CN106321025B - A kind of coal and the green harmonic extraction system of oil gas and application process - Google Patents

A kind of coal and the green harmonic extraction system of oil gas and application process Download PDF

Info

Publication number
CN106321025B
CN106321025B CN201610969268.5A CN201610969268A CN106321025B CN 106321025 B CN106321025 B CN 106321025B CN 201610969268 A CN201610969268 A CN 201610969268A CN 106321025 B CN106321025 B CN 106321025B
Authority
CN
China
Prior art keywords
coal
oil
oil gas
gas
main borehole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201610969268.5A
Other languages
Chinese (zh)
Other versions
CN106321025A (en
Inventor
袁亮
张通
赵毅鑫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Mining and Technology Beijing CUMTB
Original Assignee
China University of Mining and Technology Beijing CUMTB
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Mining and Technology Beijing CUMTB filed Critical China University of Mining and Technology Beijing CUMTB
Priority to CN201610969268.5A priority Critical patent/CN106321025B/en
Publication of CN106321025A publication Critical patent/CN106321025A/en
Application granted granted Critical
Publication of CN106321025B publication Critical patent/CN106321025B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Layouts therefor
    • E21C41/16Methods of underground mining; Layouts therefor
    • E21C41/18Methods of underground mining; Layouts therefor for brown or hard coal

Abstract

The invention discloses a kind of coal and the green harmonic extraction system of oil gas and application process.The coal and the green harmonic extraction system of oil gas, including coordination organization, coal mining mechanism, oil gas extraction mechanism, coordination organization is provided with oil gas corridor, coal-face, overlying strata depression funnel, oil gas relaxation zone, coal mining mechanism is provided with coal-winning machine, hydraulic support, drag conveyor, and oil gas extraction mechanism is provided with pumping main borehole, suction branch, oil pumping main borehole, oil pumping branch pipe.It is of the invention to determine coordination organization's azimuth dimension and the heavy water-retaining production technique of corresponding drop first as requested, using being evacuated main borehole, suction branch passes through coal bed gas in the extraction coal seam of oil gas corridor, then coal mining mechanism back production coal seam is utilized, the roof and floor oil gas relaxation zone that coal-face rear is supervened promotes petroleum resources parsing in coal seam top and the bottom free, oil gas extraction mechanism carries out extraction to different layers position different stage oil gas, treat that oil gas extraction is finished, remove suction branch, oil pumping branch pipe, corridor is made leave with rage using coal mining mechanism oil recovery, realize the purpose of coal and the green harmonic extraction of oil gas.

Description

A kind of coal and the green harmonic extraction system of oil gas and application process
Technical field
The present invention relates to resource exploitation field, more particularly to a kind of coal and the green harmonic extraction system of oil gas and described Systematic difference method.
Background technology
By taking Ordos Basin as an example, the main coal accumulating basin preservation of China enriches coal resources, while having coal bed gas, sand The rational exploitation and utilization of the common association feature of the fossil resources such as rock gas, oil, coal and oil gas is to ensureing Chinese energy safety, improving energy Source structure, realize that environment-friendly sustainable development is significant." a kind of In Situ Heating exploitation oil shale and exploitation are deeper Hydrocarbon source combination " (CN101563524A) only illustrates a kind of well shaft type pyrolysis exploitation different layers position hydrocarbon source method, but at this stage Kerosene oil-gas multiple resource coordinated development not yet forms unified system, and coal faces problems with oil-gas mining, and coal seam is first adopted then can shape Into overlying unstable formation, cause oil gas drilling construction difficult, goaf can not exploit petroleum resources, and with the serious well of generation Leakage, ultimately causing security incident causes petroleum resources to waste;Oil gas is first adopted, and the ground subsidence supervened during seam mining can draw Play the destruction of oil gas extraction well bad break, the leakage of pipe network oil gas and explode, if forbidding coal mining, or stay and set roomy barrier pillar, then Coal resources waste can be caused.Based on above-mentioned situation, especially under kerosene oil-gas longitudinal stack occurrence condition, it is badly in need of a kind of coal With the green harmonic extraction system of oil gas, to reach coal and oil gas coordinated development, resource recovery, reduction table life ecology and water are improved Soil resource is disturbed, it is ensured that the purpose of national green energy resource supply.
The content of the invention
The purpose of the embodiment of the present invention is to propose a kind of coal and the green harmonic extraction system of oil gas, true first as requested Determine coordination organization's azimuth dimension and the heavy water-retaining production technique of corresponding drop, oil gas corridor is passed through using main borehole, suction branch is evacuated Coal bed gas in extraction coal seam, then using coal mining mechanism back production coal seam, the roof and floor oil gas that coal-face rear is supervened Relaxation zone promotes petroleum resources parsing in coal seam top and the bottom free, and oil gas extraction mechanism takes out to the different grade oil gas in different layers position Adopt, treat that oil gas extraction is finished, remove suction branch, oil pumping branch pipe and utilize coal mining mechanism back production oil gas corridor, in coal mining mechanism, oil Gas extraction mechanism and coordination organization realize the purpose of coal and the green harmonic extraction of oil gas under efficiently coordinating.To achieve the above object, The present invention is adopted the following technical scheme that:
A kind of coal and the green harmonic extraction system of oil gas, including:
Harmonic extraction mechanism, including oil gas corridor, overlying strata depression funnel, oil gas relaxation zone, coal-face;Coal-winning machine Structure, including coal-winning machine, hydraulic support, drag conveyor;Oil-gas mining mechanism, including pumping main borehole, suction branch, oil pumping master Drilling, oil pumping branch pipe, the oil gas corridor are placed in coal-face both sides, and the overlying strata depression funnel is located on coal-face Side, the oil gas relaxation zone is located at coal-face top and the bottom, and the coal-winning machine, hydraulic support and drag conveyor are adopted with described Coal working face is arranged in parallel, and coal-winning machine is placed in hydraulic support bottom and the drag conveyor top, the drag conveyor Afterbody is connected with hydraulic support bottom, and the pumping main borehole, oil pumping main borehole are placed in the middle part of oil gas corridor and arranged crosswise, are taken out Gas branch pipe, oil pumping branch pipe be respectively placed in correspondence Oil And Gas Occurrence coal rock layer and by the pumping main borehole, oil pumping main borehole with Ground installation is connected.
Preferably, the oil gas corridor is placed between coal-face, and the overlying strata depression under the conditions of specific geology of its size is leaked The scope combination oil-gas mining demand that struggles against is determined.
Preferably, the pumping main borehole is placed in the middle part of oil gas corridor, and inside is equipped with different tax gas-bearing formation position pumping branch respectively Pipe.
Preferably, the oil pumping main borehole is placed in oil gas corridor, and inside is equipped with different tax oil reservoir position oil pumping branch pipes respectively.
Preferably, the oil gas relaxation zone is located in the Oil And Gas Occurrence rock stratum of coal-face top and the bottom.
The invention also provides a kind of coal and the green harmonic extraction system application method of oil gas, using said system, it is wrapped Include following job step:
A, according to coal and petroleum resources hosting geological condition, determine overlying strata depression funnel size, oil gas corridor and coal-getter Make face dimension scale and distribution orientation;
B, pumped according to coal and the determination of petroleum resources demand main borehole, pumping main borehole density, drilling size and depth, and Determine coal-face size;
Coal bed gas and sandstone petrochina resource in c, laying oil gas extraction mechanism back production coal seam;
D, laying coal mining mechanism, back production coal seam, while utilizing the different product of suction branch and oil pumping branch pipe back production different layers position Position gas and oil resource;
E, treat that petroleum resources back production is finished, suction branch, oil pumping branch pipe are removed in time, is walked using coal mining mechanism back production oil gas Corridor coal seam;
F, coal resources back production are finished, and remove coal-winning machine, drag conveyor and hydraulic support;
G, next coal work repeat step a-f is moved to, and takes water conservation to subtract heavy coal winning technology during step c-f, Reduce coal, oil, gas exploitation ecological to earth's surface and underground water, soil resource disturbance to destroy.
Compared with existing single exploitation of mineral resources system, the invention has the advantages that:
The coal that the present invention is addressed and oil gas harmonic extraction system, with coordination organization, coal mining mechanism and oil-gas mining mechanism, Coordination organization's azimuth dimension and the heavy water-retaining production technique of corresponding drop are wherein determined first as requested, using being evacuated main borehole, take out Gas branch pipe passes through coal bed gas in the extraction coal seam of oil gas corridor, it is ensured that safely mining of coalbed, then using coal mining mechanism back production coal seam, The roof and floor oil gas relaxation zone that coal-face rear is supervened promotes petroleum resources parsing in coal seam top and the bottom free, will be evacuated Branch pipe, oil pumping branch pipe are placed in kerosene relaxation zone by being evacuated main borehole, oil pumping main borehole respectively, and then realize oil gas extraction machine Structure carries out extraction to different layers position different cultivars oil gas, treats that oil gas extraction is finished, and is visited with reference to pumping main borehole and oil pumping main borehole Bright oil gas corridor geologic information, corridor is made leave with rage using coal mining mechanism oil recovery, is finally reached a hole and is used, realizes that coal is green with oil gas The purpose of color coordinated development.
Brief description of the drawings
Fig. 1 is overall structure figure of the invention;
Fig. 2 is A-A profiles in Fig. 1 in the present invention;
Fig. 3 is B-B profiles in Fig. 1 in the present invention;
Fig. 4 adopts design sketch altogether for many coal-faces of the present invention;
Fig. 5 is back production oil gas corridor figure of the invention.
In figure:1- coal-winning machines;2- hydraulic supports;3- drag conveyors;4- is evacuated main borehole;5- suction branches;6- pumps Main borehole;7- oil pumping branch pipes;8- oil gas corridor;9- coal-faces;10- overlying strata depression funnels;11- oil gas relaxation zones.
Embodiment
With reference to shown in Fig. 1, Fig. 2, Fig. 3, Fig. 4, the green harmonic extraction system of a kind of coal and oil gas, including coordination organization, adopt Coal mechanism, oil gas extraction mechanism, coal mining mechanism are used for seam mining, and oil gas extraction mechanism is ensureing the safe and efficient back production bar in coal seam It is used for the petroleum resources of the different preservation layer positions of extraction under part, coordination organization is used to coordinate coal and petroleum resources is exploited.
In harmonic extraction mechanism, the oil gas corridor 8 is placed in the both sides of coal-face 9,10, the overlying strata depression funnel In the top of coal-face 9, the oil gas relaxation zone 11 is located at the top and the bottom of coal-face 9.
In coal mining mechanism, the coal-winning machine 1, hydraulic support 2 and drag conveyor 3 and the parallel cloth of the coal-face 9 Put, and coal-winning machine 1 is placed in the bottom of hydraulic support 2 and the top of the drag conveyor 3, the afterbody of drag conveyor 3 and hydraulic pressure The bottom of support 2 is connected;
In oil-gas mining mechanism, the pumping main borehole 4, oil pumping main borehole 6 are placed in the middle part of oil gas corridor 8 and intersect cloth Put, suction branch 5, oil pumping branch pipe 7 are respectively placed in correspondence Oil And Gas Occurrence coal rock layer and by the pumping main borehole 4, oil pumping Main borehole 6 is connected with ground installation.
With reference to shown in Fig. 1, coordination organization's azimuth dimension and the heavy water-retaining production technique of corresponding drop, profit are determined first as requested With pumping main borehole 4, suction branch 5 by coal bed gas in the extraction coal seam of oil gas corridor 8, coal mining mechanism back production coal is then utilized Layer, the roof and floor oil gas relaxation zone 11 that the rear of coal-face 9 is supervened promotes petroleum resources parsing in coal seam top and the bottom free, Last oil gas extraction mechanism carries out extraction to the different grade oil gas in different layers position, treats that oil gas extraction is finished, is returned using coal mining mechanism Receive coal seam in oil gas corridor 8.
Its applying step approximately as:
A, according to coal and petroleum resources hosting geological condition, determine the size of overlying strata depression funnel 10, oil gas corridor 8 and mine The dimension scale of working face 9 and distribution orientation;
B, pumped according to coal and the determination of petroleum resources demand main borehole 6, pumping main borehole 4 density, drilling size and depth, And determine the size of coal-face 9;
Coal bed gas and sandstone petrochina resource in c, laying oil gas extraction mechanism back production coal seam;
D, laying coal mining mechanism, back production coal seam, while using suction branch 5, the back production back production different layers position of oil pumping branch pipe 7 not With grade gas and oil resource;
E, treat that petroleum resources back production is finished, suction branch 5, oil pumping branch pipe 7 are removed in time, coal mining mechanism back production oil gas is utilized The coal seam of corridor 8;
F, coal resources back production are finished, and remove coal-winning machine 1, drag conveyor 3 and hydraulic support 2;
G, next coal-face repeat step a-f is moved to, and take water conservation to subtract heavy coal-getter during step c-f Skill, reduces coal, oil, gas exploitation ecological to earth's surface and underground water, soil resource disturbance and destroys.
Certainly, described above is only presently preferred embodiments of the present invention, and the present invention is not limited to enumerate above-described embodiment, should When explanation, any those skilled in the art are all equivalent substitutions for being made, bright under the teaching of this specification Aobvious variant, all falls within the essential scope of this specification, ought to be protected by the present invention.

Claims (3)

1. a kind of coal and the green harmonic extraction system of oil gas, it is characterised in that:The coal and the green harmonic extraction system bag of oil gas Include:
Harmonic extraction mechanism, including oil gas corridor, overlying strata depression funnel, oil gas relaxation zone, coal-face;Coal mining mechanism, bag Include coal-winning machine, hydraulic support, drag conveyor;Oil-gas mining mechanism, including pumping main borehole, suction branch, oil pumping main borehole, Oil pumping branch pipe, the oil gas corridor is placed in coal-face both sides, and the overlying strata depression funnel is located above coal-face, institute Oil gas relaxation zone is stated positioned at coal-face top and bottom, the coal-winning machine, hydraulic support and drag conveyor are adopted with described Coal working face is arranged in parallel, and coal-winning machine is placed in hydraulic support bottom and the drag conveyor top, the drag conveyor Afterbody is connected with hydraulic support bottom, and the pumping main borehole, oil pumping main borehole are placed in the middle part of oil gas corridor and arranged crosswise, are taken out Gas branch pipe, oil pumping branch pipe be respectively placed in correspondence gas, oily preservation coal rock layer and by the pumping main borehole, oil pumping main borehole with Ground installation is connected, and the pumping main borehole is placed in the middle part of oil gas corridor, and inside is equipped with different tax gas-bearing formation position suction branches respectively, The oil pumping main borehole is placed in oil gas corridor, and inside is equipped with different tax oil reservoir position oil pumping branch pipes respectively.
2. coal according to claim 1 and the green harmonic extraction system of oil gas, it is characterised in that:The oil gas relaxation zone position In coal-face top and bottom Oil And Gas Occurrence rock stratum.
3. a kind of coal and the green harmonic extraction system application method of oil gas, it is characterised in that any using such as claim 1 to 2 Coal and the green harmonic extraction system of oil gas described in, comprise the following steps:
A, according to coal and petroleum resources hosting geological condition, determine overlying strata depression funnel size, oil gas corridor and coal-face Dimension scale and distribution orientation;
B, pumped according to coal and the determination of petroleum resources demand main borehole, pumping main borehole distribution density, drilling size and depth, and Determine coal-face size;
Coal bed gas and sandstone petrochina resource in c, laying oil gas extraction mechanism back production coal seam;
D, lay coal mining mechanism, back production coal seam, while using the different grade gas of suction branch and oil pumping branch pipe back production different layers position, Oily resource;
E, treat that petroleum resources back production is finished, suction branch, oil pumping branch pipe are removed in time, coal mining mechanism back production oil gas corridor coal is utilized Layer;
F, coal resources back production are finished, and remove coal-winning machine, drag conveyor and hydraulic support;
G, next coal-face repeat step a-f is moved to, and take water conservation to subtract heavy coal winning technology during step c-f, subtracted Small coal, oil, gas exploitation ecological to earth's surface and underground water, soil resource disturbance are destroyed.
CN201610969268.5A 2016-10-28 2016-10-28 A kind of coal and the green harmonic extraction system of oil gas and application process Expired - Fee Related CN106321025B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610969268.5A CN106321025B (en) 2016-10-28 2016-10-28 A kind of coal and the green harmonic extraction system of oil gas and application process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610969268.5A CN106321025B (en) 2016-10-28 2016-10-28 A kind of coal and the green harmonic extraction system of oil gas and application process

Publications (2)

Publication Number Publication Date
CN106321025A CN106321025A (en) 2017-01-11
CN106321025B true CN106321025B (en) 2017-09-12

Family

ID=57816546

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610969268.5A Expired - Fee Related CN106321025B (en) 2016-10-28 2016-10-28 A kind of coal and the green harmonic extraction system of oil gas and application process

Country Status (1)

Country Link
CN (1) CN106321025B (en)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107448178B (en) * 2017-08-25 2020-05-05 平安煤炭开采工程技术研究院有限责任公司 Method and device for exploiting coal and oil gas resources of coal-bearing stratum
CN109162676B (en) * 2018-09-27 2020-11-17 太原理工大学 Method for simultaneously extracting and utilizing coal bed gas and accumulated water in goaf
CN110043261A (en) * 2019-05-21 2019-07-23 安徽理工大学 A kind of coal uranium harmonic extraction perspectiveization physical simulating device and application method
CN113323663B (en) * 2021-06-03 2022-05-31 安徽理工大学 Associated resource is exploitation intelligent experimental apparatus in coordination altogether
CN113389597B (en) * 2021-07-29 2022-06-28 安徽理工大学 Comprehensive utilization system and application method for coal gangue in resource co-associated mining area
CN114165210B (en) * 2021-12-16 2022-08-26 中国矿业大学(北京) Deep coal resource fluidization mining method and system
CN114687709B (en) * 2022-04-08 2023-10-31 陕西延长石油(集团)有限责任公司 Coal bed gas and oil gas collaborative exploitation recycling device and method
CN115030700B (en) * 2022-04-26 2023-04-18 安徽理工大学 Oil gas extraction system for fracturing oil gas reservoir by utilizing coal bed gas

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8297377B2 (en) * 1998-11-20 2012-10-30 Vitruvian Exploration, Llc Method and system for accessing subterranean deposits from the surface and tools therefor
US7025137B2 (en) * 2002-09-12 2006-04-11 Cdx Gas, Llc Three-dimensional well system for accessing subterranean zones
WO2008048454A2 (en) * 2006-10-13 2008-04-24 Exxonmobil Upstream Research Company Combined development of oil shale by in situ heating with a deeper hydrocarbon resource
CN103174453A (en) * 2013-03-28 2013-06-26 重庆大学 Layered hydraulic fracturing method of underground coal mine multiple coal seams
CN105649578B (en) * 2016-01-29 2018-11-13 西南石油大学 Coal bed gas straight well bilayer separate pressure production method and its device

Also Published As

Publication number Publication date
CN106321025A (en) 2017-01-11

Similar Documents

Publication Publication Date Title
CN106321025B (en) A kind of coal and the green harmonic extraction system of oil gas and application process
CN109488259B (en) It is handled up the method for replacement exploitation I class hydrate system based on warm seawater-gravel
CN102080526B (en) Method for extracting gas from bedding level fractured well of ground coal seam roof
CN1875168B (en) Hydrocarbon recovery from impermeable oil shales
US9784086B2 (en) Method and process for extracting shale oil and gas by fracturing and chemical retorting in oil shale in-situ horizontal well
CN106948843B (en) A kind of bilayer multiple-limb concordant bored grouting transformation dual limestone aquifer method of roof and floor
US20160069170A1 (en) Method and process for extracting shale oil and gas by fracturing and chemical retorting in oil shale in-situ vertical well
CN102877884B (en) The difficult to understand grey top transformation of a kind of mine based on km directional drilling technology and construction method
CN102322245B (en) Gas hydrate exploitation device
CN105003237A (en) Apparatus and method for integrated processing of natural gas hydrate exploitation by geothermy and waste CO2 reinjection
CN104806217A (en) Combined separated layer fracturing, grouping and layer-combining mining method for coal bed well group
CN110671145A (en) Large-mining-width thick coal seam mining composite grouting method
CN102352769A (en) Integrated mining method for commonly mining coal and gas of high mine
CN105464700B (en) Fully mechanized mining filling mixed mining working face filling segment length determines method
CN102587980A (en) Multiple-interlayer salt cavern gas storage and building method of multiple-interlayer salt cavern gas storage
CN110644963B (en) Method for exploiting hydrate based on multilateral well
CN106761750B (en) Slot type recovery method is built in the longwell plane milling of half-edge coal seam longitudinal direction
CN102493831A (en) Method for extracting coal seam gas through ground fracturing and underground horizontal drill holes
CN105089493A (en) Ground vertical well and underground cross drilling combined pressure-released coal-bed gas extraction method
CN111608624B (en) Method for exploiting heavy oil reservoir by utilizing terrestrial heat
CN114876438A (en) Coal mining method for in-situ hydrogen production of filling coal
CN105019935A (en) Overground/underground combined pressure relief outburst elimination coal seam rapid channel digging method
CN107313743B (en) Method for repairing weak zone of coal seam floor water-resisting layer by utilizing coal seam gas well
CN105971563A (en) Extraction method for coal bed gas in composite old mined-out area formed through lower tool post method
CN108952719A (en) Coal seam gasification second mining loses the method for coal under the conditions of a kind of longwall top coal caving

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170912

Termination date: 20181028