CN111697487A - Voltage-measurable live-line double-insulator-string replacing device and operation method - Google Patents

Voltage-measurable live-line double-insulator-string replacing device and operation method Download PDF

Info

Publication number
CN111697487A
CN111697487A CN202010650151.7A CN202010650151A CN111697487A CN 111697487 A CN111697487 A CN 111697487A CN 202010650151 A CN202010650151 A CN 202010650151A CN 111697487 A CN111697487 A CN 111697487A
Authority
CN
China
Prior art keywords
pressure sensor
rod
fork
pull rod
lead screw
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202010650151.7A
Other languages
Chinese (zh)
Other versions
CN111697487B (en
Inventor
刘松波
邓龙
蒋俊杰
蔡江河
肖锰
张大成
苏申
邓善辉
裴光燚
吴文耿
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Fujian Electric Power Co Ltd
Sanming Power Supply Co of State Grid Fujian Electric Power Co Ltd
Original Assignee
State Grid Fujian Electric Power Co Ltd
Sanming Power Supply Co of State Grid Fujian Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Fujian Electric Power Co Ltd, Sanming Power Supply Co of State Grid Fujian Electric Power Co Ltd filed Critical State Grid Fujian Electric Power Co Ltd
Priority to CN202010650151.7A priority Critical patent/CN111697487B/en
Publication of CN111697487A publication Critical patent/CN111697487A/en
Application granted granted Critical
Publication of CN111697487B publication Critical patent/CN111697487B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • H—ELECTRICITY
    • H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02G—INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G1/00—Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
    • H02G1/02—Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for overhead lines or cables
    • G—PHYSICS
    • G01—MEASURING; TESTING
    • G01L—MEASURING FORCE, STRESS, TORQUE, WORK, MECHANICAL POWER, MECHANICAL EFFICIENCY, OR FLUID PRESSURE
    • G01L5/00—Apparatus for, or methods of, measuring force, work, mechanical power, or torque, specially adapted for specific purposes
    • G01L5/04—Apparatus for, or methods of, measuring force, work, mechanical power, or torque, specially adapted for specific purposes for measuring tension in flexible members, e.g. ropes, cables, wires, threads, belts or bands
    • G01L5/047—Specific indicating or recording arrangements, e.g. for remote indication, for indicating overload or underload

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Insulators (AREA)

Abstract

本发明涉及一种可测压式带电更换双联绝缘子串装置及作业方法,该装置包括压力传感器数显丝杆、长度可调式绝缘拉棒和叉型卡具,所述压力传感器数显丝杆包括直线丝杆、丝杆支座、压力传感器、控制单元和显示单元,所述直线丝杆的丝杆下端与绝缘拉棒上端连接,所述直线丝杆的螺母座经压力传感器安装于丝杆支座上,所述丝杆支座为横担卡结构,所述压力传感器连接控制单元,所述控制单元连接显示单元;所述叉型卡具上端与绝缘拉棒下端连接,所述叉型卡具下端的两个卡具上设有用于连接三角联板的插销。该装置及作业方法有利于便捷、安全、高效地进行地电位带电更换双联悬垂绝缘子串。

Figure 202010650151

The invention relates to a pressure-measurable live replacement double insulator string device and an operation method. The device comprises a pressure sensor digital display screw rod, a length-adjustable insulating pull rod and a fork clamp. The pressure sensor digital display screw rod It includes a linear screw, a screw support, a pressure sensor, a control unit and a display unit. The lower end of the linear screw is connected to the upper end of the insulating rod, and the nut seat of the linear screw is installed on the screw through the pressure sensor. On the support, the screw support is a cross arm clamp structure, the pressure sensor is connected to the control unit, and the control unit is connected to the display unit; the upper end of the fork-shaped clamp is connected to the lower end of the insulating pull rod, The two clamps at the lower end of the clamps are provided with pins for connecting the triangular coupling plates. The device and the operation method are beneficial to conveniently, safely and efficiently perform live replacement of the double-connected pendant insulator string at the ground potential.

Figure 202010650151

Description

可测压式带电更换双联绝缘子串装置及作业方法Pressure-measurable live replacement double insulator string device and operation method

技术领域technical field

本发明属于电力作业工器具领域,具体涉及一种可测压式带电更换双联绝缘子串装置及作业方法。The invention belongs to the field of electric power work tools, and in particular relates to a pressure-measurable live replacement double insulator string device and an operation method.

