish-collecting box vertical-lift according to claim 1 and horizontal movement system, it is characterised in that: described vertical supporting
Framework (15), cross-brace framework (20), top cover (16), bottom framework (21) are reinforced concrete structure.
7. fish-collecting box vertical-lift according to claim 1 and horizontal movement system, it is characterised in that: described hoist engine rail
Road (6) two ends are mounted on abutment pier (7), the long 0.3m of abutment pier (7), wide 0.3m, high 0.5m.
8. fish-collecting box vertical-lift according to claim 2 and horizontal movement system, it is characterised in that: described groove (10)
The degree of depth be 20-30cm, long and width is 1.6m, and groove (10) inner bottom surface and sidewall are provided with the thick electro-insulating rubber of 2-4cm
Isolation cushion.
9. fish-collecting box vertical-lift according to claim 1 and horizontal movement system, it is characterised in that: described transfer trolley
(8) nominal drive speed is 20-30m/min, and the nominal rated speed of hoist engine (5) is 8-15m/min.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620563261.9U CN205668777U (en) | 2016-06-13 | 2016-06-13 | A kind of fish-collecting box vertical-lift and horizontal movement system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620563261.9U CN205668777U (en) | 2016-06-13 | 2016-06-13 | A kind of fish-collecting box vertical-lift and horizontal movement system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205668777U true CN205668777U (en) | 2016-11-02 |
Family
ID=57191076
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620563261.9U Active CN205668777U (en) | 2016-06-13 | 2016-06-13 | A kind of fish-collecting box vertical-lift and horizontal movement system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205668777U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105883324A (en) * | 2016-06-13 | 2016-08-24 | 中国电建集团贵阳勘测设计研究院有限公司 | Vertical lifting and horizontal transferring system for fish collection box |
CN109736253A (en) * | 2019-02-22 | 2019-05-10 | 长江勘测规划设计研究有限责任公司 | A kind of fish-collecting box and its attracting fish method using tail water fish gathering |
-
2016
- 2016-06-13 CN CN201620563261.9U patent/CN205668777U/en active Active
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105883324A (en) * | 2016-06-13 | 2016-08-24 | 中国电建集团贵阳勘测设计研究院有限公司 | Vertical lifting and horizontal transferring system for fish collection box |
CN105883324B (en) * | 2016-06-13 | 2018-07-03 | 中国电建集团贵阳勘测设计研究院有限公司 | A kind of fish-collecting box vertical-lift and horizontal movement system |
CN109736253A (en) * | 2019-02-22 | 2019-05-10 | 长江勘测规划设计研究有限责任公司 | A kind of fish-collecting box and its attracting fish method using tail water fish gathering |
CN109736253B (en) * | 2019-02-22 | 2023-12-01 | 长江勘测规划设计研究有限责任公司 | Fish collecting box for collecting fish by utilizing tail water and fish collecting method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101476294B (en) | Mounting method for underbeam segment of large-stride steel box girder stayed-cable bridge | |
CN104912041B (en) | Fish passing system for high dam of canyon reach | |
CN201224866Y (en) | Floating pier steel bridge approach floating type elevating system | |
CN204778472U (en) | Construct small -size loop wheel machine | |
CN103798160B (en) | A kind of deep-sea breeding platform and preparation method thereof | |
CN102808382A (en) | Method for constructing arch bridge in V-shaped valley without tower | |
CN109098160B (en) | Multifunctional sluice based on single-function sluice transformation and construction method and use method thereof | |
CN105883324B (en) | A kind of fish-collecting box vertical-lift and horizontal movement system | |
CN204138201U (en) | Cable hoisting concrete apparatus in slope construction on express highway | |
CN205668777U (en) | A kind of fish-collecting box vertical-lift and horizontal movement system | |
CN203475401U (en) | Simple floating material stopping device | |
CN205492149U (en) | Fish device is blocked in fish gathering pond | |
CN105794708B (en) | A kind of collection fishpond electric fish screen structure | |
CN105692465A (en) | Cableway type transfer system for loading fish collection boxes to dam | |
CN205419568U (en) | Cableway formula collection fish box goes up dam transfer device | |
CN202064291U (en) | Traveling construction supporting pier with floating and sinking functions | |
CN104192277A (en) | Lifting reinforcement prolongation control method for floating wave-resisting platform | |
CN104863094B (en) | Be applicable in the reservoir of north cold area blocks ship's rigging | |
CN217470721U (en) | Device for closed-warehouse reclamation of large pit-type tailing warehouse | |
CN209260667U (en) | Side slope anti-scouring system | |
CN205419686U (en) | Rail mounted collection fish box goes up dam structure | |
CN205934730U (en) | Installation device of wave form steel web | |
CN210712779U (en) | Steering device and fish passing system | |
CN105621324A (en) | Rail type fish collection tank dam feeding system | |
CN108439186A (en) | Water-permeable frame hoisting transportation equipment and method of jettisoninging |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |