CN201665684U - Suspending tool arranged at top of blast furnace and used for suspending furnace shell and cooling wall - Google Patents
Suspending tool arranged at top of blast furnace and used for suspending furnace shell and cooling wall Download PDFInfo
- Publication number
- CN201665684U CN201665684U CN2010201476188U CN201020147618U CN201665684U CN 201665684 U CN201665684 U CN 201665684U CN 2010201476188 U CN2010201476188 U CN 2010201476188U CN 201020147618 U CN201020147618 U CN 201020147618U CN 201665684 U CN201665684 U CN 201665684U
- Authority
- CN
- China
- Prior art keywords
- single track
- annular single
- furnace
- electric block
- blast furnace
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Abstract
The utility model relates to the field of engineering machinery, in particular to a suspending tool arranged at the top of a blast furnace and used for suspending a furnace shell and a cooling wall. The suspending tool comprises a group of cross beams, a connecting secondary beam, an annular single track and an electric block, wherein the cross beams are connected on a platform main beam at the top of the blast furnace, the cross beams are connected with the connecting secondary beam, the annular single track is connected below the cross beams and the connecting secondary beam, the annular single track is an 'I'-shaped steel beam, the diameter of the 'I'-shaped steel beam is smaller than that of the furnace shell of a furnace throat band; and the electric block is arranged on the annular single track in a matching way and can move along a path of the annular single track. The group of cross beams are arranged on a frame of an original furnace body, the annular single track is arranged under the cross beams, and the annular single track is provided with the electric block, therefore, the suspending tool leads the electric block to be capable of rotatably moving on the annular single track and suspends by utilizing the electric block, thereby not only avoiding the use of a crane, but also being convenient for adjusting a lifting angle. The whole device is simple and practical in structure and low in cost.
Description
Technical field
The utility model relates to the engineering construction technical field, and it is very useful in the suspender of blast furnace overhaul improvement project to relate in particular to a kind of State of Blast Furnace that is arranged in.
Background technology
In the blast furnace overhaul improvement project, often need original furnace shell or cooling stave are repaired or changed, so need lifting furnace shell or cooling stave, and owing to be subjected to the limitation of blast furnace internal space, can't use loop wheel machine, in addition in construction process, also often need the furnace shell or the cooling stave of lifting are adjusted angle with suitable installation, be technical barrier in the blast furnace overhaul improvement project so furnace shell and cooling wall energy are installed quickly and safely always.
Summary of the invention
The purpose of this utility model be to provide a kind of simple and practical, can lift by crane fast to be arranged in State of Blast Furnace very useful in the suspender of lifting furnace shell and cooling stave.
To achieve these goals, the technical solution of the utility model is: a kind of State of Blast Furnace that is arranged in is very useful in the suspender of lifting furnace shell and cooling stave, its difference is: it includes cross beam, connects secondary beam, annular single track, electric block, cross beam is connected on the platform girder of blast furnace furnace roof, cross beam is connected with the connection secondary beam, cross beam be connected secondary beam below be connected with annular single track, the annular single track be steel I-beam and its diameter less than furnace throat band furnace shell diameter, electric block cooperates and is installed on the annular single track and can moves along annular single track track.
Described annular single track takes bolt to be connected with cross beam, annular single track be connected secondary beam and take welding process to connect.
Described cross beam be connected secondary beam and take welding fixing.
Described electric block is 10 tons a electric block, and its erecting bed number is no less than 2.
The utility model utilizes original furnace shell frame that one group of cross beam is set, annular single track is installed under cross beam, on annular single track, electric block is installed, electric block can be rotated on annular single track to be moved, utilizing electric block to carry out lifting work, so both avoid the use loop wheel machine, can conveniently adjust the lifting angle again; Whole apparatus structure is simple and practical, and is with low cost.
Description of drawings
Fig. 1 is installed in synoptic diagram on the platform girder for the utility model embodiment;
Fig. 2 is the synoptic diagram of the utility model embodiment;
Fig. 3 is an A-A sectional view among Fig. 1;
Fig. 4 uses the synoptic diagram of two electric block lifting furnace shells for the utility model embodiment;
Fig. 5 uses the synoptic diagram of an electric block lifting furnace shell for the utility model embodiment;
Fig. 6 lifts cooling stave for the utility model embodiment and promotes the synoptic diagram of hanging scaffold.
Description of symbols among the figure: 1-platform girder, the 2-cross beam, 3-furnace throat band furnace shell, 4-annular single track, 5-connects secondary beam, 6-electric block, 7-wireline, 8-furnace shell, 9-cooling stave, 10-cooling stave ejector, 11-hanging scaffold.
Embodiment
In order to understand the utility model better, below in conjunction with embodiment and accompanying drawing the technical solution of the utility model is described further, referring to Fig. 1 to Fig. 6:
Very useful by a kind of State of Blast Furnace that is arranged in that the utility model is implemented in the suspender of lifting furnace shell and cooling stave, it includes cross beam 2, cross beam 2 adopts the material of HM600 * 300 * 12 * 20, for firm welding to prevent because of lifting causes displacement, cross beam 2 is welded on original State of Blast Furnace roof panel girder 1.Cross beam 2 is the groined type shape, is welded with the identical connection secondary beam 5 of material between four flanks, and the below that connects secondary beam 5 and cross beam 2 is connected with annular single track 4.Connect secondary beam 5 and be that square is outer to be cut in annular single track 4 and to be attached thereto, effective tie point with annular single track 4 increases to 12 like this, eight of annular single track 4 and cross beam 2 add four that are connected secondary beam 5 and annular single track 4, thereby improved the reliability that annular single track 4 connects, make stressed more evenly, structure is more stable.Each beam assembly unit joint mode of connection all adopts welding process to connect with reference to shaped steel joint standard.
Annular single track 4 adopts the ring-like single track of I40b, and it is connected the employing bolt hole with cross beam 2 be φ 23.5mm, φ 22 Bolt Connection, annular single track 4 be connected secondary beam 5 and take the welding process connection.Annular single track 4 is according to the design of furnace throat band furnace shell 3 diameter, and its diameter must be less than furnace throat band furnace shell 3 diameters.Cooperate on the annular single track 4 10 tons electric block 6 is installed, electric block 6 can move along annular single track 4 tracks, to adjust the lifting angle, the erecting bed number of electric block 6 is no less than 2, selects for use one or two electric blocks 6 to cooperate wireline to lift according to monolithic furnace shell 8 hoisting capacities and monolithic physical dimension size.Cooling stave 9 need use cooling stave ejector 10 when installing, cooling stave ejector 10 is positioned on the hanging scaffold 11, after the electric block lifting of earlier hanging scaffold 11 usefulness being used in pairs promotes fixedly decoupling device in place, with electric hoist cooling stave 9 is winched to specified location, use cooling stave ejector 10 ejection cooling staves 9 then, cooling stave 9 is against on the blast furnace furnace wall.The hanger structure that the utility model provides is simple, and simple operation is with low cost, and lifting is reliable, can satisfy and can't use the construction requirement that lifts by crane furnace shell 8 or cooling stave 9 under the loop wheel machine situation.
Above disclosed only is preferred embodiment of the present utility model, can not limit the interest field of the utility model certainly with this, and therefore the equivalence of being done according to the utility model claim changes, and still belongs to protection domain of the present utility model.
Claims (4)
- One kind to be arranged in State of Blast Furnace very useful in the suspender of lifting furnace shell and cooling stave, it is characterized in that: it includes cross beam (2), connect secondary beam (5), annular single track (4), electric block (6), cross beam (2) is connected on the platform girder (1) of blast furnace furnace roof, cross beam (2) is connected with and connects secondary beam (5), be connected with annular single track (4) at cross beam (2) with the below that is connected secondary beam (5), annular single track (4) be steel I-beam and its diameter less than furnace throat band furnace shell (3) diameter, electric block (6) cooperation is installed on the annular single track (4) and can moves along annular single track (4) track.
- 2. according to claim 1ly be arranged in State of Blast Furnace very useful it is characterized in that: described annular single track (4) take bolt to be connected with cross beam (2) in the suspender of lifting furnace shell and cooling stave, annular single track (4) be connected secondary beam (5) and take the welding process connection.
- 3. the State of Blast Furnace that is arranged in according to claim 1 is very useful in the suspender of lifting furnace shell and cooling stave, it is characterized in that: described cross beam (2) and is connected secondary beam (5) and takes to weld and fix.
- 4. the State of Blast Furnace that is arranged in according to claim 1 is very useful in the suspender of lifting furnace shell and cooling stave, and it is characterized in that: described electric block (6) is 10 tons a electric block (6), and its erecting bed number is no less than 2.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010201476188U CN201665684U (en) | 2010-03-30 | 2010-03-30 | Suspending tool arranged at top of blast furnace and used for suspending furnace shell and cooling wall |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010201476188U CN201665684U (en) | 2010-03-30 | 2010-03-30 | Suspending tool arranged at top of blast furnace and used for suspending furnace shell and cooling wall |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201665684U true CN201665684U (en) | 2010-12-08 |
Family
ID=43266641
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010201476188U Expired - Fee Related CN201665684U (en) | 2010-03-30 | 2010-03-30 | Suspending tool arranged at top of blast furnace and used for suspending furnace shell and cooling wall |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201665684U (en) |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104030169A (en) * | 2013-03-07 | 2014-09-10 | 上海宝冶建设工业炉工程技术有限公司 | Multifunctional construction operation platform system of industrial furnace |
CN104419794A (en) * | 2013-08-30 | 2015-03-18 | 上海宝冶集团有限公司 | Device for locally changing shell of large smelting blast furnace in limited space |
CN105776011A (en) * | 2016-04-27 | 2016-07-20 | 中国十九冶集团有限公司 | Mounting method for crane beam on blast furnace top |
CN106315146A (en) * | 2016-08-22 | 2017-01-11 | 中国能源建设集团湖南火电建设有限公司 | Integral transition method for boiler roof crane and auxiliary operating device |
CN106868239A (en) * | 2017-01-10 | 2017-06-20 | 上海二十冶建设有限公司 | A kind of blast furnace throat steel brick hanging apparatus and its application method |
CN107779533A (en) * | 2016-08-27 | 2018-03-09 | 上海宝冶集团有限公司 | The installation method of blast furnace cooling stave |
CN108996385A (en) * | 2018-09-17 | 2018-12-14 | 安徽马钢设备检修有限公司 | A kind of last furnace shell lifting lifting device and its it is set using method |
CN109665444A (en) * | 2018-11-30 | 2019-04-23 | 东方电气集团东方锅炉股份有限公司 | A kind of dry pulverized coal water wall gasifier water-cooling wall internals and the vertical set aligning method of shell |
CN111332955A (en) * | 2019-11-20 | 2020-06-26 | 中国铁建重工集团股份有限公司 | Barrel hoisting equipment |
CN112537611A (en) * | 2020-11-26 | 2021-03-23 | 上海宝冶冶金工程有限公司 | Replacing device |
-
2010
- 2010-03-30 CN CN2010201476188U patent/CN201665684U/en not_active Expired - Fee Related
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104030169A (en) * | 2013-03-07 | 2014-09-10 | 上海宝冶建设工业炉工程技术有限公司 | Multifunctional construction operation platform system of industrial furnace |
CN104419794A (en) * | 2013-08-30 | 2015-03-18 | 上海宝冶集团有限公司 | Device for locally changing shell of large smelting blast furnace in limited space |
CN105776011A (en) * | 2016-04-27 | 2016-07-20 | 中国十九冶集团有限公司 | Mounting method for crane beam on blast furnace top |
CN106315146A (en) * | 2016-08-22 | 2017-01-11 | 中国能源建设集团湖南火电建设有限公司 | Integral transition method for boiler roof crane and auxiliary operating device |
CN107779533A (en) * | 2016-08-27 | 2018-03-09 | 上海宝冶集团有限公司 | The installation method of blast furnace cooling stave |
CN106868239A (en) * | 2017-01-10 | 2017-06-20 | 上海二十冶建设有限公司 | A kind of blast furnace throat steel brick hanging apparatus and its application method |
CN108996385A (en) * | 2018-09-17 | 2018-12-14 | 安徽马钢设备检修有限公司 | A kind of last furnace shell lifting lifting device and its it is set using method |
CN108996385B (en) * | 2018-09-17 | 2023-08-11 | 安徽马钢设备检修有限公司 | Method for setting and using lifting device for hoisting blast furnace shell |
CN109665444A (en) * | 2018-11-30 | 2019-04-23 | 东方电气集团东方锅炉股份有限公司 | A kind of dry pulverized coal water wall gasifier water-cooling wall internals and the vertical set aligning method of shell |
CN111332955A (en) * | 2019-11-20 | 2020-06-26 | 中国铁建重工集团股份有限公司 | Barrel hoisting equipment |
CN112537611A (en) * | 2020-11-26 | 2021-03-23 | 上海宝冶冶金工程有限公司 | Replacing device |
CN112537611B (en) * | 2020-11-26 | 2023-02-21 | 上海宝冶冶金工程有限公司 | Replacing device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201665684U (en) | Suspending tool arranged at top of blast furnace and used for suspending furnace shell and cooling wall | |
CN109184189B (en) | Construction method for conical shell silo top structure of large-diameter silo | |
CN104444762A (en) | Wind power foundation ring overturning device and method for overturning foundation ring by using same | |
WO2015188694A1 (en) | Method for lifting and transporting large parts of underground nuclear power station | |
CN104444758A (en) | Lifting lug and using method thereof | |
CN103173582A (en) | Method for integral in-position mounting of blast-furnace five-way ball and eduction tubes thereof aloft | |
CN202754711U (en) | Heavy type steel beam turnover device | |
CN105174021A (en) | Lifting turnover beam structure for large pressure container | |
CN203372980U (en) | Detachable top cover hanger applicable to pressurized water reactor | |
CN204938708U (en) | A kind of hoisting and overturning girder construction for large pressurized vessel | |
CN203887445U (en) | Giant-tower segmented assembling jig frame | |
CN101936037B (en) | Large-diameter steel bay zoning-manufacture reverse-order lifting installation construction method | |
CN102635070A (en) | Mutual-pulling type vertical turning construction method for steel towers of cable-stayed bridge | |
CN215289748U (en) | T roof beam transverse connection board seam construction equipment | |
CN204645809U (en) | Inner steel cylinder of chimney burst slides assembled positioning apparatus | |
CN106285015A (en) | Steel structural roof beam method for rapidly mounting based on location-plate | |
CN102390795B (en) | Hoisting and turning-over device and method for large chemical container | |
CN106193102B (en) | A kind of tower crane relay handling Shelf device | |
CN201877963U (en) | 180-degree turnover clamping device for large stator | |
CN103979442A (en) | Method for lifting Fischer-Tropsch reactor by 6400t hydraulic combined crane | |
CN203246731U (en) | Stand for storing vertical type rolling mill decelerator | |
CN103935881B (en) | Turning rack | |
CN205990200U (en) | 360 ° of luffing independent hoist device | |
CN106586822A (en) | Lifting tool | |
CN105019556A (en) | Lap-joint structure assisting quick hoisting of high-rise steel beam, and application of lap-joint structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20101208 Termination date: 20170330 |