背景技术Background technique

近年来,随着输电线路设计标准的进一步提高,输电线路杆塔结构形式更加多样化,目前带电更换直线塔耐张双联绝缘子串作业工具普遍存在以下几个缺点:1、所需工器具较多,塔上作业劳动强度大;2、作业中使用的导线金属双钩较长(达400mm~600mm),组装时短接过多绝缘子,存在一定安全隐患;3、由于双联双挂点绝缘子串在导线提升后,三角联板因重力作用下垂至歪斜状态,地电位远程操作绝缘子球头进出碗头变得异常困难;4、双钩金具提升导线时容易磨损导线;5、遇到大跨越、大档距、大高差线路杆塔,导线荷载无法评估,且紧线丝杆需收紧行程大,有时候会出现无法带电更换的情况。In recent years, with the further improvement of transmission line design standards, the structure forms of transmission line towers have become more diversified. At present, the following shortcomings are generally encountered in the live replacement of linear tower tension-resistant double insulator strings: 1. There are many tools required, and the tower 2. The wire metal double hooks used in the operation are long (up to 400mm~600mm), and too many insulators are short-circuited during assembly, which has certain safety hazards; 3. Since the double-connected double-hanging point insulators are stringed in the wire lifting After that, the triangular joint plate sags to a skewed state due to gravity, and it becomes extremely difficult to remotely operate the insulator ball head in and out of the bowl head at ground potential; 4. When the double hook fittings lift the wire, it is easy to wear the wire; 5. When encountering large span, large span, For line poles and towers with large height difference, the wire load cannot be evaluated, and the tightening stroke of the tightening lead screw is large, and sometimes it may not be possible to replace it with electricity.

发明内容SUMMARY OF THE INVENTION

本发明的目的在于提供一种可测压式带电更换双联绝缘子串装置及作业方法,该装置及作业方法有利于便捷、安全、高效地进行地电位带电更换双联悬垂绝缘子串。The purpose of the present invention is to provide a pressure-measurable live replacement double insulator string device and operation method, which are conducive to the convenient, safe and efficient live replacement of double pendant insulator strings at ground potential.

为实现上述目的,本发明采用的技术方案是:一种可测压式带电更换双联绝缘子串装置,包括压力传感器数显丝杆、长度可调式绝缘拉棒和叉型卡具,所述压力传感器数显丝杆包括直线丝杆、丝杆支座、压力传感器、控制单元和显示单元,所述直线丝杆的丝杆下端与绝缘拉棒上端连接,所述直线丝杆的螺母座经压力传感器安装于丝杆支座上,所述丝杆支座为横担卡结构,所述压力传感器连接控制单元,所述控制单元连接显示单元;所述叉型卡具上端与绝缘拉棒下端连接,所述叉型卡具下端的两个卡具上设有用于连接三角联板的插销。In order to achieve the above purpose, the technical solution adopted in the present invention is: a pressure-measurable live replacement double insulator string device, comprising a pressure sensor digital display screw rod, a length-adjustable insulating rod and a fork-type clamp, the pressure The digital display screw of the sensor includes a linear screw, a screw support, a pressure sensor, a control unit and a display unit. The lower end of the linear screw is connected to the upper end of the insulating rod, and the nut seat of the linear screw is pressurized The sensor is installed on the screw support, the screw support is a cross arm card structure, the pressure sensor is connected to the control unit, and the control unit is connected to the display unit; the upper end of the fork clamp is connected to the lower end of the insulating pull rod , the two clamps at the lower end of the fork-shaped clamps are provided with pins for connecting the triangular connecting plates.

进一步地,所述压力传感器为圆柱式压力传感器,所述螺母座经压力轴承与压力传感器连接。Further, the pressure sensor is a cylindrical pressure sensor, and the nut seat is connected to the pressure sensor through a pressure bearing.

进一步地,所述控制单元上设有无线通信模块,以通过无线通信模块与外部的终端或系统建立无线连接并传输数据。Further, the control unit is provided with a wireless communication module, so as to establish a wireless connection with an external terminal or system and transmit data through the wireless communication module.

进一步地,所述螺母座外侧与一金属横向摇杆连接。Further, the outer side of the nut seat is connected with a metal lateral rocker.

进一步地,所述长度可调式绝缘拉棒包括中空套管、上连杆及下连杆,所述上连杆下段、下连杆上段分别穿设于中空套管中并可上下伸缩,所述上连杆上端连接直线丝杆的丝杆,所述下连杆下端连接叉型卡具。Further, the length-adjustable insulating pull rod includes a hollow sleeve, an upper connecting rod and a lower connecting rod. The upper end of the upper connecting rod is connected with the screw rod of the linear screw rod, and the lower end of the lower connecting rod is connected with the fork-type clamp.

