CN206448166U - A kind of vertical prestressing mud jacking pipeline docking facilities - Google Patents

A kind of vertical prestressing mud jacking pipeline docking facilities Download PDF

Info

Publication number
CN206448166U
CN206448166U CN201621225206.5U CN201621225206U CN206448166U CN 206448166 U CN206448166 U CN 206448166U CN 201621225206 U CN201621225206 U CN 201621225206U CN 206448166 U CN206448166 U CN 206448166U
Authority
CN
China
Prior art keywords
steel pipe
vertical
pipe
vertical steel
mud jacking
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621225206.5U
Other languages
Chinese (zh)
Inventor
杨晓军
周海东
廖文豪
贺英全
张卫霞
付高远
王爱琴
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 12th Bureau Group Co Ltd
Second Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd
Original Assignee
China Railway 12th Bureau Group Co Ltd
Second Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 12th Bureau Group Co Ltd, Second Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd filed Critical China Railway 12th Bureau Group Co Ltd
Priority to CN201621225206.5U priority Critical patent/CN206448166U/en
Application granted granted Critical
Publication of CN206448166U publication Critical patent/CN206448166U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

The utility model belongs to bridge construction field, in order to the problems such as the efficiency for solving to exist during bridge vertical prestressing mud jacking is low, operation inconvenient, consolidation effect is poor, the utility model provides a kind of vertical prestressing mud jacking pipeline docking facilities, pulp-inlet pipe, grout outlet, fining twisted steel, bellows, laterally vertical steel pipe, small steel pipe, connection sleeve pipe, anchor plate.The utility model on vertical prestressing bar anchor plate by welding vertical steel pipe, pulp-inlet pipe and grout outlet are welded on top plate vertical steel pipe, laterally small steel pipe is welded on the vertical steel pipe of bottom, insertion fining twisted steel inside vertical steel pipe, the outer surface cover bellows of vertical steel pipe, adjacent two vertical prestressings connect bottom laterally small steel pipe by connection sleeve pipe, two vertical prestressing mud jacking pipelines is turned into an entirety, and can operate while completing two vertical prestressing bar mud jacking according to mud-jacking technology.Pressure drop efficiency of construction can be improved using this practicality, save construction cost.

Description

A kind of vertical prestressing mud jacking pipeline docking facilities
Technical field
The utility model belongs to bridge construction field, and in particular to a kind of vertical prestressing mud jacking pipeline docking facilities.
Background technology
At present, thee-direction prestressed system is generally used in cantilever continuous beam and continuous steel frame bridge construction middle girder structure, Wherein vertical prestressing system generally uses vertical fining twisted steel material, the tradition in the construction of vertical prestressing system mud jacking Single mud jacking mode from bottom to up is all used, mud jacking needs to construct into cartonning, and construction operation area is small, and madjack pipe is by abdomen Plate chamfering stretch out, reinforcing bar, template and concrete construction it is pre-buried on this section go out box beam in pipe influence larger, often mud jacking operation This section of built-in pipe of Shi Faxian is blocked, and influences normal mud jacking operation, and causes whole mud jacking process efficiency low, operation inconvenience, pressure Real less effective.
The content of the invention
The utility model is in order to which the efficiency for solving to exist during bridge vertical prestressing mud jacking is low, operation inconvenient, consolidation effect Poor the problems such as, and then there is provided a kind of vertical prestressing mud jacking pipeline docking facilities.
The utility model is adopted the following technical scheme that:
A kind of vertical prestressing mud jacking pipeline docking facilities, including two groups of vertical steel pipes be arrangeding in parallel, every group of vertical steel Pipe includes coaxial top plate vertical steel pipe and bottom plate vertical steel pipe, the top end face of top plate vertical steel pipe, the bottom of bottom plate vertical steel pipe End face is connected to anchor plate, and the top of a top plate vertical steel pipe is provided with pulp-inlet pipe obliquely, and another top plate is vertical The top of steel pipe is provided with level, the small steel of contour transverse direction in opposite directions provided with grout outlet obliquely, the bottom section of two bottom plate vertical steel pipes Pipe, two horizontal small steel pipes pass through sleeve pipe connection;Insertion is connected with the coaxial top plate vertical steel pipe and bottom plate vertical steel pipe Fining twisted steel, periphery are socketed with bellows.
The bellows and anchor plate, bellows and pulp-inlet pipe, bellows and grout outlet, bellows and horizontal small steel pipe, Laterally sealant tape has been seized in the junction of small steel pipe and connection sleeve pipe respectively.
The installation site of the pulp-inlet pipe and grout outlet is contour, towards on the contrary, tilting.
The utility model by welded on vertical prestressing bar anchor plate welded on vertical steel pipe, top plate vertical steel pipe into The horizontal small steel pipe of welding on slurry pipe and grout outlet, bottom vertical steel pipe, vertical steel pipe the inside insertion fining twisted steel, vertical steel pipe Outer surface cover bellows, adjacent two vertical prestressings connect bottom laterally small steel pipe by connection sleeve pipe, make two it is vertical pre- Stress mud jacking pipeline turns into an entirety, and can operate while completing two vertical prestressing bar pressures according to mud-jacking technology Slurry;Not only cost of manufacture is cheap for the utility model, technique simple and fast, it is easy to operate and also improve efficiency of construction, saving Construction cost.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model;
In figure:1- pulp-inlet pipes, 2- grout outlets, 3- fining twisted steels, 4- bellowss, 5a- top plates vertical steel pipe, 5b- bottom plates Vertical steel pipe, 6- laterally small steel pipe, 7- sleeve pipes, 8- anchor plates.
Embodiment
With reference to accompanying drawing, embodiment of the present utility model is described further;
Vertical prestressing mud jacking pipeline docking facilities as depicted, including pulp-inlet pipe 1, grout outlet 2, fining twisted steel 3, Bellows 4, laterally vertical steel pipe 5, small steel pipe 6, connection sleeve pipe 7, anchor plate 8.The utility model passes through in vertical prestressing bar Weld on vertical steel pipe 5, top plate vertical steel pipe 5 and welded on welding pulp-inlet pipe 1 and grout outlet 2, bottom vertical steel pipe 5 on anchor plate 8 Connect and fining twisted steel 3 is inserted inside laterally small steel pipe 6, vertical steel pipe 5, the outer surface cover bellows 4 of vertical steel pipe 5, adjacent two are erected Bottom laterally small steel pipe 6 is connected by connection sleeve pipe 7 to prestressing force, makes two vertical prestressing mud jacking pipelines whole as one Body, and can operate while completing two vertical prestressing bar mud jacking according to mud-jacking technology;Wherein described bellows 4 and anchor Backing plate 8, bellows 4 and pulp-inlet pipe 1, bellows 4 and grout outlet 2, bellows 4 and the small steel pipe 6 of transverse direction, laterally small steel pipe 6 and company Seized respectively with adhesive tape close in the junction of female connector pipe 7;Described connection sleeve pipe 7 is using the pvc pipe or steel for being more than laterally small steel pipe 6 Pipe makes;The small steel pipe 6 of described transverse direction is welded as full weld with vertical steel pipe 5, and it is firm to weld.

Claims (3)

1. a kind of vertical prestressing mud jacking pipeline docking facilities, it is characterised in that:Including two groups of vertical steel pipes be arrangeding in parallel, often Group vertical steel pipe includes coaxial top plate vertical steel pipe(5a)With bottom plate vertical steel pipe(5b), top plate vertical steel pipe(5a)Top Face, bottom plate vertical steel pipe(5b)Bottom face be connected to anchor plate(8), a top plate vertical steel pipe(5a)Top be provided with Pulp-inlet pipe obliquely(1), another top plate vertical steel pipe(5a)Top provided with grout outlet obliquely(2), two bottom plates erect To steel pipe(5b)Bottom section in opposite directions be provided with level, the small steel pipe of contour transverse direction(6), two horizontal small steel pipes(6)Pass through sleeve pipe(7)Even Connect;The coaxial top plate vertical steel pipe(5a)With bottom plate vertical steel pipe(5b)Interior insertion is connected with fining twisted steel(3), periphery It is socketed with bellows(4).
2. vertical prestressing mud jacking pipeline docking facilities according to claim 1, it is characterised in that:The bellows (4) With anchor plate (8), bellows (4) and pulp-inlet pipe (1), bellows (4) and grout outlet(2), bellows (4) and laterally small steel pipe (6), laterally sealant tape has been seized in the junction of small steel pipe (6) and connection sleeve pipe (7) respectively.
3. vertical prestressing mud jacking pipeline docking facilities according to claim 2, it is characterised in that:The pulp-inlet pipe(1) And grout outlet(2)Installation site it is contour, towards on the contrary, tilt.
CN201621225206.5U 2016-11-15 2016-11-15 A kind of vertical prestressing mud jacking pipeline docking facilities Expired - Fee Related CN206448166U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621225206.5U CN206448166U (en) 2016-11-15 2016-11-15 A kind of vertical prestressing mud jacking pipeline docking facilities

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621225206.5U CN206448166U (en) 2016-11-15 2016-11-15 A kind of vertical prestressing mud jacking pipeline docking facilities

Publications (1)

Publication Number Publication Date
CN206448166U true CN206448166U (en) 2017-08-29

Family

ID=59662379

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621225206.5U Expired - Fee Related CN206448166U (en) 2016-11-15 2016-11-15 A kind of vertical prestressing mud jacking pipeline docking facilities

Country Status (1)

Country Link
CN (1) CN206448166U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108756253A (en) * 2018-08-01 2018-11-06 中建五局华东建设有限公司 A kind of post-stressed slip casting pulp mouth structure
CN109252449A (en) * 2018-10-16 2019-01-22 中铁六局集团有限公司 The two-tube neat note construction of cantilever beam vertical duct mud jacking
CN114293452A (en) * 2021-12-29 2022-04-08 中交第四公路工程局有限公司 Variable cross-section box girder vertical prestress pore channel sealing element and using method thereof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108756253A (en) * 2018-08-01 2018-11-06 中建五局华东建设有限公司 A kind of post-stressed slip casting pulp mouth structure
CN109252449A (en) * 2018-10-16 2019-01-22 中铁六局集团有限公司 The two-tube neat note construction of cantilever beam vertical duct mud jacking
CN114293452A (en) * 2021-12-29 2022-04-08 中交第四公路工程局有限公司 Variable cross-section box girder vertical prestress pore channel sealing element and using method thereof

Similar Documents

Publication Publication Date Title
CN206448166U (en) A kind of vertical prestressing mud jacking pipeline docking facilities
CN102102396B (en) Node connection method for circular steel tube concrete column and reinforced concrete shear wall
CN203879516U (en) Sequential and segmentation grouting device of tunnel grouting model test
CN202577363U (en) H-shaped steel joint structure of underground diaphragm wall
CN204456159U (en) A kind of steel kind design concrete anchor location structure
CN102518129B (en) Post pressure-grouting pre-stressed hollow square pile and manufacturing method thereof
CN102747690A (en) Grouting construction method for vertical finish-rolling threaded steel U-shaped communicating tube
CN102061702A (en) joint with anti-seismic slots for precast concrete piles
CN106869167A (en) The bowed out box shape steel structure Urban Underground pipe gallery in section
CN208440996U (en) A kind of novel inlet pipe
CN206204992U (en) A kind of removable waterproofing node construction of prefabricated pipe gallery internode
CN207435906U (en) For the bracket of bridge construction
CN207630230U (en) Precast beam combined steel structure mortar leakage prevention pedestal
CN202577129U (en) Negative moment beam bellows connector device for continuous beam bridge
CN206319327U (en) A kind of recyclable cross piling bar and buckle steel sheet pile combined cofferdam structure
CN205244621U (en) Pipeline attaches wall fixing device
CN104195986B (en) A kind of plugging device for tunnel
CN108506027B (en) Colliery water damage controlling means
CN209412811U (en) A kind of filling pile structure
WO2019218531A1 (en) Pipe gallery anti-floating device
CN204151745U (en) A kind of plugging device for tunnel
CN204552096U (en) A kind of sealing reversed beam template is fixedly connected with positioner
CN206279534U (en) A kind of subway foundation pit building enclosure
CN203905024U (en) Internal corner connecting piece of foundation pit supporting system
CN218719258U (en) Anti vertical drawknot device that floats of long distance push pipe construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170829

CF01 Termination of patent right due to non-payment of annual fee