CN106284977B - A kind of main stupefied and its construction method of arc shear wall shuttering supporting reinforcing - Google Patents

A kind of main stupefied and its construction method of arc shear wall shuttering supporting reinforcing Download PDF

Info

Publication number
CN106284977B
CN106284977B CN201610737440.4A CN201610737440A CN106284977B CN 106284977 B CN106284977 B CN 106284977B CN 201610737440 A CN201610737440 A CN 201610737440A CN 106284977 B CN106284977 B CN 106284977B
Authority
CN
China
Prior art keywords
stupefied
horizontal reinforcement
shear wall
truss
reinforcement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610737440.4A
Other languages
Chinese (zh)
Other versions
CN106284977A (en
Inventor
周巧君
沈映
刘玉涛
王洪腾
陆建飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongtian Construction Group Co Ltd
Original Assignee
Zhongtian Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongtian Construction Group Co Ltd filed Critical Zhongtian Construction Group Co Ltd
Priority to CN201610737440.4A priority Critical patent/CN106284977B/en
Publication of CN106284977A publication Critical patent/CN106284977A/en
Application granted granted Critical
Publication of CN106284977B publication Critical patent/CN106284977B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/06Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for walls, e.g. curved end panels for wall shutterings; filler elements for wall shutterings; shutterings for vertical ducts
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/06Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for walls, e.g. curved end panels for wall shutterings; filler elements for wall shutterings; shutterings for vertical ducts
    • E04G11/062Forms for curved walls
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G17/00Connecting or other auxiliary members for forms, falsework structures, or shutterings
    • E04G17/14Bracing or strutting arrangements for formwalls; Devices for aligning forms

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Moulds, Cores, Or Mandrels (AREA)
  • Reinforcement Elements For Buildings (AREA)

Abstract

The invention discloses a kind of arc shear wall shuttering supportings to reinforce main stupefied and its construction method, including shear wall, template on the outside of shear wall, it is used to support and reinforcing template time stupefied and sequentially passes through time stupefied, template, shear wall is simultaneously realized in shear wall two sides to the Screw arbor with nut at both-ends for drawing fixation, described time stupefied outside is equipped with inside horizontal reinforcement parallel up and down in Screw arbor with nut at both-ends upper and lower sides, the Screw arbor with nut at both-ends is equipped with and inside horizontal reinforcement is strained and fixed in the chevron card in secondary stupefied outside, it is characterized by also including the steel bar girder master fixed with inside horizontal reinforcement is stupefied, it includes being equipped with spacing distance and the equidistant truss horizontal reinforcement of inside horizontal reinforcement apart from upper and lower sides with time stupefied that the steel bar girder master is stupefied, the batter brace reinforcing bar being obliquely installed is equipped between the truss horizontal reinforcement and the inside horizontal reinforcement of upper and lower sides.Structure of the invention design is succinct, and construction technology is easy to operate, quick, can effectively reduce the deformation of work progress shear wall cross section.