进一步地,所述上连杆下段、下连杆上段上沿长度方向分别设有若干个等距的定位孔,所述中空套管上沿长度方向对应开设有若干定位孔,以当上连杆和下连杆相对于中空套管伸缩调节到所需长度时,通过高强度螺栓穿过内外重合的定位孔并用高强度螺帽固定,实现绝缘拉棒的长度定位。Further, the lower section of the upper connecting rod and the upper section of the lower connecting rod are respectively provided with a number of equidistant positioning holes along the length direction, and the hollow sleeve is correspondingly provided with a number of positioning holes along the length direction to serve as the upper connecting rod. When the lower connecting rod and the lower connecting rod are telescopically adjusted to the required length relative to the hollow casing, the high-strength bolts pass through the overlapping positioning holes inside and outside and are fixed with high-strength nuts to realize the length positioning of the insulating rod.

进一步地,所述叉型卡具包括拉棒连接部、横向连接部和两个卡具,所述拉棒连接部上端与绝缘拉棒下端螺纹连接,所述拉棒连接部下端与横向连接部中部固定连接,所述两个卡具上端分别与横向连接部左右两侧部转动连接,以调节两个卡具所成的叉角,使叉型卡具适用于不同型号的三角联板,所述卡具下端设有插销,以插置于三角联板的预留孔中,实现叉型卡具与三角联板的连接。Further, the fork-shaped fixture includes a pull rod connection part, a transverse connection part and two clamps, the upper end of the pull rod connection part is screwed with the lower end of the insulating pull rod, and the lower end of the pull rod connection part is connected with the transverse connection part. The middle part is fixedly connected, and the upper ends of the two clamps are respectively connected to the left and right sides of the transverse connection part in rotation to adjust the fork angle formed by the two clamps, so that the fork clamps are suitable for different types of triangular coupling plates. The lower end of the clamp is provided with a pin, which is inserted into the reserved hole of the triangle connecting plate to realize the connection between the fork-shaped clamp and the triangle connecting plate.

本发明还提供了一种可测压式带电更换双联绝缘子串的作业方法,包括以下步骤:The present invention also provides a pressure-measurable live-replacement operation method for a double-connected insulator string, comprising the following steps:

1)作业人员登塔至横担位置,地面人员将所述装置起吊至塔上;1) The operator climbs the tower to the position of the cross arm, and the ground personnel lift the device to the tower;

2)作业人员调节长度可调式绝缘拉棒的长度,使其匹配绝缘子串;2) The operator adjusts the length of the adjustable length insulating rod to match the insulator string;

3)使丝杆支座卡在横担上,并通过绝缘操作杆远程调节叉型卡具下端两个卡具所成的叉角,使卡具上的插销插置于三角联板的预留孔内;3) The screw support is clamped on the cross arm, and the fork angle formed by the two clamps at the lower end of the fork clamp is remotely adjusted through the insulating operating rod, so that the latch on the clamp is inserted into the reserved space of the triangle connecting plate. inside the hole;

4)作业人员收紧直线丝杆,并观测显示单元显示的压力值,在荷载允许范围内提升导线,使悬垂绝缘子串松弛,从而实现地电位带电更换双联悬垂绝缘子串。4) The operator tightens the linear screw, observes the pressure value displayed by the display unit, lifts the wire within the load allowable range, and relaxes the pendant insulator string, thereby realizing the replacement of the double pendant insulator string with the ground potential live.

相较于现有技术,本发明具有以下有益效果:通过在装置上设置压力传感器数显丝杆、长度可调式绝缘拉棒和叉型卡具,减少了作业流程所需工器具,避免了传统金属双钩对导线的伤害,可以利用该装置简单、便捷、高效地进行地电位带电更换输电线路上的双联悬垂绝缘子串,并且可以实时监测作业过程中的承力荷载,解决了以往该类作业中存在的劳动强度大、安全系数低、工作效率低等诸多问题。因此,本发明具有很强的实用性和广阔的应用前景。Compared with the prior art, the present invention has the following beneficial effects: by arranging the pressure sensor digital display screw rod, the length-adjustable insulating pull rod and the fork clamp on the device, the tools required for the operation process are reduced, and the traditional method is avoided. The damage caused by the metal double hooks to the conductors can be easily, conveniently and efficiently replaced by the ground potential live replacement of the double pendant insulator strings on the transmission line, and the bearing load during the operation can be monitored in real time, which solves the problem of such operations in the past There are many problems such as high labor intensity, low safety factor and low work efficiency. Therefore, the present invention has strong practicability and broad application prospects.

附图说明Description of drawings

图1是本发明实施例的装置整体结构示意图。FIG. 1 is a schematic diagram of the overall structure of an apparatus according to an embodiment of the present invention.

图2是本发明实施例中压力传感器数显丝杆的结构示意图。FIG. 2 is a schematic structural diagram of a digital display screw rod of a pressure sensor in an embodiment of the present invention.

图3是本发明实施例中叉型卡具的结构示意图。FIG. 3 is a schematic structural diagram of a fork-type fixture in an embodiment of the present invention.

图4是本发明实施例中装置工作状态示意图。FIG. 4 is a schematic diagram of the working state of the device in the embodiment of the present invention.

图中:1-压力传感器数显丝杆,2-长度可调式绝缘拉棒,3-叉型卡具,4-圆柱式压力传感器,5-显示单元,6-丝杆支座,7-直线塔横担,8-双联悬垂绝缘子串,9-三角联板,10-双分裂悬垂线夹,11-双分裂导线,12-控制单元,13-丝杆,14-螺母座,15-压力轴承,16-金属横向摇杆,21-上连杆,22-中空套管,23-下连杆,24-定位孔,25-高强度螺栓,31-拉棒连接部,32-横向连接部,33-卡具,34-插销。In the picture: 1- Pressure sensor digital display screw, 2- Length adjustable insulating rod, 3- Fork clamp, 4- Cylindrical pressure sensor, 5- Display unit, 6- Screw support, 7- Straight line Tower Cross Arm, 8-Double Suspended Insulator String, 9-Triangle Plate, 10-Double-Split Suspension Clip, 11-Double-Split Conductor, 12-Control Unit, 13-Screw, 14-Nut Block, 15-Pressure Bearing, 16-metal lateral rocker, 21-upper link, 22-hollow sleeve, 23-lower link, 24-positioning hole, 25-high-strength bolt, 31-tie rod connection, 32-transverse connection , 33-clamp, 34-pin.

具体实施方式Detailed ways

下面结合附图及具体实施例对本发明作进一步的详细说明。The present invention will be further described in detail below with reference to the accompanying drawings and specific embodiments.

本发明提供了一种可测压式带电更换双联绝缘子串装置,如图1-4所示,包括压力传感器数显丝杆1、长度可调式绝缘拉棒2和叉型卡具3。The present invention provides a pressure-measurable live replacement double insulator string device, as shown in Figs.

所述压力传感器数显丝杆1包括直线丝杆、丝杆支座6、压力传感器4、控制单元12和显示单元5,所述直线丝杆的丝杆13下端与绝缘拉棒2上端转动连接,所述直线丝杆的螺母座14经压力传感器4安装于丝杆支座6上,所述丝杆支座6为横担卡结构,以便在作业时卡在横担上,所述压力传感器4连接控制单元12,所述控制单元12连接显示单元5。The digital display screw 1 of the pressure sensor includes a linear screw, a screw support 6, a pressure sensor 4, a control unit 12 and a display unit 5. The lower end of the screw 13 of the linear screw is rotatably connected to the upper end of the insulating rod 2. , the nut seat 14 of the linear screw rod is installed on the screw rod support 6 through the pressure sensor 4, and the screw rod support 6 is a cross-arm clamping structure, so as to be stuck on the cross-arm during operation, the pressure sensor 4. Connect the control unit 12, the control unit 12 is connected to the display unit 5.

在本实施例中,直线丝杆采用加强型抗扭力省力直线丝杆,其材质为60Si2Mn,屈服强度大于800MPa,完全能满足丝杆在受力时的强度要求。压力传感器4采用圆柱式压力传感器,受力处安装压力轴承,螺母座14经压力轴承15与压力传感器4连接。螺母座14外侧与一金属横向摇杆16连接。丝杆支座按横担卡结构设计,采用LC4.c.s材料,屈服强度大于400MPa。显示单元为可充电式,量程为0-50KN。为了便于远程监测作业过程中的荷载,所述控制单元12上可以设置无线通信模块,以通过无线通信模块与外部的终端或系统建立无线连接并传输数据。无线通信可以采用蓝牙、WIFI等通信方式。In this embodiment, the linear screw adopts a reinforced torsion-resistance and labor-saving linear screw, which is made of 60Si2Mn and has a yield strength greater than 800MPa, which can fully meet the strength requirements of the screw under stress. The pressure sensor 4 adopts a cylindrical pressure sensor, and a pressure bearing is installed at the stressed place, and the nut seat 14 is connected with the pressure sensor 4 through the pressure bearing 15 . The outer side of the nut seat 14 is connected with a metal lateral rocker 16 . The screw support is designed according to the cross arm card structure, using LC4.c.s material, the yield strength is greater than 400MPa. The display unit is rechargeable with a range of 0-50KN. In order to facilitate the remote monitoring of the load during the operation, the control unit 12 may be provided with a wireless communication module, so as to establish a wireless connection with an external terminal or system and transmit data through the wireless communication module. The wireless communication may adopt communication methods such as Bluetooth and WIFI.

所述长度可调式绝缘拉棒2包括中空套管22、上连杆21及下连杆23,所述上连杆21下段、下连杆23上段分别穿设于中空套管22中并可上下伸缩,所述上连杆21上端连接直线丝杆的丝杆13,所述下连杆23下端连接叉型卡具3。所述上连杆21下段、下连杆23上段上沿长度方向分别设有若干个等距的定位孔24,所述中空套管22上沿长度方向对应开设有若干定位孔,以当上连杆21和下连杆23相对于中空套管22伸缩调节到所需长度时,通过高强度螺栓25穿过内外重合的定位孔并用高强度螺帽固定,实现绝缘拉棒的长度定位。The length-adjustable insulating rod 2 includes a hollow sleeve 22, an upper connecting rod 21 and a lower connecting rod 23. The lower section of the upper connecting rod 21 and the upper section of the lower connecting rod 23 are respectively penetrated in the hollow sleeve 22 and can go up and down. Telescopic, the upper end of the upper link 21 is connected to the lead screw 13 of the linear screw rod, and the lower end of the lower link 23 is connected to the fork-type clamp 3 . The lower section of the upper connecting rod 21 and the upper section of the lower connecting rod 23 are respectively provided with a number of equidistant positioning holes 24 along the length direction, and the hollow sleeve 22 is correspondingly provided with a number of positioning holes along the length direction, so that when the upper connecting rod is connected. When the rod 21 and the lower link 23 are telescopically adjusted to the required length relative to the hollow sleeve 22, the high-strength bolts 25 pass through the overlapping positioning holes inside and outside and are fixed with high-strength nuts to achieve the length positioning of the insulating rod.

在本实施例中,所述长度可调式绝缘拉棒2采用防潮填充管材料,符合 JB/T8150.2和IEC855的规定,具有机械强度高(#32,20吨)、抗拉、抗扭和可调节长度等特性,绝缘性能足以满足带电作业的要求。In this embodiment, the length-adjustable insulating pull rod 2 is made of moisture-proof filling pipe material, which complies with the regulations of JB/T8150.2 and IEC855, and has high mechanical strength (#32, 20 tons), tensile resistance, torsion resistance and Adjustable length and other characteristics, the insulation performance is sufficient to meet the requirements of live work.

所述叉型卡具3上端与绝缘拉棒2下端连接,所述叉型卡具3下端的两个卡具上设有用于连接三角联板的插销。在本实施例中,所述叉型卡具为可调式叉型卡具,包括拉棒连接部31、横向连接部32和两个卡具33,所述拉棒连接部31上端与绝缘拉棒2下端螺纹连接,所述拉棒连接部31下端与横向连接部32中部固定连接,所述两个卡具33上端分别与横向连接部32左右两侧部转动连接,以调节两个卡具所成的叉角,使叉型卡具适用于不同型号的三角联板,所述卡具33下端设有插销34,以插置于三角联板9的预留孔中,实现叉型卡具3与三角联板9的连接。所述叉型卡具采用超硬铝合金 LC4.c.s材料。The upper end of the fork-shaped clamp 3 is connected with the lower end of the insulating pull rod 2 , and the two clamps at the lower end of the fork-shaped clamp 3 are provided with pins for connecting the triangular connecting plates. In this embodiment, the fork-type clamp is an adjustable fork-type clamp, including a pull rod connecting part 31, a transverse connecting part 32 and two clamps 33. The upper end of the pull rod connecting part 31 is connected to the insulating pull rod. 2. The lower end is threadedly connected, the lower end of the pulling rod connecting part 31 is fixedly connected with the middle part of the transverse connecting part 32, and the upper ends of the two clamps 33 are respectively connected with the left and right sides of the transverse connecting part 32 in rotation, so as to adjust the position of the two clamps. The formed fork angle makes the fork-type clamp suitable for different types of triangular coupling plates. The lower end of the clamp 33 is provided with a pin 34 to be inserted into the reserved hole of the triangular coupling plate 9 to realize the fork-shaped clamp 3 Connection to delta joint plate 9. The fork-type fixture adopts super-hard aluminum alloy LC4.c.s material.

本发明还提供了利用上述装置带电更换双联绝缘子串的作业方法,包括以下步骤:The present invention also provides an operation method for using the above-mentioned device to replace the double-connected insulator string with electricity, including the following steps:

1)作业人员登塔至横担7位置,地面人员将所述装置起吊至塔上;1) The operator climbs the tower to the 7th position of the cross arm, and the ground personnel lift the device to the tower;

2)作业人员调节长度可调式绝缘拉棒2的长度,使其匹配绝缘子串8;2) The operator adjusts the length of the adjustable length insulating rod 2 to match the insulator string 8;

3)使丝杆支座6卡在横担上,并通过绝缘操作杆远程调节叉型卡具3下端两个卡具33所成的叉角,使卡具33上的插销34插置于三角联板9的预留孔内;3) The screw support 6 is clamped on the cross arm, and the fork angle formed by the two clamps 33 at the lower end of the fork clamp 3 is remotely adjusted through the insulating operating rod, so that the latch 34 on the clamp 33 is inserted into the triangle. In the reserved hole of the connecting plate 9;

4)作业人员收紧直线丝杆1,并观测显示单元5显示的压力值,在荷载允许范围内提升导线11,使悬垂绝缘子串8松弛,从而实现地电位带电更换双联悬垂绝缘子串。4) The operator tightens the linear screw 1, observes the pressure value displayed by the display unit 5, lifts the wire 11 within the allowable load range, and relaxes the pendant insulator string 8, thereby realizing the replacement of the double pendant insulator string with the ground potential live.

本发明装置中,压力传感器数显丝杆能直观、实时显示起吊荷载并可通过无线传输,方便地在地面终端设备进行接收和监测。叉型卡具的设计取代传统金属双钩,并通过远程操作两个卡具的叉角,使叉型卡具适用于不同型号三角联板。叉型卡具的运用有效避免了传统金属双钩对导线的伤害,同时叉型卡具与拉棒连接部位金具总长度约200mm,避免了传统方式中金具双钩在起吊及安装过程中短接过多绝缘子而引发的安全隐患问题。整套作业流程所需工器具较少,采用叉型卡具能够始终保证三角联板处于受力状态,丝杆仅需提升3~5公分就可以使绝缘子串松弛,大大降低了导线侧第一片绝缘子进出碗头的操作难度。In the device of the present invention, the digital display screw rod of the pressure sensor can display the hoisting load in an intuitive and real-time manner, and can receive and monitor the terminal equipment on the ground conveniently through wireless transmission. The design of the fork-type clamp replaces the traditional metal double hook, and the fork-type clamp is suitable for different types of triangular coupling plates by remotely operating the fork angles of the two clamps. The use of the fork-type clamp effectively avoids the damage of the traditional metal double hook to the wire. At the same time, the total length of the hardware at the connection between the fork-type clamp and the pull rod is about 200mm, which avoids excessive short-circuiting during the lifting and installation process in the traditional method. Safety hazards caused by insulators. The whole operation process requires less tools. The use of fork-type clamps can always ensure that the triangular coupling plate is in a stressed state. The screw rod only needs to be lifted by 3~5 cm to loosen the insulator string, which greatly reduces the first piece on the wire side. Difficulty in getting insulators in and out of the bowl head.

以上是本发明的较佳实施例,凡依本发明技术方案所作的改变,所产生的功能作用未超出本发明技术方案的范围时,均属于本发明的保护范围。The above are the preferred embodiments of the present invention, and all changes made according to the technical solutions of the present invention, if the resulting functional effects do not exceed the scope of the technical solutions of the present invention, belong to the protection scope of the present invention.

Claims (8)

