CN205935875U - Underground ditch of unloading coal - Google Patents

Underground ditch of unloading coal Download PDF

Info

Publication number
CN205935875U
CN205935875U CN201620879910.6U CN201620879910U CN205935875U CN 205935875 U CN205935875 U CN 205935875U CN 201620879910 U CN201620879910 U CN 201620879910U CN 205935875 U CN205935875 U CN 205935875U
Authority
CN
China
Prior art keywords
coal
bunker
underground
underground track
side wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620879910.6U
Other languages
Chinese (zh)
Inventor
郭志博
郭国红
石天庆
苏瑞杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huadian Zhengzhou Machinery Design and Research Institute Co Ltd
Original Assignee
Huadian Zhengzhou Machinery Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huadian Zhengzhou Machinery Design and Research Institute Co Ltd filed Critical Huadian Zhengzhou Machinery Design and Research Institute Co Ltd
Priority to CN201620879910.6U priority Critical patent/CN205935875U/en
Application granted granted Critical
Publication of CN205935875U publication Critical patent/CN205935875U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The utility model provides an underground ditch of unloading coal, the ditch body of unloading coal that constitutes including bottom plate and double -phase right lateral wall, the symmetry sets up two coal scuttles on the opposite face of two lateral walls, and two coal scuttles be narrow toper structure under the width, and the formation platform is chosen to the coal scuttle bottom level, has the through -hole between two platforms, and the ditch of unloading coal physically sets up the top straining beam in the top. The utility model discloses an underground ditch of unloading coal structural arrangement volume of unloading coal is big, and whole structural arrangement atress is more reasonable, and stability is good, saves and thoughtlessly to congeal geomaterials, and the demand of construction degree of difficulty low grade condition more does benefit to using widely of underground ditch of unloading coal.

