CN106285476A CN201610764453.0A CN201610764453A CN106285476A CN 106285476 A CN106285476 A CN 106285476A CN 201610764453 A CN201610764453 A CN 201610764453A CN 106285476 A CN106285476 A CN 106285476A
Authority
CN
China
Prior art keywords
well
target
real
guided modes
drilling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610764453.0A
Other languages
Chinese (zh)
Other versions
CN106285476B (en
Inventor
廖朋
张水山
刘其军
邓萍
刘勇江
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Geophysical Survey Research Institute,Jianghan Oilfield Branch,China Petrochemical Corporation
China Petrochemical Corp
Original Assignee
GEOPHYSICAL SURVEY RESEARCH INSTITUTE JIANGHAN OILFIELD BRANCH CHINA PETROCHEMICAL Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GEOPHYSICAL SURVEY RESEARCH INSTITUTE JIANGHAN OILFIELD BRANCH CHINA PETROCHEMICAL Corp filed Critical GEOPHYSICAL SURVEY RESEARCH INSTITUTE JIANGHAN OILFIELD BRANCH CHINA PETROCHEMICAL Corp
Priority to CN201610764453.0A priority Critical patent/CN106285476B/en
Publication of CN106285476A publication Critical patent/CN106285476A/en
Application granted granted Critical
Publication of CN106285476B publication Critical patent/CN106285476B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • E21B7/04Directional drilling
    • E21B7/046Directional drilling horizontal drilling
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]

Abstract

The invention discloses a kind of horizontal drilling Real-time Seismic geological syntheses guidance method, the method comprises the following steps: 1) in known oil gas field work area, three-dimensional prestack time is turned deep seismic data and explains, obtain and treat the initial guided modes of drilling well;2) each reference lamina in oil gas field work area and purpose oil-gas Layer and the lithology of adjacent formations, electrical and Seismic reflection character are determined;3), before positive drilling well enters target, velocity field is carried out real-time update, obtains positive drilling well modified model guided modes;4) when target will be entered after positive drilling well is bored and met reference lamina, it was predicted that positive drilling well enters the target spot height above sea level degree of depth, and carries out track optimizing before target;5) after positive drilling well enters target, renewal speed field again, to obtain up-to-date guided modes;6) under the guidance of up-to-date guided modes, analyze in conjunction with real boring, carry out horizontal segment guiding.The present invention provides a kind of Seismology and Geology integrated guidance method that can revise guided modes in real time, it is ensured that horizontal well can accurately enter target zone, and efficiently walks in target zone.

Description

A kind of horizontal drilling Real-time Seismic geological syntheses guidance method
Technical field
The present invention relates to natural petroleum gas field technical field, particularly relate to a kind of horizontal drilling Real-time Seismic geological syntheses Guidance method.
Background technology
Horizontal drilling can be significantly increased the draining gas area of target payzone, improves the production efficiency of oil-gas Layer, is fine and close The key of the unconventionaloil pool reservoir Efficient Development such as oil reservoir, shale gas reservoir.In the drilling process of horizontal well, guide and play to pass Important effect, it is to ensure that horizontal well accurately enters target zone, the key that safeguard level section is efficiently walked in oil-gas Layer, directly Connect the single well productivity affecting horizontal well.
Traditional horizontal drilling guides and generally comprises: before boring, guided modes is set up, entered track optimizing and horizontal segment ground before target Matter guides.At present, during horizontal drilling guides, guided modes is the most changeless, when guided modes and reality occur When brill strata condition is not inconsistent, it is difficult to the most effectively Guidance Levels well drilling well.
Summary of the invention
The technical problem to be solved in the present invention is for defect of the prior art, it is provided that a kind of horizontal drilling is in real time Shake geological syntheses guidance method.
The technical solution adopted for the present invention to solve the technical problems is: a kind of horizontal drilling Real-time Seismic geological syntheses is led To method, comprise the following steps:
1) in known oil gas field work area, existing three-dimensional prestack time is turned deep seismic data and explains, implement work area geology structure Make feature and purpose oil-gas Layer structural configuration, be initial guided modes to cross the seismic profile of well bore track to be drilled;
2) lead a well rock core, well logging and well-log information according to the finishing drilling of oil gas field work area, regional stratum is divided, determines region The lithology of each reference lamina and purpose oil-gas Layer and adjacent formations, electrically and Seismic reflection character;
3), before positive drilling well enters target, collect the new drilled well of acquisition in time and bore the coordinate of reference lamina characteristic point, reinforcing the heart height above sea level and vertical depth in fact Data, carry out real-time update, and utilize most current speed field that three-dimensional prestack time seismic data is turned depths reason velocity field; Then, in up-to-date prestack time turns deep seismic data cube, the seismic profile of decimated positive well-drilling borehole track is led as modified model To model;
Velocity field real time updating method is as follows: collect in time new drilled well real bore the coordinate of reference lamina characteristic point, reinforcing the heart height above sea level and Vertical depth data, on the premise of old velocity field is as quality control, calculate Error Trend face;In conjunction with obtaining initial guided modes Velocity field Error Trend face is corrected;Volume is repaiied on the premise of finally the Error Trend face after correction being carried out quality control Whole district's 3D velocity field;
4) when target will be entered after positive drilling well is bored and met reference lamina, according to the neighbouring vertical thickness of oil-gas Layer led a well or bored offset well, knot Close reference lamina feature and modified model guided modes, comprehensively analyze and calculate, it was predicted that positive drilling well enters the target spot height above sea level degree of depth, goes forward side by side Row enters track optimizing before target;
5) after positive drilling well enters target, if the target zone degree of depth in guided modes and the real absolute error piercing the target spot target zone degree of depth Exceed the 10% of target zone thickness, utilize this to enter the target spot real brill coordinate of reference lamina characteristic point, reinforcing the heart height above sea level and vertical depth number the most in time Again update according to velocity field, obtain the most up-to-date guided modes;
6) under the guidance of up-to-date guided modes, analyze in conjunction with real boring, carry out horizontal segment guiding.
By such scheme, described step 6) enters the guiding of the horizontal segment after target and can be subdivided into three aspects: drill bit is in target Location confirmation in Ceng, drilling direction confirms with the relation of stratigraphic dip, and drill bit earth layer in front situation anticipation and well track adjust;
6.1) drill bit location confirmation in destination layer: according to reference lamina feature analysis, survey in conjunction with well logging lithology, gas and bore the time-division Analysis, launches the research of substratum fine correlation, determines the substratum residing for drill bit and away from the distance at the bottom of this substratum top;Such as guided modes The target zone degree of depth exceedes the 10% of target zone thickness with real target zone degree of depth absolute error of boring, and need to bore target zone characteristic point according to real Coordinate, reinforcing the heart height above sea level and vertical depth data carry out velocity field update with guided modes substitute;
6.2) drilling direction confirms with the relation of stratigraphic dip: according to Measurement While Drilling Data and stratigraphic dip relation, it is judged that bore in fact Mutual meet relation between track and substratum;Described Measurement While Drilling Data includes the vertical depth of positive drilling well, depth measurement, hole angle, side Parallactic angle;
6.3) anticipation of drill bit earth layer in front situation and well track adjust: according to up-to-date guided modes, by producing earth layer in front Shape, the judgement of structure situation, in conjunction with the analysis of first two steps, walk at high-quality purpose oil gas interval to greatest extent controlling well track For principle, well track is made monitoring in real time and adjusts, guide orientation construction.
The beneficial effect comprise that: the present invention is directed to initial guided modes in prior art immobilize be difficult to full Full international standard drilling guidance, it is provided that a kind of Seismology and Geology integrated guidance method that can revise guided modes in real time, the present invention exists The guided modes of different drilling phases is change, and becomes closer to the geology fact that drilling well discloses, the most finely, symbol Close the real-time that horizontal drilling guides, it is ensured that horizontal well can accurately enter target zone, and efficiently walks in target zone.
Accompanying drawing explanation
Below in conjunction with drawings and Examples, the invention will be further described, in accompanying drawing:
Fig. 1 is the initial guided modes of the embodiment of the present invention;
Fig. 2 is each reference lamina Seismic reflection character figure of embodiment of the present invention region;
Fig. 3 is each reference lamina lithology and the electrical property feature figure of embodiment of the present invention region;
Fig. 4 is the velocity field real-time update flow chart that the present invention proposes;
Fig. 5 is the modified model guided modes in embodiment of the present invention implementation process according to new drilled well acquisition of information;
Fig. 6 is that the embodiment of the present invention enters target spot vertical depth prognostic chart;
Fig. 7 is according to entering the up-to-date guided modes of acquisition of information after target in embodiment of the present invention implementation process;
Fig. 8 is embodiment of the present invention live effect figure;
Fig. 9 is embodiment of the present invention method flow diagram.
Detailed description of the invention
In order to make the purpose of the present invention, technical scheme and advantage clearer, below in conjunction with embodiment, to the present invention It is further elaborated.Should be appreciated that specific embodiment described herein, only in order to explain the present invention, is not used to limit Determine the present invention.
As it is shown in figure 9, a kind of horizontal drilling Real-time Seismic geological syntheses guidance method, comprise the following steps:
1) in known oil gas field work area, existing three-dimensional prestack time is turned deep seismic data and explains, implement work area geology structure Make feature and purpose oil-gas Layer structural configuration, be initial guided modes to cross the seismic profile of well bore track to be drilled;
2) lead a well rock core, well logging and well-log information according to the finishing drilling of oil gas field work area, regional stratum is divided, determines region The lithology of each reference lamina and purpose oil-gas Layer and adjacent formations, electrically and Seismic reflection character;
3), before positive drilling well enters target, collect the new drilled well of acquisition in time and bore the coordinate of reference lamina characteristic point, reinforcing the heart height above sea level and vertical depth in fact Data, carry out real-time update, and utilize most current speed field that three-dimensional prestack time seismic data is turned depths reason velocity field; Then, in up-to-date prestack time turns deep seismic data cube, the seismic profile of decimated positive well-drilling borehole track is led as modified model To model;
Velocity field real time updating method is as follows: collect in time new drilled well real bore the coordinate of reference lamina characteristic point, reinforcing the heart height above sea level and Vertical depth data, on the premise of old velocity field is as quality control, calculate Error Trend face;In conjunction with obtaining initial guided modes Velocity field Error Trend face is corrected;Volume is repaiied on the premise of finally the Error Trend face after correction being carried out quality control Whole district's 3D velocity field;
4) when target will be entered after positive drilling well is bored and met reference lamina, according to the neighbouring vertical thickness of oil-gas Layer led a well or bored offset well, knot Close reference lamina feature and modified model guided modes, comprehensively analyze and calculate, it was predicted that positive drilling well enters the target spot height above sea level degree of depth, goes forward side by side Row enters track optimizing before target;
5) after positive drilling well enters target, if the target zone degree of depth in guided modes and the real absolute error piercing the target spot target zone degree of depth Exceed the 10% of target zone thickness, utilize this to enter the target spot real brill coordinate of reference lamina characteristic point, reinforcing the heart height above sea level and vertical depth number the most in time Again update according to velocity field, obtain the most up-to-date guided modes;
6) under the guidance of up-to-date guided modes, analyze in conjunction with real boring, carry out horizontal segment guiding.
Step 6) enters the horizontal segment after target guide and can be subdivided into three aspects: drill bit location confirmation in destination layer, Drilling direction confirms with the relation of stratigraphic dip, and drill bit earth layer in front situation anticipation and well track adjust;
6.1) drill bit location confirmation in destination layer: according to reference lamina feature analysis, survey in conjunction with well logging lithology, gas and bore the time-division Analysis, launches the research of substratum fine correlation, determines the substratum residing for drill bit and away from the distance at the bottom of this substratum top;Such as guided modes The target zone degree of depth exceedes the 10% of target zone thickness with real target zone degree of depth absolute error of boring, and need to bore target zone characteristic point according to real Coordinate, reinforcing the heart height above sea level and vertical depth data carry out velocity field update with guided modes substitute;
6.2) drilling direction confirms with the relation of stratigraphic dip: according to Measurement While Drilling Data and stratigraphic dip relation, it is judged that bore in fact Mutual meet relation between track and substratum;Described Measurement While Drilling Data includes the vertical depth of positive drilling well, depth measurement, hole angle, side Parallactic angle;
6.3) anticipation of drill bit earth layer in front situation and well track adjust: according to up-to-date guided modes, by producing earth layer in front Shape, the judgement of structure situation, in conjunction with the analysis of first two steps, walk at high-quality purpose oil gas interval to greatest extent controlling well track For principle, well track is made monitoring in real time and adjusts, guide orientation construction.
Further the inventive method is illustrated below in conjunction with instantiation and schematic diagram:
1) in known oil gas field work area, three-dimensional prestack time is turned deep seismic data and explains, to cross well bore track to be drilled Seismic profile be initial guided modes.As it is shown in figure 1, mark platform, A target spot, B target spot projected position on section, A target Point and the B target spot height above sea level degree of depth, away from, A-B horizontal range before target, A-B stratigraphic dip.
2) lead based on a well rock core, well logging and well-log information by the finishing drilling of oil gas field work area, regional stratum divided, Determine each reference lamina in region and purpose oil-gas Layer and the lithology of adjacent formations, electrical and Seismic reflection character, guided for follow-up In journey, the determination of bit location lays the foundation.Fig. 2 is each reference lamina (P1、sand-top、O3W) response on seismic profile is special Levying, Fig. 3 is each substratum of oil-gas Layer and overlying turbid long-pending sand response characteristic on log, and 1. the target zone of horizontal development well is ~ 3. substratum, thickness about 40m.
3) positive drilling well is before three open, and has new well finishing drilling in oil gas field work area.Now, new drilled well real brill reference lamina is collected The coordinate of characteristic point, reinforcing the heart height above sea level and vertical depth data, carry out real-time update, more new technological process as shown in Figure 4 to velocity field.
4) utilize most current speed field that three-dimensional prestack time seismic data is turned depths reason, then obtain modified model and guide Model, track before entering target is optimized by last foundation modified model guided modes.As it is shown in figure 5, compared with original guided modes, A target spot in modified model guided modes, the B target spot prediction height above sea level degree of depth the most relatively before deep 53m, 95m;A-B stratum form is by it Front micro-have a down dip (0.22 °) has become two sections of amplitudes bigger have a down dip (1.5 °, 5.5 °).
5) three open target before, bore and meet after turbid long-pending sand reference lamina (sand-top), in conjunction with reference lamina feature (Fig. 2, Fig. 3) and Modified model guided modes (Fig. 5), again predicts that into the target spot height above sea level degree of depth be-2718m, as shown in Figure 6, optimizes track further.
6) after entering target, real bore the A target spot height above sea level degree of depth be the A target spot height above sea level degree of depth in-2718m, with modified model guided modes (- 2723m, Fig. 5) absolute error be 5m, exceeded the 10% of major pay thickness (40m).Therefore, mesh at real brill A target spot is utilized The coordinate of layer, reinforcing the heart height above sea level and vertical depth data, again carry out velocity field real-time update and turn with three-dimensional prestack time seismic data Depths is managed, and obtains up-to-date guided modes.As it is shown in fig. 7, A-B stratum form is had a down dip change by the big section of two in modified model guided modes In order to six segments in up-to-date guided modes rise and fall.
7) with up-to-date guided modes for instructing, combine the position in destination layer of drill bit during real boring, drilling direction and The relation of stratigraphic dip, carries out drilling guidance to horizontal segment, is eventually led to effect fine.In Fig. 8, A-B horizontal segment 1. ~ the least The layer rate of walking is 100%.
By comparing, the present invention is change at the guided modes of different drilling phases, and becomes closer to drilling well and take off The geology shown is true, and the most finely, this has met the real-time that horizontal drilling guides.
It should be appreciated that for those of ordinary skills, can be improved according to the above description or be converted, And all these modifications and variations all should belong to the protection domain of claims of the present invention.

Claims (2)

1. a horizontal drilling Real-time Seismic geological syntheses guidance method, it is characterised in that comprise the following steps:
1) in known oil gas field work area, existing three-dimensional prestack time is turned deep seismic data and explains, implement work area geology structure Make feature and purpose oil-gas Layer structural configuration, be initial guided modes to cross the seismic profile of well bore track to be drilled;
2) lead a well rock core, well logging and well-log information according to the finishing drilling of oil gas field work area, regional stratum is divided, determines region The lithology of each reference lamina and purpose oil-gas Layer and adjacent formations, electrically and Seismic reflection character;
3), before positive drilling well enters target, collect the new drilled well of acquisition in time and bore the coordinate of reference lamina characteristic point, reinforcing the heart height above sea level and vertical depth in fact Data, carry out real-time update, and utilize most current speed field that three-dimensional prestack time seismic data is turned depths reason velocity field; Then, in up-to-date prestack time turns deep seismic data cube, the seismic profile of decimated positive well-drilling borehole track is led as modified model To model;
Velocity field real time updating method is as follows: collect in time new drilled well real bore the coordinate of reference lamina characteristic point, reinforcing the heart height above sea level and Vertical depth data, on the premise of old velocity field is as quality control, calculate Error Trend face;In conjunction with obtaining initial guided modes Velocity field Error Trend face is corrected;Volume is repaiied on the premise of finally the Error Trend face after correction being carried out quality control Whole district's 3D velocity field;
4) when target will be entered after positive drilling well is bored and met reference lamina, according to the neighbouring vertical thickness of oil-gas Layer led a well or bored offset well, knot Close reference lamina feature and modified model guided modes, comprehensively analyze and calculate, it was predicted that positive drilling well enters the target spot height above sea level degree of depth, goes forward side by side Row enters track optimizing before target;
5) after positive drilling well enters target, if the target zone degree of depth in guided modes and the real absolute error piercing the target spot target zone degree of depth Exceed the 10% of target zone thickness, utilize this to enter the target spot real brill coordinate of reference lamina characteristic point, reinforcing the heart height above sea level and vertical depth number the most in time Again update according to velocity field, obtain the most up-to-date guided modes;
6) under the guidance of up-to-date guided modes, analyze in conjunction with real boring, carry out horizontal segment guiding.
Horizontal drilling the most according to claim 1 real-time geology integrated guidance method, it is characterised in that in described step 6) Enter the guiding of the horizontal segment after target and can be subdivided into three aspects: drill bit location confirmation in destination layer, drilling direction inclines with stratum The relation at angle confirms, drill bit earth layer in front situation anticipation and well track adjust;
6.1) drill bit location confirmation in destination layer: according to reference lamina feature analysis, survey in conjunction with well logging lithology, gas and bore the time-division Analysis, launches the research of substratum fine correlation, determines the substratum residing for drill bit and away from the distance at the bottom of this substratum top;Such as guided modes The target zone degree of depth exceedes the 10% of target zone thickness with real target zone degree of depth absolute error of boring, and need to bore target zone characteristic point according to real Coordinate, reinforcing the heart height above sea level and vertical depth data carry out velocity field update with guided modes substitute;
6.2) drilling direction confirms with the relation of stratigraphic dip: according to Measurement While Drilling Data and stratigraphic dip relation, it is judged that bore in fact Mutual meet relation between track and substratum;Described Measurement While Drilling Data includes the vertical depth of positive drilling well, depth measurement, hole angle, side Parallactic angle;
6.3) anticipation of drill bit earth layer in front situation and well track adjust: according to up-to-date guided modes, by producing earth layer in front Shape, the judgement of structure situation, in conjunction with the analysis of first two steps, walk at high-quality purpose oil gas interval to greatest extent controlling well track For principle, well track is made monitoring in real time and adjusts, guide orientation construction.
CN201610764453.0A 2016-08-30 2016-08-30 A kind of horizontal drilling Real-time Seismic geological syntheses guidance method Active CN106285476B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610764453.0A CN106285476B (en) 2016-08-30 2016-08-30 A kind of horizontal drilling Real-time Seismic geological syntheses guidance method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610764453.0A CN106285476B (en) 2016-08-30 2016-08-30 A kind of horizontal drilling Real-time Seismic geological syntheses guidance method

Publications (2)

Publication Number Publication Date
CN106285476A true CN106285476A (en) 2017-01-04
CN106285476B CN106285476B (en) 2018-12-18

Family

ID=57675529

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610764453.0A Active CN106285476B (en) 2016-08-30 2016-08-30 A kind of horizontal drilling Real-time Seismic geological syntheses guidance method

Country Status (1)

Country Link
CN (1) CN106285476B (en)

Cited By (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106894761A (en) * 2017-01-13 2017-06-27 武汉时代地智科技股份有限公司 Using the geosteering method of the geosteering model of time-domain seismic volume
CN106940450A (en) * 2017-01-13 2017-07-11 武汉时代地智科技股份有限公司 Geosteering method for establishing model based on time-domain seismic volume
CN107818217A (en) * 2017-10-30 2018-03-20 中国石油化工股份有限公司 A kind of seismic-guided method based on horizontal well heuristic visual analysis
CN108132485A (en) * 2017-11-16 2018-06-08 中国石油天然气股份有限公司 A kind of data processing method and device
CN108549101A (en) * 2018-06-28 2018-09-18 中国石油化工股份有限公司江汉油田分公司物探研究院 Seismic data processing technique and device
CN108625782A (en) * 2018-05-30 2018-10-09 徐芝香 A kind of horizontal well inclination section geosteering method
CN109190318A (en) * 2018-10-31 2019-01-11 中国石油化工股份有限公司 Inclined shaft well track calculating method based on time measure
CN109408837A (en) * 2017-08-16 2019-03-01 中国石油化工股份有限公司 A method of correction geosteering model
CN109557584A (en) * 2018-12-07 2019-04-02 防灾科技学院 A kind of horizontal drilling Real-time Seismic geological syntheses guidance method
CN111257945A (en) * 2018-11-30 2020-06-09 中国石油化工股份有限公司 Method for updating seismic velocity of stratum around drilled well section
CN111257937A (en) * 2018-11-30 2020-06-09 中国石油化工股份有限公司 Method for updating seismic velocity of stratum to be drilled
CN111257946A (en) * 2018-11-30 2020-06-09 中国石油化工股份有限公司 Geophysical drilling guiding method and method for updating stratum seismic velocity
CN111273342A (en) * 2018-12-05 2020-06-12 中国石油天然气股份有限公司 Prediction method and device for carbonate rock fracture-cave body and terminal
CN111722276A (en) * 2019-03-22 2020-09-29 中国石油天然气集团有限公司 Seismic guiding method and system for rock drilling
CN112578445A (en) * 2019-09-27 2021-03-30 中国石油天然气集团有限公司 Method and device for point-by-point guiding drilling of earthquake
CN112943217A (en) * 2021-02-22 2021-06-11 中海石油(中国)有限公司海南分公司 Remote intelligent logging analysis method and system
CN113323587A (en) * 2021-06-28 2021-08-31 数皮科技(湖北)有限公司 Multidimensional horizontal well guiding quantitative method based on drilling, recording and measuring data
CN113550734A (en) * 2020-04-07 2021-10-26 中国石油天然气集团有限公司 Shale gas horizontal well earthquake tracking method and device while drilling
CN113673801A (en) * 2020-11-02 2021-11-19 中国海洋石油集团有限公司 Quantitative analysis method for geological guiding construction quality
CN113738276A (en) * 2020-05-27 2021-12-03 中国石油化工股份有限公司 Control method and system for drilling horizontal well and drilling system for horizontal well
CN114764844A (en) * 2021-01-15 2022-07-19 中国石油天然气集团有限公司 Shale gas drilling optimization design method and device
CN115434688A (en) * 2022-08-16 2022-12-06 成都捷科思石油天然气技术发展有限公司 Drilling curve control method for logging while drilling of horizontal well

Cited By (31)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106940450A (en) * 2017-01-13 2017-07-11 武汉时代地智科技股份有限公司 Geosteering method for establishing model based on time-domain seismic volume
CN106940450B (en) * 2017-01-13 2018-11-02 武汉时代地智科技股份有限公司 Geosteering method for establishing model based on time-domain seismic volume
CN106894761A (en) * 2017-01-13 2017-06-27 武汉时代地智科技股份有限公司 Using the geosteering method of the geosteering model of time-domain seismic volume
CN109408837A (en) * 2017-08-16 2019-03-01 中国石油化工股份有限公司 A method of correction geosteering model
CN109408837B (en) * 2017-08-16 2021-10-19 中国石油化工股份有限公司 Method for correcting geosteering model
CN107818217B (en) * 2017-10-30 2021-02-26 中国石油化工股份有限公司 Seismic guiding method based on horizontal well exploration type visual analysis
CN107818217A (en) * 2017-10-30 2018-03-20 中国石油化工股份有限公司 A kind of seismic-guided method based on horizontal well heuristic visual analysis
CN108132485A (en) * 2017-11-16 2018-06-08 中国石油天然气股份有限公司 A kind of data processing method and device
CN108625782A (en) * 2018-05-30 2018-10-09 徐芝香 A kind of horizontal well inclination section geosteering method
CN108625782B (en) * 2018-05-30 2019-11-22 尤少华 A kind of horizontal well inclination section geosteering method
CN108549101A (en) * 2018-06-28 2018-09-18 中国石油化工股份有限公司江汉油田分公司物探研究院 Seismic data processing technique and device
CN108549101B (en) * 2018-06-28 2019-11-08 中国石油化工股份有限公司江汉油田分公司物探研究院 Seismic data processing technique and device
CN109190318A (en) * 2018-10-31 2019-01-11 中国石油化工股份有限公司 Inclined shaft well track calculating method based on time measure
CN109190318B (en) * 2018-10-31 2022-10-14 中国石油化工股份有限公司 Inclined shaft trajectory calculation method based on time measurement
CN111257937A (en) * 2018-11-30 2020-06-09 中国石油化工股份有限公司 Method for updating seismic velocity of stratum to be drilled
CN111257946A (en) * 2018-11-30 2020-06-09 中国石油化工股份有限公司 Geophysical drilling guiding method and method for updating stratum seismic velocity
CN111257945A (en) * 2018-11-30 2020-06-09 中国石油化工股份有限公司 Method for updating seismic velocity of stratum around drilled well section
CN111273342A (en) * 2018-12-05 2020-06-12 中国石油天然气股份有限公司 Prediction method and device for carbonate rock fracture-cave body and terminal
CN109557584A (en) * 2018-12-07 2019-04-02 防灾科技学院 A kind of horizontal drilling Real-time Seismic geological syntheses guidance method
CN111722276A (en) * 2019-03-22 2020-09-29 中国石油天然气集团有限公司 Seismic guiding method and system for rock drilling
CN112578445A (en) * 2019-09-27 2021-03-30 中国石油天然气集团有限公司 Method and device for point-by-point guiding drilling of earthquake
CN113550734A (en) * 2020-04-07 2021-10-26 中国石油天然气集团有限公司 Shale gas horizontal well earthquake tracking method and device while drilling
CN113738276A (en) * 2020-05-27 2021-12-03 中国石油化工股份有限公司 Control method and system for drilling horizontal well and drilling system for horizontal well
CN113673801A (en) * 2020-11-02 2021-11-19 中国海洋石油集团有限公司 Quantitative analysis method for geological guiding construction quality
CN114764844A (en) * 2021-01-15 2022-07-19 中国石油天然气集团有限公司 Shale gas drilling optimization design method and device
CN114764844B (en) * 2021-01-15 2023-11-28 中国石油天然气集团有限公司 Shale gas drilling optimization design method and device
CN112943217A (en) * 2021-02-22 2021-06-11 中海石油(中国)有限公司海南分公司 Remote intelligent logging analysis method and system
CN112943217B (en) * 2021-02-22 2022-07-12 中海石油(中国)有限公司海南分公司 Remote intelligent logging analysis method and system
CN113323587A (en) * 2021-06-28 2021-08-31 数皮科技(湖北)有限公司 Multidimensional horizontal well guiding quantitative method based on drilling, recording and measuring data
CN115434688A (en) * 2022-08-16 2022-12-06 成都捷科思石油天然气技术发展有限公司 Drilling curve control method for logging while drilling of horizontal well
CN115434688B (en) * 2022-08-16 2024-01-30 成都捷科思石油天然气技术发展有限公司 Drilling curve control method for logging while drilling of horizontal well

Also Published As

Publication number Publication date
CN106285476B (en) 2018-12-18

Similar Documents

Publication Publication Date Title
CN106285476B (en) A kind of horizontal drilling Real-time Seismic geological syntheses guidance method
US10119385B2 (en) Formation dip geo-steering method
US7546209B2 (en) Formation dip geo-steering method
US9534446B2 (en) Formation dip geo-steering method
US7359844B2 (en) Real time earth model for collaborative geosteering
CN104975808B (en) A kind of deep water horizontal well wellbore trace method of adjustment
CN109557584A (en) A kind of horizontal drilling Real-time Seismic geological syntheses guidance method
CN103510853B (en) A kind of coal bed gas horizontal well integrated guidance method
CN103774989B (en) Treat that drilling well Trajectory Design horizontal well geosteering analyzes method with boring dynamic modeling
CN108019150B (en) A kind of boring method and system
CN106894761B (en) Utilize the geosteering method of the geosteering model of time-domain seismic volume
CN106437512A (en) Tracking-while-drilling controlling method for landing track of shale gas horizontal well
CN109267996A (en) A kind of Depression Basin fluvial facies stratum horizontal drilling trajectory predictions method
CN108442882A (en) Shale gas extended horizontal well based on 2-d seismic data is with brill geosteering method
CN109138837A (en) Reservoir geology guidance method
CN103790577A (en) Depth domain constraint inversion method based on horizontal well horizontal section vertical shaft virtualization
US10544666B1 (en) Formation dip geo-steering method
Ezioba et al. Mapping-While-Drilling system improves well placement and field development
CN109184560B (en) Method and device for controlling well track of stepped horizontal well
CN109736773A (en) A kind of river channel sand horizontal well path tracking
Cheraghi Kootiani Investigation of a powerful tool for the development of thinly bedded carbonate reservoirs
CN113761620B (en) Shale gas middle gas layer well geological guiding method
Zhou Technical analysis of improving sand body penetration rate in horizontal well
CN112901070B (en) Method for tracking horizontal well while drilling and control method for controlling drilling direction of drill bit
Zhang et al. Application of 3D geological model in guiding horizontal wells in the Wuqi oilfield

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20191206

Address after: 100728 Beijing, Chaoyangmen, North Street, No. 22, No.

Co-patentee after: Geophysical Survey Research Institute,Jianghan Oilfield Branch,China Petrochemical Corporation

Patentee after: China Petrochemical Co., Ltd.

Address before: HSBC enterprise headquarters No. 37 430035 Hubei Province, Wuhan city road two Qiaokou District Gutian Nanniwan Avenue 5 block A

Patentee before: Geophysical Survey Research Institute,Jianghan Oilfield Branch,China Petrochemical Corporation

TR01 Transfer of patent right