1. The pressure-measurable type device for live replacement of the duplex insulator string is characterized by comprising a pressure sensor digital display lead screw, a length-adjustable insulating pull rod and a fork-shaped fixture, wherein the pressure sensor digital display lead screw comprises a linear lead screw, a lead screw support, a pressure sensor, a control unit and a display unit, the lower end of the lead screw of the linear lead screw is connected with the upper end of the insulating pull rod, a nut seat of the linear lead screw is installed on the lead screw support through the pressure sensor, the lead screw support is of a cross arm clamp structure, the pressure sensor is connected with the control unit, and the control unit is connected with the display unit; the upper end of the forked fixture is connected with the lower end of the insulating pull rod, and the two fixtures at the lower end of the forked fixture are provided with bolts for connecting the triangular connecting plates.
2. The device for live replacement of a duplex insulator string with a voltage tester according to claim 1, wherein the pressure sensor is a cylindrical pressure sensor, and the nut holder is connected with the pressure sensor through a pressure bearing.
3. The device for live replacement of a duplex insulator string with a voltage tester according to claim 1, wherein the control unit is provided with a wireless communication module for establishing wireless connection with an external terminal or system through the wireless communication module and transmitting data.
4. The device for live replacement of a duplex insulator string with a voltage tester according to claim 1, wherein the outside of the nut holder is connected with a metal transverse rocker.
5. The voltage-measurable duplex insulator string device capable of being charged and replaced according to claim 1, wherein the length-adjustable insulating pull rod comprises a hollow sleeve, an upper connecting rod and a lower connecting rod, the lower section of the upper connecting rod and the upper section of the lower connecting rod are respectively arranged in the hollow sleeve in a penetrating manner and can be stretched up and down, the upper end of the upper connecting rod is connected with a lead screw of a linear lead screw, and the lower end of the lower connecting rod is connected with a fork-shaped fixture.
6. The device of claim 5, wherein the lower section of the upper connecting rod and the upper section of the lower connecting rod are respectively provided with a plurality of positioning holes at equal intervals along the length direction, and the hollow sleeve is correspondingly provided with a plurality of positioning holes along the length direction, so that when the upper connecting rod and the lower connecting rod are adjusted to a required length relative to the hollow sleeve in a telescopic manner, the insulating pull rod is positioned in length by passing a high-strength bolt through the positioning holes which are overlapped inside and outside and fixing the insulating pull rod by a high-strength nut.
7. The measurable voltage type double-insulator string replacing device with electricity as claimed in claim 1, wherein the fork-shaped fixture comprises a pull rod connecting part, a transverse connecting part and two fixtures, the upper end of the pull rod connecting part is in threaded connection with the lower end of the insulating pull rod, the lower end of the pull rod connecting part is fixedly connected with the middle part of the transverse connecting part, the upper ends of the two fixtures are respectively rotatably connected with the left side part and the right side part of the transverse connecting part to adjust a fork angle formed by the two fixtures, so that the fork-shaped fixture is suitable for different types of triangular yoke plates, and the lower end of the fixture is provided with a plug pin to be inserted into a reserved hole of the triangular yoke plate to realize the connection of the fork-shaped fixture and the triangular yoke plate.
8. A pressure-measurable operation method for live replacement of duplex insulator strings is characterized by comprising the following steps:
1) the operating personnel ascend the tower to the cross arm position, and the ground personnel hoist the device to the tower;
2) the operator adjusts the length of the length-adjustable insulating pull rod to match with the insulator string;
3) the screw rod support is clamped on the cross arm, and a fork angle formed by two clamps at the lower end of the fork-shaped clamp is remotely adjusted through an insulating operating rod, so that a plug pin on the clamp is inserted into a reserved hole of the triangular yoke plate;
4) the operator tightens up the linear screw rod, observes the pressure value that the display element shows, promotes the wire in load allowed range, makes the insulator chain that dangles relax to realize that the ground potential is electrified and change pair and dangle insulator chain.
CN202010650151.7A 2020-07-08 2020-07-08 Pressure-measurable live replacement device for double insulator strings and operation method Active CN111697487B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010650151.7A CN111697487B (en) 2020-07-08 2020-07-08 Pressure-measurable live replacement device for double insulator strings and operation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010650151.7A CN111697487B (en) 2020-07-08 2020-07-08 Pressure-measurable live replacement device for double insulator strings and operation method

Publications (2)

Publication Number Publication Date
CN111697487A true CN111697487A (en) 2020-09-22
CN111697487B CN111697487B (en) 2025-03-04

Family

ID=72484999

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010650151.7A Active CN111697487B (en) 2020-07-08 2020-07-08 Pressure-measurable live replacement device for double insulator strings and operation method

Country Status (1)

Country Link
CN (1) CN111697487B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112366590A (en) * 2020-10-30 2021-02-12 国网山东省电力公司青岛供电公司 Replacing tool and replacing method for replacing horizontally-arranged strain pole cross arm in electrified mode
CN114123027A (en) * 2021-11-24 2022-03-01 国网江苏省电力有限公司检修分公司 Steel tube tower linear double-I-string clamp and operation method thereof

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102208776A (en) * 2011-03-22 2011-10-05 福建省电力有限公司厦门电业局 Working tool for live-line replacement of insulator chain of triangle link plate hanging point type and working method thereof
CN105932599A (en) * 2016-06-17 2016-09-07 国网湖南省电力公司带电作业中心 Tool set capable of replacing insulator chain of ultra-high-voltage transmission line under electrified state and use method for tool set
CN106300138A (en) * 2016-10-27 2017-01-04 国网浙江省电力公司绍兴供电公司 A kind of fixture of live-line replacing strain single insulator
CN210201322U (en) * 2019-05-13 2020-03-27 中国南方电网有限责任公司超高压输电公司广州局 Prevent that insulator from falling string intelligence and reminding fixture
CN110992789A (en) * 2019-11-19 2020-04-10 宁海县雁苍山电力建设有限公司 A training device for live replacement of tensile rod insulator strings
CN212435212U (en) * 2020-07-08 2021-01-29 国网福建省电力有限公司 Pressure-measurable live replacement double insulator string device

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102208776A (en) * 2011-03-22 2011-10-05 福建省电力有限公司厦门电业局 Working tool for live-line replacement of insulator chain of triangle link plate hanging point type and working method thereof
CN105932599A (en) * 2016-06-17 2016-09-07 国网湖南省电力公司带电作业中心 Tool set capable of replacing insulator chain of ultra-high-voltage transmission line under electrified state and use method for tool set
CN106300138A (en) * 2016-10-27 2017-01-04 国网浙江省电力公司绍兴供电公司 A kind of fixture of live-line replacing strain single insulator
CN210201322U (en) * 2019-05-13 2020-03-27 中国南方电网有限责任公司超高压输电公司广州局 Prevent that insulator from falling string intelligence and reminding fixture
CN110992789A (en) * 2019-11-19 2020-04-10 宁海县雁苍山电力建设有限公司 A training device for live replacement of tensile rod insulator strings
CN212435212U (en) * 2020-07-08 2021-01-29 国网福建省电力有限公司 Pressure-measurable live replacement double insulator string device

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112366590A (en) * 2020-10-30 2021-02-12 国网山东省电力公司青岛供电公司 Replacing tool and replacing method for replacing horizontally-arranged strain pole cross arm in electrified mode
CN112366590B (en) * 2020-10-30 2022-03-01 国网山东省电力公司青岛供电公司 Replacing tool and replacing method for replacing horizontally-arranged strain pole cross arm in electrified mode
CN114123027A (en) * 2021-11-24 2022-03-01 国网江苏省电力有限公司检修分公司 Steel tube tower linear double-I-string clamp and operation method thereof
CN114123027B (en) * 2021-11-24 2024-03-01 国网江苏省电力有限公司检修分公司 A linear double I string fixture for steel pipe towers and its operating method

Also Published As

Publication number Publication date
CN111697487B (en) 2025-03-04

Similar Documents

Publication Publication Date Title
CN100464474C (en) Method and device for live replacement of tension insulator strings for high-voltage transmission lines
WO2012088987A1 (en) Maintenance tool for insulator of direct current transmission line
CN107069562B (en) Replacing insulator under electrified method and load transfer device
CN103594968B (en) A kind of transmission tower multiple fission conductor lifting device
CN204144479U (en) A kind of earth connection
CN101546894B (en) Method for replacing 220KV steel pipe tower composite insulator electrifiedly
CN111697487B (en) Pressure-measurable live replacement device for double insulator strings and operation method
CN106450835A (en) Shoe manufacturer high voltage wire landing device
CN114865524A (en) Wire side fixture for indirectly live replacement of 10kV line tension insulator and use method
CN201075410Y (en) Insulated Line Grounding Wire Quick Hanging Tool
CN103779809B (en) The two oidiospore wire pitch operational method of charged adjustment
CN208337014U (en) A kind of charged for replacement Voltage for Insulators on HV Lines lifting block hanging point heightening device
CN102496887A (en) Folding live-working safety shelter
CN110707599B (en) A special tool for live adjustment of 220kv vertically arranged double-split conductor sag
CN212435212U (en) Pressure-measurable live replacement double insulator string device
CN208656288U (en) The replacement tool of ground electrode circuit insulator and fitting
CN205565515U (en) Overhead OPGW composite optical cable ground wire riser
CN103606849B (en) Transmission tower multiple fission conductor live line working lifting device and special mould clamp thereof
CN107091943A (en) A kind of high-altitude wiring clamp device and its field application method
CN104022461A (en) Tool capable of replacing 500KV straight-line single-connection double-string horizontal insulator
CN105977860B (en) A kind of replacement overhead transmission line composite cross-arm insulator device and method
CN210779813U (en) Special tool for adjusting sag of 220kV vertically-arranged double-bundle conductor in electrified manner
CN204012433U (en) Change the two string of 500kV straight line simply connected horizontal insulator instrument
CN203352055U (en) Electric pole grounding downlead lifting apparatus
CN205081393U (en) Electrified insulator chain lifting mechanism

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant