CN204138201U - Cable hoisting concrete apparatus in slope construction on express highway - Google Patents

Cable hoisting concrete apparatus in slope construction on express highway Download PDF

Info

Publication number
CN204138201U
CN204138201U CN201420569191.9U CN201420569191U CN204138201U CN 204138201 U CN204138201 U CN 204138201U CN 201420569191 U CN201420569191 U CN 201420569191U CN 204138201 U CN204138201 U CN 204138201U
Authority
CN
China
Prior art keywords
concrete
fixing feet
hand cradle
main rope
feet hand
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420569191.9U
Other languages
Chinese (zh)
Inventor
朱俊虎
王振江
蔡新宁
王兆辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Middle Friendship One 6th Engineering Co Ltd Of Public Office
Original Assignee
Middle Friendship One 6th Engineering Co Ltd Of Public Office
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Middle Friendship One 6th Engineering Co Ltd Of Public Office filed Critical Middle Friendship One 6th Engineering Co Ltd Of Public Office
Priority to CN201420569191.9U priority Critical patent/CN204138201U/en
Application granted granted Critical
Publication of CN204138201U publication Critical patent/CN204138201U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Paving Machines (AREA)

Abstract

To the utility model discloses on a kind of express highway cable hoisting concrete apparatus in slope construction, two earth anchors 6 comprising main rope 1 and be individually fixed in top, slope on roadbed, side slope between described two earth anchors 6 is fixed with the fixing feet hand cradle 4 supporting main rope 1, described fixing feet hand cradle 4 is provided with fixed pulley 5, concrete balancing weight 7 is also provided with near earth anchor 6 on described roadbed, concrete balancing weight 7 is installed with winch 3, also comprise concrete hopper 8, described concrete hopper 8 hangs in main rope 1 by the pulley on it, also comprise secondary cable 2, one end of described secondary cable 2 is connected on the roller bearing of winch 3, the fixed pulley 5 that the other end is walked around in fixing feet hand cradle 4 is connected on the pulley on concrete hopper 8.The beneficial effects of the utility model are, reduce labour intensity and the security risk of operating personal, increase economic efficiency.

