CN107933821B - The locating mounting method of bulb bow - Google Patents

The locating mounting method of bulb bow Download PDF

Info

Publication number
CN107933821B
CN107933821B CN201711237838.2A CN201711237838A CN107933821B CN 107933821 B CN107933821 B CN 107933821B CN 201711237838 A CN201711237838 A CN 201711237838A CN 107933821 B CN107933821 B CN 107933821B
Authority
CN
China
Prior art keywords
bulb bow
bow
bulb
line
ship structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201711237838.2A
Other languages
Chinese (zh)
Other versions
CN107933821A (en
Inventor
卢友敏
汤忠文
谢锐
赵钦之
李小荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuchang Shipbuilding Industry Group Co Ltd
Original Assignee
Wuchang Shipbuilding Industry Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuchang Shipbuilding Industry Group Co Ltd filed Critical Wuchang Shipbuilding Industry Group Co Ltd
Priority to CN201711237838.2A priority Critical patent/CN107933821B/en
Publication of CN107933821A publication Critical patent/CN107933821A/en
Application granted granted Critical
Publication of CN107933821B publication Critical patent/CN107933821B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B71/00Designing vessels; Predicting their performance

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Butt Welding And Welding Of Specific Article (AREA)
  • Position Fixing By Use Of Radio Waves (AREA)

Abstract

The invention discloses a kind of bulb bow positioning tool and the locating mounting methods of bulb bow, are related to ship domain.The positioning tool includes pre- assembling platform, pedestal and soft liner, places bulb bow above soft liner, and the shape of soft liner and the shape of bulb bow match, and the bottom of pre- assembling platform is equipped with mobile device.This method comprises: S1, marking center line, elevation line and rib bit line on pre- assembling platform, Ship Structure and bulb bow;S2, bulb bow lifting is placed on soft liner, docks place for what bulb bow was moved to Ship Structure and bulb bow;S3, the installation site for marking bulb bow inner electronic equipment;S4, bulb bow is removed, electronic equipment is installed in the installed position of electronic equipment;S5, bulb bow and Ship Structure are welded.Bulb bow can be placed on positioning tool by the present invention, and measurement is convenient, highly-safe, be can be realized and installed electronic equipment before bulb bow fills warship, be conducive to improve advance fitting-out rate.

Description

The locating mounting method of bulb bow
Technical field
The present invention relates to ship domains, are specifically related to a kind of locating mounting method of bulb bow, are suitable for surface ship Bulb bow installation.
Background technique
Currently, bulb bow locating mounting method both domestic and external generallys use lift-on/lift-off system, the basic technology of positioning is lifted such as Under: using bulb bow as one be segmented, using single crane or more are crane combined lift by the way of lifted.Firstly, Bulb bow is positioned for the first time, bulb bow is lifted to the position to connect with Ship Structure, checked center line, elevation line and After rib bit line, the allowance line of bulb bow and Ship Structure is marked respectively, after removing a distance, cuts surplus;It lifts by crane again, core Contraposition postpones examination combination, formal welding after meeting the requirements.But this lifting localization method has the following problems: (1) high-altitude is made Industry is more, and risk is big;(2) bulb bow is easily deformed and damages in lifting;(3) lifting measurement is inconvenient, the difficulty of positioning Greatly, inefficient.Moreover, being typically provided with the electronic equipments such as communication, positioning in the bulb bow of surface ship, installation accuracy is required very Height, it is larger using calibration when lifting mode and positioning difficulty, it is difficult to guarantee required precision, therefore, generally after bulb bow fills warship It just can be carried out the installation of bulb bow inner electronic equipment.But bulb bow dress warship after electronic equipment is installed, not only installation space it is narrow, Execution conditions are severe, and are unfavorable for improving advance fitting-out rate.
Summary of the invention
The purpose of the invention is to overcome the shortcomings of above-mentioned background technique, a kind of location and installation side of bulb bow is provided Method.Bulb bow can be placed on positioning tool by the present invention, and measurement is convenient, highly-safe, be can be realized and filled warship in bulb bow Preceding installation electronic equipment is conducive to improve advance fitting-out rate.
The present invention provides a kind of locating mounting method of bulb bow, provides a kind of bulb bow positioning tool, is used for mounting ball Nose bow, the bulb bow positioning tool include pre- assembling platform, the pedestal for being fixed on prepackage table top and are fixed on base top Soft liner, place bulb bow above the soft liner, the shape of the soft liner and the shape of bulb bow match, The bottom of the pre- assembling platform is equipped with the mobile device moved it;
This method comprises the following steps:
S1, center line, elevation line and rib bit line are marked on pre- assembling platform, Ship Structure and bulb bow;
S2, by bulb bow lifting be placed on soft liner, push positioning tool by bulb bow be moved to Ship Structure with At the docking of bulb bow;
S3, adjustment bulb bow, so that the center line of bulb bow, elevation line and rib bit line are aligned the center of Ship Structure respectively Line, elevation line and rib bit line mark the allowance line of bulb bow and Ship Structure and the installation site of bulb bow inner electronic equipment;
S4, bulb bow is removed, is cut the surplus of bulb bow and Ship Structure according to allowance line, in the installation of electronic equipment Electronic equipment is installed at position;
S5, it pushes positioning tool that bulb bow is moved again to dock place of the Ship Structure with bulb bow, adjusts bulb bow, It is aligned center line, elevation line and the rib bit line and the center line of Ship Structure, elevation line and rib bit line of bulb bow respectively, by ball nose Bow and Ship Structure welding.
Based on the above technical solution, in step S2, after bulb bow lifting is placed on soft liner, in ball The two sides stationary positioned framve of nose bow.
Based on the above technical solution, in step S5, it is aligned center line, elevation line and the rib bit line of bulb bow respectively After the center line of Ship Structure, elevation line and rib bit line, check that bulb bow docks place with Ship Structure with wild card template Coverboard line style is coincide and fairing degree meets the requirements.
Based on the above technical solution, in step S5, bulb bow and Ship Structure welding include:
First fix in a manner of spot welding bulb bow and Ship Structure;Then the position location for measuring bulb bow comprehensively, when After measurement accuracy inspection declaration is qualified, bulb bow and Ship Structure are welded.
Based on the above technical solution, in step S5, before bulb bow and Ship Structure welding, by pre- assembling platform With the track spot welding below Ship Structure, when preventing bulb bow and Ship Structure from welding, bulb bow is moved.
Compared with prior art, advantages of the present invention is as follows:
(1) bulb bow will be placed on positioning tool by the present invention, by the mobile bulb bow of running fix tooling, be avoided Bulb bow is deformed and damages when lifting repeatedly.And the present invention does not need high altitude operation, measures convenient, the positioning of bulb bow Efficiency and precision have obtained significant increase, reduce difficulty of construction, shorten construction period, to reduce entreprise cost.
(2) present invention does not need to lift in bulb bow measurement, and electronics in bulb bow can be directly marked on bulb bow The installation site of equipment refills warship after realizing bulb bow installation electronic equipment, and electronic equipment is installed after solving bulb bow dress warship Inconvenient technical problem, ensure that the installation accuracy of electronic equipment, be conducive to improve advance fitting-out rate.
(3) positioning tool of the invention, structure is simple, can reuse, and reduces the installation cost of bulb bow.It is mobile Device is sextuple mobile device, can be adjusted to the front, back, left, right, up, down of bulb bow, convenient for the positioning of bulb bow.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of bulb bow positioning tool of the embodiment of the present invention, wherein bulb bow is placed on positioning tool On.
Fig. 2 is the flow chart of the locating mounting method of bulb bow of the embodiment of the present invention.
Appended drawing reference: the pre- assembling platform of 1-, 2- pedestal, the soft liner of 3-, 4- locating rack, 5- bulb bow, 6- mobile device, 61- hydraulic device, 62- idler wheel, 11- platform board, 12- reinforcement structure, 13- support frame.
Specific embodiment
With reference to the accompanying drawing and specific embodiment the present invention is described in further detail.
Shown in Figure 1, the embodiment of the present invention provides a kind of bulb bow positioning tool, for installing bulb bow 5, the positioning Tooling includes pre- assembling platform 1, the pedestal 2 for being fixed on 1 top of pre- assembling platform and the soft liner 3 for being fixed on 2 top of pedestal, soft Bulb bow 5 is placed in 3 top of liner, and the shape of soft liner 3 and the shape of bulb bow 5 match, and the bottom of pre- assembling platform 1 is equipped with The mobile device 6 moved it.Wherein, pedestal 2 is block seat, and soft liner 3 is block material.Pedestal 2 and soft liner 3 can Think strip, multiple, 3 settings spaced apart of multiple pedestals 2 and soft liner also can be set.
In the present embodiment, it being set on pre- assembling platform 1 there are two locating rack 4, locating rack 4 is located at the two sides of bulb bow 5, and two Locating rack 4 prevents bulb bow 5 from toppling over, while can also be used as the handrail of running fix tooling for protecting bulb bow 5.
Wherein, pre- assembling platform 1 includes platform board 11 and the reinforcement structure 12 for being fixed on 11 bottom of platform board, reinforcement structure 12 It is made of the channel steel of several horizontal and vertical arrangements, reinforces the structural strength of pre- assembling platform 1.Pre- assembling platform 1 further includes support Frame 13, support frame 13 are fixed on the bottom of platform board 11, are used to support platform board 11.
Wherein, mobile device 6 is sextuple mobile device, and mobile device 6 includes idler wheel 62 and goes up and down for pre- assembling platform 1 Hydraulic device 61, idler wheel 62 are located at the bottom of mobile device 6, and hydraulic device 61 is between pre- assembling platform 1 and idler wheel 62.It is mobile The movement of 6 front, back, left, right, up, down of device, realizes the adjusting of multiple freedom degrees, thus the position and posture to bulb bow 5 into Row adjustment, safety flexibly, avoid the unstability and insecurity of high altitude operation.It in practical applications, can be flat by prepackage Platform 1 be directly placed on berth bogie or other trolleies on.
Shown in Figure 2, the embodiment of the present invention also provides a kind of locating mounting method of bulb bow, includes the following steps:
S1, center line, elevation line and rib bit line, center line are marked on pre- assembling platform 1, Ship Structure and bulb bow 5 For the lines at center respective on pre- assembling platform 1, Ship Structure and bulb bow 5, elevation line is that the height of bulb bow 5 checks line, rib Bit line is the datum rib bit line of bulb bow 5;
S2, the lifting of bulb bow 5 is placed on soft liner 3, in the two sides stationary positioned framve 4 of bulb bow 5, pushes positioning Tooling docks place for what bulb bow 5 was moved to Ship Structure and bulb bow 5;
S3, adjustment bulb bow 5, so that the center line of bulb bow 5, elevation line and rib bit line are aligned in Ship Structure respectively Heart line, elevation line and rib bit line mark the installation position of 5 inner electronic equipment of allowance line and bulb bow of bulb bow 5 and Ship Structure It sets;
S4, bulb bow 5 is removed, is cut the surplus of bulb bow 5 and Ship Structure according to allowance line, in the peace of electronic equipment Electronic equipment is installed at holding position;
S5, it pushes positioning tool that bulb bow 5 is moved again to dock place of the Ship Structure with bulb bow 5, adjusts ball nose Bow 5 is aligned center line, elevation line and the rib bit line and the center line of Ship Structure, elevation line and rib bit line of bulb bow 5 respectively, Check that bulb bow 5 coincide with the coverboard line style at the Ship Structure place of docking and fairing degree meets the requirements with wild card template, by bulb bow 5 It is welded with Ship Structure;In actual operation, if bulb bow 5 docked with Ship Structure place coverboard line style coincide and fairing degree not It meets the requirements, can meet the requirements so that coverboard line style is identical with fairing degree using to techniques such as coverboard heating.
In step S5, bulb bow 5 and Ship Structure welding are specifically comprised the following steps:
S501, it fixes bulb bow 5 and Ship Structure in a manner of spot welding, reduces welding deformation;
The position location of S502, comprehensively measurement bulb bow 5, after measurement accuracy inspection declaration is qualified, by pre- assembling platform 1 and hull Track spot welding below structure, when preventing bulb bow 5 and Ship Structure from welding, bulb bow 5 is moved, then by bulb bow 5 It is welded with Ship Structure.
Those skilled in the art can carry out various modifications to the embodiment of the present invention and modification, if these modifications and change For type within the scope of the claims in the present invention and its equivalent technologies, then these modifications and variations are also in protection scope of the present invention Within.
The prior art that the content being not described in detail in specification is known to the skilled person.

Claims (5)

1. a kind of locating mounting method of bulb bow provides a kind of bulb bow positioning tool, described for installing bulb bow (5) Bulb bow positioning tool include pre- assembling platform (1), the pedestal (2) being fixed at the top of pre- assembling platform (1) and be fixed on pedestal (2) top Bulb bow (5) are placed in the soft liner (3) in portion, soft liner (3) top, the shape and ball nose of the soft liner (3) The shape of bow (5) matches, and the bottom of the pre- assembling platform (1) is equipped with the mobile device (6) moved it;
It is characterized by comprising the following steps:
S1, center line, elevation line and rib bit line are marked on pre- assembling platform (1), Ship Structure and bulb bow (5);
S2, bulb bow (5) lifting is placed on soft liner (3), pushes positioning tool that bulb bow (5) is moved to hull knot Structure docks place with bulb bow (5);
S3, adjustment bulb bow (5), so that the center line of bulb bow (5), elevation line and rib bit line are aligned in Ship Structure respectively Heart line, elevation line and rib bit line mark the peace of allowance line and bulb bow (5) inner electronic equipment of bulb bow (5) and Ship Structure Holding position;
S4, bulb bow (5) are removed, is cut the surplus of bulb bow (5) and Ship Structure according to allowance line, in the peace of electronic equipment Electronic equipment is installed at holding position;
S5, it pushes positioning tool that bulb bow (5) is moved again to dock place of the Ship Structure with bulb bow (5), adjusts ball nose Bow (5) is aligned center line, elevation line and the rib bit line and the center line of Ship Structure, elevation line and rib position of bulb bow (5) respectively Line welds bulb bow (5) and Ship Structure.
2. the locating mounting method of bulb bow as described in claim 1, it is characterised in that: in step S2, bulb bow (5) is hung After dress is placed on soft liner (3), in the two sides stationary positioned framve (4) of bulb bow (5).
3. the locating mounting method of bulb bow as described in claim 1, it is characterised in that: in step S5, be aligned ball nose respectively After center line, elevation line and the rib bit line and the center line of Ship Structure of bow (5), elevation line and rib bit line, with wild card template Check that bulb bow (5) coincide with the coverboard line style at the Ship Structure place of docking and fairing degree meets the requirements.
4. the locating mounting method of bulb bow as described in claim 1, which is characterized in that in step S5, bulb bow (5) and ship Body structure welding includes:
First fix in a manner of spot welding bulb bow (5) and Ship Structure;Then the position location of bulb bow (5) is measured comprehensively, After measurement accuracy inspection declaration is qualified, bulb bow (5) and Ship Structure are welded.
5. the locating mounting method of bulb bow as claimed in claim 4, it is characterised in that: in step S5, by bulb bow (5) and Before Ship Structure welding, by the track spot welding below pre- assembling platform (1) and Ship Structure, to prevent bulb bow (5) and hull When structure welding, bulb bow (5) is moved.
CN201711237838.2A 2017-11-30 2017-11-30 The locating mounting method of bulb bow Active CN107933821B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711237838.2A CN107933821B (en) 2017-11-30 2017-11-30 The locating mounting method of bulb bow

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711237838.2A CN107933821B (en) 2017-11-30 2017-11-30 The locating mounting method of bulb bow

Publications (2)

Publication Number Publication Date
CN107933821A CN107933821A (en) 2018-04-20
CN107933821B true CN107933821B (en) 2019-06-07

Family

ID=61947030

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711237838.2A Active CN107933821B (en) 2017-11-30 2017-11-30 The locating mounting method of bulb bow

Country Status (1)

Country Link
CN (1) CN107933821B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108773455B (en) * 2018-06-06 2019-06-07 广州中船文冲船坞有限公司 Bulb bow reform technology
CN109583139B (en) * 2018-12-29 2022-09-23 武昌船舶重工集团有限公司 Method for determining fixing form of base plate of vibration isolator
CN110466675B (en) * 2019-08-22 2021-08-20 中船黄埔文冲船舶有限公司 Bulbous bow mounting platform and using method
CN114291226A (en) * 2021-12-20 2022-04-08 上海中远船务工程有限公司 Sliding carrying device in irregular curved surface structure segmentation dock

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101353118A (en) * 2007-07-24 2009-01-28 (株)洧永精工 Self-driving apparatus for transfering a ship
CN201321146Y (en) * 2008-12-30 2009-10-07 中国长江航运集团江东船厂 Container ship bulb bow sectional translation trolley
CN103192952A (en) * 2013-04-23 2013-07-10 青岛北海船舶重工有限责任公司 Vehicular bulbous bow integral-replacing process
CN203358836U (en) * 2013-06-13 2013-12-25 浙江合兴船厂 Hydraulic drive flat-bed trailer
CN204077995U (en) * 2014-07-22 2015-01-07 江苏新扬子造船有限公司 Screw propeller installation car
KR101576121B1 (en) * 2015-07-10 2015-12-10 비에이치중공업 주식회사 Improve feed safety feature heavy equipment
KR20170017071A (en) * 2015-08-05 2017-02-15 주식회사 일성이엔지 An apparatus of a complex cart which can be adjustable supporter of ship according to curvature of ship

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101353118A (en) * 2007-07-24 2009-01-28 (株)洧永精工 Self-driving apparatus for transfering a ship
CN201321146Y (en) * 2008-12-30 2009-10-07 中国长江航运集团江东船厂 Container ship bulb bow sectional translation trolley
CN103192952A (en) * 2013-04-23 2013-07-10 青岛北海船舶重工有限责任公司 Vehicular bulbous bow integral-replacing process
CN203358836U (en) * 2013-06-13 2013-12-25 浙江合兴船厂 Hydraulic drive flat-bed trailer
CN204077995U (en) * 2014-07-22 2015-01-07 江苏新扬子造船有限公司 Screw propeller installation car
KR101576121B1 (en) * 2015-07-10 2015-12-10 비에이치중공업 주식회사 Improve feed safety feature heavy equipment
KR20170017071A (en) * 2015-08-05 2017-02-15 주식회사 일성이엔지 An apparatus of a complex cart which can be adjustable supporter of ship according to curvature of ship

Also Published As

Publication number Publication date
CN107933821A (en) 2018-04-20

Similar Documents

Publication Publication Date Title
CN107933821B (en) The locating mounting method of bulb bow
CN109895945A (en) A kind of pre-assembled method of bulkhead in length and breadth of ore in sand form board block
CN108189960B (en) A kind of base of steering gear installation method
CN104192265B (en) The installation method of deck plane hatchcover system
CN106741607A (en) A kind of method that boat segmental installs container buried base frame
CN104229061A (en) Hatch coaming closing and hoisting method
CN111039169A (en) Ship equipment module hoisting method
CN110525582A (en) One kind large-scale pedestal peculiar to vessel always organizes prepackage accuracy control method
CN113148058A (en) Process for installing and positioning double-rudder sleeve and tail casting in segmented construction stage
CN205278015U (en) Stand crossbeam connection structure
CN106494565A (en) The installation method in watertight ramp in a kind of shipbuilding
CN110789684A (en) Method for assembling large deck machinery body base
CN107010173B (en) The installation method of support component
CN111846141B (en) Method for hoisting high-load liquefied gas carrier tank by using crane with low hoisting capacity
CN101954957B (en) Method for mounting liner of independent liquid cargo tank of ship
CN206457204U (en) A kind of hydraulic lifting workbench
CN104390630A (en) Method for measuring and estimating overall inclination of external floating-roof storage tank
CN206399353U (en) A kind of weld seam camber measuring scale
CN203956396U (en) A kind of hanger welding tooling
CN204657826U (en) A kind of lifting deflector roll shelf
CN104149932A (en) Tail fin preassembling and folding process for 10000-ton bulk cargo ships
CN106002031A (en) Liquid level meter connecting pipe installing, welding and locating device and use method thereof
CN111745563B (en) Guide rail installation positioning tool and method
CN209522555U (en) Tool part for cutter suction dredger gantry Integral transporting
CN110182302A (en) A kind of ship goes straight up to the positioning tool and preparation method thereof of machine aided drop instruction lamp seat

Legal Events

Date Code Title Description