CN106271176A - A kind of curved surface indulges bone installation method - Google Patents
A kind of curved surface indulges bone installation method Download PDFInfo
- Publication number
- CN106271176A CN106271176A CN201610765656.1A CN201610765656A CN106271176A CN 106271176 A CN106271176 A CN 106271176A CN 201610765656 A CN201610765656 A CN 201610765656A CN 106271176 A CN106271176 A CN 106271176A
- Authority
- CN
- China
- Prior art keywords
- outside plate
- vertical
- line
- bone
- plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23K—SOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
- B23K33/00—Specially-profiled edge portions of workpieces for making soldering or welding connections; Filling the seams formed thereby
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Surgical Instruments (AREA)
Abstract
The invention discloses a kind of curved surface and indulge bone installation method, step: 1: spread out successively by each outside plate (11), the structural plane connected is upward;2: draw vertical line using the summit of first row outside plate as zero point;3: analogize in S2 mode, all strakes have been drawn line justification entirety lower plate mouth value (13);4: with the lower end side summit of the outside plate (11) under for line 0 point, repeat step 2~3 from top to bottom, accurate to verify rib bit line;5: vertical bone (12) is pressed vertical line binding on outside plate;Per pass is indulged on bone hookup wire (4), has vertical inclination angle between outside plate and vertical bone, and it is consistent that angle should pass through orifice angle (14) with vertical bone;6: grillage step S5 completed stands up, weld with middle assembling structure, it is ensured that outside plate is smooth.This invention ensures that assembly precision and welding quality, it is to avoid the situation causing the shortest chi of outside plate is shunk in welding in the vertical bone welding process, reduces cost allowance, it is ensured that enterprise employee health, and whole efficiency promotes.
Description
Technical field
The present invention relates to shipbuilding technology field, more particularly, it relates to bone mounting process indulged by the boats and ships turn of the bilge exceptionally plate.
Background technology
Along with world shipping market continued downturn, shipbuilding market competition is the fiercest.Promote work efficiency, alleviate
Welder's difficulty of construction, reduces welder technology grade, controls steel plate trueness error, makes artificial, place, environment, efficiency be promoted,
Reduce shipbuilding cost, be a big emphasis of boats and ships construction working.
Container ship is due to construction features, and cargo hold is stairstepping, and as shown in figure 11, outside plate 11 line style curvature is big, distribution
Area is wide, and vertical bone 12 angular transformation is big.Segmentation conventional construction be all upside-down mounting mode with platform as tire, with ensure future place packaging
Case Corner Strapped device precision, outside plate, vertical bone are all constructions in bulk.Vertical bone is in bulk after middle assembling structure, then outside plate in bulk.
Conventional construction technique has the disadvantage in that
1, outside plate is welded as facing upward face with vertical bone and welds, and welder requires height, and assembly precision and welding quality it is difficult to ensure that.
2, outside plate forms cabin with floor and landing slab, and in cabin, the severe efficiency of working environment is low.
3, process without surplus due to outside plate, in vertical bone welding process, owing to welding contraction causes the shortest chi of outside plate.
And making tire with outside plate, moulding bed makes a large amount of for waste artificial, structure interleaved operation, assembles difficulty, mainly places
Container apparatus cannot accuracy of detection, bring the biggest hidden danger to follow-up closing up, can not use.
Summary of the invention
The drawback brought in order to avoid conventional mounting processes, the present invention attempts providing the novel outside plate of a kind of practicality to indulge bone peace
Dress technique.Conventional mounting processes, according to line style data analysis, is improved by the present invention, is welded with outside plate by vertical bone and stands in groups,
Then integral installation is in segmentation, vertical bone and outside plate is faced upward face weldering complanation weldering, decreases welding capacity in cabin.
In order to achieve the above object, one curved surface of the present invention indulges bone installation method, comprises the steps:
S1: each outside plate is spread out successively, connect structural plane upward, it is simple to line and with vertical bone welding equipment;
S2: drawing vertical line as line zero point O going up most the upper end side summit of first row outside plate, vertical line includes platform
Line, vertical bone line;Line numerical value takes rib bit data expansion value, and rib position draws longitudinal point from top to bottom, thus reference point falls at rib bit line
On;The first row outside plate lower plate mouth value relative to 0 keeps a record for subsequent analysis, and per pass rib bit line longitudinally point is linked together
It is exactly vertical line, wherein, the plate mouth value stayed if any a upper outside plate, then individually add up as offset;
S3: second and third ... row outside plate, analogize in S2 mode, all upper and lower strakes have been drawn line justification entirety lower plate mouth
Value positive and negative values, is on the occasion of most descending seam on the occasion of entirely leaving over to segmentation, for cutting away in the future;It is negative value, then stitches bar number according to plate
Uniformly divide;Wherein, every batten seam ensures 4mm-10mm gap, gap accumulation range 20mm-30mm.
Concrete adding up is meant that: if every strake short chi 5mm, totally 6 strake, the shortest chi 30mm, and 6 strakes would have 5 guidance tapes
Seam, if every guidance tape gap 6mm, then can make up the 30mm of short chi.
S4: with the lower end side summit of the outside plate under for 0 point of ruling, repeat step S2~S3 from top to bottom, to verify rib
Whether accurate bit line is;
S5: vertical bone is pressed vertical line binding on outside plate;Per pass is indulged on bone hookup wire, has longitudinal direction between outside plate and vertical bone
Inclination angle, it is consistent that angle should pass through orifice angle with vertical bone;
If time between two vertical bones in the structure of falling Figure of eight, wherein one is directly installed on outside plate, and another with first with
Disposing way is placed in middle assembling structure, does not welds.
S6: grillage step S5 completed stands up, back side firer's calibration release stress, it is ensured that outer plate flatness, edge
Vertical bone back side firer's calibration;Edges of boards set reversible deformation, lift up 3mm, it is ensured that smooth with middle assembling structure postwelding outside plate.
It is under optimal way, in step S5, consistent in order to ensure that outside plate and the vertical inclination angle of vertical bone pass through orifice angle with vertical bone,
Measuring vertical bone in selection bevel protractor component in kind at the scene and pass through orifice angle, reflection is installed to vertical bone, and it is fixing to realize support.
Compared with existing mounting process, the invention have benefit that: avoid difficulty operations such as facing upward face weldering, make construction
Rear welder's qualification reduces, and high, normal, basic welder is reasonably combined, and working environment changes, and place resource is fully used, it is ensured that dress
Join precision and welding quality.And the short chi of steel plate revised again, it is to avoid weld outside contraction causes in vertical bone welding process
The situation of the shortest chi of plate, reduces cost allowance, it is ensured that enterprise employee health, and whole efficiency promotes.
Accompanying drawing explanation
Fig. 1 is the operation chart of outside plate row's plate.
Fig. 2 is vertical bone line hookup wire schematic diagram.
Fig. 3 is the schematic diagram gathering and passing through orifice angle.
Fig. 4 is the enlarged drawing passing through orifice angle in Fig. 3 at A.
Fig. 5 is the first strake line schematic diagram.
Fig. 6 is the two or three strake line schematic diagram.
Fig. 7 is rib bit line Accuracy Verification schematic diagram.
Fig. 8 is to indulge bone at floor to pass through hole schematic diagram.
Fig. 9 is the schematic diagram of middle assembling structure before outside plate is installed.
Figure 10 is partial enlarged drawing at the B in Fig. 9.
Figure 11 is the structural representation after outside plate is installed.
In figure: 1, the first strake;2, the second strake;3, plate suture;4, vertical bone hookup wire;5, floor hookup wire;6, vertical bone
Pass through hole;7, rib bit line;8,0 point of ruling;9, floor;10, platform;11, outside plate;12, vertical bone;13, plate mouth value;14, vertical bone is worn
More orifice angle, 15, normal vertical bone passes through hole;16, eight words are indulged bone and are passed through hole.
Detailed description of the invention
1: as depicted in figs. 1 and 2, utilize any one piece of idle place to arrange each outside plate in bulk, but structural plane is upward, just
In line and vertical bone welding equipment.