Description

Cable hoisting concrete apparatus in slope construction on express highway
Technical field
The utility model relates to the realm of building construction, particularly cable hoisting concrete apparatus in slope construction on a kind of express highway.
Background technology
On express highway in the construction of side slope Anchored frame beam.The arranging of concrete agitator needs the approach conditions considering sand, building stones and cement, also need certain area smooth location simultaneously, but the side slope of express highway does not meet the condition of laying concrete mixer, if concrete mixer to be placed in the roadbed place of express highway, so concrete transport significantly will improve construction cost, does not calculate very much.
Utility model content
The purpose of this utility model is to solve the problem, and devises one and utilizes the concrete device of cable hoisting.
Realizing above-mentioned purpose the technical solution of the utility model is, cable hoisting concrete apparatus in slope construction on a kind of express highway, two earth anchors 6 comprising main rope 1 and be individually fixed in top, slope on roadbed, side slope between described two earth anchors 6 is fixed with the fixing feet hand cradle 4 supporting main rope 1, described fixing feet hand cradle 4 is provided with fixed pulley 5, concrete balancing weight 7 is also provided with near earth anchor 6 on described roadbed, concrete balancing weight 7 is installed with winch 3, also comprise concrete hopper 8, described concrete hopper 8 hangs in main rope 1 by the pulley on it, also comprise secondary cable 2, one end of described secondary cable 2 is connected on the roller bearing of winch 3, the fixed pulley 5 that the other end is walked around in fixing feet hand cradle 4 is connected on the pulley on concrete hopper 8.
One end that described main rope is positioned at roadbed is fixed on earth anchor, be positioned at slope top one end can be fixed on be positioned at slope top earth anchor on or be positioned at slope top large usage tree root, will arrange immediately below main rope for cable support and fixing fixing feet hand cradle, fixing feet hand cradle also can be used as the supporting body of fixed installation fixed pulley simultaneously.Described secondary cable is walked around on cylinder that two ends are connected respectively to hoisting machine by fixed pulley and on concrete hopper, described winch is fixedly mounted on concrete balancing weight, secondary cable is fixed on the cylinder of winch, by the power-lift concrete hopper of winch.Described fixing feet hand cradle can according to the particular location of construction, side slope neatly immediately below main rope is set up, fix main rope by fixing feet hand cradle in practice and can improve the safety that cement concrete unloads operating personal, simultaneously for pulley fixedly provide support.
Described main rope adopts Φ 16 steel rope to be made.
Described secondary cable adopts Φ 8 steel rope to be made.
The tractive force of described winch 3 is greater than the gravity suffered by concrete hopper 8.
The weight of described concrete balancing weight 7 is greater than the weight of concrete hopper 8.
In described fixing feet hand cradle 4, also binding has the hawser 10 of ground connection to reinforce.
Described fixing feet hand cradle 4 side is also placed with waggon 9.
Described fixing feet hand cradle 4 is set up by Φ 4.8 steel pipe and is formed, and the fixed position of described fixing feet hand cradle 4 is any domatic position immediately below main rope 1.
The concrete handling device utilizing the technical solution of the utility model to make, to efficiently solve on express highway concrete supply problem in the construction of side slope Anchored frame beam, the concrete handling be stirred by express highway roadbed place concrete mixer by the mode of handling is to the assigned address in side slope, greatly reduce construction cost, the simultaneously use of fixing feet hand cradle in side slope, fully can also ensure the safety problem of operative, application is strong.
Accompanying drawing explanation
Fig. 1 is the structural representation of the concrete device of cable hoisting described in the utility model;
Fig. 2 is the local structure enlarged drawing at fixing feet hand cradle place described in the utility model;
Fig. 3 is the local structure enlarged drawing at winch place described in the utility model;
In figure 1, main rope; 2, secondary cable; 3, electric winch; 4, fixing feet hand cradle; 5, fixed pulley; 6, earth anchor; 7, concrete balancing weight; 8, concrete hopper; 9, waggon; 10, hawser.
Detailed description of the invention
Below in conjunction with accompanying drawing, the utility model is specifically described, as Figure 1-3, cable hoisting concrete apparatus in slope construction on a kind of express highway, two earth anchors 6 comprising main rope 1 and be individually fixed in top, slope on roadbed, side slope between described two earth anchors 6 is fixed with the fixing feet hand cradle 4 supporting main rope 1, described fixing feet hand cradle 4 is provided with fixed pulley 5, concrete balancing weight 7 is also provided with near earth anchor 6 on described roadbed, concrete balancing weight 7 is installed with winch 3, also comprise concrete hopper 8, described concrete hopper 8 hangs in main rope 1 by the pulley on it, also comprise secondary cable 2, one end of described secondary cable 2 is connected on the roller bearing of winch 3, the fixed pulley 5 that the other end is walked around in fixing feet hand cradle 4 is connected on the pulley on concrete hopper 8.Wherein, described main rope adopts Φ 16 steel rope to be made; Described secondary cable adopts Φ 8 steel rope to be made; The tractive force of described winch 3 is greater than the gravity suffered by concrete hopper 8; The weight of described concrete balancing weight 7 is greater than the weight of concrete hopper 8; In described fixing feet hand cradle 4, also binding has the hawser 10 of ground connection to reinforce; Described fixing feet hand cradle 4 side is also placed with waggon 9; Described fixing feet hand cradle 4 is set up by Φ 4.8 steel pipe and is formed, and the fixed position of described fixing feet hand cradle 4 is any domatic position immediately below main rope 1.
The feature of the technical program is in work progress, by the erection of main rope, for the lifting of concrete hopper provides " track ", by the erection installation of secondary cable and the Power output of winch, achieves concrete handling.Side slope arranges the span that fixing feet hand cradle can reduce main rope, simultaneously also for the installation of fixed pulley fixedly provides basis, also falls to providing safety control for concrete the unloading in plain stage of slope place simultaneously.In the front end of fixing feet hand cradle, fall on waggon by artificial cement concrete in concrete hopper unloaded, then with waggon again by concrete transportation to pouring location.
Technique scheme only embodies the optimal technical scheme of technical solutions of the utility model; those skilled in the art all embody principle of the present utility model to some variations that wherein some part may be made, and belong within protection domain of the present utility model.

