CN109488259B - It is handled up the method for replacement exploitation I class hydrate system based on warm seawater-gravel - Google Patents

It is handled up the method for replacement exploitation I class hydrate system based on warm seawater-gravel Download PDF

Info

Publication number
CN109488259B
CN109488259B CN201811514174.4A CN201811514174A CN109488259B CN 109488259 B CN109488259 B CN 109488259B CN 201811514174 A CN201811514174 A CN 201811514174A CN 109488259 B CN109488259 B CN 109488259B
Authority
CN
China
Prior art keywords
hydrate
decompression
reservoir
gravel
exploitation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201811514174.4A
Other languages
Chinese (zh)
Other versions
CN109488259A (en
Inventor
刘昌岭
李彦龙
胡高伟
陈强
吴能友
万义钊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao Institute of Marine Geology
Original Assignee
Qingdao Institute of Marine Geology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao Institute of Marine Geology filed Critical Qingdao Institute of Marine Geology
Priority to CN201811514174.4A priority Critical patent/CN109488259B/en
Publication of CN109488259A publication Critical patent/CN109488259A/en
Application granted granted Critical
Publication of CN109488259B publication Critical patent/CN109488259B/en
Priority to JP2019223624A priority patent/JP6679038B1/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/01Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells specially adapted for obtaining from underwater installations
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B41/00Equipment or details not covered by groups E21B15/00 - E21B40/00
    • E21B41/0099Equipment or details not covered by groups E21B15/00 - E21B40/00 specially adapted for drilling for or production of natural hydrate or clathrate gas reservoirs; Drilling through or monitoring of formations containing gas hydrates or clathrates

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Drilling And Exploitation, And Mining Machines And Methods (AREA)

Abstract

The present invention program discloses a kind of to be handled up the method for replacement exploitation I class hydrate system based on warm seawater-gravel: (1) containing blocky hydrate I class hydrate system reservoir for shallow-layer, make a call to a main borehole for running through hydrate layer and free gas-bearing formation, and in free gas-bearing formation perforation, the free gas that underlies is exploited in decompression;(2) main shaft is drilled through by using hydrate reservoir add the method for branched hole and increase the decomposition surface area of blocky hydrate, and handle up the production technique that method, fluid extraction voltage drop method combine in conjunction with surface seawater, decompose blocky hydrate gradually;(3) by the intermittent gravel for injecting certain partial size into stratum, the formation depletion space as caused by blocky decomposition of hydrate is constantly filled up, stratum is maintained to improve nearly well permeability while stabilization;Move in circles execution, had not only realized duration, the scale exploitation of gas hydrates, but also maintains the stabilization of subsea environment and the ecosystem, embodies environmentally protective utility strategies.

Description

It is handled up the method for replacement exploitation I class hydrate system based on warm seawater-gravel
Technical field
The present invention relates to Gas Hydrate In Sea Areas development fields, and in particular to and one kind handled up based on warm seawater-and gravel sets The ocean I class hydrate system decompression recovery method changed.
Background technique
Gas hydrates reserves are huge, are the generally acknowledged following potential energy sources, wherein about 90% or more natural gas is hydrated Object resource enrichness Yu Haiyang evokes the dense research interest of many countries and exploitation enthusiasm.How safely, effectively to extract natural gas Hydrate, it has also become the hot issue in gas hydrates field.
Symbiosis of the hydrate hiding in ocean according to hydrate sublayer and underlie free gas sublayer or aqueous sublayer, Ke Yifen For I class hydrate system, II class hydrate system and Group III hydrate system, wherein I class hydrate system refers to upper sublayer For hydrate layer, underlie symbiosis free gas sublayer, and top hydrate layer and the free gas sublayer that underlies belong to the same hydrate Gas accumulation system, the interface between two sublayers are among dynamic changing process.This kind of reservoir is that gas hydrates pilot production is excellent The reservoir first considered, for the I class hydrate system containing shallow-layer bulk hydrate, the hydrate system is from upper Blocky hydrate sublayer, dispersed hydrate sublayer and the free gas sublayer that underlies are sequentially distributed under.Investigation display in recent years, shallowly Layer natural gas hydrate resources specific gravity is being substantially improved.China Seas also obtains the sample of shallow-layer hydrate, it was demonstrated that The gas hydrates of this type are widely present in sea area, show that the stock number of the type hydrate is huge.
Compared with deep layer diffused hydrate, I class hydrate system has its unique resources advantage.However, due to exploitation Basic theory is unclear, is restricted by production technique, not yet carried out any shallow-layer bulk hydrate pilot production in the world and attempts, main There are following critical issues to need to solve:
1. the blocky hydrate ore body of shallow-layer large area requires supplementation with a large amount of heat, therefore simple drop to decompose Platen press is not appropriate for the continuous exploitation of blocky hydrate;
2. the hydrate thickness of some ore bodies can since shallow-layer bulk hydrate is the component part of bottom sediment skeleton Up to tens of rice, these hydrates will lead to stratum large area during being decomposed into air water two-phase output by solid phase is in debt, can Stratum is caused quickly to collapse and cause environment and ecocatastrophe;
3. if there is free natural gases for the seabed below blocky hydrate reservoir, after hydrate reservoir decomposes, phase It is destroyed when in cap rock, the natural gas that underlies will escape into ocean and atmosphere, cause local geology disaster, to marine ecology ring Cause irreversible disaster in border.
Therefore, Yao Youxiao exploiting ocean shallow-layer bulk hydrate first has to the concrete condition for findding out ore body, including specific Geological structure, with the presence or absence of area, thickness of underlie natural gas reservoir and ore body etc..For such ore body, it would be highly desirable to propose one kind The production technique and method of technical feasibility are able to solve above-mentioned technological difficulties, realize holding for shallow-layer bulk I class hydrate system Continuous, environmental protection exploitation, promotes the Gas Hydrate In Sea Areas industrialization process in China.
Summary of the invention
The present invention proposes a kind of completely new, handling up-gravel based on warm seawater of being applicable in the exploitation of Yu Haiyang's shallow-layer bulk hydrate The method of stone replacement exploitation shallow-layer bulk I class hydrate system, the mesh realized safety, constantly exploit shallow-layer bulk hydrate 's.
The present invention is that the following technical solution is employed and realizes: one kind is handled up-gravel replacement exploitation I class water based on warm seawater The method of polymer system, comprising the following steps:
S1, it is directed to ocean shallow-layer bulk I class hydrate system, makes a call to a vertical main borehole through hydrate reservoir and free gas Layer, and in free gas-bearing formation perforation;Then pit shaft and the hydrate reservoir free gas that underlies are depressured simultaneously, make hydrate reservoir following table Face, main borehole blocky hydrate gradually decompose, decompression exploitation is underlied free gas;
S2, when decompression exploitation gas output reduce when, to hydrate reservoir inject surface layer temperature seawater, stand a period of time carry out Heat exchange is exchanged by the heat of seawater, promotes blocky hydrate surface to decompose, after reservoir hydrate further decomposes, so Extraction seawater decompression afterwards realizes that decompression joins with heating and adopts, and is opened using what surface seawater handled up that method, fluid extraction voltage drop method combine Technology is adopted, decomposes blocky hydrate gradually;
S3, decompression recovery percent is judged according to gas output, when decomposition of hydrate is near wellbore and hydrate reservoir bottom When generating hole, the gravel that specific quantity is intermittently conveyed by pipeline is gradually covered the deficit, certain by injecting into stratum The gravel of partial size constantly fills up the formation depletion space as caused by blocky decomposition of hydrate, keeps the complete of stratum, and gravel Permeability it is very high, will not influence the flowing of air-liquid, improve nearly well permeability while maintaining stratum to stablize, promote hydration Effective decomposition of object;
S4, step S2 and S3 are repeated, by continuous seawater handle up circulation, decompression exploitation, injection gravel, make shallow-layer Blocky hydrate ore body constantly decomposes until exploitation terminates, and the gravel of injection maintains the steady of stratum instead of hydrate ore body It is qualitative, achieve the purpose that safety, constantly exploit shallow-layer bulk hydrate.
Further, in the step S1 decompression exploitation underlie free gas when, realized especially by following manner:
(1) shallow-layer bulk hydrate buried depth, distribution area, thickness, underlie free gas position, extension side are determined first To, reservoir permeability and mechanical strength etc., and the drilling plan and casing programme of main borehole are designed accordingly;In production well construction Before, it lays overflow feelings for monitoring blocky hydrate reservoir decomposing state, sweep area, formation stability and methane gas first The monitoring well of condition;
(2) suction anchor is then placed in seabed mud face hereinafter, " casing and well head head utilize for prefabricated installation 20 in suction anchor Drilling ship bores after a vertical main shaft successively drills surface deposit, hydrate reservoir and free gas-bearing formation, and in free gas-bearing formation perforation, Production casing is installed to free gas-bearing formation after well cementation;
(3) the complete well of sand preventing tool is used, the flow channel of free gas-bearing formation and pit shaft is established;
(4) in major diameter main hole, a set of high-power electric pump and a set of for hydrate decompression exploitation is installed respectively For infusing the high head injection pump of surface seawater and gravel pack, high-power electric pump and high head injection pump two systems by cutting automatically Switch is changed, is used alternatingly in the left and right sides, air-water-sand three phase separator is placed in high-power electric pump front end;
(5) the annular BOP for closing RMR well system suction apparatus starts the lifting device of RMR well system to reduce well Bottom pressure realizes decompression production.
Further, it in the step S1, in order to increase decomposition of hydrate surface area, is beaten in the main borehole of hydrate reservoir Multiple branched holes, the branched hole are laid along main borehole circumferencial direction, and the length of branched hole is extensible according to practical exploitation situation To hundreds of meters.
Further, in the step S2, surface layer temperature seawater progress heat exchange is injected by high head injection pump, promotes to store up It deposits after hydrate further decomposes, is again turned on high head injection pump, extracts borehole fluid decompression, starting decompression mining sequence continues Decompression production, and repeat the step.
Further, in the step S3, the decomposition volume of blocky hydrate is obtained according to gas water yield is produced, and combine prison The monitoring data of well logging obtain hydrate reservoir deficit situation, gravel are injected into hole by high head injection pump, with retentively Layer is stablized.
Compared with prior art, the advantages and positive effects of the present invention are:
The intermittent ocean superficial layer bulk hydrate exploitation technology that the present invention program is proposed, is handled up using surface seawater The production technique that method, fluid extraction voltage drop method combine, decomposes blocky hydrate gradually;It is injected by intermittent into stratum The gravel of certain partial size, constantly fills up the formation depletion space as caused by blocky decomposition of hydrate, while maintaining stratum to stablize Nearly well permeability is improved, effective decomposition of hydrate is promoted;It moves in circles, carries out the water that temperature seawater in surface layer is handled up, gravel is replaced Object exploitation is closed, achieved the purpose that safety, constantly exploited shallow-layer bulk hydrate, both realized continuing for gas hydrates Property, scale exploitation, and maintain the stabilization of subsea environment and the ecosystem, embody environmentally protective utility strategies, be a kind of Ocean superficial layer bulk hydrate recovery method with broad prospect of application.
Detailed description of the invention
Fig. 1 is the working principle diagram of replacement exploitation I class hydrate system handled up based on warm seawater-gravel;
Fig. 2 is the casing programme schematic diagram of replacement exploitation I class hydrate system handled up based on warm seawater-gravel;
Wherein: 1, filling gravel;2, sea level;3, gravel injection channel;4, seawater;5, surface layer temperature seawater injection channel; 6, multiphase output channel;7, seabed;8, hydrate reservoir;9, gravel;10, sand preventing tool;11, dissociate gas-bearing formation;12, gas-liquid delivery Pipeline;13, mud line;14,RMR;15, underwater testing tree;16, underwater well head;17, coiled tubing;18, suction anchor;19, conduit; 20, coiled tubing;21, naked eye;22, multilateral well;23, monitoring well.
Specific embodiment
In order to which the above objects, features and advantages of the present invention is more clearly understood, with reference to the accompanying drawing and implement The present invention will be further described for example.It should be noted that in the absence of conflict, in embodiments herein and embodiment Feature can be combined with each other.
A method of it is handled up-gravel replacement exploitation I class hydrate system based on warm seawater, referring to figs. 1 and 2, The following steps are included:
S1, it is directed to ocean shallow-layer bulk I class hydrate system reservoir, makes a call to a vertical main borehole through hydrate reservoir and trip From gas-bearing formation, and in free gas-bearing formation perforation;In order to increase decomposition of hydrate surface area, multiple scores are made in the main borehole of hydrate reservoir Zhi Kong, the branched hole are laid along main borehole circumferencial direction, and the length of branched hole may extend to hundreds of according to practical exploitation situation Then rice is depressured pit shaft and the hydrate reservoir free gas that underlies simultaneously, makes hydrate reservoir lower surface, main borehole and Multilateral Wells Blocky hydrate gradually decompose, decompression exploitation is underlied free gas;
S2, when decompression exploitation gas output reduce when, to hydrate reservoir inject surface layer temperature seawater, stand a period of time carry out Heat exchange is exchanged by the heat of seawater, promotes blocky hydrate surface to decompose, after reservoir hydrate further decomposes, so Extraction seawater decompression afterwards realizes that decompression joins with heating and adopts, and is opened using what surface seawater handled up that method, fluid extraction voltage drop method combine Technology is adopted, decomposes blocky hydrate gradually;
S3, decompression recovery percent is judged according to gas output, when decomposition of hydrate is near wellbore and hydrate reservoir bottom When generating hole, gradually covered the deficit by the gravel (20 mesh or so) of the intermittent conveying specific quantity of pipeline, by intermittent The gravel of certain partial size is injected into stratum, constantly fills up the formation depletion space as caused by blocky decomposition of hydrate, retentively Layer it is complete, and the permeability of gravel is very high, will not influence the flowing of air-liquid, improves while maintaining stratum to stablize close Well permeability promotes effective decomposition of hydrate;
S4, step S2 and S3 are repeated, by continuous seawater handle up circulation, decompression exploitation, injection gravel, make shallow-layer Blocky hydrate ore body constantly decomposes until exploitation terminates, and the gravel of injection maintains the steady of stratum instead of hydrate ore body It is qualitative, achieve the purpose that safety, constantly exploit shallow-layer bulk hydrate.
When specific implementation:
(1) first by ore body meticulous depiction technology determine shallow-layer bulk hydrate buried depth, distribution area, thickness, Underlie free gas position, extending direction, reservoir permeability and mechanical strength etc., and designs the drilling plan of vertical main borehole accordingly With well depth structure;Before producing well construction, first lay for monitor blocky hydrate reservoir decomposing state, sweep area, Layer stability and methane gas overflow the monitoring well of situation;
(2) suction anchor is then placed in seabed mud face or less 12m-15m, 20 " casing and well heads of prefabricated installation in suction anchor Head is bored after a vertical main borehole successively drills surface deposit, hydrate reservoir and free gas-bearing formation using drilling ship, using continuous Oil pipe beats multiple branched holes in the main borehole of hydrate reservoir, to increase decomposition of hydrate surface area, and in free gas-bearing formation perforation, Production casing is installed to free gas-bearing formation, as shown in Figure 1 after well cementation;
(3) the complete well of Georform sand preventing tool is used, establishes the flow channel of free gas-bearing formation and pit shaft, as shown in Figure 2;
(4) in major diameter main hole, a set of high-power electric pump and a set of for hydrate decompression exploitation is installed respectively For infusing the high head injection pump of surface seawater and gravel pack, high-power electric pump and high head injection pump two systems by cutting automatically Switch is changed, is used alternatingly in the left and right sides, air-water-sand three phase separator is placed in high-power electric pump front end;
(5) the annular BOP for closing RMR well system suction apparatus starts the lifting device of RMR well system to reduce well Bottom pressure realizes decompression production, as shown in Fig. 2, decompression is to a certain extent, will move on on the methane gas of decomposition of hydrate generation The suction apparatus of RMR well system, then by lifting device, in main borehole by hydrocyclone and gas-liquid separator into The sorting of one step, rises to ground through mud Return Line and enters surface testing flow;
(6) gas after three phase separation is prepared into liquefied natural gas after purified above deck, dry, is stored in first In natural gas liquefaction device on plate, storage and transportation is carried out in the form of liquefied gas.
(7) when decompression exploitation gas output is reduced, surface layer temperature seawater is injected to hydrate reservoir using production casing, it is static A period of time carries out heat exchange, so that reservoir hydrate further decomposes;
(8) it is again turned on high head injection pump, extracts borehole fluid decompression, starting decompression mining sequence continues decompression production, And repeat step (7) and (8);
(9) when decompression produces to a certain extent, decomposition of hydrate can generate hole near wellbore, according to production gas water yield The decomposition volume of blocky hydrate is obtained, and the monitoring data of monitoring well is combined to obtain hydrate reservoir deficit situation, passes through height Pressure injection pump injects gravel into hole, to keep stratum to stablize;
(10) step (5)-(9) are repeated, injection seawater, reinjects gravel at decompression exploitation of drawing water.It moves in circles, carries out table The warm seawater of layer is handled up, the hydrate of gravel displacement is exploited, and realizes ocean shallow-layer hydrate under the premise of keeping stratum to stablize Safe and efficient exploitation meets marine eco-environment requirement.
The above described is only a preferred embodiment of the present invention, being not that the invention has other forms of limitations, appoint What those skilled in the art changed or be modified as possibly also with the technology contents of the disclosure above equivalent variations etc. It imitates embodiment and is applied to other fields, but without departing from the technical solutions of the present invention, according to the technical essence of the invention Any simple modification, equivalent variations and remodeling to the above embodiments, still fall within the protection scope of technical solution of the present invention.

Claims (4)

1. handled up based on warm seawater-method of gravel replacement exploitation I class hydrate system, which comprises the following steps:
S1, it is directed to I class hydrate system reservoir, makes a call to a vertical main borehole through hydrate reservoir and free gas-bearing formation, and in Quan Jing Section perforation is completed;It is depressured simultaneously to hydrate layer and with the free gas that underlies, makes the blocky water of hydrate reservoir lower surface, main borehole It closes object gradually to decompose, the free gas that underlies is exploited in decompression;
Decompression exploitation underlie free gas when, realized especially by following manner:
(1) determine first the buried depth of each substratum in I class hydrate system, distribution area, thickness, free gas position of underliing, Extending direction, reservoir permeability and mechanical strength, and the drilling plan and well depth structure of main borehole are designed accordingly;It is applied in producing well Before work, lays and overflow situation for monitoring blocky hydrate reservoir decomposing state, sweep area, formation stability and methane gas Monitoring well;
(2) suction anchor is then placed in seabed mud face hereinafter, boring a vertical main borehole using drilling ship successively drills superficial deposit After object, superficial layer bulk hydrate reservoir, dispersed hydrate reservoir and free gas-bearing formation, full well section well cementation, perforation;
(3) the complete well of sand preventing tool is used, the flow channel of free gas-bearing formation and pit shaft is established;
(4) in main borehole, a set of high-power electric pump for hydrate decompression exploitation and a set of for infusing surface layer is installed respectively The high head injection pump of seawater and gravel pack, high-power electric pump and high head injection pump two systems are by automatic transfer switch on a left side Right two sides are used alternatingly, and one air-water-sand three phase separator is arranged in high-power electric pump front end;
(5) the annular BOP for closing RMR well system suction apparatus starts the lifting device of RMR well system to reduce shaft bottom pressure Power realizes decompression production;
S2, when decompression exploitation gas output reduce when, to hydrate reservoir injection surface layer temperature seawater carry out heat exchange, to reservoir water It closes object further to decompose, after reservoir pressure recovery, extraction seawater decompression realizes that decompression is adopted with connection is heated;
S3, decompression recovery percent is judged according to gas output, when decomposition of hydrate is generated near wellbore and hydrate reservoir bottom When hole, gradually covered the deficit by the gravel of the intermittent conveying specific quantity of pipeline;
S4, step S2 and S3 are repeated, is handled up circulation, decompression exploitation, injection gravel by continuous seawater, keeps shallow-layer blocky I class hydrate system ore body constantly decomposes until exploitation terminates.
2.-the method for gravel replacement exploitation I class hydrate system according to claim 1 of being handled up based on warm seawater, special Sign is: in the step S1, beating multiple branched holes in the main borehole of hydrate reservoir, the branched hole is along main borehole circumference side To laying.
3.-the method for gravel replacement exploitation I class hydrate system according to claim 2 of being handled up based on warm seawater, special Sign is: in the step S2, by high head injection pump inject surface layer temperature seawater carry out heat exchange, promote store hydrate into After one step is decomposed, it is again turned on high head injection pump, extracts borehole fluid decompression, starting decompression mining sequence continues decompression production, And repeat the step.
4.-the method for gravel replacement exploitation I class hydrate system according to claim 3 of being handled up based on warm seawater, special Sign is: in the step S3, obtaining the decomposition volume of blocky hydrate according to gas water yield is produced, and combine the monitoring of monitoring well Data obtain hydrate reservoir deficit situation, and gravel is injected into hole by high head injection pump.
CN201811514174.4A 2018-12-12 2018-12-12 It is handled up the method for replacement exploitation I class hydrate system based on warm seawater-gravel Active CN109488259B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201811514174.4A CN109488259B (en) 2018-12-12 2018-12-12 It is handled up the method for replacement exploitation I class hydrate system based on warm seawater-gravel
JP2019223624A JP6679038B1 (en) 2018-12-12 2019-12-11 Mining method of I-type hydrate system based on vomiting displacement of warm seawater and gravel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811514174.4A CN109488259B (en) 2018-12-12 2018-12-12 It is handled up the method for replacement exploitation I class hydrate system based on warm seawater-gravel

Publications (2)

Publication Number Publication Date
CN109488259A CN109488259A (en) 2019-03-19
CN109488259B true CN109488259B (en) 2019-08-06

Family

ID=65709835

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811514174.4A Active CN109488259B (en) 2018-12-12 2018-12-12 It is handled up the method for replacement exploitation I class hydrate system based on warm seawater-gravel

Country Status (2)

Country Link
JP (1) JP6679038B1 (en)
CN (1) CN109488259B (en)

Families Citing this family (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109915084B (en) * 2019-04-09 2020-02-21 中国石油大学(北京) Deepwater natural gas hydrate exploitation system and deepwater natural gas hydrate exploitation method
CN111721574B (en) * 2020-05-28 2023-04-28 北京城建中南土木工程集团有限公司 Sampling device for rapidly detecting thickness of sediment
CN111707800B (en) * 2020-06-10 2021-11-05 大连理工大学 Device and method for simulating remodeling and depressurization exploitation of natural gas hydrate reservoir of underlying gas
CN111734359A (en) * 2020-07-28 2020-10-02 广州海洋地质调查局 Natural gas hydrate horizontal branch well exploitation method based on deepwater suction anchor
CN112253057B (en) * 2020-10-09 2021-08-10 青岛海洋地质研究所 Efficient exploitation method of pore filling type natural gas hydrate
CN112253058B (en) * 2020-10-19 2021-07-27 青岛海洋地质研究所 System and method for artificially enriching and exploiting deep-water shallow-layer low-abundance unconventional natural gas
CN112343558B (en) * 2020-12-18 2024-03-29 福州大学 Sea area natural gas hydrate barrel type exploitation simulation test device and test method thereof
CN112282707B (en) * 2020-12-18 2021-11-19 福州大学 Sea natural gas hydrate barrel type mining device and method thereof
CN113006764B (en) * 2021-03-09 2022-03-11 广州海洋地质调查局 Multi-branch hydrate replacement mining method
CN113356800B (en) * 2021-06-28 2022-09-09 西南石油大学 Experimental device and method for combined exploitation of marine hydrate and free gas
CN114215502B (en) * 2021-12-17 2023-10-10 广东石油化工学院 Multi-exploitation-mode simulated natural gas hydrate three-dimensional development experimental device and method
CN114412421A (en) * 2022-01-20 2022-04-29 北京大学 Sea area natural gas hydrate exploitation method
CN114542022B (en) * 2022-02-28 2024-02-27 山东科技大学 Deep sea natural gas hydrate filling exploitation method
CN115370325B (en) * 2022-09-26 2023-06-09 中国科学院广州能源研究所 System and method for exploiting marine natural gas hydrate resources
CN116122781B (en) * 2023-02-23 2024-07-30 西南石油大学 Device and method for realizing combined exploitation of underlying free gas and ocean hydrate

Family Cites Families (24)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2891913B2 (en) * 1995-12-07 1999-05-17 核燃料サイクル開発機構 Submarine gas hydrate decomposition system
JP3479699B2 (en) * 2002-01-18 2003-12-15 飛島建設株式会社 Gas hydrate mining method and equipment
JP2005083134A (en) * 2003-09-10 2005-03-31 Taisei Corp Sampling apparatus and sampling method for gas hydrate
CN101248162A (en) * 2005-08-26 2008-08-20 财团法人电力中央研究所 Method for production, substitution or digging of gas hydrate
CN1776192A (en) * 2005-10-31 2006-05-24 中国科学院广州能源研究所 Well pattern arrangement method for underground decomposing and extracting natural gas hydrate
WO2007117167A1 (en) * 2006-04-07 2007-10-18 Petru Baciu Procedure and apparatus for hydrocarbon gases extraction from under ground hydrates
JP4852492B2 (en) * 2007-07-27 2012-01-11 日本海洋掘削株式会社 Methane hydrate decomposition promotion and methane gas collection system
CN101666286B (en) * 2009-09-28 2011-12-07 中国海洋石油总公司 System for integrally exploiting marine energy resource
CN101672177B (en) * 2009-09-28 2012-09-26 中国海洋石油总公司 Exploitation method for sea bed gas hydrate
CN103967473B (en) * 2014-05-06 2017-01-04 大连理工大学 A kind of apparatus and method of exploiting ocean natural gas hydrates well desanding
CN103982163B (en) * 2014-05-06 2017-01-04 大连理工大学 A kind of ocean gas hydrate individual well blood pressure lowering mining system and method
CN106285617B (en) * 2015-11-11 2018-12-21 华通科创(唐山)石油工程技术服务有限公司 Gas water horizontal well completion method
CN105422055B (en) * 2015-12-03 2017-12-22 中国石油大学(华东) A kind of system of co-development natural gas, Water Soluble Gas and gas hydrates
CN105781499B (en) * 2016-04-12 2018-05-04 青岛海洋地质研究所 A kind of multistage anti-sand method of ocean gas hydrate decompression exploitation
CN106761587B (en) * 2016-11-18 2018-04-20 青岛海洋地质研究所 Ocean aleuritic texture reservoir gas hydrates multiple-limb hole finite sand control recovery method
CN106837259B (en) * 2017-04-01 2023-02-17 吉林大学 Device and method for increasing yield of marine shallow natural gas hydrate microtubules
CN107575187A (en) * 2017-10-09 2018-01-12 中国石油大学(华东) A kind of high saturation filling control water anti-sand method of the more slugs of Extra-fine sand reservoir
CN107869331B (en) * 2017-10-11 2019-04-16 青岛海洋地质研究所 Aleuritic texture ocean gas hydrate gravel is handled up recovery method and quarrying apparatus
CN107676058B (en) * 2017-10-11 2019-04-16 青岛海洋地质研究所 A kind of ocean gas hydrate mortar replacement exploitation method and quarrying apparatus
CN107795303B (en) * 2017-11-30 2023-08-08 青岛海洋地质研究所 Gravel pack simulation system and method in hydrate exploitation well pipe
CN108086961A (en) * 2017-12-12 2018-05-29 大连理工大学 A kind of water erosion method exploiting ocean natural gas hydrates method of combination heat injection
CN108086962B (en) * 2018-01-16 2023-04-25 吉林大学 Device and method for exploiting natural gas hydrate of shallow non-diagenetic stratum on seabed based on vacuum depressurization method
CN108278103B (en) * 2018-01-19 2020-01-31 吉林大学 Argillaceous powder sand mold natural gas hydrate exploitation method based on foam mortar injection technology
CN108590594A (en) * 2018-04-02 2018-09-28 齐鲁工业大学 A kind of method and apparatus system to be tapped natural gas using sea surface warm water

Also Published As

Publication number Publication date
JP6679038B1 (en) 2020-04-15
CN109488259A (en) 2019-03-19
JP2020094483A (en) 2020-06-18

Similar Documents

Publication Publication Date Title
CN109488259B (en) It is handled up the method for replacement exploitation I class hydrate system based on warm seawater-gravel
CN103498648B (en) The method and apparatus of a kind of associating step-down and hydraulic fracturing technology production of water compound
CN107100605B (en) Method for developing dry hot rock by using double horizontal wells and circulating supercritical carbon dioxide
CN105041271B (en) A kind of buck exploiting ocean natural gas hydrates method and sub-sea production systems
CN110644963B (en) Method for exploiting hydrate based on multilateral well
CN108868706B (en) Method for exploiting natural gas hydrate by directional drilling supercritical carbon dioxide fracturing and displacement
CN109236186B (en) Well drilling casing and rapid well drilling and completion method for multilateral well of large well
CN105003237A (en) Apparatus and method for integrated processing of natural gas hydrate exploitation by geothermy and waste CO2 reinjection
CN106194122B (en) A kind of method that oil field abandoned well transform geothermal well or sub-salt well as
CN105863569A (en) Single-well fracture gravity self-circulation dry-hot-rock geotherm mining method
CN104806217A (en) Combined separated layer fracturing, grouping and layer-combining mining method for coal bed well group
CN106321025B (en) A kind of coal and the green harmonic extraction system of oil gas and application process
CN101864937A (en) Process for exploiting ocean gas hydrate by utilizing terrestrial heat
CN103982163A (en) Single-well depressurizing mining system and method for marine gas hydrate
CN105422055B (en) A kind of system of co-development natural gas, Water Soluble Gas and gas hydrates
CN110159233B (en) Method for improving natural gas hydrate reservoir recovery ratio through artificial dense cover layer
CN113294126A (en) Natural gas hydrate combined mining method and device for stabilizing stratum
CN108086962A (en) Device and method based on the vacuum pump-down method exploitation non-diagenesis formation gas hydrate of sea-bottom shallow
CN104818978A (en) One-well multi-control method for offshore low-permeability reservoir thick oil layer exploitation
WO2014048119A1 (en) New mining process for underground in-situ drilling corrosion of nonmetallic mineral
CN107120098A (en) One kind utilizes CO2The well construction design and method hidden with geothermal energy exploitation of gas hydrate
CN110006185B (en) Hot dry rock geothermal exploitation method
Lichao et al. Development techniques of multi-layer tight gas reservoirs in mining rights overlapping blocks: A case study of the Shenmu gas field, Ordos Basin, NW China
CN207795179U (en) Exploit the device of the non-diagenesis formation gas hydrate of sea-bottom shallow
Wu et al. Development of a novel self-entry exploitation device for marine natural gas hydrate and the feasibility studies

Legal Events

Date Code Title Description