Description

A kind of underground track hoppers
Technical field
This utility model is related to coal receiving bunker, more particularly, to a kind of Novel underground unload coal groove structure arrangement, particularly to one kind Novel reinforced concrete underground box automobile coal receiving bunker structural arrangement form.
Background technology
Coal receiving bunker is a kind of structures of conveying coal and other particulate species mineral, applies wide especially in thermal power plant General, due to the growing tension of thermal power plant fire coal demand and ecological requirements, coal receiving bunker is as closed series connection transhipment coal body system In first term, it is generally characterized by located underground, and typically at ten meters about, width changes buried depth from several meters to more than ten meters, length From tens meters to 100 meters, it is applicable to the modes such as automobile is unloaded coal and train is unloaded coal, closure is good, transports coal ability By force, thermal power plant plays important role, be also one of higher structures of cost in power plant.
Traditional coal receiving bunker is generally box underground structure, and coal bunker, from top downward, stretches out Liang Laizhi from side-walls The pressure of support coal bunker, side soil pressure mainly kept out by side wall, and middle standing pillar is simultaneously chosen platform from post and unloaded coal, but with unloading The increasing of coal trench depth, the increasing of side wall root institute's bending moment and shearing, sidewall thickness also increases therewith, and bring is coal receiving bunker Overall cost increases, and difficulty of construction increases, and globality is general, and the structure to coal receiving bunker and cost-effectiveness requirement are required for carrying out excellent Change.
Utility model content
In order to solve in existing coal receiving bunker arrangement, economic performance is poor, and concrete usage amount is big, and difficulty of construction is big, and structure is overall The problems such as performance is general, provide a kind of Novel underground unload coal groove structure arrangement.
This utility model employs the following technical solutions:
A kind of underground track hoppers, the coal receiving bunker body constituting including the relative side wall of base plate and two, the opposite face of two side walls On be symmetrical arranged two coal bunkers, two coal bunkers are pyramidal structure wide at the top and narrow at the bottom, and coal bunker bottom level chooses formation platform, two There is between platform through hole, coal receiving bunker body top setting top straining beam.
The platform of described two coal bunkers is oppositely arranged.
Described coal bunker, side wall, base plate are the reinforced concrete structure pouring molding.
Described base plate external both sides Kuan Chu side wall.
Described coal receiving bunker body width is 6m ~ 15m.
Described top cross-bar is no less than one, in the setting of coal receiving bunker body head clearance.
Angle between described coal bunker and horizontal plane is 50 ° ~ 70 °.
A kind of underground track hoppers according to claim 1 it is characterised in that:Described platform(4)The part chosen is not More than 2m.
The underground track hoppers structure arrangement amount of unloading coal of the present utility model is big, and integral arrangement stress is more reasonable, stability Good, save concrete material, the promoting the use of of the demand of the low condition of difficulty of construction, more conducively underground track hoppers.
Brief description
Fig. 1 is structural representation of the present utility model.
Fig. 2 is the structural representation of prior art.
Specific embodiment
The utility model proposes a kind of new underground track hoppers, including 1, two side walls 2 of base plate and two coal bunkers 3, coal Bucket 3, side wall 2, base plate 1 may be selected to pour the reinforced concrete structure of molding.Two side walls 2 are oppositely arranged on base plate 1, two Coal bunker 3 is separately positioned on the opposite face of two side walls 2, and two coal bunkers 3 are set to pyramidal structure wide at the top and narrow at the bottom, taper coal bunker 3 bottom level extends and forms platform 4, has through hole, coal receiving bunker body top setting top straining beam 5, top between two platforms 4 Straining beam 5 number is indefinite, is disposed on coal receiving bunker body top as needed.The platform 4 of two coal bunkers 3 is oppositely arranged, be easy to into Row transhipment coal.
Base plate 1 both sides external wide go out side wall 2, that is, bottom base plate width be wider than coal receiving bunker body width.Coal receiving bunker body width one As be set to 6m ~ 15m.Base plate 1 is to bear superstructure load and moment of flexure that sidewall earth pressure transmits and shearing, base plate 1 thickness Determined according to geological conditions, between generally 600mm~1500mm, both sides can slightly wider go out coal receiving bunker 1m, main mesh Also for increasing base plate bearing capacity and offsetting the moment of flexure that side wall conduct, base plate 1 bottom method for processing foundation regards to be had Body situation determines to change using subsoil to fill out or carry out piling process.
Side wall 2 main purpose is conduction superstructure vertical force and side soil pressure, rises and form a connecting link in total Effect link coal bunker 3 and base plate 1, side wall 2 thickness determines according to coal receiving bunker buried depth and width, generally 500mm~1000mm.
Coal bunker part 3 main purpose is to unload coal, and topples over, from top, the coal getting off and slides to platform, Ran Houtong by coal bunker Cross feeder coal is gone to belt and be transported to elsewhere.Side wall 2 and coal bunker part 3 are connected by this utility model, middle Do not set beam to support, transferring platform 4 is extended to directly down by coal bunker 3, coal bunker 3 is generally 50~70 degree with horizontal plane angle Between, for reducing concrete usage amount, typically encorbelmenting in coal bunker bottom, has space between coal bunker 3 bottom and side wall 2.
Platform 4 be coal bunker 3 horizontal-extending choose part, platform 4 physical dimension is typically changed to 200mm from 500mm, put down Platform typically connects lower belt by feeder, and platform 4 is chosen width and is generally no greater than 2m.
The purpose of setting top straining beam 5 is to allow structure more monolithic stability, and also to carrying the conduction of coal double-edged fine-toothed comb The load coming, straining beam 5 spacing is generally 6m, and straining beam 5 span and sectional dimension need to according to coal receiving bunker width adjustment, span one As be not more than 15m, wide × High variation is between 300mm × 900mm~500mm × 1500mm.
Coal receiving bunker body can arrange staircase to enter bottom maintenance in end, can arrange vent at middle or two ends and protect Card air circulation, vent size determines according to coal receiving bunker size, generally 1m × 1m about, simultaneously for meeting fire prevention and illuminating Demand, can install fire protection pipeline, the device such as arrangement cable testing bridge in coal receiving bunker.
This utility model underground track hoppers structure arranges beautiful design, more meets structural mechanics mechanical characteristic, especially in coal Bucket 3 and side wall 2 are inclined upwardly position, and it is more reasonable using space inside soil pressure mode suffered by outside, coal receiving bunker to change, and reinforcing bar mixes Solidifying soil usage amount about reduces 5%~10% than the coal receiving bunker of ability of unloading coal on an equal basis, accordingly overall civil engineering cost reduce 5%~ 10%, and globality is more preferably, eliminates middle standing pillar, and construction is convenient, also decreases the construction period simultaneously, reduces overall Investment.
Above-described is only preferred implementation of the present utility model it is noted that for those skilled in the art For, under the premise of without departing from this utility model general idea, some changes and improvements can also be made, these also should be considered as Protection domain of the present utility model.

Claims (8)

1. a kind of underground track hoppers it is characterised in that:Including base plate(1)The side wall relative with two(2)The coal receiving bunker body constituting, two Individual side wall(2)Opposite face on be symmetrical arranged two coal bunkers(3), two coal bunkers(3)For pyramidal structure wide at the top and narrow at the bottom, coal bunker (3)Bottom level chooses formation platform(4), two platforms(4)Between there is through hole, coal receiving bunker body top setting top straining beam (5).
2. a kind of underground track hoppers according to claim 1 it is characterised in that:Described two coal bunkers(3)Platform(4)Phase To setting.
3. a kind of underground track hoppers according to claim 1 it is characterised in that:Described coal bunker(3), side wall(2), base plate (1)For pouring the reinforced concrete structure of molding.
4. a kind of underground track hoppers according to claim 1 it is characterised in that:Described base plate(1)Both sides external width goes out side Wall(2).
5. a kind of underground track hoppers according to claim 1 it is characterised in that:Described coal receiving bunker body width is 6m ~ 15m.
6. a kind of underground track hoppers according to claim 1 it is characterised in that:Described top cross-bar is no less than one, Coal receiving bunker body head clearance is arranged.
7. a kind of underground track hoppers according to claim 1 it is characterised in that:Described coal bunker(3)And horizontal plane between Angle is 50 ° ~ 70 °.
8. a kind of underground track hoppers according to claim 1 it is characterised in that:Described platform(4)That chooses is partly little In 2m.
CN201620879910.6U 2016-08-15 2016-08-15 Underground ditch of unloading coal Expired - Fee Related CN205935875U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620879910.6U CN205935875U (en) 2016-08-15 2016-08-15 Underground ditch of unloading coal

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620879910.6U CN205935875U (en) 2016-08-15 2016-08-15 Underground ditch of unloading coal

Publications (1)

Publication Number Publication Date
CN205935875U true CN205935875U (en) 2017-02-08

Family

ID=57920429

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620879910.6U Expired - Fee Related CN205935875U (en) 2016-08-15 2016-08-15 Underground ditch of unloading coal

Country Status (1)

Country Link
CN (1) CN205935875U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109051511A (en) * 2018-08-01 2018-12-21 中国能源建设集团广东省电力设计研究院有限公司 It unloads coal slot
CN109629894A (en) * 2018-12-13 2019-04-16 徐州华阳饲料有限公司 A kind of method of construction of discharging dust guard

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109051511A (en) * 2018-08-01 2018-12-21 中国能源建设集团广东省电力设计研究院有限公司 It unloads coal slot
CN109629894A (en) * 2018-12-13 2019-04-16 徐州华阳饲料有限公司 A kind of method of construction of discharging dust guard

Similar Documents

Publication Publication Date Title
CN102182163B (en) Assembled type debris flow silt dam and construction method thereof
CN201771516U (en) Supporting structure of district passing through cavern and underground river for tunnel
CN101338562B (en) Concrete conveying process for high steep and big drop height landform
CN102011588A (en) House pillar type cutting and filling method of medium coal seam for controlling movement deformation of overlying rock
CN203855866U (en) Large-span frame bridge overhead roof with beams convenient to construct
CN202298650U (en) Arched retaining wall
CN208563118U (en) A kind of precast beam place
CN102277874A (en) Assembled retaining wall and construction method thereof
CN205421026U (en) Cable loop wheel machine cable support tower
CN205935875U (en) Underground ditch of unloading coal
CN103855650A (en) Special construction method by utilizing electricity jacking pipe
CN103939137A (en) Method for filling aeolian sand empty field of western desert mining area shallow coal seam
CN205917601U (en) Integrally lift up device of bridge arch rib
CN204919602U (en) Compound anchored retaining wall by tie rods
CN206928315U (en) Blinding layer structure for Compacted Concrete Gravity Dam Section
CN207032147U (en) Arch form counterfort vertivcal quay structure
CN102926388A (en) Earth moving device and method for deep foundation pit excavation
CN202865812U (en) Flow-isolating structure of ship-lock approach channels
CN102535344A (en) Concrete transportation method for bridge body of high-pier bridge in gully region
CN202767102U (en) Combined type balance weight retaining wall
CN104032742B (en) A kind of Placement of Underwater Concrete for Casting technique based on DLC four hopper
CN102888855A (en) Combined balance weight retaining wall
CN104695315A (en) Frame structure of deep foundation pit under existing railway and layered jacking method for construction of frame structure
CN202809400U (en) Precast slab for ballast bed base
CN204919568U (en) Compound supporting construction of shallow foundation ditch

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170208