Description

A kind of main stupefied and its construction method of arc shear wall shuttering supporting reinforcing
Technical field
The present invention relates to building construction formwork bracing reinforcement technical fields, are inclined outwardly more particularly to one kind, variable curvature The formwork reinforcement master of the arc shear wall of radius is stupefied and its construction method.
Background technique
The beauty of the development of modern large public building, increasingly emphasis architectural appearance is novel.Most outstanding show is exactly Cultural center, gymnasium, cinema etc. are all using complicated, irregular inclined arc concrete structure form.Flare arc is cast-in-place There are radian control, inclination angle control, arc-shaped recliner wall moulding to be difficult to accurately determine in reinforced concrete shear wall work progress The problems such as position measurement.To the back cord of shuttering supporting reinforcement system, more stringent requirements are proposed: one, it is tight to tilt arc shear wall centroid Weight is eccentric, and it is full that shuttering supporting reinforcement system, which needs to bear casting process lateral pressure and out-of-balance force, increases with shear wall cross section, The requirement of the main stupefied bending strength of foot, it is necessary to using the biggish big section fashioned iron of self weight or use new structural form;Main stupefied three To curvature of space, processing capacity is big, and processing charges is high, and the precision for being unable to satisfy the smooth smoothness of concrete component circular arc lines is wanted It asks;Using reinforcing bar when master is stupefied, steel bar end and structure fixed point free, no image of Buddha close ring play the tensile strength of reinforcing bar.
Summary of the invention
The technical problem to be solved by the invention is to provide a kind of for the arc shear wall template being inclined outwardly, design It is a kind of to save the light easy processing processing of engineering cost, material under the premise of ensuring form bracing system safety, adapt to not Arc shear wall shuttering supporting reinforcing master with radius of curvature combination is stupefied.
In order to solve the above technical problems, the present invention adopts the following technical scheme: a kind of arc shear wall shuttering supporting is reinforced Master is stupefied, and template including shear wall, on the outside of shear wall is used to support and reinforcing template time stupefied and sequentially passes through time Stupefied, template, shear wall simultaneously realize that in shear wall two sides, described stupefied outside is on Screw arbor with nut at both-ends to fixed Screw arbor with nut at both-ends is drawn Downside is equipped with inside horizontal reinforcement parallel up and down, and the Screw arbor with nut at both-ends, which is equipped with, is strained and fixed inside horizontal reinforcement in secondary stupefied outer The chevron card of side further includes that the steel bar girder master fixed with inside horizontal reinforcement is stupefied, the steel bar girder master is stupefied include with it is secondary stupefied The equidistant truss horizontal reinforcement of inside horizontal reinforcement equipped with spacing distance and apart from upper and lower sides, the truss horizontal reinforcement The batter brace reinforcing bar being obliquely installed, two V-shaped friendships of batter brace reinforcing bar are equipped between the inside horizontal reinforcement of upper and lower sides Fork is arranged and crosspoint connects with truss horizontal reinforcement, and the truss horizontal reinforcement and batter brace reinforcement welding are fixed.
Preferably, the inside horizontal reinforcement is respectively provided with two in Screw arbor with nut at both-ends upper and lower sides.
Main stupefied construction method is reinforced for above-mentioned arc shear wall shuttering supporting the present invention also provides a kind of, including such as Lower step:
Step 1: designing and checks truss horizontal reinforcement and batter brace reinforcing bar, determines respective cross-section, determines truss level Reinforcing bar determines inside horizontal reinforcement vertical direction spacing, determines batter brace reinforcing bar horizontal direction spacing from wall spacing;
Step 2: it is installation template, secondary stupefied according to conventional shear wall construction process, wear Screw arbor with nut at both-ends;
Step 3: secondary stupefied inside horizontal reinforcement is close in installation, installs chevron card, tightens bolt;
Step 4: four horizontal reinforcements of lower truss diagonal brace reinforcing bar and lower inside weld;
Step 5: downside truss horizontal reinforcement and batter brace reinforcement welding;
Step 6: top batter brace reinforcing bar and four, top horizontal reinforcement and truss horizontal reinforcement weld.
The technical solution adopted by the present invention, decoration structure features simple design, construction technology are easy to operate, quick.Steel bar girder master is stupefied Bending stiffness be 10 times of common double steel pipe or more, and can effectively reduce work progress shear wall cross section deformation;Horizontal reinforcement Without working process, the variation of different curvature radius is adapted to, it is ensured that smooth, the raising of formwork reinforcement and template circular arc portion The smoothnesses of concrete component circular arc lines;It gathers materials on the spot conveniently, using terminating to recycle.Steel bar girder master is stupefied not only Suitable for the curved wall of various change, it is also applied for most common shear wall.
Detailed description of the invention
Fig. 1 is elevation of the invention;
Fig. 2 is 1-1 sectional view in Fig. 1;
In figure: 1, inside horizontal reinforcement;2, batter brace reinforcing bar;3, truss horizontal reinforcement;4, secondary stupefied;5, template;6, it cuts Power wall;7, Screw arbor with nut at both-ends.
Specific embodiment
As depicted in figs. 1 and 2, a kind of arc shear wall shuttering supporting is reinforced main stupefied, the mould including being set to 6 outside of shear wall Plate 5, be used to support and reinforcing template 5 times stupefied 4 and sequentially pass through times stupefied 4, template 5, shear wall 6 and realize in shear wall two To fixed Screw arbor with nut at both-ends 7 is drawn, described time stupefied 4 outside is equipped with inside level parallel up and down in 7 upper and lower sides of Screw arbor with nut at both-ends for side Reinforcing bar 1, the inside horizontal reinforcement are respectively provided with two in Screw arbor with nut at both-ends upper and lower sides, and four are close to secondary stupefied inside horizontal reinforcement 1 Composition reinforcing bar group to it is secondary it is stupefied reinforce, the Screw arbor with nut at both-ends 7, which is equipped with, is strained and fixed four inside horizontal reinforcements in secondary stupefied outer The chevron card of side.
In addition, stupefied equipped with the steel bar girder master fixed with inside horizontal reinforcement on the outside of template, the stupefied packet of steel bar girder master It includes and secondary stupefied equipped with spacing distance and the equidistant truss horizontal reinforcement 3 of inside horizontal reinforcement apart from upper and lower sides, the purlin Batter brace reinforcing bar 2 is equipped between frame horizontal reinforcement 3 and the inside horizontal reinforcement 1 of upper and lower sides.Wherein, two batter brace reinforcing bars V-shaped arranged in a crossed manner and crosspoint end connects with truss horizontal reinforcement 3, and intersection end is welded and fixed with inside horizontal reinforcement 1, several Transversely sequentially connect setting to V-shaped batter brace reinforcing bar arranged in a crossed manner.The truss horizontal reinforcement 3 and batter brace steel Muscle 2 is welded and fixed.3 sectional dimension of truss horizontal reinforcement and the spacing with inside horizontal reinforcement 1 are calculated by design and are determined, reinforcing bar Wirerope binding overlap joint or welding can be used in docking;Batter brace reinforcing bar diagonal brace section need to meet wanting for shearing strength and stability It asks.
In addition, the present invention also provides a kind of arc shear wall shuttering supportings to reinforce main stupefied installation method, it is main to construct Steps are as follows:
Step 1: designing and checks truss horizontal reinforcement and batter brace reinforcing bar, determines respective cross-section, determines truss level Reinforcing bar determines inside horizontal reinforcement vertical direction spacing, determines batter brace reinforcing bar horizontal direction spacing from wall spacing;
Step 2: according to conventional shear wall construction process, installation template, secondary stupefied flitch wear Screw arbor with nut at both-ends;
Step 3: secondary four stupefied horizontal reinforcements are close in installation, install three word buttons, tighten bolt;
Step 4: four horizontal reinforcements of lower truss diagonal brace reinforcing bar and lower inside weld, when batter brace steel bar meter Than the long 5cm of size in CAD diagram, and the angle of diagonal brace is controlled in welding process, notice that diagonal brace welding position should not be right It draws at screw rod;
Step 5: downside truss horizontal reinforcement and batter brace reinforcement welding;
Step 6: top batter brace reinforcing bar and four, top horizontal reinforcement and truss horizontal reinforcement weld;
Step 7: the stupefied welding quality of steel bar girder master is checked.
Construction is simple of the present invention is easy, and bending strength is larger, can largely adapt to the variation of arc modeling, guarantees arc Shear wall exterior wall is smooth.

Claims (3)

1. a kind of arc shear wall shuttering supporting is reinforced, master is stupefied, and template including shear wall, on the outside of shear wall is used to support And it reinforcing template time stupefied and sequentially pass through time stupefied, template, shear wall and realizes fixed to drawing to drawing in shear wall two sides Screw rod, described time stupefied outside is equipped with inside horizontal reinforcement parallel up and down in Screw arbor with nut at both-ends upper and lower sides, and the Screw arbor with nut at both-ends is set Have and inside horizontal reinforcement is strained and fixed in the chevron card in secondary stupefied outside, it is characterised in that: further includes solid with inside horizontal reinforcement Fixed steel bar girder master is stupefied, and the stupefied steel bar girder master includes horizontal with time stupefied inside equipped with spacing distance and apart from upper and lower sides Reinforcing bar equidistant truss horizontal reinforcement is equipped with inclination between the truss horizontal reinforcement and the inside horizontal reinforcement of upper and lower sides The batter brace reinforcing bar of setting, two batter brace reinforcing bars are V-shaped arranged in a crossed manner and crosspoint connects with truss horizontal reinforcement, institute It states truss horizontal reinforcement and batter brace reinforcement welding is fixed.
2. it is stupefied that a kind of arc shear wall shuttering supporting according to claim 1 reinforces master, it is characterised in that: the inside water Flat reinforcing bar is respectively provided with two in Screw arbor with nut at both-ends upper and lower sides.
3. a kind of arc shear wall shuttering supporting according to claim 1 reinforces main stupefied construction method, it is characterised in that Include the following steps:
Step 1: designing and checks truss horizontal reinforcement and batter brace reinforcing bar, determines respective cross-section, determines truss horizontal reinforcement From wall spacing, determines inside horizontal reinforcement vertical direction spacing, determine batter brace reinforcing bar horizontal direction spacing;
Step 2: it is installation template, secondary stupefied according to conventional shear wall construction process, wear Screw arbor with nut at both-ends;
Step 3: secondary stupefied inside horizontal reinforcement is close in installation, installs chevron card, tightens bolt;
Step 4: four horizontal reinforcements of lower truss diagonal brace reinforcing bar and lower inside weld;
Step 5: downside truss horizontal reinforcement and batter brace reinforcement welding;
Step 6: top batter brace reinforcing bar and four, top horizontal reinforcement and truss horizontal reinforcement weld.
CN201610737440.4A 2016-08-26 2016-08-26 A kind of main stupefied and its construction method of arc shear wall shuttering supporting reinforcing Active CN106284977B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610737440.4A CN106284977B (en) 2016-08-26 2016-08-26 A kind of main stupefied and its construction method of arc shear wall shuttering supporting reinforcing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610737440.4A CN106284977B (en) 2016-08-26 2016-08-26 A kind of main stupefied and its construction method of arc shear wall shuttering supporting reinforcing

