CN106284097B - 一种钢管拱桥拱上墩k撑的安装方法 - Google Patents
一种钢管拱桥拱上墩k撑的安装方法 Download PDFInfo
- Publication number
- CN106284097B CN106284097B CN201610854207.4A CN201610854207A CN106284097B CN 106284097 B CN106284097 B CN 106284097B CN 201610854207 A CN201610854207 A CN 201610854207A CN 106284097 B CN106284097 B CN 106284097B
- Authority
- CN
- China
- Prior art keywords
- support
- supportted
- hanger
- concrete
- lifting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D4/00—Arch-type bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D2101/00—Material constitution of bridges
- E01D2101/30—Metal
Abstract
Description
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610854207.4A CN106284097B (zh) | 2016-09-28 | 2016-09-28 | 一种钢管拱桥拱上墩k撑的安装方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610854207.4A CN106284097B (zh) | 2016-09-28 | 2016-09-28 | 一种钢管拱桥拱上墩k撑的安装方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106284097A CN106284097A (zh) | 2017-01-04 |
CN106284097B true CN106284097B (zh) | 2017-11-07 |
Family
ID=57715193
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610854207.4A Active CN106284097B (zh) | 2016-09-28 | 2016-09-28 | 一种钢管拱桥拱上墩k撑的安装方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106284097B (zh) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106835955A (zh) * | 2017-03-27 | 2017-06-13 | 中铁二院工程集团有限责任公司 | 钢k撑‑空心混凝土柱式桥墩 |
CN108103937A (zh) * | 2017-11-24 | 2018-06-01 | 中国建筑第八工程局有限公司 | 利用土胎模取代模板支架的现浇混凝土箱梁施工方法 |
CN109944161B (zh) * | 2019-03-11 | 2020-09-25 | 中铁五局集团有限公司 | 一种钢管拱桥拱上钢箱混凝土排架墩及施工方法 |
Family Cites Families (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100946716B1 (ko) * | 2007-08-30 | 2010-03-12 | (주)한맥기술 | 모멘트 재분배를 통한 장경간 프리스트레스트 콘크리트거더형 라멘교량 및 그 시공방법 |
JP5189546B2 (ja) * | 2009-04-01 | 2013-04-24 | 三井住友建設株式会社 | 中路式アーチ橋の架設方法 |
CN103374976B (zh) * | 2012-04-12 | 2017-03-08 | 孙善骏 | 开结构单元组合体 |
CN103334373B (zh) * | 2013-07-17 | 2015-10-28 | 大连海事大学 | 一种含屈曲约束支撑的肋拱桥横向抗震结构新体系 |
CN104594175B (zh) * | 2014-12-23 | 2016-03-30 | 重庆交通大学 | 一种现代拱式竹质桥梁及其施工方法 |
CN104631303B (zh) * | 2015-02-10 | 2015-12-02 | 福建省交通规划设计院 | 一种单肋拱加劲v型撑刚构-连续梁桥及其施工方法 |
CN105603881B (zh) * | 2016-02-24 | 2017-06-06 | 广东省交通规划设计研究院股份有限公司 | 一种大型跨海拱桥的整体架设系统及其施工方法 |
-
2016
- 2016-09-28 CN CN201610854207.4A patent/CN106284097B/zh active Active
Also Published As
Publication number | Publication date |
---|---|
CN106284097A (zh) | 2017-01-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107905114B (zh) | 一种特大跨径连续刚构拱桥的施工方法 | |
CN104695337B (zh) | 自提升滑翻施工系统及施工方法 | |
CN106702910A (zh) | 一种双塔双索面矮塔斜拉桥的主梁施工工艺 | |
CN103938533B (zh) | 简支变连续结构的施工方法 | |
CN106192717B (zh) | 桥梁钢混结合段及其安装方法 | |
CN104746422A (zh) | 一种桥梁预制空心墩柱后浇连接结构及施工方法 | |
CN104631343A (zh) | 自走行菱形销结桁架式挂篮结构及挂篮走行和施工方法 | |
CN205025086U (zh) | 一种劲性骨架混凝土梁施工的悬吊模板 | |
CN105350454B (zh) | 一种用于钢桁拱桥梁的钢拱肋外包混凝土施工方法 | |
CN106284097B (zh) | 一种钢管拱桥拱上墩k撑的安装方法 | |
CN109025295A (zh) | 一种高空大跨度型钢混凝土连廊施工方法 | |
CN108374319A (zh) | 一种下承式系杆拱桥结构单元及拱桥结构及其施工方法 | |
CN202466845U (zh) | 钢管混凝土柱与型钢混凝土梁中层节点连接结构 | |
CN108360678A (zh) | 一种装配式梁柱节点卯榫连接结构 | |
CN106381814B (zh) | 折形钢腹板连续箱梁移动吊机模架悬浇结构及其施工工法 | |
CN107090908A (zh) | 一种新型竖向预制构件节点连接方法 | |
CN204097864U (zh) | 一种桥梁预制空心墩柱后浇连接结构 | |
CN106012851A (zh) | 钢箱梁与混凝土墩柱同步施工方法 | |
CN202466844U (zh) | 钢管混凝土柱与型钢混凝土梁顶层节点连接结构 | |
CN206887771U (zh) | 一种小跨径板梁施工平台结构 | |
CN206233120U (zh) | 折形钢腹板连续箱梁移动吊机模架悬浇结构 | |
CN205889488U (zh) | 一种钢套箱的预制钢筋混凝土封底模板及其吊装装置 | |
CN104746434B (zh) | 一种不拆除外模的合龙段模板系统 | |
CN106948267A (zh) | 一种牌坊门楼式桥梁索塔塔柱同步施工方法 | |
CN204359161U (zh) | 一种带水平中间环梁结构的自然通风冷却塔 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20180410 Address after: 100036 Haidian District, Wanshou Road, No. 2, Co-patentee after: Taiyuan Railway Construction Co., Ltd., Zhongtie 6-Bureau Group Patentee after: The Sixth Engineering Bureau Group Co., Ltd., China Railway Co-patentee after: Shanxi Huacheng Engineering Testing Co., Ltd. Address before: 100036 Haidian District, Wanshou Road, No. 2, Co-patentee before: Taiyuan Railway Construction Co., Ltd., Zhongtie 6-Bureau Group Patentee before: The Sixth Engineering Bureau Group Co., Ltd., China Railway |
|
TR01 | Transfer of patent right | ||
CP01 | Change in the name or title of a patent holder |
Address after: 100036 No. 2, Haidian District, Beijing, Wanshou Road Patentee after: CHINA RAILWAY SIXTH GROUP Co.,Ltd. Patentee after: CHINA RAILWAY 6TH GROUP TAIYUAN RAILWAY CONSTRUCTION Co.,Ltd. Patentee after: Huaguan Tiancheng testing certification Co.,Ltd. Address before: 100036 No. 2, Haidian District, Beijing, Wanshou Road Patentee before: CHINA RAILWAY SIXTH GROUP Co.,Ltd. Patentee before: CHINA RAILWAY 6TH GROUP TAIYUAN RAILWAY CONSTRUCTION Co.,Ltd. Patentee before: SHANXI HUACHENG ENGINEERING TESTING Co.,Ltd. |
|
CP01 | Change in the name or title of a patent holder |