CN105019935A - Overground/underground combined pressure relief outburst elimination coal seam rapid channel digging method - Google Patents

Overground/underground combined pressure relief outburst elimination coal seam rapid channel digging method Download PDF

Info

Publication number
CN105019935A
CN105019935A CN201410151121.6A CN201410151121A CN105019935A CN 105019935 A CN105019935 A CN 105019935A CN 201410151121 A CN201410151121 A CN 201410151121A CN 105019935 A CN105019935 A CN 105019935A
Authority
CN
China
Prior art keywords
coal seam
ground
target
gas
underground
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410151121.6A
Other languages
Chinese (zh)
Inventor
冯立杰
王金凤
翟雪琪
王延峰
岳俊举
潘云波
张博
卢明
秦颖
王亚州
王宇彬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhengzhou University
Original Assignee
Zhengzhou University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhengzhou University filed Critical Zhengzhou University
Priority to CN201410151121.6A priority Critical patent/CN105019935A/en
Publication of CN105019935A publication Critical patent/CN105019935A/en
Pending legal-status Critical Current

Links

Landscapes

  • Solid Fuels And Fuel-Associated Substances (AREA)

Abstract

The invention discloses an overground/underground combined pressure relief outburst elimination coal seam rapid channel digging method comprising the following steps: drilling a vertical shaft (3) on a ground (2) portion of a target coal seam (1), and using a high pressure hydraulic fracturing pump to reconstruct the target coal seam (1); arranging a ground gas extraction apparatus on the ground vertical shaft (3), and carrying out gas extraction process for the target coal seam (1); reasonably drilling holes and extraction holes (5) on a target coal seam (1) digging channel work plane (4), and arranging an underground gas extraction apparatus to carry out secondary gas extraction process for the target coal seam (1) until coal seam gas content and pressure to be under a safety exploitation standard; carrying out rapid channel digging for the pressure relief outburst elimination coal seam. The invention provides a novel method for rapidly digging channel in the low permeability high outburst coal seam.