Publications (2)

Publication Number Publication Date
CN106284977A CN106284977A (en) 2017-01-04
CN106284977B true CN106284977B (en) 2019-02-12

Family

ID=57677284

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610737440.4A Active CN106284977B (en) 2016-08-26 2016-08-26 A kind of main stupefied and its construction method of arc shear wall shuttering supporting reinforcing

Country Status (1)

Country Link
CN (1) CN106284977B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL7905429A (en) * 1979-07-11 1981-01-13 Maco Veenendaal B V Reinforcing truss beam for shuttering panel - has adjustable tensioning screw jack to compensate for varying sag of panel under concrete load
FR2669363A1 (en) * 1990-11-20 1992-05-22 Peru Jean Claude Improvements to curved shutterings
CN201206329Y (en) * 2008-05-16 2009-03-11 浙江杭萧钢构股份有限公司 Assembled reinforced bar truss template
CN101906871A (en) * 2010-07-15 2010-12-08 天津市建科机械制造有限公司 Simple bearing type template truss
CN202810195U (en) * 2012-04-01 2013-03-20 荣盛建设工程有限公司 Template reinforcing system
CN203271113U (en) * 2013-05-31 2013-11-06 中国葛洲坝集团股份有限公司 Formwork for pouring arched concrete precast beam slabs

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL7905429A (en) * 1979-07-11 1981-01-13 Maco Veenendaal B V Reinforcing truss beam for shuttering panel - has adjustable tensioning screw jack to compensate for varying sag of panel under concrete load
FR2669363A1 (en) * 1990-11-20 1992-05-22 Peru Jean Claude Improvements to curved shutterings
CN201206329Y (en) * 2008-05-16 2009-03-11 浙江杭萧钢构股份有限公司 Assembled reinforced bar truss template
CN101906871A (en) * 2010-07-15 2010-12-08 天津市建科机械制造有限公司 Simple bearing type template truss
CN202810195U (en) * 2012-04-01 2013-03-20 荣盛建设工程有限公司 Template reinforcing system
CN203271113U (en) * 2013-05-31 2013-11-06 中国葛洲坝集团股份有限公司 Formwork for pouring arched concrete precast beam slabs

Also Published As

Publication number Publication date
CN106284977A (en) 2017-01-04

Similar Documents

Publication Publication Date Title
CN107090925A (en) Reinforced precast reinforced concrete shear wall, structural system and its construction method
CN208586936U (en) A kind of control protects brick mixed building joist and demolishes walls constructing device
CN201339250Y (en) Stiffness structure framework beam preformed steel reinforcement framework structure
CN107419824A (en) The full precast shear wall structural system of regenerative steel skeleton and construction method
CN105586833B (en) Stiff skeleton steel reinforcement cage global formation large-scale cast-in-place tall pier and thin wall construction method
CN104088397A (en) Prefabricated column and precast construction method thereof
CN106192758A (en) A kind of construction method utilizing the cantilever form large-scale high pier stud of construction
CN106351445B (en) A kind of strengthening concrete sloping core form assembly bracing reinforcement system and construction method of installation
CN105625186A (en) Method for constructing large-section concrete Y-shaped column
CN101029502A (en) Built-in steel-case or H-shaped concrete assembled beam frame of angle steel concrete pile
CN202466845U (en) Middle-layer node connecting structure for steel tube concrete column and steel reinforced concrete beam
CN212534174U (en) Raft foundation steel bar supporting tool
CN103866693A (en) Installing method of reinforced concrete bowstring rod arch bridge arch ribs and hanging auxiliary bridge
CN110306774A (en) A kind of installation method and device of spigot-and-socket builder's jack
CN206917265U (en) A kind of adjustable small bore beam side reinforcement tools
CN202007535U (en) Supporting reinforcing structure
CN103938871B (en) A kind of construction method adopting the steel core concrete column bonded prestress frame beam structure of reinforced concrete ring beam joint
CN109869153A (en) The whole of rapid construction vertical shaft lining cutting promotes cantilever form device and construction method
CN102454292A (en) Supporting steel frame of high altitude large-span cantilever structure mold frame
CN206902913U (en) A kind of high-altitude long-span overhung structure
CN203066352U (en) Self-supporting type special-shaped steel-encased-concrete composite beam
CN205712733U (en) Super-section strengthening concrete conversion beam formwork system
CN106284977B (en) A kind of main stupefied and its construction method of arc shear wall shuttering supporting reinforcing
CN104018655B (en) A kind of assembly type monomer bracing frame
CN204173804U (en) A kind of inside-climbing tower crane of structural beams bearing-type is installed and climbing structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant