CN106337580A - Stacking single-layer over-bridge garage crossing road tunnel - Google Patents

Stacking single-layer over-bridge garage crossing road tunnel Download PDF

Info

Publication number
CN106337580A
CN106337580A CN201610849599.5A CN201610849599A CN106337580A CN 106337580 A CN106337580 A CN 106337580A CN 201610849599 A CN201610849599 A CN 201610849599A CN 106337580 A CN106337580 A CN 106337580A
Authority
CN
China
Prior art keywords
road
overline bridge
bicycle parking
lifting
layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610849599.5A
Other languages
Chinese (zh)
Inventor
黄德斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hubei Saier Automation Equipment Ltd By Share Ltd
Original Assignee
Hubei Saier Automation Equipment Ltd By Share Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hubei Saier Automation Equipment Ltd By Share Ltd filed Critical Hubei Saier Automation Equipment Ltd By Share Ltd
Publication of CN106337580A publication Critical patent/CN106337580A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H6/00Buildings for parking cars, rolling-stock, aircraft, vessels or like vehicles, e.g. garages
    • E04H6/08Garages for many vehicles
    • E04H6/12Garages for many vehicles with mechanical means for shifting or lifting vehicles
    • E04H6/18Garages for many vehicles with mechanical means for shifting or lifting vehicles with means for transport in vertical direction only or independently in vertical and horizontal directions
    • E04H6/24Garages for many vehicles with mechanical means for shifting or lifting vehicles with means for transport in vertical direction only or independently in vertical and horizontal directions characterised by use of dollies for horizontal transport, i.e. cars being permanently parked on wheeled platforms
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C1/00Design or layout of roads, e.g. for noise abatement, for gas absorption
    • E01C1/04Road crossings on different levels; Interconnections between roads on different levels
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D1/00Bridges in general
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H14/00Buildings for combinations of different purposes not covered by any single one of main groups E04H1/00-E04H13/00 of this subclass, e.g. for double purpose; Buildings of the drive-in type
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T10/00Road transport of goods or passengers
    • Y02T10/60Other road transportation technologies with climate change mitigation effect
    • Y02T10/7072Electromobility specific charging systems or methods for batteries, ultracapacitors, supercapacitors or double-layer capacitors

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Warehouses Or Storage Devices (AREA)

Abstract

The invention relates to a stacking single-layer over-bridge garage crossing a road tunnel. The stacking single-layer over-bridge garage comprises a body, a ladder, an over-bridge, a tunnel-type stacking machine and an elevation hoist. The stacking single-layer over-bridge garage spans over a road and is built in an idle space at a certain height above the road and used for parking cars; two sides of the road are respectively provided with the elevation hoister, so that the cars can be stored and fetched at two sides of the road, and the cars can be turned on a rotating tray; and therefore, a certain number of stacking single-layer over-bridge garage can be built in cities, so that the difficulties in parking and garage building can be solved, and the congestion when people and cars go across the road can be solved.

Description

Across road tunnel stacking monolayer overline bridge garage
Technical field
The present invention relates to vehicle parking equipment, belong to dolly multi-storied garage.
Background technology
In the face of dolly enters the age of family in a large number, now dolly recoverable amount socially increasingly increases in geometry degree Long, cause substantial amounts of dolly in city nowhere can stop, form difficulty of stopping;Simultaneously current all kinds of multi-storied garages take city Free space is very big, if the newly-built garage for solution " parking difficulty " problem, then newly-built garage will certainly be with substantial amounts of business Rob domain with house building, enterprises and institutions, institutional settings, green coverage, public place and rob the useful space, make already crowded City can't bear the heavy load, lead to bicycle parking storage capacity in city cannot increase, formed and there is " parking difficulty " and " build garage in city simultaneously The difficult situation of hardly possible ";Meanwhile, because car is many, also result in dolly and cross road and the problems such as be difficult;Meanwhile, in the face of pedestrian Laterally cross road, need to build overline bridge of passing by one's way, or build underpass, but both this, all presence construction investment is big, outward appearance is not beautiful, Thus the quantity built is not, the trip giving people is made troubles.
Content of the invention
For this reason, the present invention provides one kind across road tunnel stacking monolayer overline bridge garage, across road, it build in above road Idle space from road surface certain altitude;It is provided simultaneously with dolly access and car and pedestrian cross the dual-use function of road;Road two Lifting elevator is all installed in side, and both sides of the road can access dolly, and can turn to dolly on a rotary disc, and solves little Car moves in garage, crosses road and changes travel direction, from face effectively solving because crossing the problem of congestion in road;Therefore may be used With the double-layer platform bridge garage of some present invention newly-built in city, and solve simultaneously " parking difficulty " and " build garage difficult " with And solve the three difficult problems of " it is difficult that pedestrian crosses road ".
The realization of the present invention:
The present invention comprises: body, stair, overline bridge, laneway type piler, lifting elevator.
Body includes: bottom, bicycle parking layer, top layer;Bottom is across building up framework in the overhead of road, and this frame body is by building Isolate the column and road of center line column on both sides of the road in garage opposite road to be supported;Each support intercolumniation is connected by crossbeam, Crossbeam upper layer is formed with horizontal panel;The horizontal panel left side that longitudinally (i.e. the orthogonal direction with road traffic direction, similarly hereinafter) keeps to the side Right two ends are respectively formed with lifting elevator and run hole;Longitudinal rail in laneway type piler is provided with bottom horizontal panel, Mounted thereon have carrier-and-stacker, and longitudinal rail supports and constraint carrier-and-stacker linear longitudinal movement;Bicycle parking layer is built on bottom, deposits Deck is corresponding with the beam column construction of bottom, and horizontal panel is reserving tunnel breach along longitudinal central axis line, longitudinally logical for carrier-and-stacker OK;The left and right two ends longitudinally kept to the side in the edge of bicycle parking layer, respectively correspond to bottom and lift what elevator operation hole vertical projected upward , there is the installation position of lifting lifting power and deceleration of motion part horizontal panel inner surface position.
The number of plies of the bicycle parking layer of body of the present invention is 1 to 5 layer;Top layer is built on bicycle parking layer, and top panel is flat-head type knot Structure, locates rain slope;Top layer is corresponding with bicycle parking layer, bottom beam column construction.
Overline bridge includes: basis, overline bridge passage;With the bottom of body, overline bridge passage is built on basis, sky for the process on basis It is overline bridge top on bridge passage, or do not have overline bridge top;Longitudinal two ends of overline bridge passage, respectively have a half space, and it is put down Face is docked with half space;Between half space and ground, stair are installed, on stair, plane is docked with half space.
The each several part of body makes entirety, or is assembled entirety by respective part;Entirety made by body and overline bridge, or Assembling is integral;Body is concrete structure with all structures of overline bridge, or steel structure.
Stair of the present invention are manually to mark time, or elevator.
It is disposed with bicycle parking position, bicycle parking position includes: light rail and be higher than on bottom horizontal panel and bicycle parking layer horizontal panel The car supporting plane of light section rail level.
Longitudinal rail of bottom horizontal panel is provided with carrier-and-stacker.
It is to apply relatively broad and ripe reliable lane on market that the present invention runs Transport Vehicle and the supporting equipment of control Road formula piler a complete set of equipment, wherein: Transport Vehicle human computer conversation's window of control system is ic card or man machine interface;Bottom From the baseplane of Transport Vehicle to lift stroke terminal plane, its lifting part separately joins lifting elevator.