Description

Lane method is dug in a kind of underground associating release extinction coal seam fast
Technical field
The present invention relates to hypotonic, high prominent coal-bed gas release extinction and field, lane is dug in coal seam fast, be particularly suitable for coal seam geostatic stress and respectively dig lane fast to the coal seam of the basic same sex.
Background technology
Coal bed gas (gas) is the mineral resources of coal, mainly composes with ADSORPTION STATE form and is stored in coal seam.Along with China's part pit mining degree of depth constantly increases, gas bearing capacity increases, and gas stores pressure increase, and due to reasons such as China's coalbed methane reservoir poor air permeability, the tax gas be stored in coal seam is dug the work such as lane and exploitation fast to coal seam and is brought huge potential safety hazard, increased risk.Therefore, first release extinction must be carried out to it in the pick lane in high methane content coal seam.
At present, China digs fast in the process of lane in coal seam and mainly contains two kinds for the method for gas release extinction.One method is, in the process of pick lane, down-hole, rational cloth hole is carried out to getting working face and drills, pressure break pipeline is installed in lateral aperture, shutoff is carried out between pressure break conduit entrance place and working face of coal seam, utilizing fracturing to treat mining coal seam and carry out pressure break, treating mining coal seam gas bearing capacity and pressure to reducing.But because in hydraulic fracturing process, hydraulic pressure reaches more than 30MPa, induction outstanding accident easily occurs between pressure break conduit entrance place and working face of coal seam, and the method does not reach extinction object, and danger coefficient is higher.Another kind method beats straight well to carry out fracturing from ground to coal seam rational position, takes aboveground extraction technology to treat mining coal seam release extinction.Because mining depth increases, the method is long to the coal bed gas extraction cycle, and there is blind area.
Summary of the invention
The object of the present invention is to provide a kind of underground associating release extinction coal seam to dig lane method fast, the method adopting ground straight well fracturing and down-hole brill horizontal drainage holes release extinction to combine, solves Problems existing in existing two kinds of technology.
For overcoming the above problems, the present invention is realized by following technique measures (step):
(1) by target coal seam characteristic distributions, determine coal seam digging laneway, according to fracturing influence area and coal seam stress direction, carry out well spacing design on ground;
(2) at well spacing position, ground drilling straight-hole to target coal seam, more than roof take cased hole completion, below roof, take composite material completion;
(3) utilize on ground high-pressure hydraulic fracturing pump to inject water under high pressure to ground straight well successively, fracturing is carried out to target coal seam, carries out coal bed texture and reproduce, increase coal seam flow conductivity;
(4) utilize ground gas drainage device, by ground straight well, gas pumping is carried out to target coal seam, until cannot till mining;
(5) on target coal seam digging laneway work plane, rational arrangement bores bores horizontal drainage holes, forms horizontal drainage holes influence area, and horizontal drainage holes influence area and fracturing influence area are linked up, and forms gas migration passage, increases gas permeability of coal seam;
(6) underground gas extraction device is set in the digging laneway of coal seam and by horizontal drainage holes, secondary gas pumping is carried out to target coal seam, until target coal seam gas bearing capacity and pressure arrive safe working below the mark till;
(7) after the process of twice pair of target coal seam gas pumping, reach coal seam pressure relief extinction object, conventional coal seam can be adopted to dig lane technology fast pick lane is carried out to target coal seam;
(8) according to the influence area scope of horizontal drainage holes, determine target coal seam driving distance, repeat (5) ~ (7), until whole heading headwork completes.
The quantity of described ground straight well and distribution situation, should determine jointly according to geological conditions, target coal seam characteristic distributions, coal seam stress direction and fracturing sphere of action, and fracturing scope must cover whole coal seam digging laneway; Described down-hole horizontal drainage holes quantity and distribution situation, should determine jointly according to underworkings working face of coal seam size, coal seam characteristic distributions and ground straight well fracturing sphere of action; Described down-hole horizontal drainage holes creeps into distance forward, should determine according to underground gas extraction device extraction capacity of water.
Beneficial effect of the present invention is as follows:
Lane method is dug in a kind of underground associating release extinction coal seam of the present invention fast, multiple ground straight well is utilized to carry out fracturing to target coal seam, regular pressure break band is formed in target coal seam, utilize ground gas extraction technology to carry out gas pumping in advance to target coal seam, reduce coal seam gas-bearing capacity and pressure; In underworkings, cloth hole drill lateral aperture is carried out to target coal seam work plane simultaneously, extraction technology in down-hole is utilized to carry out gas pumping again to target coal seam, finally reach coal seam gas-bearing capacity safety standard once, underground associating release outburst elimination method can make discharge channel increase greatly, coal seam pressure relief space increases, gas permeability of coal seam strengthens, create favorable conditions to the release of inside, coal seam, gas release and flowing, coal seam gas-bearing capacity is reached and can adopt standard, reduce potential safety hazard, realize coal seam and dig lane fast.
Accompanying drawing explanation
Fig. 1 is that lane overall structure schematic diagram is dug in underground associating release extinction coal seam of the present invention fast;
Fig. 2 is straight well fracturing influence area, ground of the present invention schematic diagram;
Fig. 3 is down-hole horizontal drainage holes distribution schematic diagram of the present invention;
Be labeled as in figure: 1: target coal seam; 2: ground; 3: ground straight well; 4: roof; 5: horizontal drainage holes; 6: digging laneway work plane; 7: seat earth; 8: fracturing influence area.
Detailed description of the invention
Below in conjunction with accompanying drawing, one embodiment of the present of invention are further described:
Lane method is dug in described a kind of underground associating release extinction coal seam fast, and as shown in Figure 1, Figure 2 and Figure 3, concrete implementation step is as follows:
Step 1: by target coal seam 1 characteristic distributions, determine coal seam digging laneway, according to fracturing influence area 8 and coal seam stress direction, carries out well spacing design on ground 2;
Step 2: at well spacing position, ground 2 drilling straight-hole 3 to seat earth 7, roof more than 4 takes cased hole completion, and roof less than 4 takes composite material completion;
Step 3: utilize high-pressure hydraulic fracturing pump to inject water under high pressure to ground straight well 3 successively on ground, carries out fracturing to target coal seam 1, coal bed texture is reproduced, and increases coal seam flow conductivity;
Step 4: utilize ground gas drainage device, carries out gas pumping by ground straight well 3 pairs of target coal seam 1, until cannot till mining;
Step 5: rational arrangement bores bores horizontal drainage holes 5 on target coal seam 1 digging laneway work plane 6, form horizontal drainage holes 5 influence area, horizontal drainage holes 5 influence area and fracturing influence area 8 are linked up, and form gas migration passage, increase gas permeability of coal seam;
Step 6: underground gas extraction device is set in the digging laneway of coal seam and carries out secondary gas pumping by horizontal drainage holes 5 pairs of target coal seam 1, until target coal seam 1 gas bearing capacity and pressure arrive safe working below the mark till;
Step 7: after the process of twice pair of target coal seam 1 gas pumping, reach coal seam pressure relief extinction object, can adopt conventional coal seam to dig lane technology fast and carry out pick lane to target coal seam 1;
Step 8: according to the influence area scope of horizontal drainage holes, determine tunnelling distance, repeats step 5 ~ 7, until whole heading headwork completes.

Claims (5)

1. a lane method is dug in underground associating release extinction coal seam fast, comprises following step, it is characterized in that:
Step 1: by target coal seam (1) characteristic distributions, determine coal seam digging laneway, according to fracturing influence area (8) and coal seam stress direction, carries out well spacing design in ground (2);
Step 2: in ground (2) well spacing position drilling straight-hole (3) to seat earth (7), roof takes cased hole completion more than (4), and roof takes composite material completion below (4);
Step 3: utilize on ground high-pressure hydraulic fracturing pump to inject water under high pressure to ground straight well (3) successively, fracturing is carried out to target coal seam (1), coal bed texture is reproduced, increase coal seam flow conductivity;
Step 4: utilize ground gas drainage device, carries out gas pumping by ground straight well (3) to target coal seam (1), until cannot till mining;
Step 5: bore horizontal drainage holes (5) at the upper rational arrangement bores of target coal seam (1) digging laneway work plane (6), form horizontal drainage holes (5) influence area, horizontal drainage holes (5) influence area and fracturing influence area (8) are linked up, and form gas migration passage, increase gas permeability of coal seam;
Step 6: underground gas extraction device is set in the digging laneway of coal seam and by horizontal drainage holes (5), secondary gas pumping is carried out to target coal seam (1), until target coal seam (1) gas bearing capacity and pressure arrive safe working below the mark till;
Step 7: after the gas pumping process of twice pair of target coal seam (1), reach coal seam pressure relief extinction object, can adopt conventional coal seam to dig lane technology fast and carry out pick lane to target coal seam (1);
Step 8: according to the influence area scope of horizontal drainage holes, determine tunnelling distance, repeats step 5 ~ 7, until whole heading headwork completes.
2. lane method is dug in a kind of underground associating release extinction coal seam as claimed in claim 1 fast, it is characterized in that: the quantity of ground straight well and distribution situation, jointly should determine according to geological conditions, target coal seam characteristic distributions, coal seam stress direction and fracturing sphere of action, fracturing scope must cover whole coal seam digging laneway.
3. lane method is dug in a kind of underground associating release extinction coal seam as claimed in claim 1 or 2 fast, it is characterized in that: down-hole horizontal drainage holes quantity and distribution situation, jointly should determine according to underworkings working face of coal seam size, coal seam characteristic distributions and ground straight well fracturing sphere of action.
4. lane method is dug in a kind of underground associating release extinction coal seam as described in claim 1,2 or 3 fast, it is characterized in that: down-hole horizontal drainage holes creeps into distance forward, is determined by underground gas extraction device extraction capacity of water.
5. lane method is dug in a kind of underground associating release extinction coal seam as described in claim 1,2,3 or 4 fast, it is characterized in that: lane distance is dug in coal seam fast, should creep into forward gas bearing capacity and pressure in Distance geometry coal seam determine according to horizontal drainage holes.
CN201410151121.6A 2014-04-16 2014-04-16 Overground/underground combined pressure relief outburst elimination coal seam rapid channel digging method Pending CN105019935A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410151121.6A CN105019935A (en) 2014-04-16 2014-04-16 Overground/underground combined pressure relief outburst elimination coal seam rapid channel digging method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410151121.6A CN105019935A (en) 2014-04-16 2014-04-16 Overground/underground combined pressure relief outburst elimination coal seam rapid channel digging method

Publications (1)

Publication Number Publication Date
CN105019935A true CN105019935A (en) 2015-11-04

Family

ID=54410178

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410151121.6A Pending CN105019935A (en) 2014-04-16 2014-04-16 Overground/underground combined pressure relief outburst elimination coal seam rapid channel digging method

Country Status (1)

Country Link
CN (1) CN105019935A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107905832A (en) * 2017-11-06 2018-04-13 北京九尊能源技术股份有限公司 The outburst elimination method of pump drainage is combined on a kind of nitrogen pressure break and ground with underground
CN111005723A (en) * 2018-12-12 2020-04-14 天地科技股份有限公司 Ground large-range rock stratum pre-splitting area anti-impact method based on up-down combined arrangement
CN111894595A (en) * 2020-08-11 2020-11-06 昆明理工大学 Pressure relief prevention and control method for surrounding rock burst of side wall of vertical shaft
CN114233369A (en) * 2021-12-28 2022-03-25 山西晋煤集团技术研究院有限责任公司 Method for accurately eliminating coal and gas outburst by combining up and down of well
US11299954B2 (en) * 2018-05-31 2022-04-12 China University Of Mining And Technology Fracturing relief method for stress concentration of remaining ore pillars in overlying goaf

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101498210A (en) * 2008-12-18 2009-08-05 中国石油集团长城钻探工程有限公司 Coal bed gas slim hole hydraulic jet directional fracturing production increasing method
CN101775975A (en) * 2010-01-28 2010-07-14 郑州大学 Method for exploiting coal bed gas by hydraulic drilling and pressure relieving
CN101936153A (en) * 2010-09-14 2011-01-05 中矿瑞杰(北京)科技有限公司 Method for exploiting coal bed gas by water power spray drilling for releasing pressure
CN102352769A (en) * 2011-10-21 2012-02-15 河南煤业化工集团研究院有限责任公司 Integrated mining method for commonly mining coal and gas of high mine
CN102392678A (en) * 2011-10-21 2012-03-28 河南煤业化工集团研究院有限责任公司 Gas drainage method combining surface and underground fracturing and permeability improvement
CN102425397A (en) * 2011-12-29 2012-04-25 郑州大学 Method for exploiting coal-bed methane by utilizing water force of horizontal pinnate well of double well-shaft to scour, drill and relieve pressure
CN102518411A (en) * 2011-12-29 2012-06-27 郑州大学 Method for mining coal bed gas by hydraulic washout of butted well in manner of pressure relief
CN102536302A (en) * 2012-01-17 2012-07-04 河南省煤层气开发利用有限公司 Method for relieving pressure and eliminating outburst of ground butting well
CN103104222A (en) * 2013-02-01 2013-05-15 中北大学 Method for pumping and collecting coal bed gas through combination of ground vertical well and long bedding drill hole

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101498210A (en) * 2008-12-18 2009-08-05 中国石油集团长城钻探工程有限公司 Coal bed gas slim hole hydraulic jet directional fracturing production increasing method
CN101775975A (en) * 2010-01-28 2010-07-14 郑州大学 Method for exploiting coal bed gas by hydraulic drilling and pressure relieving
CN101936153A (en) * 2010-09-14 2011-01-05 中矿瑞杰(北京)科技有限公司 Method for exploiting coal bed gas by water power spray drilling for releasing pressure
CN102352769A (en) * 2011-10-21 2012-02-15 河南煤业化工集团研究院有限责任公司 Integrated mining method for commonly mining coal and gas of high mine
CN102392678A (en) * 2011-10-21 2012-03-28 河南煤业化工集团研究院有限责任公司 Gas drainage method combining surface and underground fracturing and permeability improvement
CN102425397A (en) * 2011-12-29 2012-04-25 郑州大学 Method for exploiting coal-bed methane by utilizing water force of horizontal pinnate well of double well-shaft to scour, drill and relieve pressure
CN102518411A (en) * 2011-12-29 2012-06-27 郑州大学 Method for mining coal bed gas by hydraulic washout of butted well in manner of pressure relief
CN102536302A (en) * 2012-01-17 2012-07-04 河南省煤层气开发利用有限公司 Method for relieving pressure and eliminating outburst of ground butting well
CN103104222A (en) * 2013-02-01 2013-05-15 中北大学 Method for pumping and collecting coal bed gas through combination of ground vertical well and long bedding drill hole

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107905832A (en) * 2017-11-06 2018-04-13 北京九尊能源技术股份有限公司 The outburst elimination method of pump drainage is combined on a kind of nitrogen pressure break and ground with underground
US11299954B2 (en) * 2018-05-31 2022-04-12 China University Of Mining And Technology Fracturing relief method for stress concentration of remaining ore pillars in overlying goaf
CN111005723A (en) * 2018-12-12 2020-04-14 天地科技股份有限公司 Ground large-range rock stratum pre-splitting area anti-impact method based on up-down combined arrangement
CN111894595A (en) * 2020-08-11 2020-11-06 昆明理工大学 Pressure relief prevention and control method for surrounding rock burst of side wall of vertical shaft
CN111894595B (en) * 2020-08-11 2021-07-16 昆明理工大学 Pressure relief prevention and control method for surrounding rock burst of side wall of vertical shaft
CN114233369A (en) * 2021-12-28 2022-03-25 山西晋煤集团技术研究院有限责任公司 Method for accurately eliminating coal and gas outburst by combining up and down of well
CN114233369B (en) * 2021-12-28 2023-10-31 山西晋煤集团技术研究院有限责任公司 Method for precisely eliminating coal and gas outburst by up-and-down combination

Similar Documents

Publication Publication Date Title
CN101915083B (en) Method for extracting coalbed gases from coal mines by upper and lower combination
CN104405283B (en) The technique of L-type well mash gas extraction is bored on a kind of minery ground
CN102080526B (en) Method for extracting gas from bedding level fractured well of ground coal seam roof
CN104806217B (en) Combined separated layer fracturing, grouping and layer-combining mining method for coal bed well group
CN103867229B (en) A kind of coal mine large-mining is dark prevents and treats comprehensive treatment method for water with lower group of coal mining
CN102678092B (en) A kind ofly abovegroundly combine construction coal and the coal bed gas method of adopting altogether down
CN102383828A (en) Refection reducing and outburst eliminating method for deep-hole hydraulic fracture driving gas shallow hole extraction
CN106321025B (en) A kind of coal and the green harmonic extraction system of oil gas and application process
CN112593936B (en) Advanced comprehensive control method for multi-disaster area of deep mine
CN102392678A (en) Gas drainage method combining surface and underground fracturing and permeability improvement
CN104131831A (en) Coal-bed gas well vertical three-dimensional united extraction method
CN105089493B (en) Ground vertical well combines pressure released seam gas pumping method with underground layer-through drilling
CN108894813B (en) Gas outburst elimination method combining underground drilling, ground fracturing and underground extraction
CN105019935A (en) Overground/underground combined pressure relief outburst elimination coal seam rapid channel digging method
CN105822341A (en) Low permeability coal bed supercritical carbon dioxide anti-reflection system and method
CN105804786B (en) A kind of weak seam bottom plate layer-through drilling pressure rushes anti-reflection method
CN104989339A (en) Old goaf coalbed methane extracting and mining system and method
CN104895531A (en) Single thick coal seam ground mining well extraction process
CN104806285A (en) Coal mine goaf gas control method based on ground horizontal well
CN104594866A (en) New method for rapid gas drainage technology based on low permeability coal bed gas phase fracturing
CN104632223A (en) Mining environment-reconstructing mobile pumping filling artificial pillar shrinkage mining method
CN104847401A (en) Regional coal and gas outburst coal seam coal face outburst preventing and controlling method
CN102226412B (en) Underground dark mining drilling well gas extraction method
CN106014345B (en) A kind of lower part caving method exploits the pumping method for the compound old dead zone coal bed gas to be formed
CN204327172U (en) Formula boring goaf extraction structure before and after high-rise position

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20151104

WD01 Invention patent application deemed withdrawn after publication