2: as it is shown in figure 5, figure is gone up most the plate suture 3 of the first strake for 0: 8 stroke of vertical line of line (containing platform line, vertical bone
Line, this single-row plate hypostoma suture), line numerical value takes this rib bit data expansion value, and rib position draws longitudinal point from top to bottom.Reference point
Falling on rib bit line 7, this plate lower plate mouth value 13 keeps a record and is easy to analyze in the future, and per pass rib bit line 7 longitudinally point is linked together
It is exactly to need longitudinal relation lines, notes it being a little that upper plate tape edge stays if any a upper plate plate mouth value 13 is then as offset list
Solely add up.
3: as shown in Figure 6, all upper and lower strakes by that analogy, have been drawn line justification entirety lower plate mouth by second and third strake etc.
Be worth 13 positive and negative how much, be on the occasion of most descending seam on the occasion of entirely leaving over to segmentation, and cut away in the future;It is that negative value is uniform according to plate seam bar number
Spread out.Every batten seam ensures 4mm-10mm gap, minimum spreads out short chi scope 20mm-30mm, and plate seam is the most, and row is the best at stand.
4: as it is shown in fig. 7, after completing step 3, then with bottom plate suture 3 for line 0: 8, repeat step 2 from top to bottom,
Whether accurate with checking rib bit line.
5: be all expansion value due to value, so it is all deployed condition that outside plate places any region, and numerical control line-transect is also
Expansion value.
6: such as figure Fig. 3, shown in Fig. 4, Fig. 8, Fig. 9, Figure 10, vertical bone is pressed vertical line binding on outside plate.At this moment per pass is indulged
On bone hookup wire 4, between outside plate 11 and vertical bone 12, there is vertical inclination angle.This angle should pass through orifice angle 14 1 with described vertical bone
Cause.We pass through orifice angle 14 with measuring vertical bone in bevel protractor at the scene component in kind, and reflection is installed to vertical bone, and with support
Fixing.
7: as shown in Figure 9 and Figure 10, if two vertical bones pass through and fall eight words between hole on component, then there is a vertical bone first to dissipate
Load onto, it is impossible to close together with outer grillage.Support preferably to lift up at grillage and cut again.
8: grillage be soldered process qualified after stand up, back side firer's calibration is discharged stress, it is ensured that outer plate flatness, plate mouth is
The firer's calibration of the Zong Gu back side, limit, edges of boards has been lifted up 3mm and has set reversible deformation, it is ensured that big group transverse joint postwelding outside plate is smooth, after completing such as
Shown in Figure 11.
The above, the only present invention preferably detailed description of the invention, but protection scope of the present invention is not limited thereto,
Any those familiar with the art in the technical scope of present disclosure, according to technical scheme and
Inventive concept equivalent or change in addition, all should contain within protection scope of the present invention.
Claims (2)
1. a curved surface indulges bone installation method, it is characterised in that comprise the steps:
S1: each outside plate (11) is spread out successively, connect structural plane upward, it is simple to line and with vertical bone (12) welding equipment;
S2: drawing vertical line as line zero point O going up most the upper end side summit of first row outside plate (11), vertical line includes platform
Line, vertical bone line;Line numerical value takes rib bit data expansion value, and rib position draws longitudinal point from top to bottom, thus reference point falls at rib bit line
(7) on;Lower plate mouth value (13) of relative 0 of first row outside plate (11) keeps a record for subsequent analysis, and per pass rib bit line (7) is indulged
Linking together to point is exactly vertical line, wherein, and plate mouth value (13) stayed if any a upper outside plate, then individually tire out as offset
Add;
S3: second and third ... row outside plate, analogize in S2 mode, all upper and lower strakes have been drawn line justification entirety lower plate mouth value
(13) positive and negative values, is on the occasion of most descending seam on the occasion of entirely leaving over to segmentation, for cutting away in the future;It is negative value, then stitches bar according to plate
Number is uniformly divided;
Wherein, every batten seam ensures 4mm-10mm gap, gap accumulation range 20mm-30mm;
S4: with the lower end side summit of the outside plate (11) under for line 0 point, repeat step S2~S3 from top to bottom, to verify rib
Whether accurate bit line is;
S5: vertical bone (12) is pressed vertical line binding on outside plate (11);Per pass is indulged on bone hookup wire (4), outside plate (11) and vertical bone
(12) having vertical inclination angle between, it is consistent that angle should pass through orifice angle (14) with vertical bone;
If time between two vertical bones in the structure of falling Figure of eight, wherein one is directly installed on outside plate, and another is with elder generation is to put
Mode is placed in middle assembling structure;
S6: grillage step S5 completed stands up, back side firer's calibration release stress, it is ensured that outer plate flatness, the vertical bone at edge
(12) back side firer calibration;Edges of boards set reversible deformation, lift up 3mm, ensure that outside plate is smooth with middle assembling structure postwelding.
The most according to claim 1, curved surface indulges bone installation method, it is characterised in that in step S5, in order to ensure outside plate (11)
Pass through orifice angle (14) with vertical bone with the vertical inclination angle of vertical bone (12) consistent, select bevel protractor component in kind at the scene measures vertical
Bone passes through orifice angle (14), and reflection is installed to vertical bone, it is achieved support fixing.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610765656.1A CN106271176B (en) | 2016-08-30 | 2016-08-30 | A kind of vertical bone installation method of curved surface |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610765656.1A CN106271176B (en) | 2016-08-30 | 2016-08-30 | A kind of vertical bone installation method of curved surface |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106271176A true CN106271176A (en) | 2017-01-04 |
CN106271176B CN106271176B (en) | 2019-06-18 |
Family
ID=57675137
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610765656.1A Active CN106271176B (en) | 2016-08-30 | 2016-08-30 | A kind of vertical bone installation method of curved surface |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106271176B (en) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106995037A (en) * | 2017-04-14 | 2017-08-01 | 上海外高桥造船有限公司 | Ship hull surface outside plate indulges the arrangement method of bone |
CN112191719A (en) * | 2020-09-25 | 2021-01-08 | 广州文冲船厂有限责任公司 | Method for processing hull twisted longitudinal frame |
CN113401307A (en) * | 2021-06-30 | 2021-09-17 | 上海外高桥造船有限公司 | Ship outer plate longitudinal frame positioning and mounting method |
CN113510403A (en) * | 2021-07-30 | 2021-10-19 | 广船国际有限公司 | Welding method for longitudinal frame structure of ship |
CN113697061A (en) * | 2021-10-28 | 2021-11-26 | 南通中远海运川崎船舶工程有限公司 | Method for improving precision of ship bilge rib plate splicing plate |
CN115535180A (en) * | 2022-10-14 | 2022-12-30 | 沪东中华造船(集团)有限公司 | Positioning and mounting method for longitudinal frame of curved surface segmented outer plate |
CN115743395A (en) * | 2022-11-21 | 2023-03-07 | 沪东中华造船(集团)有限公司 | LNG bilge outer plate longitudinal joint structure under high stress condition |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101987401A (en) * | 2009-08-07 | 2011-03-23 | 上海外高桥造船有限公司 | Segmental assembling and welding method of stem |
CN102019999A (en) * | 2010-12-10 | 2011-04-20 | 广州中船黄埔造船有限公司 | Horizontal general assembly method of curved surface sections of fore body |
KR20120000601A (en) * | 2010-06-28 | 2012-01-04 | 대우조선해양 주식회사 | Method of construction for a block curved shape in ship building |
JP2012011898A (en) * | 2010-06-30 | 2012-01-19 | Hamamura Tekko Kk | Ship's bottom jacket structure |
CN102346789A (en) * | 2011-05-25 | 2012-02-08 | 沪东中华造船(集团)有限公司 | Setting method of intensive curvature longitudinal structure line of inner and outer dual-hull type ship |
-
2016
- 2016-08-30 CN CN201610765656.1A patent/CN106271176B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101987401A (en) * | 2009-08-07 | 2011-03-23 | 上海外高桥造船有限公司 | Segmental assembling and welding method of stem |
KR20120000601A (en) * | 2010-06-28 | 2012-01-04 | 대우조선해양 주식회사 | Method of construction for a block curved shape in ship building |
JP2012011898A (en) * | 2010-06-30 | 2012-01-19 | Hamamura Tekko Kk | Ship's bottom jacket structure |
CN102019999A (en) * | 2010-12-10 | 2011-04-20 | 广州中船黄埔造船有限公司 | Horizontal general assembly method of curved surface sections of fore body |
CN102346789A (en) * | 2011-05-25 | 2012-02-08 | 沪东中华造船(集团)有限公司 | Setting method of intensive curvature longitudinal structure line of inner and outer dual-hull type ship |
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106995037A (en) * | 2017-04-14 | 2017-08-01 | 上海外高桥造船有限公司 | Ship hull surface outside plate indulges the arrangement method of bone |
CN106995037B (en) * | 2017-04-14 | 2018-11-02 | 上海外高桥造船有限公司 | Ship hull surface outside plate indulges the arrangement method of bone |
CN112191719A (en) * | 2020-09-25 | 2021-01-08 | 广州文冲船厂有限责任公司 | Method for processing hull twisted longitudinal frame |
CN113401307A (en) * | 2021-06-30 | 2021-09-17 | 上海外高桥造船有限公司 | Ship outer plate longitudinal frame positioning and mounting method |
CN113510403A (en) * | 2021-07-30 | 2021-10-19 | 广船国际有限公司 | Welding method for longitudinal frame structure of ship |
CN113697061A (en) * | 2021-10-28 | 2021-11-26 | 南通中远海运川崎船舶工程有限公司 | Method for improving precision of ship bilge rib plate splicing plate |
CN113697061B (en) * | 2021-10-28 | 2021-12-24 | 南通中远海运川崎船舶工程有限公司 | Method for improving precision of ship bilge rib plate splicing plate |
CN115535180A (en) * | 2022-10-14 | 2022-12-30 | 沪东中华造船(集团)有限公司 | Positioning and mounting method for longitudinal frame of curved surface segmented outer plate |
CN115535180B (en) * | 2022-10-14 | 2024-06-11 | 沪东中华造船(集团)有限公司 | Longitudinal bone positioning and mounting method for curved surface segmented outer plate |
CN115743395A (en) * | 2022-11-21 | 2023-03-07 | 沪东中华造船(集团)有限公司 | LNG bilge outer plate longitudinal joint structure under high stress condition |
CN115743395B (en) * | 2022-11-21 | 2024-06-11 | 沪东中华造船(集团)有限公司 | LNG (liquefied Natural gas) bilge external plate longitudinal bone node structure under high-stress condition |
Also Published As
Publication number | Publication date |
---|---|
CN106271176B (en) | 2019-06-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106271176A (en) | A kind of curved surface indulges bone installation method | |
CN101885368B (en) | Method for manufacturing and installing guide rail in container ship cargo hold | |
CN102019999B (en) | Horizontal general assembly method of curved surface sections of fore body | |
CN102848091B (en) | Ship double bottom block assembly welding technology | |
CN102513664B (en) | Actual ship assembly welding process for ultra-large high-precision base | |
CN106347948A (en) | Loading & unloading method using AGV | |
JP4450775B2 (en) | Hull block mounting method and hull block mounting simulation system usable in the method | |
CN109533192B (en) | Carrying loose hook constraint method for ultra-large container ship bulkhead block | |
CN105947109A (en) | Process for hoisting whole assembly section of upper-layer building living zone of ship | |
CN103057663B (en) | Underwater installation process of removable deck of million-ton roll-on-roll-off ship | |
CN113581408B (en) | Ship total section dividing method | |
CN104210619B (en) | Container ship embedded type block installation method | |
CN103523168B (en) | CSS platform connecting bridge area segmentation manufacturing process and special skew moulding bed | |
CN102795316A (en) | Method for mounting base of container | |
CN107988908A (en) | The total assembling method of tubular arch | |
CN109080763A (en) | A kind of LNG ship cargo tank pedestal is got ready and prepackage method | |
CN110937079A (en) | Double-layer bottom box position precision control method for large container ship | |
CN110696993A (en) | Ship section outer plate and aggregate positioning method | |
CN107933821B (en) | The locating mounting method of bulb bow | |
CN210555495U (en) | Ro-ro vessel ramp manufacturing, mounting and inspecting device | |
CN203094369U (en) | Folded structure of cargo hold C section general assembly | |
CN110182299A (en) | A kind of accuracy control method of hull flipper guide rail location and installation | |
CN110789684A (en) | Method for assembling large deck machinery body base | |
CN102218587B (en) | Fillet-welding method for trough-shaped bulkhead and upper deck of vessel | |
CN205366016U (en) | Bow side pushes away body centering bed -jig |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |