CN106315146A - Integral transition method for boiler roof crane and auxiliary operating device - Google Patents

Integral transition method for boiler roof crane and auxiliary operating device Download PDF

Info

Publication number
CN106315146A
CN106315146A CN201610696522.9A CN201610696522A CN106315146A CN 106315146 A CN106315146 A CN 106315146A CN 201610696522 A CN201610696522 A CN 201610696522A CN 106315146 A CN106315146 A CN 106315146A
Authority
CN
China
Prior art keywords
crane
furnace roof
transporting unit
body transporting
heavy body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610696522.9A
Other languages
Chinese (zh)
Other versions
CN106315146B (en
Inventor
杨建平
吕强
蔡明明
李勤华
周斌
丁佳泉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan Thermal Power Construction Co Ltd Of China Energy Engineering Group Corp Ltd
Original Assignee
Hunan Thermal Power Construction Co Ltd Of China Energy Engineering Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan Thermal Power Construction Co Ltd Of China Energy Engineering Group Corp Ltd filed Critical Hunan Thermal Power Construction Co Ltd Of China Energy Engineering Group Corp Ltd
Priority to CN201610696522.9A priority Critical patent/CN106315146B/en
Publication of CN106315146A publication Critical patent/CN106315146A/en
Application granted granted Critical
Publication of CN106315146B publication Critical patent/CN106315146B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G35/00Mechanical conveyors not otherwise provided for

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Carriers, Traveling Bodies, And Overhead Traveling Cranes (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses an integral transition method for a boiler roof crane. In order to meet integral transition requirements of a boiler roof crane and a crane, an auxiliary mobile operating device is arranged below the roof crane according to the position of the roof crane; the auxiliary mobile operating device is combined with a fixed roof crane bottom frame, and a drawing mechanism is adopted for drawing a heavy object shifting and transporting machine to horizontally move, so that integral transition of the roof crane is realized. The auxiliary mobile operating device is arranged below the roof crane, i.e., the heavy object shifting and transporting machine is mounted on the roof crane bottom frame, the roof crane bottom frame is arranged on the heavy object shifting and transporting machine, the roof crane bottom frame is connected with the heavy object shifting and transporting machine through a fastening part, the drawing mechanism is arranged on a roof, and the heavy object shifting and transporting machine is driven to move on the roof through the drawing mechanism, so that translation, on the roof, of the roof crane is realized.

Description

A kind of boiler top crane integral translating method and less important work device
Technical field
The present invention relates to a kind of equipment and move operational method and apparatus, be specifically related to a kind of boiler top crane Walking in a horizontal state shift method and less important work device, be mainly used in power plant boiler equipment hoisting and transformation, belongs to boiler plant peace Packing technique field.
Background technology
Along with the fast development of China's power industry, high parameter, large sized unit have become as power industry trend and Trend.At present, through introducing and digesting and assimilating, China has grasped large sized unit technology, and starts to produce supercritical in batches 600MW, the unit of ultra supercritical 1 000MW.Nearly ten years, the ratio shared by more than 600MW unit reached 40% with On.By the end of the end of last year, have been put into 1 000MW unit of commercial operation more than more than 60 platforms, make China become hundred The country that ten thousand kilowatts of unit owning amounts are most, maintains the leading position in the whole world.Due to large sized unit institute exclusive economy and High efficiency, now has become as the main flow of Chinese large-sized coal unit.But, along with unit capacity increases, the thing followed is not only The weight being only equipment is increasing, and the quantity of equipment increases the most significantly, seems especially prominent for boiler plant, Also the boiler structural design machinery reasonable disposition of electric power construction unit is had higher requirement simultaneously.At present 600MW~ 1000MW boiler plant lifts, and routine typically uses on the left of boiler or tower of right side layout one 80t~120t tonne Heavy-duty machine is as main force's loop wheel machine, but depends a loop wheel machine alone and cannot cover whole boiler, completes the lifting task of all devices, still needs Arranging that a 25t~50t tonne of derrick crane coordinates, the space arranged due to this crane limits, and can only be arranged in Furnace roof, therefore referred to as furnace roof loop wheel machine.Because of the erect-position of furnace roof loop wheel machine, the installation of lower portion equipment usually can be affected, therefore this stove Jack-up heavy-duty machine should possess walking in a horizontal state translation functions.Although what existing furnace roof crane had also carries a set of walking mechanism, but Moving structure is complicated, and relatively costly, so needing to be improved this.
It is not found to have the patent literature constructed with the present invention by patent retrieval, has certain relation with the present invention Patent mainly have following:
1, Patent No. CN201420058741.0, entitled " a kind of horizontal type waste heat boiler interim boom hoisting of module furnace roof " Utility model patent, which disclose a kind of horizontal type waste heat boiler interim boom hoisting of module furnace roof, including upending frame, The shroud ring being connected equipped with beam hot with furnace roof on upending frame, shroud ring is also connected with left column and right column, at left column and right column Top equipped with cantilever beam, between two columns, be also equipped with the connection beam played a supporting role, in the bottom of cantilever beam equipped with hanging Ear.
2, Patent No. CN201110235603.6, the entitled " company for blast furnace roof Crane Beam System integral hoisting Fitting and using method thereof " patent of invention, which disclose a kind of for blast furnace roof Crane Beam System integral hoisting Connector and using method thereof.A kind of connector for blast furnace roof Crane Beam System integral hoisting, connects including lower power transmission Plate, is characterized in that: also include that the pin sleeves such as middle power transmission connecting plate, upper power transmission connecting plate, bearing pin, lower nut and lower gasket are at three pieces In the through hole of connecting plate.The using method of a kind of connector for blast furnace roof Crane Beam System integral hoisting, including ground Assembling, vertical lifting, angle adjustment and in place fix this four steps carried out successively.
3, Patent No. CN201020147618.8, entitled " is arranged in blast furnace roof for lifting furnace shell and cooling wall Suspender " utility model patent, which disclose a kind of blast furnace roof that is arranged in for lifting hanging of furnace shell and cooling wall Having, it includes cross beam, connects secondary beam, monorail loop, electric block, and cross beam is connected to the platform girder of blast furnace roof On, cross beam connects connection secondary beam, and connecting in the lower section of cross beam and connection secondary beam has monorail loop, and monorail loop is I-shaped Girder steel and its diameter are less than furnace throat band furnace shell diameter, and electric block coordinates that be arranged on monorail loop can annularly single track track Mobile.
Although so these patents above-mentioned are directed to boiler top hanging device, and proposing some concrete furnace roofs and hang The improvement of dress method or apparatus, but unresolved furnace roof to hang moving structure complicated, and relatively costly problem, thus still need into One step is improved.
Summary of the invention
Present invention aims to existing furnace roof, to hang moving structure complicated, and relatively costly problem, propose one Moving method that kind of furnace roof hangs and the mobile apparatus for work of auxiliary, moving method and less important work device that this kind of furnace roof hangs can be more Conveniently realizing the movement that furnace roof hangs, and simple in construction, operating cost is low.
In order to reach this purpose, the invention provides a kind of boiler top crane integral translating method, for satisfied pot Stove furnace roof arranges crane and the integral translation requirement of crane, according to the position of furnace roof crane, under furnace roof crane Arranging a mobile apparatus for work of auxiliary, combined with stationary furnace jack-up heavy-duty machine underframe by mobile for auxiliary apparatus for work, employing is led Draw mechanism's traction heavy body transporting unit to move horizontally, it is achieved furnace roof crane complete machine translates.
Further, the described mobile apparatus for work of auxiliary that arranges under furnace roof crane is at furnace roof crane base Heavy body transporting unit is installed on plinth underframe, then furnace roof crane underframe is placed on heavy body transporting unit, and with securing member by furnace roof Crane underframe couples together with heavy body transporting unit, arranges haulage gear at furnace roof simultaneously, and drives weight by haulage gear Body transporting unit moves at furnace roof, thus realizes the translation on furnace roof of the furnace roof crane.
Further, described heavy body transporting unit includes a heavy body transporting unit frame, and heavy body transporting unit frame is arranged above with stove Flat board installed by jack-up heavy-duty machine underframe, and furnace roof crane underframe is arranged on furnace roof crane underframe by securing member and installs on flat board, Walking mechanism being arranged below at heavy body transporting unit frame, walking mechanism is placed at the heavy body transporting unit walking track of furnace roof On, walking mechanism drive the overall walking on heavy body transporting unit walking track of heavy body transporting unit, it is achieved furnace roof crane is at stove Translation on top.
Further, described walking mechanism is crawler type walking mechanism, and the crawler belt of walking mechanism is laid on heavy thing moving On device walking track, the Caterpillar walking wheel of walking mechanism is arranged on the side of heavy body transporting unit frame.
Further, described heavy body transporting unit walking track is to walk using boiler top large girder as furnace roof crane Carrier bar, selects channel-section steel tiled arrangements as the walking track of heavy body transporting unit at boiler top large girder top.
Further, it is to be positioned at weight at boiler top that described employing haulage gear traction heavy body transporting unit moves horizontally The end of the walking track of body transporting unit arranges haulage gear, and haulage gear is fixed on track end, and haulage gear passes through steel strand wires Or chain couples with heavy body transporting unit;It is overall that furnace roof crane drives steel strand wires or chain to realize furnace roof crane by driving machine Translation.
Further, described haulage gear be boiler top be positioned at heavy body transporting unit walking track end arrange Two set levels draw oil cylinder, and these 2 oil cylinders are carried out centralized Control by a hydraulic power unit;One end of oil cylinder is fixed on track end End, cylinder piston rod is coupled with heavy body transporting unit assembly by steel strand wires;Furnace roof crane passes through 2 cross cylinder simultaneous retractables Piston rod action realizes furnace roof crane integral translation.
Further, described haulage gear be boiler top be positioned at heavy body transporting unit walking track end arrange Hoist engine traction apparatus, hoist engine traction apparatus is coupled with heavy body transporting unit assembly by steel strand wires;Furnace roof crane is by volume Raise the traction of machine travel device and realize furnace roof crane integral translation.
Further, described being combined with stationary furnace jack-up heavy-duty machine underframe by mobile for auxiliary apparatus for work is existing by weight Body transporting unit is arranged on the walking track being laid in boiler top large girder top, then furnace roof crane is hung heavy body transporting unit On so that furnace roof crane underframe is placed on the furnace roof crane underframe of heavy body transporting unit and installs on flat board, then uses securing member Furnace roof crane is tightened together with heavy body transporting unit.
Further, described furnace roof crane translation step is including at least following steps:
1) translation track makes: lays channel-section steel on boiler top large girder, and uses intermittent weld to weld channel-section steel and Boiler Furnace Top large girder is fixed together, using channel-section steel as the track of walking carriage;
2) heavy body transporting unit is installed: according to crane pedestal profile, produce heavy body transporting unit, it is ensured that the stove on heavy body transporting unit Jack-up heavy-duty machine mounting platform matches with furnace roof crane underframe, and the walking mechanism of heavy body transporting unit is installed to walking carriage In track;
3) drive arrangement: after furnace roof crane deploys, hauls pumping plant oil cylinder and arranges to track end portion, debugging Haul system, makes both sides oil cylinder shrink and synchronizes, adjust oil cylinder contraction speed so that it is be about about 1m/min;Or directly utilize Hoist engine traction apparatus is drawn, and hoist engine traction apparatus is arranged on track end portion;
4) cleaning track, layout steel strand wires or chain: cleaning track channel-section steel, and the joint of channel-section steel junction is polished smooth, nothing Steel strand wires are placed in channel-section steel by burr, note the rotation direction collocation of steel strand wires.By steel strand wires one end of about two rotation directions with drag The piston of fortune oil cylinder pins with claw, and the other end is connected with the connection iron plate on heavy body transporting unit;
5) complete machine translation: connect power supply, stretches out oil cylinder, locks claw, slight retract cylinder, steel strand wires band power;Inspection claw is No whole locking.After confirmation, two side cylinders slowly shrink, and note the steel strand wires that rolling is exited simultaneously;After completing a stroke, weight This process multiple, until crane integral translation is to precalculated position;Or directly utilize hoist engine traction crane integral translation in advance Location is put;
6) remove translation device: taking off claw, steel strand wires and union joint, oil cylinder shrinks completely, disconnect oil pipe, by joint rag Bandaging, dish goes on pumping plant.Dish turns steel strand wires, ties with iron wire.Oil cylinder, pumping plant etc. are winched to ground.
It is an advantage of the current invention that:
The present invention, for meeting mechanical arrangement and boiler plant lifting requirements, takes boiler top crane foundation underframe is carried out skill Art is transformed, and installs heavy body transporting unit additional and replaces furnace roof crane complete walking haulage gear, thus realizes boiler top crane Integral translation.This technology scientific and technical innovation is produced effects substantially, and scheme is implemented safe and reliable, the most significantly improves the utilization of loop wheel machine Efficiency, accelerates site operation progress, has saved fee of material and the crane walking carriage of crane walking track installation simultaneously The lease expenses of device, mainly has following advantages:
1) utilize heavy body transporting unit conventional in construction, after transformation, combine with stationary furnace jack-up heavy-duty machine underframe, replace Heavy-duty machine complete walking haulage gear.
2) utilize boiler top large girder as furnace roof crane walking carrier bar, use the groove of #30 at large girder top Steel tiled arrangements, as the walking guide rail of heavy body transporting unit, substitutes the rail of QU100 needed for former furnace roof crane.
3) after the installation of furnace roof crane, using hydraulic levels to draw oil cylinder, traction heavy body transporting unit moves horizontally, real Existing furnace roof crane complete machine translation.
Accompanying drawing explanation
Fig. 1 is the principle schematic of the present invention;
Fig. 2 is the heavy body transporting unit structural representation of one embodiment of the invention;
Fig. 3 is the translation track scheme of installation of one embodiment of the invention.
Detailed description of the invention
The present invention is expanded on further below in conjunction with the accompanying drawings with specific embodiment.
Embodiment one
By accompanying drawing it can be seen that the present invention relates to a kind of boiler top crane integral translating method, for meeting boiler top Arrange crane and the integral translation requirement of crane, according to the position of furnace roof crane, under furnace roof crane, arrange one The mobile apparatus for work of individual auxiliary, combines mobile for auxiliary apparatus for work with stationary furnace jack-up heavy-duty machine underframe, uses haulage gear Traction heavy body transporting unit moves horizontally, it is achieved furnace roof crane complete machine translates.
The described mobile apparatus for work of auxiliary that arranges under furnace roof crane is on furnace roof crane foundation underframe Heavy body transporting unit 2 is installed, then furnace roof crane underframe 3 is placed on heavy body transporting unit 2, and with securing member by furnace roof crane Underframe 3 couples together with heavy body transporting unit 2, arranges haulage gear 4 at furnace roof simultaneously, and drives weight to move by haulage gear 4 Fortune device 2 moves along track 1 at furnace roof, thus realizes the translation on furnace roof 1 of the furnace roof crane.
Described heavy body transporting unit 2 includes a heavy body transporting unit frame 6, and heavy body transporting unit frame 6 is arranged above with furnace roof lifting Flat board 7 installed by machine underframe, and furnace roof crane underframe 3 is arranged on furnace roof crane underframe by securing member 8 and installs on flat board 7, Heavy body transporting unit frame 6 is arranged below walking mechanism 9, and walking mechanism 9 is placed at the heavy body transporting unit walking track 1 of furnace roof On, walking mechanism 9 drive heavy body transporting unit 2 entirety to walk on heavy body transporting unit walking track, it is achieved furnace roof crane exists Translation on furnace roof.
Described walking mechanism 9 is crawler type walking mechanism, and the crawler belt of walking mechanism 9 is laid on heavy body transporting unit walking rail On road, the Caterpillar walking wheel of walking mechanism is arranged on the side of heavy body transporting unit frame.
Described heavy body transporting unit walking track 1 is using boiler top large girder 10 as the walking carrying of furnace roof crane Beam, selects channel-section steel tiled arrangements as the walking track of heavy body transporting unit at boiler top large girder 10 top.In order to ensure rail The setting height(from bottom) in road 1 is walked at boiler top large girder 10 top and heavy body transporting unit and is provided with bracing frame between track 1, is simultaneously Improve the intensity of boiler top large girder 10, oblique between the side of boiler top large girder 10 and structure coupling beam 12 be provided with Reinforcement 13.
Described employing haulage gear traction heavy body transporting unit moves horizontally and is positioned at heavy body transporting unit 2 at boiler top The end of walking track 1 arranges haulage gear 4, and haulage gear 4 is fixed on track 1 end, and haulage gear 4 is by steel strand wires or chain Bar couples with heavy body transporting unit 2;It is overall that furnace roof crane drives steel strand wires or chain to realize furnace roof crane by haulage gear 4 Translation.
Described haulage gear 4 be boiler top be positioned at heavy body transporting unit walking track end arrange two set levels Dilatory oil cylinder, these 2 oil cylinders are carried out centralized Control by a hydraulic power unit;One end of oil cylinder is fixed on track end, and oil cylinder is lived Stopper rod is coupled with heavy body transporting unit assembly by steel strand wires;Furnace roof crane is moved by 2 cross cylinder simultaneous retractable piston rods Realize furnace roof crane integral translation.
Described being combined with stationary furnace jack-up heavy-duty machine underframe by mobile for auxiliary apparatus for work is now to be pacified by heavy body transporting unit 2 It is contained on the walking track 1 being laid in boiler top large girder top, then furnace roof crane is hung on heavy body transporting unit 2, make Obtain furnace roof crane underframe 3 to be placed on the furnace roof crane underframe installation flat board 7 of heavy body transporting unit 2, then will with securing member Furnace roof crane tightens together with heavy body transporting unit.
Described furnace roof crane translation step is including at least following steps:
1) translation track makes: lays channel-section steel on boiler top large girder, and uses intermittent weld to weld channel-section steel and Boiler Furnace Top large girder is fixed together, using channel-section steel as the track of walking carriage;
2) heavy body transporting unit is installed: according to crane pedestal profile, produce heavy body transporting unit, it is ensured that the stove on heavy body transporting unit Jack-up heavy-duty machine mounting platform matches with furnace roof crane underframe, and the walking mechanism of heavy body transporting unit is installed to walking carriage In track;
3) pumping plant, dilatory oil cylinder are arranged: after furnace roof crane deploys, and pumping plant is hauled oil cylinder and arranges to beam end, adjust Examination haul system, makes both sides oil cylinder shrink and synchronizes, adjust oil cylinder contraction speed so that it is be about about 1m/min;
4) cleaning track, layout steel strand wires: cleaning track channel-section steel, and the joint of channel-section steel junction is polished smooth, impulse-free robustness, will Steel strand wires are placed in channel-section steel, note the rotation direction collocation of steel strand wires.By steel strand wires one end of about two rotation directions and haul oil cylinder Piston with claw pin, the other end is connected with the connection iron plate on heavy body transporting unit;
5) complete machine translation: connect power supply, stretches out oil cylinder, locks claw, slight retract cylinder, steel strand wires band power;Inspection claw is No whole locking.After confirmation, two side cylinders slowly shrink, and note the steel strand wires that rolling is exited simultaneously;After completing a stroke, weight This process multiple, until crane integral translation is to precalculated position;
6) remove translation device: taking off claw, steel strand wires and union joint, oil cylinder shrinks completely, disconnect oil pipe, by joint rag Bandaging, dish goes on pumping plant.Dish turns steel strand wires, ties with iron wire.Oil cylinder, pumping plant etc. are winched to ground.
Embodiment two
Embodiment two is as the ultimate principle of embodiment one, and simply structure is different, whole for a kind of boiler top crane Body shift method, arranges crane and the integral translation requirement of crane, according to furnace roof crane for meeting boiler top Position, arranges a mobile apparatus for work of auxiliary under furnace roof crane, by mobile for auxiliary apparatus for work and stationary furnace jack-up weight Machine underframe combines, and uses haulage gear traction heavy body transporting unit to move horizontally, it is achieved furnace roof crane complete machine translates.
The described mobile apparatus for work of auxiliary that arranges under furnace roof crane is on furnace roof crane foundation underframe Heavy body transporting unit is installed, then furnace roof crane underframe is placed on heavy body transporting unit, and with securing member by the bottom of furnace roof crane Frame couples together with heavy body transporting unit, arranges haulage gear at furnace roof simultaneously, and drives heavy body transporting unit to exist by haulage gear Furnace roof moves, thus realizes the translation on furnace roof of the furnace roof crane.
Described heavy body transporting unit includes a heavy body transporting unit frame, and heavy body transporting unit frame is arranged above with at the bottom of furnace roof crane Flat board installed by frame, and furnace roof crane underframe is arranged on furnace roof crane underframe by securing member and installs on flat board, at heavy thing moving Device frame is arranged below walking mechanism, and walking mechanism is placed on the heavy body transporting unit walking track of furnace roof, by vehicle with walking machine Structure drives the overall walking on heavy body transporting unit walking track of heavy body transporting unit, it is achieved the translation on furnace roof of the furnace roof crane.
Described walking mechanism is wheel type traveling mechanism, and the road wheel of walking mechanism is placed in heavy body transporting unit walking track On, the live axle of walking mechanism is arranged on the side of heavy body transporting unit frame.
Described heavy body transporting unit walking track is to walk carrier bar using boiler top large girder as furnace roof crane, Boiler top large girder top selects channel-section steel tiled arrangements as the walking track of heavy body transporting unit.
Described employing haulage gear traction heavy body transporting unit moves horizontally and is positioned at heavy body transporting unit at boiler top The end of walking track arranges haulage gear, and haulage gear is fixed on track end, haulage gear by steel strand wires or chain with Heavy body transporting unit couples;Furnace roof crane drives steel strand wires or chain to realize furnace roof crane integral translation by driving machine.
Described haulage gear be boiler top be positioned at heavy body transporting unit walking track end arrange hoist engine lead Leading-in device, hoist engine traction apparatus is coupled with heavy body transporting unit assembly by steel strand wires;Furnace roof crane is drawn by hoist engine Device traction realizes furnace roof crane integral translation.
Described being combined with stationary furnace jack-up heavy-duty machine underframe by mobile for auxiliary apparatus for work is existing by heavy body transporting unit peace It is contained on the walking track being laid in boiler top large girder top, then furnace roof crane is hung on heavy body transporting unit so that Furnace roof crane underframe is placed on the furnace roof crane underframe of heavy body transporting unit and installs on flat board, is then risen by furnace roof with securing member Heavy-duty machine tightens together with heavy body transporting unit.
Further, described furnace roof crane translation step is including at least following steps:
1) translation track makes: lays channel-section steel on boiler top large girder, and uses intermittent weld to weld channel-section steel and Boiler Furnace Top large girder is fixed together, using channel-section steel as the track of walking carriage;
2) heavy body transporting unit is installed: according to crane pedestal profile, produce heavy body transporting unit, it is ensured that the stove on heavy body transporting unit Jack-up heavy-duty machine mounting platform matches with furnace roof crane underframe, and the walking mechanism of heavy body transporting unit is installed to walking carriage In track;
3) drive arrangement: directly utilize hoist engine traction apparatus traction, hoist engine traction apparatus is arranged on track end Portion;
4) cleaning track, layout steel strand wires: cleaning track channel-section steel, and the joint of channel-section steel junction is polished smooth, impulse-free robustness, will Steel strand wires are placed in channel-section steel, note the rotation direction collocation of steel strand wires.By steel strand wires one end of about two rotation directions and haul oil cylinder Piston with claw pin, the other end is connected with the connection iron plate on heavy body transporting unit;
5) complete machine translation: connect power supply, directly utilizes hoist engine traction crane integral translation to precalculated position;
6) remove translation device: taking off claw, steel strand wires and union joint, oil cylinder shrinks completely, disconnect oil pipe, by joint rag Bandaging, dish goes on pumping plant.Dish turns steel strand wires, ties with iron wire.Oil cylinder, pumping plant etc. are winched to ground.
Embodiment three
Embodiment three is as the ultimate principle of embodiment one, and simply structure is different, whole for a kind of boiler top crane Body shift method, arranges crane and the integral translation requirement of crane, according to furnace roof crane for meeting boiler top Position, arranges a mobile apparatus for work of auxiliary under furnace roof crane, by mobile for auxiliary apparatus for work and stationary furnace jack-up weight Machine underframe combines, and uses haulage gear traction heavy body transporting unit to move horizontally, it is achieved furnace roof crane complete machine translates.Simply institute The haulage gear stated is chain-type haulage gear, installs in track end and drives motor, drives motor by a chain wheel drive Link chain mechanism be connected with heavy body transporting unit, and by drive chain-driving heavy body transporting unit move horizontally.
Above-mentioned listed embodiment, simply combines accompanying drawing and technical scheme is carried out clear, complete description;Aobvious So, described embodiment is only a part of embodiment of the present invention rather than whole embodiments.Based in the present invention Embodiment, all other embodiments that those of ordinary skill in the art are obtained under not making creative work premise, all Belong to the scope of protection of the invention.
It is an advantage of the current invention that:
The present invention, for meeting mechanical arrangement and boiler plant lifting requirements, takes boiler top crane foundation underframe is carried out skill Art is transformed, and installs heavy body transporting unit additional and replaces furnace roof crane complete walking haulage gear, thus realizes boiler top crane Integral translation.This technology scientific and technical innovation is produced effects substantially, and scheme is implemented safe and reliable, the most significantly improves the utilization of loop wheel machine Efficiency, accelerates site operation progress, has saved fee of material and the crane walking carriage of crane walking track installation simultaneously The lease expenses of device, mainly has following advantages:
1) utilize heavy body transporting unit conventional in construction, after transformation, combine with stationary furnace jack-up heavy-duty machine underframe, replace Heavy-duty machine complete walking haulage gear.
2) utilize boiler top large girder as furnace roof crane walking carrier bar, use the groove of #30 at large girder top Steel tiled arrangements, as the walking guide rail of heavy body transporting unit, substitutes the rail of QU100 needed for former furnace roof crane.
3) after the installation of furnace roof crane, using hydraulic levels to draw oil cylinder, traction heavy body transporting unit moves horizontally, real Existing furnace roof crane complete machine translation.

Claims (10)

1. a boiler top crane integral translating method, it is characterised in that: for meet boiler top arrange crane and The integral translation requirement of crane, according to the position of furnace roof crane, arranges a mobile operation of auxiliary under furnace roof crane Device, combines mobile for auxiliary apparatus for work with stationary furnace jack-up heavy-duty machine underframe, uses haulage gear traction heavy body transporting unit Move horizontally, it is achieved furnace roof crane complete machine translates.
2. boiler top crane integral translating method as claimed in claim 1, it is characterised in that: described in furnace roof lifting Arranging a mobile apparatus for work of auxiliary under machine is installation heavy body transporting unit on furnace roof crane foundation underframe, then is risen by furnace roof Heavy-duty machine underframe is placed on heavy body transporting unit, and is coupled together with heavy body transporting unit by furnace roof crane underframe with securing member, with Time at furnace roof, haulage gear is set, and drive heavy body transporting unit to move at furnace roof by haulage gear, thus realize furnace roof lifting Machine translation on furnace roof.
3. boiler top crane integral translating method as claimed in claim 2, it is characterised in that: described heavy body transporting unit Including a heavy body transporting unit frame, heavy body transporting unit frame is arranged above with furnace roof crane underframe and installs flat board, at the bottom of furnace roof crane Frame is arranged on furnace roof crane underframe by securing member and installs on flat board, walking mechanism is arranged below at heavy body transporting unit frame, OK Walk mechanism to be placed on the heavy body transporting unit walking track of furnace roof, walking mechanism drive heavy body transporting unit overall at weight Walk on thing body transporting unit walking track, it is achieved the translation on furnace roof of the furnace roof crane.
4. boiler top crane integral translating method as claimed in claim 3, it is characterised in that: described walking mechanism is Crawler type walking mechanism, the crawler belt of walking mechanism is laid on heavy body transporting unit walking track, the Caterpillar walking wheel of walking mechanism It is arranged on the side of heavy body transporting unit frame.
5. boiler top crane integral translating method as claimed in claim 4, it is characterised in that: described heavy body transporting unit Walking track is using boiler top large girder as furnace roof crane walking carrier bar, selects groove at boiler top large girder top Steel tiled arrangements is as the walking track of heavy body transporting unit.
6. boiler top crane integral translating method as claimed in claim 1, it is characterised in that: described employing traction machine Structure traction heavy body transporting unit move horizontally be boiler top be positioned at heavy body transporting unit walking track end arrange traction machine Structure, haulage gear is fixed on track end, and haulage gear is coupled with heavy body transporting unit by steel strand wires or chain;Furnace roof crane Steel strand wires or chain is driven to realize furnace roof crane integral translation by driving machine.
7. boiler top crane integral translating method as claimed in claim 6, it is characterised in that: described haulage gear is Boiler top be positioned at heavy body transporting unit walking track end arrange that two set levels draw oil cylinder, these 2 oil cylinders are by one Hydraulic power unit carries out centralized Control;One end of oil cylinder is fixed on track end, and cylinder piston rod passes through steel strand wires and heavy thing moving Device assembly couples;Furnace roof crane realizes furnace roof crane integral translation by 2 cross cylinder simultaneous retractable piston rod actions.
8. boiler top crane integral translating method as claimed in claim 6, it is characterised in that: described haulage gear is Be positioned at the end layout hoist engine traction apparatus of the walking track of heavy body transporting unit at boiler top, hoist engine traction apparatus is passed through Steel strand wires couple with heavy body transporting unit assembly;It is overall that furnace roof crane realizes furnace roof crane by hoist engine traction apparatus traction Translation.
9. boiler top crane integral translating method as claimed in claim 1, it is characterised in that: described is mobile by auxiliary It is that existing being arranged on by heavy body transporting unit is laid in boiler top large girder that apparatus for work and stationary furnace jack-up heavy-duty machine underframe combine On the walking track at top, then furnace roof crane is hung on heavy body transporting unit so that furnace roof crane underframe is placed on weight The furnace roof crane underframe of body transporting unit is installed on flat board, then with securing member, furnace roof crane and heavy body transporting unit is fastened on one Rise.
10. boiler top crane integral translating method as claimed in claim 1, it is characterised in that: described furnace roof lifting Machine translation step is including at least following steps:
1) translation track makes: lays channel-section steel on boiler top large girder, and uses intermittent weld to weld channel-section steel and Boiler Furnace Top large girder is fixed together, using channel-section steel as the track of walking carriage;
2) heavy body transporting unit is installed: according to crane pedestal profile, produce heavy body transporting unit, it is ensured that the stove on heavy body transporting unit Jack-up heavy-duty machine mounting platform matches with furnace roof crane underframe, and the walking mechanism of heavy body transporting unit is installed to walking carriage In track;
3) drive arrangement: after furnace roof crane deploys, hauls pumping plant oil cylinder and arranges to track end portion, debugging Haul system, makes both sides oil cylinder shrink and synchronizes, adjust oil cylinder contraction speed so that it is be about about 1m/min;Or directly utilize Hoist engine traction apparatus is drawn, and hoist engine traction apparatus is arranged on track end portion;
4) cleaning track, layout steel strand wires or chain: cleaning track channel-section steel, and the joint of channel-section steel junction is polished smooth, nothing Steel strand wires are placed in channel-section steel by burr, note the rotation direction collocation of steel strand wires;By steel strand wires one end of about two rotation directions with drag The piston of fortune oil cylinder pins with claw, and the other end is connected with the connection iron plate on heavy body transporting unit;
5) complete machine translation: connect power supply, stretches out oil cylinder, locks claw, slight retract cylinder, steel strand wires band power;Inspection claw is No whole locking;After confirmation, two side cylinders slowly shrink, and note the steel strand wires that rolling is exited simultaneously;After completing a stroke, weight This process multiple, until crane integral translation is to precalculated position;Or directly utilize hoist engine traction crane integral translation in advance Location is put;
6) remove translation device: taking off claw, steel strand wires and union joint, oil cylinder shrinks completely, disconnect oil pipe, by joint rag Bandaging, dish goes on pumping plant;Dish turns steel strand wires, ties with iron wire;Oil cylinder, pumping plant etc. are winched to ground.
CN201610696522.9A 2016-08-22 2016-08-22 A kind of boiler top crane integral translating method and less important work device Active CN106315146B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610696522.9A CN106315146B (en) 2016-08-22 2016-08-22 A kind of boiler top crane integral translating method and less important work device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610696522.9A CN106315146B (en) 2016-08-22 2016-08-22 A kind of boiler top crane integral translating method and less important work device

Publications (2)

Publication Number Publication Date
CN106315146A true CN106315146A (en) 2017-01-11
CN106315146B CN106315146B (en) 2019-01-22

Family

ID=57741080

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610696522.9A Active CN106315146B (en) 2016-08-22 2016-08-22 A kind of boiler top crane integral translating method and less important work device

Country Status (1)

Country Link
CN (1) CN106315146B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107227853A (en) * 2017-06-18 2017-10-03 中国能源建设集团山西电力建设有限公司 Stoplog lifts mechanism in place and installation method on heat power plant boiler steel construction
CN108557514A (en) * 2018-05-10 2018-09-21 佛山市建新源机械实业有限公司 A kind of walking ship unloaders

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB652461A (en) * 1947-09-27 1951-04-25 Westinghouse Electric Int Co Improvements in or relating to door assemblies
JPH03561A (en) * 1989-05-29 1991-01-07 Daifuku Co Ltd Conveyor device using self-travelling body
CN101634375A (en) * 2009-08-20 2010-01-27 曹蓝天 Construction device and method for underground pipeline installation
CN201665684U (en) * 2010-03-30 2010-12-08 中国第一冶金建设有限责任公司 Suspending tool arranged at top of blast furnace and used for suspending furnace shell and cooling wall
CN201825635U (en) * 2010-10-21 2011-05-11 四川电力建设三公司 Hoisting structure of power station boiler
CN105384096A (en) * 2015-12-30 2016-03-09 安徽省超盛起重机械有限公司 Crane dynamic folding safety fence
CN205170224U (en) * 2015-11-20 2016-04-20 王玉喜 Crawler -type moves tower crane
CN205419596U (en) * 2016-01-28 2016-08-03 国家电网公司 Side jack -up loading and unloading all -in -one

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB652461A (en) * 1947-09-27 1951-04-25 Westinghouse Electric Int Co Improvements in or relating to door assemblies
JPH03561A (en) * 1989-05-29 1991-01-07 Daifuku Co Ltd Conveyor device using self-travelling body
CN101634375A (en) * 2009-08-20 2010-01-27 曹蓝天 Construction device and method for underground pipeline installation
CN201665684U (en) * 2010-03-30 2010-12-08 中国第一冶金建设有限责任公司 Suspending tool arranged at top of blast furnace and used for suspending furnace shell and cooling wall
CN201825635U (en) * 2010-10-21 2011-05-11 四川电力建设三公司 Hoisting structure of power station boiler
CN205170224U (en) * 2015-11-20 2016-04-20 王玉喜 Crawler -type moves tower crane
CN105384096A (en) * 2015-12-30 2016-03-09 安徽省超盛起重机械有限公司 Crane dynamic folding safety fence
CN205419596U (en) * 2016-01-28 2016-08-03 国家电网公司 Side jack -up loading and unloading all -in -one

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107227853A (en) * 2017-06-18 2017-10-03 中国能源建设集团山西电力建设有限公司 Stoplog lifts mechanism in place and installation method on heat power plant boiler steel construction
CN108557514A (en) * 2018-05-10 2018-09-21 佛山市建新源机械实业有限公司 A kind of walking ship unloaders

Also Published As

Publication number Publication date
CN106315146B (en) 2019-01-22

Similar Documents

Publication Publication Date Title
CN111794754B (en) Pipe piece assembled derrick and construction method thereof
CN102556854B (en) Mine hydraulic hoisting traveling crane
CN106315146B (en) A kind of boiler top crane integral translating method and less important work device
CN201874475U (en) Low-position installation sleeve-type derrick
CN202139584U (en) Walking type dynamic compaction machine
CN203684019U (en) Height and span adjustable track laying machine for subway construction
CN203628021U (en) Movable roadway pipeline installation trolley
CN208684247U (en) A kind of prefabricated subsection hanging apparatus
CN104249979B (en) Guide tracked from climbing turning crane
CN207312994U (en) Power station major diameter surge shaft steel lining cantilevered annular track boom hoisting
CN213865098U (en) Crank arm type monorail crane operation platform
CN202279833U (en) Simple converter flue transition carriage
CN115676648A (en) Multifunctional underground maintenance vehicle
CN205089243U (en) Formula hydraulic power catwalk system lifts
CN212503717U (en) Crawler crane for coal mine
CN208883376U (en) A kind of dedicated translating trolleys for ship lift retarder
CN210066384U (en) Urban rail scattered paving method mechanical construction equipment
CN207031936U (en) A kind of bracket
CN206860194U (en) A kind of macroportion tunnel inverted arch construction stepping type self truss structure movable trestle
CN106276599A (en) Possesses the tower crane of illumination highlights function
CN205417839U (en) Engineering machine tool crawler -belt mounting device
CN214145494U (en) Novel shield constructs quick-witted station-crossing device
CN2136234Y (en) Rail and pole loader for platform trailer
CN111706149A (en) Construction method of novel assembled holding pole
CN109052206A (en) A kind of dedicated translating trolleys and its application method for ship lift retarder

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant