CN106300138A - A kind of fixture of live-line replacing strain single insulator - Google Patents
A kind of fixture of live-line replacing strain single insulator Download PDFInfo
- Publication number
- CN106300138A CN106300138A CN201610949013.2A CN201610949013A CN106300138A CN 106300138 A CN106300138 A CN 106300138A CN 201610949013 A CN201610949013 A CN 201610949013A CN 106300138 A CN106300138 A CN 106300138A
- Authority
- CN
- China
- Prior art keywords
- fixture
- wire
- built
- clamp
- module
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02G—INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
- H02G1/00—Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
- H02G1/02—Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for overhead lines or cables
Landscapes
- Insulators (AREA)
Abstract
Description
技术领域technical field
本发明涉及一种输电线路带电作业检修用工具,具体是一种带电更换耐张单串绝缘子的卡具。The invention relates to a tool for live work maintenance of a power transmission line, in particular to a fixture for live replacement of tension-resistant single-string insulators.
背景技术Background technique
电力是一切的根本,随着经济的迅猛发展,各行业对电力的需求也逐年增加,给电力供应带来空前的压力,供不应求。所以应不断提高输电线路的可靠性,为避免线路停电,以减轻供电压力,减少经济损失和电能损耗,广泛开展不停电检修显得尤为重要。Electricity is the foundation of everything. With the rapid development of the economy, the demand for electricity in various industries is also increasing year by year, which brings unprecedented pressure on the power supply, and the supply exceeds the demand. Therefore, the reliability of transmission lines should be continuously improved. In order to avoid power outages, reduce power supply pressure, reduce economic losses and power loss, it is particularly important to carry out extensive non-stop maintenance.
为了确保优势服务,国网公司正在大力开展带电作业工作,绍兴供电公司输电运检室现辖35kV-500kV线路均为重要输电线路,任何一条线路停电,都将给社会带来巨大的经济损失,同时造成大量的电能损耗。因此,带电作业消缺,是解决以上矛盾的必经之路。带电作业既能实现对设备的检修、消缺,又能使设备保持继续运行状态,保证电力系统的稳定运行,使用户得到不间断的电能,具有极大的社会效益和经济效益。我们应不断研发和改进带电作业方法、工器具,提高作业效率。In order to ensure superior service, the State Grid Corporation is vigorously carrying out live-line work. Shaoxing Power Supply Company’s Transmission Inspection Office currently governs 35kV-500kV lines, which are all important transmission lines. Any power failure on any line will bring huge economic losses to the society. At the same time, a large amount of power loss is caused. Therefore, the elimination of defects in live work is the only way to solve the above contradictions. Live work can not only realize the maintenance and elimination of equipment, but also keep the equipment in continuous operation, ensure the stable operation of the power system, and enable users to obtain uninterrupted electric energy, which has great social and economic benefits. We should continue to develop and improve live working methods and tools to improve work efficiency.
目前,带电更换双串耐张绝缘子已使用非常广泛,然而带电更换耐张双串绝缘子的工器具无法应用到更换耐张单串绝缘子上去,这造成了带电更换耐张单串绝缘子的空白,停电更换极大地消耗人力物力,同时造成停电损失。At present, live replacement of double-strand insulators has been widely used. However, the tools and tools for live replacement of double-strand insulators cannot be applied to replace single-strand insulators. Replacement greatly consumes manpower and material resources, and causes power failure loss at the same time.
发明内容Contents of the invention
基于上述原因,本发明的目的是提供一种带电更换耐张单串绝缘子的卡具,弥补了现有单串耐张绝缘子停电更换的空白。Based on the above reasons, the object of the present invention is to provide a fixture for replacing a single-string tension insulator while it is live, which makes up for the gap in the existing single-string tension insulator replacement when power failure occurs.
为了实现上述目的,本发明所采用的技术方案为:In order to achieve the above object, the technical solution adopted in the present invention is:
一种带电更换耐张单串绝缘子的卡具,包括紧线丝杠、绝缘托瓶架、杆塔侧卡具、导线侧卡具、绝缘拉板以及内置于杆塔侧卡具内的杆塔侧内置模块和内置于导线侧卡具内的导线侧内置模块;所述杆塔侧卡具和导线侧卡具分别位于绝缘子串的首尾两端,杆塔侧卡具的两端各与一个紧线丝杠连接,紧线丝杠的另一端连接绝缘拉板,绝缘拉板的另一端与导线侧卡具固定连接;杆塔侧卡具和导线侧卡具之间且位于绝缘子串的下方设有绝缘托瓶架,绝缘托瓶架的两端分别与杆塔侧卡具和导线侧卡具连接;绝缘子串的首尾两端分别与杆塔侧内置模块和导线侧内置模块连接。A jig for replacing tension-resistant single-string insulators with electricity, including a tightening lead screw, an insulating bottle holder, a jig on the tower side, a jig on the wire side, an insulating pull plate, and a built-in module on the tower side built in the jig on the side of the tower and the built-in module on the wire side built in the wire side fixture; the pole tower side fixture and the wire side fixture are respectively located at the first and last ends of the insulator string, and the two ends of the pole tower side fixture are respectively connected to a tight wire screw, The other end of the tightening lead screw is connected to the insulating pull plate, and the other end of the insulating pull plate is fixedly connected to the clamp on the wire side; between the clamp on the tower side and the clamp on the wire side, an insulating bottle holder is provided under the insulator string. The two ends of the insulated bottle holder are respectively connected to the fixture on the tower side and the fixture on the wire side; the first and last ends of the insulator string are respectively connected to the built-in module on the tower side and the built-in module on the wire side.
所述紧线丝杠采用强力型抗扭力丝杠。The tight-wire lead screw adopts a powerful anti-torsion lead screw.
所述杆塔侧卡具和导线侧卡具的两端分别设有圆孔,圆孔处固定有安装夹或圆环,绝缘托瓶架为两个,绝缘托瓶架的两端分别固定于杆塔侧卡具的安装夹或圆环以及导线侧卡具的安装夹或圆环上。The two ends of the tower side jig and the wire side jig are respectively provided with round holes, and the round holes are fixed with mounting clips or rings. There are two insulating bottle holders, and the two ends of the insulating bottle holders are respectively fixed on the pole tower. On the mounting clip or ring of the side clamp and on the mounting clip or ring of the wire side clamp.
所述两个绝缘托瓶架之间设有若干加强筋。Several reinforcing ribs are arranged between the two insulating bottle holders.
所述杆塔侧卡具和导线侧卡具的中部均设有长方体槽,杆塔侧内置模块和导线侧内置模块内嵌于长方体槽内。Both the tower side jig and the wire side jig are provided with cuboid grooves in the middle, and the tower side built-in modules and the wire side built-in modules are embedded in the cuboid grooves.
所述杆塔侧内置模块和导线侧内置模块采用钛合金材质制成。The built-in module on the tower side and the built-in module on the wire side are made of titanium alloy.
所述绝缘托瓶架采用环氧树脂材质制成。The insulating bottle holder is made of epoxy resin material.
所述杆塔侧卡具和导线侧卡具采用铝合金材质制成。The tower side fixture and the wire side fixture are made of aluminum alloy.
所述绝缘拉板与导线侧卡具相连的一侧设有若干通孔,导线侧卡具的两端通过螺栓固定于绝缘拉板的通孔处。A number of through holes are provided on the side of the insulating pull plate connected to the wire side clamp, and the two ends of the wire side clamp are fixed to the through holes of the insulation pull plate by bolts.
所述紧线丝杠上设有手柄。A handle is provided on the tightening lead screw.
本发明提供的卡具其结构简单、体积小、重量轻,便于携带;内置模块可根据金具结构进行配置和更换,使得该卡具的通用性强,避免工作人员携带多套卡具进行作业,降低了工作强度;可通过两个人员配合作业,操作简单,工作效率高;实现了带电作业,减少了停电的次数,提高了供电的可靠性。The jig provided by the present invention is simple in structure, small in size, light in weight, and easy to carry; the built-in module can be configured and replaced according to the structure of the hardware, which makes the jig highly versatile and prevents the staff from carrying multiple sets of jigs for operation. The work intensity is reduced; two persons can work together, the operation is simple and the work efficiency is high; live work is realized, the number of power outages is reduced, and the reliability of power supply is improved.
以下通过附图和具体实施方式对本发明做进一步阐述。The present invention will be further elaborated below through the accompanying drawings and specific embodiments.
附图说明:Description of drawings:
图1为本发明的主视结构示意图;Fig. 1 is the front view structure schematic diagram of the present invention;
图2为本发明的俯视图;Fig. 2 is the top view of the present invention;
图3为本发明的仰视图;Fig. 3 is the bottom view of the present invention;
图4为本发明的左视图;Fig. 4 is the left view of the present invention;
图5为本发明的右视图。Fig. 5 is a right side view of the present invention.
具体实施方式:detailed description:
如图1至图5所示,一种带电更换耐张单串绝缘子的卡具,包括紧线丝杠4、绝缘托瓶架6、杆塔侧卡具2、导线侧卡具3和绝缘拉板5,在杆塔侧卡具2和导线侧卡具3的中部均开设有长方体槽,长方体槽用于放置与金具结构相配的内置模块,即在杆塔侧卡具2上的长方体槽内嵌入杆塔侧内置模块7,在导线侧卡具3上的长方体槽内嵌入导线侧内置模块8。工作人员上塔后,位于地电位作业人员先将杆塔侧卡具2安装于杆塔上,并用两个紧线丝杠4的一端分别与杆塔侧卡具2的两端固定连接,另一位处于等电位作业人员可以通过特制的专用绝缘平梯或软体进入导线侧,并将导线侧卡具3固定于导线侧,使杆塔侧卡具2和导线侧卡具3分别位于绝缘子1的两端,再用两个绝缘拉板5分别将导线侧卡具3和杆塔侧卡具2的两端分别连接在一起,使绝缘拉板5的一端与紧线丝杠4连接,绝缘拉板5的另一端与导线侧卡具3连接。绝缘拉板5上与导线侧卡具3相连的一侧还开设有若干通孔,导线侧卡具3的两端通过螺栓固定于绝缘拉板5的通孔处,可以根据绝缘子1的长度选取合适的通孔安装位置。为了在更换绝缘子1时能够对绝缘子1起到支撑作用,在绝缘子1的下方还设有两个绝缘托瓶架6,绝缘托瓶架6的两端分别与杆塔侧卡具2和导线侧卡具3相连,即在杆塔侧卡具2和导线侧卡具3的两端均开设圆孔,在圆孔处固定有安装夹10或圆环均可,将绝缘托瓶架6的两端分别穿入圆环内进行位置固定或用螺栓固定在安装夹10上。As shown in Figures 1 to 5, a fixture for replacing a single string of tension-resistant insulators with electricity, including a tightening screw 4, an insulating bottle holder 6, a fixture 2 on the pole side, a fixture 3 on the wire side, and an insulating puller 5. There are cuboid slots in the middle of the tower side fixture 2 and the wire side fixture 3. The cuboid slots are used to place built-in modules that match the hardware structure, that is, the tower side is embedded in the cuboid groove on the pole tower side fixture 2. The built-in module 7 is embedded into the built-in module 8 on the wire side in the cuboid groove on the wire side fixture 3 . After the staff go up to the tower, the operator at the ground potential first installs the tower side fixture 2 on the pole tower, and uses one end of two tightening wire screws 4 to fix the two ends of the pole tower side fixture 2 respectively, and the other is at the Equipotential operators can enter the wire side through a special special insulating ladder or software, and fix the wire side clamp 3 on the wire side, so that the tower side clamp 2 and the wire side clamp 3 are respectively located at both ends of the insulator 1, Respectively connect the two ends of the wire side fixture 3 and the pole tower side fixture 2 together with two insulating pull plates 5, so that one end of the insulating pull plate 5 is connected with the tightening lead screw 4, and the other end of the insulating pull plate 5 One end is connected with the wire side fixture 3. There are also several through holes on the side of the insulating pull plate 5 connected to the wire side clamp 3, and the two ends of the wire side clamp 3 are fixed to the through holes of the insulating pull plate 5 by bolts, which can be selected according to the length of the insulator 1. Suitable through-hole mounting locations. In order to support the insulator 1 when the insulator 1 is replaced, two insulating bottle holders 6 are provided below the insulator 1. The tool 3 is connected, that is, a round hole is provided at both ends of the pole tower side fixture 2 and the wire side fixture 3, and the mounting clip 10 or the ring can be fixed at the round hole, and the two ends of the insulating bottle holder 6 are respectively Penetrate into the ring to fix the position or fix it on the mounting clip 10 with bolts.
更换绝缘子1时,将杆塔侧内置模块7和导线侧内置模块8分别与绝缘子串的首尾进行连接。利用紧线丝杠4上的手柄9来转动紧线丝杠4,从而调节杆塔侧卡具2和导线侧卡具3之间的距离,通过收紧紧线丝杠4达到收紧耐张绝缘子串的目的,因此紧线丝杠4采用强力型抗扭力丝杠,可以增大强度与行程裕度,能够实现收紧LGJ-240(110KV、220KV)导线的荷载。杆塔侧内置模块7和导线侧内置模块8均采用钛合金材质制成,具有极高的强度和抗拉性能。绝缘托瓶架6采用环氧树脂材质制成,在更换绝缘子1使耐张导线松弛时,绝缘托瓶架6可以起到托举绝缘子1的作用。为了令托举效果更稳定,在两个绝缘托瓶架之间还设有若干加强筋11,以增加绝缘托瓶架6的强度。杆塔侧卡具2和导线侧卡具3均采用铝合金LC4.C.S材质制成,其强度应满足耐张杆最大承力要求。When replacing the insulator 1, the built-in module 7 on the tower side and the built-in module 8 on the wire side are respectively connected to the head and tail of the insulator string. Use the handle 9 on the tightening screw 4 to turn the tightening screw 4, thereby adjusting the distance between the clamp 2 on the pole tower side and the clamp 3 on the wire side, and tighten the tension insulator by tightening the tightening screw 4 Therefore, the tightening lead screw 4 adopts a strong anti-torque lead screw, which can increase the strength and stroke margin, and can realize the load tightening of LGJ-240 (110KV, 220KV) wires. Both the built-in module 7 on the tower side and the built-in module 8 on the wire side are made of titanium alloy, which has extremely high strength and tensile properties. The insulating bottle holder 6 is made of epoxy resin material, and when the insulator 1 is replaced to make the tension wire loose, the insulating bottle holder 6 can play the role of lifting the insulator 1. In order to make the lifting effect more stable, several reinforcing ribs 11 are also provided between the two insulating bottle holders to increase the strength of the insulating bottle holder 6 . Both the tower side fixture 2 and the conductor side fixture 3 are made of aluminum alloy LC4.C.S, and their strength should meet the maximum load-bearing requirements of the tension bar.
使用本发明的卡具带电更换耐张单串绝缘子时,先按照上述要求完成卡具各部分结构的安装,地电位工作人员通过紧线丝杠4收紧杆塔侧卡具2和导线侧卡具3的距离,使工器具承受耐张导线拉力,从而放松单串绝缘子1,使其不再承受耐张导线的拉力,在绝缘子托瓶架6的托举下,等电位工作人员可以带电更换单个或整串绝缘子操作。整个卡具采用易于拆装的结构,方便将各部件带上杆塔上进行组装,为工作人员的作业提供了便利。When using the clamp of the present invention to replace the tension-resistant single-string insulator, first complete the installation of the structure of each part of the clamp according to the above requirements, and the ground potential staff tighten the clamp 2 on the tower side and the clamp on the wire side through the tightening screw 4 3, so that the tool bears the tensile force of the tension wire, thereby loosening the single string insulator 1, so that it no longer bears the tension of the tension wire. Under the lifting of the insulator bottle holder 6, the equipotential staff can replace a single Or whole string insulator operation. The entire jig adopts a structure that is easy to disassemble and assemble, and it is convenient to bring various parts to the tower for assembly, which provides convenience for the staff's work.
以上实施例仅用以说明本发明的技术方案而非限制,本领域普通技术人员对本发明的技术方案所做的其他修改或者等同替换,只要不脱离本发明技术方案的精神和范围,均应涵盖在本发明的权利要求范围中。The above embodiments are only used to illustrate the technical solution of the present invention without limitation. Other modifications or equivalent replacements made by those of ordinary skill in the art to the technical solution of the present invention should be covered as long as they do not depart from the spirit and scope of the technical solution of the present invention. Within the scope of the claims of the present invention.
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201610949013.2A CN106300138A (en) | 2016-10-27 | 2016-10-27 | A kind of fixture of live-line replacing strain single insulator |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201610949013.2A CN106300138A (en) | 2016-10-27 | 2016-10-27 | A kind of fixture of live-line replacing strain single insulator |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN106300138A true CN106300138A (en) | 2017-01-04 |
Family
ID=57719613
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201610949013.2A Pending CN106300138A (en) | 2016-10-27 | 2016-10-27 | A kind of fixture of live-line replacing strain single insulator |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN106300138A (en) |
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN108512120A (en) * | 2018-05-30 | 2018-09-07 | 广东电网有限责任公司 | Insulator replacement tool |
| CN108736426A (en) * | 2018-07-24 | 2018-11-02 | 国网辽宁省电力有限公司本溪供电公司 | A kind of single string strain insulator puts, stringing attachment device |
| CN111313320A (en) * | 2020-02-24 | 2020-06-19 | 国网福建省电力有限公司龙岩供电公司 | a replacement device |
| CN111697487A (en) * | 2020-07-08 | 2020-09-22 | 国网福建省电力有限公司 | Voltage-measurable live-line double-insulator-string replacing device and operation method |
| CN112467616A (en) * | 2020-11-30 | 2021-03-09 | 贵州电网有限责任公司 | Assembly type strain insulator string reloading tool |
Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102270817A (en) * | 2011-08-12 | 2011-12-07 | 江苏省电力公司南京供电公司 | Tool for changing tension insulator in live line |
| CN202308919U (en) * | 2011-11-11 | 2012-07-04 | 华北电网有限公司北京超高压公司 | Tool for replacing insulator |
| CN102882155A (en) * | 2012-10-19 | 2013-01-16 | 山东电力集团公司枣庄供电公司 | Supporting frame for replacing line insulator |
| CN203747299U (en) * | 2014-02-17 | 2014-07-30 | 国家电网公司 | Mountable and dismountable dual-purpose airfoil-profile clamping device |
| CN105914646A (en) * | 2016-04-26 | 2016-08-31 | 江苏省电力公司常州供电公司 | Working method for replacing 35kV tension insulator strings with power on |
| CN206148847U (en) * | 2016-10-27 | 2017-05-03 | 国网浙江省电力公司绍兴供电公司 | Change fixture of strain insulator list cluster insulator with electricity |
-
2016
- 2016-10-27 CN CN201610949013.2A patent/CN106300138A/en active Pending
Patent Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102270817A (en) * | 2011-08-12 | 2011-12-07 | 江苏省电力公司南京供电公司 | Tool for changing tension insulator in live line |
| CN202308919U (en) * | 2011-11-11 | 2012-07-04 | 华北电网有限公司北京超高压公司 | Tool for replacing insulator |
| CN102882155A (en) * | 2012-10-19 | 2013-01-16 | 山东电力集团公司枣庄供电公司 | Supporting frame for replacing line insulator |
| CN203747299U (en) * | 2014-02-17 | 2014-07-30 | 国家电网公司 | Mountable and dismountable dual-purpose airfoil-profile clamping device |
| CN105914646A (en) * | 2016-04-26 | 2016-08-31 | 江苏省电力公司常州供电公司 | Working method for replacing 35kV tension insulator strings with power on |
| CN206148847U (en) * | 2016-10-27 | 2017-05-03 | 国网浙江省电力公司绍兴供电公司 | Change fixture of strain insulator list cluster insulator with electricity |
Cited By (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN108512120A (en) * | 2018-05-30 | 2018-09-07 | 广东电网有限责任公司 | Insulator replacement tool |
| CN108736426A (en) * | 2018-07-24 | 2018-11-02 | 国网辽宁省电力有限公司本溪供电公司 | A kind of single string strain insulator puts, stringing attachment device |
| CN108736426B (en) * | 2018-07-24 | 2024-05-17 | 国网辽宁省电力有限公司本溪供电公司 | Single-string tension insulator wire releasing and tightening connecting device |
| CN111313320A (en) * | 2020-02-24 | 2020-06-19 | 国网福建省电力有限公司龙岩供电公司 | a replacement device |
| CN111697487A (en) * | 2020-07-08 | 2020-09-22 | 国网福建省电力有限公司 | Voltage-measurable live-line double-insulator-string replacing device and operation method |
| CN112467616A (en) * | 2020-11-30 | 2021-03-09 | 贵州电网有限责任公司 | Assembly type strain insulator string reloading tool |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN106300138A (en) | A kind of fixture of live-line replacing strain single insulator | |
| CN203456796U (en) | Broadsword fixture for replacing single insulator of duplex insulator string during power failure | |
| CN101820144B (en) | Special tool of live line work for replacing rectilinear insulator string of large-section double multiple wire | |
| CN103594968B (en) | A kind of transmission tower multiple fission conductor lifting device | |
| CN105514877B (en) | Common-tower double-return steel pipe pole replacement insulation subjob cross-arm fixture | |
| CN108847612A (en) | The specific purpose tool of charged for replacement 35kV strain insulator string | |
| CN105932599A (en) | Tool set capable of replacing insulator chain of ultra-high-voltage transmission line under electrified state and use method for tool set | |
| CN205791227U (en) | Charged for replacement UHV transmission line insulator chain tool set | |
| CN101814707B (en) | Tool for live replacement of 220kV line 'V' string insulator and method | |
| CN203456797U (en) | Broadsword fixture for replacing entire string of insulator of duplex insulator string during power failure | |
| CN206148847U (en) | Change fixture of strain insulator list cluster insulator with electricity | |
| CN103500961B (en) | A special tool for live replacement of tension insulator strings | |
| CN203800477U (en) | Clamping tool used for electriferous replacement of first insulator of power transmission line tension single chain at wire side | |
| CN205565511U (en) | Change insulators cross arm fixture for operation with two steel pipe poles that return of tower | |
| CN106033872B (en) | Equipotential changes the instrument of the double soft bus strain insulators of simply connected | |
| CN204424804U (en) | Equipotential changes the instrument of the two soft bus strain insulator of simply connected | |
| WO2012088988A1 (en) | Maintenance tool used for double insulator strings of direct current transmission line | |
| CN104253394B (en) | A kind of replacing instrument of strain insulator string | |
| CN103825222B (en) | A kind of charged for replacement 220kV narrow base tower strain insulator string instrument | |
| CN201584701U (en) | Tool for replacing 'V' string insulator of 220kV line in live state | |
| CN100566059C (en) | The method of a kind of charged for replacement 500kV circuit " L " insulator string | |
| CN204144800U (en) | The special cross-arm card of a kind of ZML type tower | |
| CN204290154U (en) | A kind of replacing insulator under electrified specific purpose tool | |
| CN203967627U (en) | Charged for replacement 110kV strain insulator string bilateral hook bottle supporting Work tool | |
| CN207490436U (en) | The double models for hanging V-type composite insulator string replacing options of ± 500kV DC power transmission lines duplex |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170104 |
|
| RJ01 | Rejection of invention patent application after publication |