The lifting hoist installation of the present invention is under the bicycle parking layer horizontal panel of bottom;The reel at left and right two ends twists Disk, and power section is near bicycle parking layer horizontal panel, wirerope bypasses reel capstan winch and down each connects the flat of lifting elevator Platform, in lifting diverse location equipped with position sensor, its elevating movement has vertical track to constrain, and for ease of expression, saves in accompanying drawing Slightly vertical track.
Has dynamic device inside turntable below the described rotating circular disk of the present invention;Turntable is arranged on lifting The inside of elevator platform, the bearing that the motor of turntable drives variable-speed motor and passes through between axis hole is supporting, turntable and rotation Form revolute, for changing the direction of dolly between disk;Direction of rotation parking spot equipped with position sensor.
The lifting elevator of the present invention includes: motor, speed change gear, reel capstan winch.
Load vehicle frame in carrier-and-stacker is arranged on stacking support, can carry out vertical motion with respect to stacking support;Carrier-and-stacker Horizontal lengthwise movement can be carried out on the longitudinal rail on bottom, this two operations do not interfere with each other, be formed individually or synthesize Motion, be in any diverse location of plane coordinates of vertical and vertical equity for realizing carrying vehicle frame;Plus horizontal intelligent vehicle Motion, can any locus parking stall access dolly.
Carrier-and-stacker of the present invention includes: stacking support, load vehicle frame, rail wheel;And laneway type piler includes: stacking Car, longitudinal rail, control system, man machine interface.
Traversing intelligent vehicle travels on light rail, is held up or release dolly by piercing dolly bottom, before carry The horizontal operation entered or retreat.
By lifting the longitudinal horizontal movement of the elevating movement on elevator and carrier-and-stacker and carrying the synthesis of vehicle frame upper and lower vertical Move, and moving with respect to horizontal (road direction, similarly hereinafter) on vehicle-containing and parking stall of traversing intelligent vehicle is superimposed, and realizes horizontal Move intelligent vehicle three-dimensional motion on devices, add that traversing intelligent vehicle holds up and release dolly, reach bicycle parking and pick-up.
Longitudinal rail on bottom horizontal plane is matched with the rail wheel of carrier-and-stacker;Light-duty on bicycle parking position with vehicle-containing The same gauge of rail same specification, and match with the rail wheel of traversing intelligent vehicle.
Electrical connection is carried out inside laneway type piler complete equipment.
Laneway type piler is carried out and is electrically connected with lifting elevator, rotary round table.
Laneway type piler is carried out with position sensor and is electrically connected.
Laneway type piler, elevator, lifting elevator, rotary round table are carried out with power frequency supply respectively and are electrically connected.
The invention has the beneficial effects as follows: one, the present invention is across the garage of urban road, is not take up effective sky in city Between, it build the idle space from road surface certain altitude above road in, for crowded city, can be with newly-built a certain amount of car Storehouse, increases substantial amounts of bicycle parking position newly;2nd, due to building urban road overhead in so that bicycle parking, upper road current with dolly of picking up the car realize zero Distance, so traffic jam can be slowed down taking, in bicycle parking traffic;3rd, vehicle is as usual current on urban road, and garage is in road The normal Transport Vehicle in overhead, in garage, Transport Vehicle is mutually incoherent with the traffic of road;4th, solve the horizontal congestion crossing road of dolly to ask Topic;5th, solve the problems, such as pedestrian's crossover-passing simultaneously.
Brief description
Fig. 1 is that the axle of the present invention surveys schematic diagram.
Fig. 2 is that the dismounting top layer of the present invention, bicycle parking layer and part parking stall, dolly, the axle behind overline bridge top survey schematic diagram.
In figure: 1. stair;2. body;3. longitudinal rail;4. parking stall;5. dolly;6. stacking support;7. carry vehicle frame;8. Vehicle-containing;9. traversing intelligent vehicle;10. lift elevator;11. rotating circular disks;12. road left side bearings;The left line of 13. roads;14. Road right median;15. road right side bearings;16. overline bridges;17. wireropes.
Specific embodiment
Embodiment 1: according to the width of urban road, select leap road height and the width of the present invention, by each column Based process is good, makes each column, between the cylinder of each Self-stabilised post of the road left and right sides, with cast-in-place form by body (2) column of bottom pass through crossbeam cast-in-place for entirety.
After body (2) bottom transverse beam curing period reaches, prefabricated across road beam and flat board are arranged on crossbeam, are formed Bottom horizontal panel.
Bicycle parking layer is on the upper plane relevant position of bottom, and bulk junction is made in cast-in-place or assembling in a similar way Structure.
Top layer is also to make body (2) structure according to the method that bicycle parking layer is similar to.
Build overline bridge (16), first on the basis of overline bridge passage processed, afterwards system go up overline bridge top, then half space processed;In overline bridge (16) Half space two escalator slope escalators are respectively installed.
Lifting elevator: wirerope (17) the reel capstan winch of both sides of the road is installed, and power section is each arranged on bicycle parking The interior surface of plate above the both sides of the road of layer;Both sides of the road lift the lifting lifting clutch end volume of elevator (10) Axle connects lifting wirerope (17), and the other end of wirerope (17) is each connected with lifting elevator (10) platform;Logical on rotation platform Cross bearing, rotating circular disk (11) is installed, motor and deceleration device are installed;Lifting elevator (10) and the rotating circular disk of rotation platform (11) each self installation vehicle-containing (8) above;Lifting elevator (10) platform on under motion all have vertical track restrained, for just Vertical track is omitted in expression, accompanying drawing;The shutdown exact position of lifting elevator (10) platform and rotary round table is each equipped with Position sensor, so that the control system to laneway type piler provides position signalling.
On the relevant position of bottom horizontal panel, symmetrical assembling longitudinal direction rail (3), in carrier-and-stacker installed above;In dress Join the upper assembling of stacking support (6) and carry vehicle frame (7).
Startup optimization, opens escalator slope escalator.
Bicycle parking: inserted the bayonet socket of the control system of laneway type piler with ic card by bicycle parking people, system reads bicycle parking signal, Red warning lamp is bright, and emergency lock puts down, and dolly (5) enters in emergency lock;Then system, according to parking stall (4) vacant information, determines tool The parking stall (4) of body;Operation program: 1, dolly (5) enters;2nd, according to voice message, bicycle parking person drives dolly (5) in warehouse-in, and It is parked on vehicle-containing (8) accurate location;3rd, bicycle parking person people leaves;4th, lifting elevator (10) starts, and platform rises or rotational circle Vehicle-containing (8) on disk (11) reaches the upper horizontal plane plate of bottom, and with the upper vehicle-containing (8) of load vehicle frame (7) light rail During docking plane, lifting elevator (10) stops;5th, after traversing intelligent vehicle (9) pierces dolly (5) bottom, support carries dolly (5) and leads to Cross vehicle-containing (8), reached on carrier-and-stacker by lifting elevator (10) is upper;6th, stacking support (6) and the vertical and the water that carry vehicle frame (7) Flat compound motion, dolly (5) is sent to vertical and the vertical equity coordinate accurate location that system selectes parking stall (4);7th, traversing Intelligent vehicle (9) carries dolly (5) and passes through vehicle-containing (8), drives on the light rail of parking stall (4);8th, traversing intelligent vehicle (9) will Dolly (5) is delivered on the accurate location of parking stall (4) car supporting plane;9th, red warning lamp on/off, emergency lock is opened.
Pick up the car: inserted the bayonet socket of the control system of laneway type piler with ic card by bicycle parking people, system reads letter of picking up the car Number, the red warning lamp of pick-up is bright, and emergency lock puts down;System, according to the information of this bicycle parking, determines specific parking stall (4), runs Program: 1, traversing intelligent vehicle (9) enters parking stall (4) by vehicle-containing (8);2nd, traversing intelligent sliding motor-car (9) carries dolly (5) and leads to Cross vehicle-containing (8), reached on carrier-and-stacker by parking stall (4);3rd, pass through stacking support (6) and carry the vertical of vehicle frame (7) and longitudinally put down The compound motion in face, the lifting elevator (10) that the traversing intelligent vehicle (9) being loaded with dolly (5) is delivered to bottom horizontal panel runs The accurate location in hole;4th, lifting elevator (10) starts and rises, and the vehicle-containing (8) on platform or rotating circular disk (11) reaches bottom Upper horizontal plane plate, and with the light rail of load vehicle frame (7) upper vehicle-containing (8) dock plane when, lift elevator (10) and stop Only;5th, traversing intelligent vehicle (9) carries dolly (5) and reaches the vehicle-containing on the platform lifting elevator (10) or rotating circular disk (11) (8);6th, lifting elevator (10) platform declines the pick-up plane reaching bottom;7th, after system validation reaches pick-up plan-position, Pick-up person enters;8th, according to voice message, dolly (5) is driven outbound by pick-up person;9th, red warning lamp on/off, emergency lock is opened.
Turned to road: system execution turns to passageway distance sequence, and system continuously performs the program process of above Transport Vehicle, and Not executing wherein dolly (5) needs to enter the work step of bicycle parking position;When dolly (5) stops on the vehicle-containing on rotating circular disk (11) When steady, the operation work step of insertion rotation 180 degree, so that dolly (5) is turned to;Dolly (5) is in the lifting elevator of road opposite side (10) decline, and outbound.
Whole system is in bicycle parking, in the run action picking up the car, turned in road, all linked with one another, run in each program In, in line with the principle do not interfered, and carry out safety interlock, can be with isolated operation, with time-consuming.
The specific embodiment of the above-described simply present invention, the example above explanation not flesh and blood structure to the present invention Become limit, the those of ordinary skill of affiliated technology above-mentioned specific embodiment can be made an amendment after reading this specification or Deformation, without departing from the spirit and scope of the invention.

Claims (4)

1. one kind, across road tunnel stacking monolayer overline bridge garage, across road, is built in above road from road surface certain altitude Idle space;Comprise: body (2), stair (1), overline bridge (16), laneway type piler, lifting elevator (10);It is characterized in that, Body (2) includes: bottom, bicycle parking layer, top layer;Bottom is across building up framework in the overhead of road, and this frame body is by building car in The column and road of row opposite road isolation center line column on both sides of the road is supported;Each support intercolumniation is connected by crossbeam, crossbeam Upper layer is formed with horizontal panel;The horizontal panel left and right two that longitudinally (i.e. the orthogonal direction with road traffic direction, similarly hereinafter) keeps to the side End is respectively formed with lifting elevator (10) and runs hole;Longitudinal rail in laneway type piler is provided with bottom horizontal panel (3), mounted thereon have carrier-and-stacker, and longitudinal rail (3) supports and constraint carrier-and-stacker linear longitudinal movement;Bicycle parking layer build bottom in On, bicycle parking layer is corresponding with the beam column construction of bottom, and horizontal panel is reserving tunnel breach along longitudinal central axis line, for carrier-and-stacker Longitudinally current;Overline bridge (16) includes: basis, overline bridge passage;The bottom of the same body of the process (2) on basis, overline bridge passage build base in On plinth;Longitudinal two ends of overline bridge passage, respectively have a half space, and its plane is docked with half space;In half space Stair (1) are installed and ground between, the upper plane of stair (1) is docked with half space;Longitudinal rail (3) in bottom horizontal panel On carrier-and-stacker is installed;The lifting elevator (10) of the present invention is arranged under the bicycle parking layer horizontal panel of bottom;Left and right The reel capstan winch at two ends, and power section is near bicycle parking layer horizontal panel, wirerope (17) bypasses reel capstan winch and down each connects Connect the platform of lifting elevator (10), in lifting diverse location equipped with position sensor, its elevating movement has vertical track to constrain; Has dynamic device inside the described rotating circular disk (11) of present invention turntable below;Turntable is arranged on lifting lifting The inside of machine (10) platform, the bearing that the motor of turntable drives variable-speed motor and passes through between axis hole is supporting, turntable and rotation Form revolute, for changing the direction of dolly (5) between disk (11);Direction of rotation parking spot equipped with position sensing Device;Load vehicle frame (7) in carrier-and-stacker is arranged on stacking support (6);Longitudinal rail (3) on bottom horizontal plane and carrier-and-stacker Rail wheel match;The same gauge of light rail same specification on bicycle parking position and vehicle-containing (8), and with traversing intelligent vehicle (9) Rail wheel match;Electrical connection is carried out inside laneway type piler complete equipment;Laneway type piler and lifting elevator (10), rotary round table carries out electrical connection;Laneway type piler is carried out with position sensor and is electrically connected;Laneway type piler, elevator, Lifting elevator (10), rotary round table are carried out with power frequency supply respectively and are electrically connected.
2. according to claim 1 across road tunnel stacking monolayer overline bridge garage, it is characterized in that: each portion of body (2) Point make entirety, or be assembled entirety by respective part;Entirety made by body (2) and overline bridge (16), or assembling is integral; Body (2) is concrete structure with all structures of overline bridge (16), or steel structure.
3. according to claim 1 across road tunnel stacking monolayer overline bridge garage, it is characterized in that: building of the present invention Terraced (1) is manually to mark time, or elevator.
4. according to claim 1 across road tunnel stacking monolayer overline bridge garage, it is characterized in that: the bicycle parking of body (2) The number of plies of layer is 1 to 5 layer.
CN201610849599.5A 2016-09-04 2016-09-26 Stacking single-layer over-bridge garage crossing road tunnel Pending CN106337580A (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201610800498 2016-09-04
CN2016108004989 2016-09-04

Publications (1)

Publication Number Publication Date
CN106337580A true CN106337580A (en) 2017-01-18

Family

ID=57714977

Family Applications (6)

Application Number Title Priority Date Filing Date
CN201610849883.2A Pending CN106285126A (en) 2016-09-04 2016-09-26 Across stacking double-layer platform bridge garage, road tunnel
CN201610849599.5A Pending CN106337580A (en) 2016-09-04 2016-09-26 Stacking single-layer over-bridge garage crossing road tunnel
CN201610849600.4A Pending CN106437241A (en) 2016-09-04 2016-09-26 Three-layer stacked platform bridge garage of stretching over roadway
CN202210425828.6A Pending CN115234067A (en) 2016-09-04 2016-09-26 Method for stacking double-layer overbridge garages, vehicles to be stored and taken and people and vehicles to pass through road
CN201610965831.1A Pending CN106481122A (en) 2016-09-04 2016-10-28 Across road aerial steel structure level stacking garage
CN202210407720.4A Pending CN114837479A (en) 2016-09-04 2016-10-28 Method for stacking garages, parking and taking vehicles and aisle ways crossing roads and in air through steel structure layers

Family Applications Before (1)

Application Number Title Priority Date Filing Date
CN201610849883.2A Pending CN106285126A (en) 2016-09-04 2016-09-26 Across stacking double-layer platform bridge garage, road tunnel

Family Applications After (4)

Application Number Title Priority Date Filing Date
CN201610849600.4A Pending CN106437241A (en) 2016-09-04 2016-09-26 Three-layer stacked platform bridge garage of stretching over roadway
CN202210425828.6A Pending CN115234067A (en) 2016-09-04 2016-09-26 Method for stacking double-layer overbridge garages, vehicles to be stored and taken and people and vehicles to pass through road
CN201610965831.1A Pending CN106481122A (en) 2016-09-04 2016-10-28 Across road aerial steel structure level stacking garage
CN202210407720.4A Pending CN114837479A (en) 2016-09-04 2016-10-28 Method for stacking garages, parking and taking vehicles and aisle ways crossing roads and in air through steel structure layers

Country Status (1)

Country Link
CN (6) CN106285126A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106907052A (en) * 2017-03-30 2017-06-30 湖北赛尔智能科技股份有限公司 The tower wagon storehouse of cross road crossing elevating translational multilayer market overline bridge eight
CN107035184A (en) * 2017-03-30 2017-08-11 湖北赛尔智能科技股份有限公司 The tower wagon storehouse of cross road crossing elevating translational multilayer market overline bridge four
CN107035181A (en) * 2017-03-30 2017-08-11 湖北赛尔智能科技股份有限公司 The tower wagon storehouse of cross road crossing tunnel stacking layers market overline bridge four
CN107130826A (en) * 2017-06-04 2017-09-05 武汉平行世界网络科技有限公司 A kind of parking systems being set up on road surface
CN108590292A (en) * 2018-06-29 2018-09-28 广州维绅科技有限公司 Three-dimensional parking system and parking and taking method thereof

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106884556A (en) * 2017-03-30 2017-06-23 湖北赛尔智能科技股份有限公司 The tower wagon storehouse of cross road crossing elevating translational individual layer market overline bridge four
CN107035183A (en) * 2017-03-30 2017-08-11 湖北赛尔智能科技股份有限公司 The tower wagon storehouse of cross road crossing tunnel stacking individual layer market overline bridge eight
CN106836954A (en) * 2017-03-30 2017-06-13 湖北赛尔智能科技股份有限公司 The tower wagon storehouse of cross road crossing tunnel stacking layers market overline bridge eight
CN107035182A (en) * 2017-03-30 2017-08-11 湖北赛尔智能科技股份有限公司 The tower wagon storehouse of cross road crossing tunnel stacking individual layer market overline bridge four
CN107035185A (en) * 2017-03-30 2017-08-11 湖北赛尔智能科技股份有限公司 The tower wagon storehouse of cross road crossing elevating translational individual layer market overline bridge eight
CN108149984A (en) * 2018-01-04 2018-06-12 中建钢构有限公司 A kind of overline bridge parking systems
CN108221635B (en) * 2018-03-27 2023-08-04 遵义路鑫机械有限公司 Steel construction pavement
CN108756338B (en) * 2018-04-04 2020-06-09 河北师范大学 Bicycle parking device

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1614834A2 (en) * 2004-07-09 2006-01-11 Paul Stolzer Shelf storage facility for automobiles
CN103015773A (en) * 2012-12-31 2013-04-03 东莞市伟创东洋自动化设备有限公司 Aisle-stacking garage comb fork exchange lifter and car parking and taking process thereof
CN203783216U (en) * 2014-03-19 2014-08-20 洛阳龙辇居停车设备有限公司 Overpass-type planar-movement spatial parking garage
CN203961388U (en) * 2014-07-02 2014-11-26 魏琪林 Parallel-moving type H type multi-storied garage
CN105350801A (en) * 2015-09-18 2016-02-24 杜开淼 Intelligent three-dimensional garage

Family Cites Families (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2674564B2 (en) * 1987-07-10 1997-11-12 株式会社日立製作所 Driving method of mechanical parking lot and mechanical parking lot
IT1253649B (en) * 1991-09-20 1995-08-22 Eride Rossato INSTALLATION FOR THE PARKING OF MOTOR VEHICLES
KR101064968B1 (en) * 2009-09-12 2011-09-19 송영철 Personal Parking Lifter
CN103132751A (en) * 2011-11-26 2013-06-05 梁嘉麟 Stereo garage over road and operational scheme thereof
CN104675159A (en) * 2013-11-26 2015-06-03 西安奥赛福科技有限公司 Lifting mechanism of parking system over road
CN105041022A (en) * 2014-04-18 2015-11-11 吴祖勇 City road intelligent type multifunctional stereo garage
CN104265035A (en) * 2014-09-29 2015-01-07 尹时中 Three-dimensional garage
CN204920373U (en) * 2015-07-10 2015-12-30 中冶南方工程技术有限公司 Utilize stereo garage in road upper portion space
CN205422087U (en) * 2015-09-12 2016-08-03 王冠卿 Overhead multilayer sky parking system in road or river

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1614834A2 (en) * 2004-07-09 2006-01-11 Paul Stolzer Shelf storage facility for automobiles
CN103015773A (en) * 2012-12-31 2013-04-03 东莞市伟创东洋自动化设备有限公司 Aisle-stacking garage comb fork exchange lifter and car parking and taking process thereof
CN203783216U (en) * 2014-03-19 2014-08-20 洛阳龙辇居停车设备有限公司 Overpass-type planar-movement spatial parking garage
CN203961388U (en) * 2014-07-02 2014-11-26 魏琪林 Parallel-moving type H type multi-storied garage
CN105350801A (en) * 2015-09-18 2016-02-24 杜开淼 Intelligent three-dimensional garage

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
中国建筑标准设计研究院: "《国家建筑标准设计图集:无障碍设计,12J926(替代03J926)》", 31 October 2013 *
同济大学土木工程学院(杨林德教授论文选集)编写组: "《杨林德教授论文选集》", 31 October 2014 *
孙在鲁: "《建筑施工特种设备安全使用知识》", 30 April 2005 *
建设部工程质量安全监督与行业发展司 等: "《建筑产品选用技术:建筑、装修》", 30 June 2003 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106907052A (en) * 2017-03-30 2017-06-30 湖北赛尔智能科技股份有限公司 The tower wagon storehouse of cross road crossing elevating translational multilayer market overline bridge eight
CN107035184A (en) * 2017-03-30 2017-08-11 湖北赛尔智能科技股份有限公司 The tower wagon storehouse of cross road crossing elevating translational multilayer market overline bridge four
CN107035181A (en) * 2017-03-30 2017-08-11 湖北赛尔智能科技股份有限公司 The tower wagon storehouse of cross road crossing tunnel stacking layers market overline bridge four
CN107130826A (en) * 2017-06-04 2017-09-05 武汉平行世界网络科技有限公司 A kind of parking systems being set up on road surface
CN108590292A (en) * 2018-06-29 2018-09-28 广州维绅科技有限公司 Three-dimensional parking system and parking and taking method thereof

Also Published As

Publication number Publication date
CN115234067A (en) 2022-10-25
CN106437241A (en) 2017-02-22
CN106481122A (en) 2017-03-08
CN114837479A (en) 2022-08-02
CN106285126A (en) 2017-01-04

Similar Documents

Publication Publication Date Title
CN106337580A (en) Stacking single-layer over-bridge garage crossing road tunnel
CN103643826B (en) Mechanical stereo garage and car carrying method thereof
CN203795916U (en) Lifting system for mechanical parking system
CN106545206A (en) Across road translation bilateral access garage
CN105178670A (en) Combined annular three-dimensional parking system
CN106930586A (en) Across road vertical lift translation individual layer overline bridge garage
CN104594688B (en) A kind of overhead system parking apparatus
CN206110748U (en) Double -deck parking equipment of machinery breast -stroke
CN109458021A (en) A kind of bus lifting device
CN103046785A (en) Three-dimensional garage capable of implementing rapid parking and fetching of cars
CN102134928A (en) Petal basket type intelligent underground parking garage
CN207194551U (en) The tower wagon storehouse of cross road crossing elevating translational multilayer market overline bridge four
CN207194550U (en) The tower wagon storehouse of cross road crossing elevating translational individual layer market overline bridge eight
CN207177428U (en) The tower wagon storehouse of cross road crossing tunnel stacking layers market overline bridge eight
CN207194600U (en) The tower wagon storehouse of cross road crossing elevating translational multilayer market overline bridge eight
CN207194572U (en) The tower wagon storehouse of cross road crossing elevating translational individual layer market overline bridge four
CN207194548U (en) The tower wagon storehouse of cross road crossing tunnel stacking layers market overline bridge four
CN105604368A (en) Track type stereo garage and control method thereof
CN207194547U (en) The tower wagon storehouse of cross road crossing tunnel stacking individual layer market overline bridge four
CN207194549U (en) The tower wagon storehouse of cross road crossing tunnel stacking individual layer market overline bridge eight
CN106545202A (en) Garage is accessed across road stacking bilateral
CN106351487A (en) Air stacking garage crossing road
TWM641799U (en) parking tower
CN106836954A (en) The tower wagon storehouse of cross road crossing tunnel stacking layers market overline bridge eight
CN204920385U (en) Make up cyclic annular sky parking system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
CB02 Change of applicant information
CB02 Change of applicant information

Address after: 434200 Jingzhou city of Hubei province Songzi City Desheng new Jiangkou Town embankment Village

Applicant after: HUBEI SAIER INTELLIGENT TECHNOLOGY CO.,LTD.

Address before: 434200 Jingzhou city of Hubei province Songzi City Desheng new Jiangkou Town embankment Village

Applicant before: HUBEI SAIER AUTOMATION EQUIPMENT CO.,LTD.

SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination