CN106276577B - 一种框架独立基础的吊架及操作方法 - Google Patents
一种框架独立基础的吊架及操作方法 Download PDFInfo
- Publication number
- CN106276577B CN106276577B CN201610946168.0A CN201610946168A CN106276577B CN 106276577 B CN106276577 B CN 106276577B CN 201610946168 A CN201610946168 A CN 201610946168A CN 106276577 B CN106276577 B CN 106276577B
- Authority
- CN
- China
- Prior art keywords
- steel
- square steel
- frame
- steelframe
- channel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 239000000725 suspension Substances 0.000 title claims description 9
- 238000011017 operating method Methods 0.000 title claims 4
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 133
- 239000010959 steel Substances 0.000 claims abstract description 133
- 238000000034 method Methods 0.000 abstract description 11
- 238000010586 diagram Methods 0.000 description 5
- 239000002689 soil Substances 0.000 description 2
- 230000000694 effects Effects 0.000 description 1
- 238000009415 formwork Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C1/00—Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
- B66C1/10—Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
- B66C1/12—Slings comprising chains, wires, ropes, or bands; Nets
- B66C1/16—Slings with load-engaging platforms or frameworks
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Joining Of Building Structures In Genera (AREA)
Abstract
本发明公开了一种框架独立基础的吊架及操作方法,包括钢架、底部方钢和槽钢;钢架的顶端是由四根方钢焊接而成的矩形框,矩形框的四个顶点分别垂直于矩形框平面焊接有四根竖直向下的方钢,钢架的底端为两根互相平行方钢,各焊接在一对垂直于矩形框平面的方钢的端头之间;钢架底端的两根方钢上等距离设置有若干螺栓孔;底部方钢通过螺栓垂直固定在钢架底端的两根方钢之间;两个槽钢槽口向上的分别通过螺栓安装于钢架的底端两侧的底部方钢下端面。本发明采用方钢焊接而成的钢架与底部方钢和槽钢可拆卸的结构,实现自身设置吊点进行吊装,而且可以根据模型结构自由调整底部方钢的数量,吊运过程平稳、安全性能高;且操作方便、工作效率高。
Description
技术领域
本发明涉及模型结构吊装技术领域,特别涉及一种框架独立基础的吊架及操作方法。
背景技术
一般的结构模型在完成制作以后都需要吊运到目标位置。由于每个模型结构的差异与试验的不同,采用的吊运装置也会影响到吊运的成功与试验的成功,所以采用适合结构模型和试验的吊装方法是十分重要的。一般结构模型都是采用刚性底座,刚性底座上设置吊点,直接进行吊运。如果模型结构采用的是独立基础,模型下部无法设置刚性底座,所以采用刚性底座来进行吊装的方法不在使用。此外结构缩尺原因,结构构件的承载力有限,无法在自身设置吊点进行吊装。所以,研制开发一种操作方便、工作效率高、吊运过程平稳、安全性能高的吊架装置是客观需要的。
发明内容
本发明的目的在于提供一种框架独立基础的吊架及操作方法,以解决上述技术问题。本发明操作简便、安全性能高、工作效率高、吊运平稳、实施成本低。
为达到上述目的,本发明采用以下技术方案:
一种框架独立基础的吊架,包括钢架、底部方钢和槽钢;钢架的顶端是由四根方钢焊接而成的矩形框,矩形框的四个顶点分别垂直于矩形框平面焊接有四根竖直向下的方钢,钢架的底端为两根互相平行方钢,各焊接在一对垂直于矩形框平面的方钢的端头之间;钢架底端的两根方钢上等距离设置有若干螺栓孔;底部方钢通过螺栓垂直固定在钢架底端的两根方钢之间;两个槽钢槽口向上的分别通过螺栓安装于钢架的底端两侧的底部方钢下端面。
进一步的,钢架的顶端矩形框上设置有若干吊钩。
进一步的,底部方钢中轴线距离等于每列独立基础中轴线距离。
进一步的,其包括以下步骤:
1)将两个槽钢分别布置于两个底部方钢下部并采用两个螺栓连接;
2)将底部方钢布设于独立基础的预制模板下,有槽钢连接的两个底部方钢放置在无槽钢连接的底部方钢两侧;
3)整个结构混凝土完成浇筑并养护完成后,将钢架吊到底部方钢上方,采用螺栓连接;
4)在土箱中挖沟槽,沟槽数量与吊架底部方钢数量相同;沟槽之间的间距等于底部方钢之间的间距;
5)进行吊装,吊到高于沟槽位置正上方一定高度时,松开槽钢和底部方钢连接的螺栓,取下槽钢,然后吊至预定位置,底部方钢落入沟槽中;
6)松开所有螺栓,钢架与底部方钢分离,将底部方钢沿沟槽抽出。
进一步的,沟槽宽度大于独立基础宽度10mm。
与现有技术相比,本发明具有以下技术效果:
本发明采用方钢焊接而成的钢架与底部方钢和槽钢可拆卸的结构,实现自身设置吊点进行吊装,而且可以根据模型结构自由调整底部方钢的数量,吊运过程平稳、安全性能高;且操作方便、提高了工作效率,降低了在调运过程中对结构模型的影响,且实施成本较低,具有较好的推广价值。
附图说明
图1为本发明一种框架独立基础的吊架结构示意图。
图2为本发明一种框架独立基础的吊架的上部的结构示意图。
图3为本发明一种框架独立基础的吊架的槽钢的结构示意图。
图4为本发明一种框架独立基础的吊架的下部两侧方钢的结构示意图。
图5为本发明一种框架独立基础的吊架的下部中间方钢的结构示意图。
图中:1-钢架,2-底部方钢,3-吊钩,4-槽钢,5-螺栓孔。
具体实施方式
为了更清楚地阐述本发明,下面通过具体实施例对发明作进一步说明。
如图1至图5所示,一种框架独立基础的吊架,包括钢架1、底部方钢2和槽钢4。
钢架1的顶端是由四根方钢焊接而成的矩形框,矩形框的四个顶点分别垂直于矩形框平面焊接有四根竖直向下的方钢,钢架1的底端为两根互相平行方钢,各焊接在一对垂直于矩形框平面的方钢的底部端头之间。钢架1底端的两根方钢上等距离设置有若干螺栓孔;底部方钢2通过螺栓垂直固定在钢架1底端的两根方钢之间;两个槽钢4槽口向上的分别通过螺栓安装于钢架1的底端两侧的底部方钢2下端面。钢架1的顶端矩形框上设置有若干吊钩。底部方钢2中轴线距离等于每列独立基础中轴线距离。
底部方钢2的数量和模型结构的跨度有关。本模型结构选用是3×3跨的框架结构,有4列独立基础,所以选用四根方钢。
一种框架独立基础的吊架的操作方法,包括以下步骤:
1)将两个槽钢4分别布置于两个底部方钢2下部并采用两个螺栓连接;
2)将底部方钢2布设于独立基础的预制模板下,有槽钢4连接的两个底部方钢2放置在无槽钢连接的底部方钢2两侧;
3)整个结构混凝土完成浇筑并养护完成后,将钢架1吊到底部方钢2上方,采用螺栓连接;
4)在土箱中挖沟槽,沟槽数量与吊架底部方钢2数量相同;沟槽之间的间距等于底部方钢2之间的间距;
5)进行吊装,吊到高于沟槽位置正上方50公分时,松开槽钢4和底部方钢2连接的螺栓,取下槽钢4,然后吊至预定位置,底部方钢2落入沟槽中;
6)松开所有螺栓,钢架与底部方钢2分离,将底部方钢2沿沟槽抽出。
沟槽宽度须大于独立基础宽度10mm。
以上实施例仅是本发明的优越实施例,并不作为对本发明保护范围的限制,凡事参照本发明所做的同等替换或近似设计的装置皆在本发明的权利保护范围内。
Claims (2)
1.一种框架独立基础的吊架操作方法,其特征在于,基于一种框架独立基础的吊架;所述框架独立基础的吊架包括:钢架(1)、底部方钢(2)和槽钢(4);钢架(1)的顶端是由四根方钢焊接而成的矩形框,矩形框的四个顶点分别垂直于矩形框平面焊接有四根竖直向下的方钢,钢架(1)的底端为两根互相平行方钢,各焊接在一对垂直于矩形框平面的方钢的端头之间;钢架(1)底端的两根方钢上等距离设置有若干螺栓孔(5);若干底部方钢(2)通过螺栓垂直固定在钢架(1)底端的两根方钢之间;两个槽钢(4)槽口向上的分别通过螺栓安装于钢架(1)的底端两侧的底部方钢(2)的下端面;钢架(1)的顶端矩形框上设置有若干吊钩;底部方钢(2)中轴线距离等于被吊装每列独立基础中轴线距离;
所述一种框架独立基础的吊架操作方法,包括以下步骤:
1)将两个槽钢(4)分别布置于两个底部方钢(2)下部并采用螺栓连接;
2)将底部方钢(2)布设于独立基础的预制模板下,有槽钢(4)连接的两个底部方钢(2)放置在无槽钢连接的底部方钢(2)两侧;
3)整个结构混凝土完成浇筑并养护完成后,将钢架(1)吊到底部方钢(2)上方,采用螺栓连接;
4)在土箱中挖沟槽,沟槽数量与吊架底部方钢(2)数量相同;沟槽之间的间距等于底部方钢(2)之间的间距;
5)进行吊装,吊到高于沟槽位置正上方时,松开槽钢(4)和底部方钢(2)连接的螺栓,取下槽钢(4),然后吊至预定位置,底部方钢(2)落入沟槽中;
6)松开所有螺栓,钢架与底部方钢(2)分离,将底部方钢(2)沿沟槽抽出。
2.根据权利要求1所述的一种框架独立基础的吊架操作方法,其特征在于,沟槽宽度大于独立基础宽度10mm。
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201610946168.0A CN106276577B (zh) | 2016-11-02 | 2016-11-02 | 一种框架独立基础的吊架及操作方法 |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201610946168.0A CN106276577B (zh) | 2016-11-02 | 2016-11-02 | 一种框架独立基础的吊架及操作方法 |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN106276577A CN106276577A (zh) | 2017-01-04 |
| CN106276577B true CN106276577B (zh) | 2017-12-12 |
Family
ID=57719913
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201610946168.0A Expired - Fee Related CN106276577B (zh) | 2016-11-02 | 2016-11-02 | 一种框架独立基础的吊架及操作方法 |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN106276577B (zh) |
Families Citing this family (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106865401B (zh) * | 2017-03-03 | 2018-12-28 | 凯迈(洛阳)航空防护装备有限公司 | 一种吊具及使用该吊具的组合堆码吊具 |
| CN106809722B (zh) * | 2017-03-03 | 2018-12-28 | 凯迈(洛阳)航空防护装备有限公司 | 一种框架式吊具及使用该框架式吊具的组合堆码吊具 |
| CN107720517B (zh) * | 2017-09-29 | 2019-03-22 | 中国五冶集团有限公司 | 用于拆除内支撑梁起吊装置 |
| CN108313865A (zh) * | 2018-04-18 | 2018-07-24 | 西安建筑科技大学 | 一种箱涵式地铁车站实验装置用吊架 |
| CN110271959B (zh) * | 2019-07-29 | 2024-08-13 | 朝阳金鹏文化艺术品制作有限责任公司 | 一种地层剖面安装结构及方法 |
| CN114538262A (zh) * | 2020-03-16 | 2022-05-27 | 深圳市时代华影科技股份有限公司 | 一种led箱体吊装结构 |
| CN115287658B (zh) * | 2022-08-09 | 2024-10-08 | 西安雅西复合材料有限公司 | 一种铝蜂窝芯的蚀刻方法及夹持装置 |
| CN116553362B (zh) * | 2023-05-08 | 2025-11-25 | 中国能源建设集团浙江火电建设有限公司 | 一种用于环吊大车运行机构铰轴穿装装置 |
Citations (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS62222081A (ja) * | 1986-03-25 | 1987-09-30 | Toyo Giken Kogyo Kk | 薄板用治具 |
| JPH0342494A (ja) * | 1989-07-10 | 1991-02-22 | Mitsubishi Electric Corp | 電子機器包装体吊り金具装置 |
| CN202687760U (zh) * | 2012-08-10 | 2013-01-23 | 烟台市红旗置业有限公司 | 工程升降起重吊笼 |
| CN203806944U (zh) * | 2014-03-08 | 2014-09-03 | 吉林大学 | 用于搬运风洞实验车的安全吊装装置 |
| CN104652853A (zh) * | 2015-01-12 | 2015-05-27 | 南京航空航天大学 | 快速起吊安装建筑结构 |
| CN105858445A (zh) * | 2016-06-21 | 2016-08-17 | 合肥市神雕起重机械有限公司 | 一种活动底座吊笼 |
| CN206108705U (zh) * | 2016-11-02 | 2017-04-19 | 西安建筑科技大学 | 一种框架独立基础的吊架 |
-
2016
- 2016-11-02 CN CN201610946168.0A patent/CN106276577B/zh not_active Expired - Fee Related
Patent Citations (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS62222081A (ja) * | 1986-03-25 | 1987-09-30 | Toyo Giken Kogyo Kk | 薄板用治具 |
| JPH0342494A (ja) * | 1989-07-10 | 1991-02-22 | Mitsubishi Electric Corp | 電子機器包装体吊り金具装置 |
| CN202687760U (zh) * | 2012-08-10 | 2013-01-23 | 烟台市红旗置业有限公司 | 工程升降起重吊笼 |
| CN203806944U (zh) * | 2014-03-08 | 2014-09-03 | 吉林大学 | 用于搬运风洞实验车的安全吊装装置 |
| CN104652853A (zh) * | 2015-01-12 | 2015-05-27 | 南京航空航天大学 | 快速起吊安装建筑结构 |
| CN105858445A (zh) * | 2016-06-21 | 2016-08-17 | 合肥市神雕起重机械有限公司 | 一种活动底座吊笼 |
| CN206108705U (zh) * | 2016-11-02 | 2017-04-19 | 西安建筑科技大学 | 一种框架独立基础的吊架 |
Also Published As
| Publication number | Publication date |
|---|---|
| CN106276577A (zh) | 2017-01-04 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN106276577B (zh) | 一种框架独立基础的吊架及操作方法 | |
| CN202055516U (zh) | 竖井整体提升模板系统 | |
| CN109081247A (zh) | 一种连廊大跨度钢梁的吊装方法 | |
| CN110526153B (zh) | 一种千斤顶辅助桩基钢筋笼吊放结构及其施工方法 | |
| CN203639095U (zh) | 内边柱倒装法提升装置 | |
| CN105438965B (zh) | 集块模式砌体墙片两点对中吊装装置的吊装方法 | |
| CN102767289B (zh) | 大型网格结构非对称整体提升施工方法 | |
| CN204324684U (zh) | 用于核电厂燃料格架的吊具工装 | |
| CN105421741B (zh) | 一种自立式塔机与模架一体化的集成施工平台系统 | |
| CN206108705U (zh) | 一种框架独立基础的吊架 | |
| CN204802884U (zh) | 一种储罐倒装平衡提升装置 | |
| CN108342984B (zh) | 一种滩涂软弱地基栈桥及其安装沉降方法 | |
| CN202850507U (zh) | 一种逆作法桩基施工钢立柱定位调垂装置 | |
| CN104499706A (zh) | 电梯井模板平台及其施工方法 | |
| CN103982380A (zh) | 预制混凝土塔架构件、其组合件、其累叠方法及预埋件 | |
| CN218714838U (zh) | 一种自升降重载施工平台 | |
| CN105951683A (zh) | 闸墩牛腿钢筋施工方法 | |
| CN207484292U (zh) | 盖梁底模拆除装置 | |
| CN217580664U (zh) | 一种带后浇段的预制剪力墙的施工装置 | |
| CN203320922U (zh) | 电梯井模板定型支撑装置 | |
| CN208219546U (zh) | 一种桩帽整体反吊底系统 | |
| CN206928625U (zh) | 一种高空施工载具 | |
| CN217808292U (zh) | 一种输电线路工程机械成孔钢筋笼吊装专用调节工具 | |
| CN211201111U (zh) | 一种可提升式型钢平台 | |
| CN206267039U (zh) | 一种空心板梁顶升施工用的千斤顶支撑平台 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20171212 Termination date: 20201102 |