Claims (8)

1. cable hoisting concrete apparatus in slope construction on an express highway, comprise main rope (1) and be individually fixed in two earth anchors (6) with top, slope on roadbed, it is characterized in that, side slope between described two earth anchors (6) is fixed with the fixing feet hand cradle (4) supporting main rope (1), described fixing feet hand cradle (4) is provided with fixed pulley (5), concrete balancing weight (7) is also provided with near earth anchor (6) on described roadbed, concrete balancing weight (7) is installed with winch (3), also comprise concrete hopper (8), described concrete hopper (8) hangs in main rope (1) by the pulley on it, also comprise secondary cable (2), one end of described secondary cable (2) is connected on the roller bearing of winch (3), the fixed pulley (5) that the other end is walked around in fixing feet hand cradle (4) is connected on the pulley on concrete hopper (8).
2. cable hoisting concrete apparatus in upper slope construction according to claim 1, is characterized in that, described main rope adopts Φ 16 steel rope to be made.
3. cable hoisting concrete apparatus in upper slope construction according to claim 1, is characterized in that, described secondary cable adopts Φ 8 steel rope to be made.
4. cable hoisting concrete apparatus in upper slope construction according to claim 1, is characterized in that, the tractive force of described winch (3) is greater than the gravity suffered by concrete hopper (8).
5. cable hoisting concrete apparatus in upper slope construction according to claim 1, is characterized in that, the weight of described concrete balancing weight (7) is greater than the weight of concrete hopper (8).
6. cable hoisting concrete apparatus in upper slope construction according to claim 1, is characterized in that, on described fixing feet hand cradle (4), also binding has the hawser (10) of ground connection to reinforce.
7. cable hoisting concrete apparatus in upper slope construction according to claim 1, is characterized in that, described fixing feet hand cradle (4) side is also placed with waggon (9).
8. cable hoisting concrete apparatus in upper slope construction according to claim 1, it is characterized in that, described fixing feet hand cradle (4) is set up by Φ 4.8 steel pipe and is formed, and the fixed position of described fixing feet hand cradle (4) is any domatic position immediately below main rope (1).
CN201420569191.9U 2014-09-30 2014-09-30 Cable hoisting concrete apparatus in slope construction on express highway Expired - Fee Related CN204138201U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420569191.9U CN204138201U (en) 2014-09-30 2014-09-30 Cable hoisting concrete apparatus in slope construction on express highway

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420569191.9U CN204138201U (en) 2014-09-30 2014-09-30 Cable hoisting concrete apparatus in slope construction on express highway

Publications (1)

Publication Number Publication Date
CN204138201U true CN204138201U (en) 2015-02-04

Family

ID=52414905

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420569191.9U Expired - Fee Related CN204138201U (en) 2014-09-30 2014-09-30 Cable hoisting concrete apparatus in slope construction on express highway

Country Status (1)

Country Link
CN (1) CN204138201U (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105692465A (en) * 2016-03-21 2016-06-22 中国电建集团贵阳勘测设计研究院有限公司 Cableway type transfer system for loading fish collection boxes to dam
CN106436724A (en) * 2016-11-11 2017-02-22 四川大学 Root-anchor system reinforcing ecological slope protection method for fill slope
CN107100168A (en) * 2017-04-10 2017-08-29 中国十七冶集团有限公司 A kind of High Slope Protection concrete delivery device
CN107190991A (en) * 2017-07-10 2017-09-22 北京江河幕墙系统工程有限公司 The special-shaped curtain wall vertical lifting system of glass plate
CN110344421A (en) * 2019-06-24 2019-10-18 中建桥梁有限公司 A kind of high slope Vierendeel girder concrete construction method
CN110565656A (en) * 2019-08-27 2019-12-13 中国十七冶集团有限公司 Safe moving method for high slope constructors
CN111206601A (en) * 2020-01-19 2020-05-29 湖南工程学院 Method for rapid rush repair and reinforcement of high and steep landslide

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105692465A (en) * 2016-03-21 2016-06-22 中国电建集团贵阳勘测设计研究院有限公司 Cableway type transfer system for loading fish collection boxes to dam
CN106436724A (en) * 2016-11-11 2017-02-22 四川大学 Root-anchor system reinforcing ecological slope protection method for fill slope
CN106436724B (en) * 2016-11-11 2018-08-28 四川大学 Root anchor system reinforces embankment slope ecological bank protecting method
CN107100168A (en) * 2017-04-10 2017-08-29 中国十七冶集团有限公司 A kind of High Slope Protection concrete delivery device
CN107190991A (en) * 2017-07-10 2017-09-22 北京江河幕墙系统工程有限公司 The special-shaped curtain wall vertical lifting system of glass plate
CN110344421A (en) * 2019-06-24 2019-10-18 中建桥梁有限公司 A kind of high slope Vierendeel girder concrete construction method
CN110565656A (en) * 2019-08-27 2019-12-13 中国十七冶集团有限公司 Safe moving method for high slope constructors
CN111206601A (en) * 2020-01-19 2020-05-29 湖南工程学院 Method for rapid rush repair and reinforcement of high and steep landslide

Similar Documents

Publication Publication Date Title
CN204138201U (en) Cable hoisting concrete apparatus in slope construction on express highway
CN204370830U (en) A kind of electric pole centralizer
CN204778472U (en) Construct small -size loop wheel machine
CN205387439U (en) Mast hoisting accessory
CN204198225U (en) A kind of suspension bracket of lifting for prefabricated U-shaped aqueduct and device
CN103215862B (en) A kind of rail section of track crab shape device about track-laying machine and construction method thereof
RU157792U1 (en) PILED-SCREW ANCHOR OF INCREASED HORIZONTAL STABILITY
CN204474271U (en) A kind of high wind resistance nacelle device
CN204418013U (en) Bridge flange plate is constructed self-propelled cantilever hanging basket
CN204643651U (en) A kind of construction-site crane
CN218371502U (en) Anti-falling concrete lifting device
CN104401887B (en) A kind of micro lifter
CN206290072U (en) A kind of Convenient-safe electric pole erecting device
CN202390077U (en) Lifting appliance for conveying tower crane
CN203781713U (en) High slope support material transport device
CN205934730U (en) Installation device of wave form steel web
CN205617771U (en) Construction operation platform and pipe -line transportation integrated device in high residential building elevartor shaft
CN204198329U (en) Anchor pole hanging device
CN208378287U (en) A kind of simple vertical transport equipment of architecture construction
CN202467221U (en) Power plant main workshop steel roof truss hoisting lifting device
CN203246794U (en) Machine for hoisting and transporting railway and highway high-cutting protection slope protective construction sandstone materials
CN203513129U (en) Lifting device for conveying digging pile construction materials
CN206775439U (en) The anchor structure of water surface photovoltaic apparatus
CN208151872U (en) Scaffold formula Wavelike steel webplate hanging apparatus
CN204702436U (en) A kind of building small crane

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150204

Termination date: 20190930

CF01 Termination of patent right due to non-payment of annual fee