CN106239704A - A kind of concrete blinding slack adjuster - Google Patents
A kind of concrete blinding slack adjuster Download PDFInfo
- Publication number
- CN106239704A CN106239704A CN201610683150.6A CN201610683150A CN106239704A CN 106239704 A CN106239704 A CN 106239704A CN 201610683150 A CN201610683150 A CN 201610683150A CN 106239704 A CN106239704 A CN 106239704A
- Authority
- CN
- China
- Prior art keywords
- concrete blinding
- latch
- slack adjuster
- concrete
- elongated slot
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B7/00—Moulds; Cores; Mandrels
- B28B7/0002—Auxiliary parts or elements of the mould
- B28B7/0014—Fastening means for mould parts, e.g. for attaching mould walls on mould tables; Mould clamps
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B7/00—Moulds; Cores; Mandrels
- B28B7/0002—Auxiliary parts or elements of the mould
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B7/00—Moulds; Cores; Mandrels
- B28B7/02—Moulds with adjustable parts specially for modifying at will the dimensions or form of the moulded article
Landscapes
- Engineering & Computer Science (AREA)
- Manufacturing & Machinery (AREA)
- Chemical & Material Sciences (AREA)
- Ceramic Engineering (AREA)
- Mechanical Engineering (AREA)
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
The present invention provides a kind of concrete blinding slack adjuster, including body, regulating block and the first latch, one end of described body is provided with regulation portion, the other end is provided with connecting portion, it is provided with elongated slot in described regulation portion, the length direction of described elongated slot is identical with the stitching direction of concrete blinding, the depth direction of described gathering sill is perpendicular with the length direction of described elongated slot, described gathering sill is connected with the inside of described elongated slot, described first latch can be connected through described elongated slot with concrete blinding, described regulating block has the oblique surface for promoting described first latch.By control and regulation block in the position of gathering sill depth direction, oblique surface is made to promote the first latch opposing body in elongated slot to move, so that the concrete blinding being connected to body connecting portion is drawn close in opposite directions with the concrete blinding being connected to regulation portion, realize the regulation to concrete mould sheet separation, go for the gap regulating between the concrete blinding of shear wall.
Description
Technical field
The present invention be Patent No. ZL 201410261824.4, entitled " a kind of concrete blinding gap adjusting method and
Its device " the divisional application of patent of invention.
The present invention relates to a kind of concrete blinding installed part, especially a kind of concrete blinding slack adjuster.
Background technology
Template, the concrete used due to difform building is used in a large number during precast concrete
Template is different, and the most most template can not be reused and cause significant wastage;Standardized template list is have employed for this
Unit, modular unit is reusable and can be spliced into variously-shaped concrete blinding.But existing concrete blinding is being spelled
When connecing, the gap between two concrete blindings is changeable, when its gap is bigger, may produce the when of placing concrete
Leakage, or local expansion is produced relatively greatly due to gap.
The applicant once submitted the patent of invention of entitled " a kind of strong roof pressing type concrete blinding locker " to,
Patent No. ZL 201310228656.4, this locker includes fastener, clamp bolt and roof bolt;Arc is had on fastener
Shape recess, fastener connects clamp bolt and roof bolt by helicitic texture respectively, and the end of roof bolt is provided with top board part,
Top board part relative to the shaft of roof bolt in expanding shape.Use this device, pouring pillar, Liang Shi, splice by required form
Concrete blinding, sets up fixing pipe relatively enclosing the concrete blinding periphery set, makes concrete blinding be stayed in one by the most clamping
Rising, the gap between concrete blinding is less.But this device must use in pairs, and sphere of action is less for profile more
Particularly shear wall, owing to using in pairs, this device is the most inapplicable, needs to regulate the coagulation of shear wall with additive method
Gap between clay model plate.
Summary of the invention
It is an object of the invention to provide a kind of simple to operate, range of accommodation wide and can be suitably used for shear wall or floor mixes
The concrete blinding slack adjuster of solidifying clay model sheet separation regulation.
To achieve these goals, the present invention adopts the following technical scheme that
A kind of concrete blinding slack adjuster, including body, regulating block and the first latch, one end of described body sets
Being equipped with regulation portion, the other end is provided with the connecting portion being connected with concrete blinding, described regulation portion is provided with placement described
The gathering sill of regulating block and for connecting the elongated slot of concrete blinding, the length direction of described elongated slot and the splicing of concrete blinding
Direction is identical, and the depth direction of described gathering sill is perpendicular with the length direction of described elongated slot, described gathering sill and described elongated slot
Inside be connected, described first latch can be connected with concrete blinding through described elongated slot, described regulating block have for
Promote the oblique surface of described first latch.
Use such scheme, by control and regulation block in the position of gathering sill depth direction so that oblique surface promotes first
Latch opposing body in elongated slot move, so that be connected to the concrete blinding of body connecting portion and be connected to regulation
The concrete blinding in portion is drawn close in opposite directions, it is achieved the regulation to concrete mould sheet separation, owing to need not with the limit of concrete blinding
Angle is supported, and goes for the gap regulating between the concrete blinding of shear wall.
As a kind of improvement of assembly of the invention, the concrete blinding slack adjuster of the present invention also includes that second inserts
Pin, described connecting portion is provided with connecting hole, and described second latch can be connected through described connecting hole with concrete blinding.Logical
Cross above-mentioned improvement so that connecting portion preferably can be connected with concrete blinding.
As a kind of improvement of assembly of the invention, described first latch and/or described second latch are cone pin.Pass through
Above-mentioned improvement, facilitates the first latch and/or the assembling of the second latch.
As a kind of improvement of assembly of the invention, the bottom of described gathering sill is provided with elastic component, described elastic component one
End contacts with described regulating block, and the other end touches with the bottom connection of described gathering sill.By above-mentioned improvement so that regulating block can
With automatic rebounding, convenient use.
One as assembly of the invention is preferred, and described elastic component is spring or rubber.
As a kind of improvement of assembly of the invention, described gathering sill is provided with guide rail, described regulating block is provided with
The chute matched with described guide rail.By above-mentioned improvement so that the regulating block direction of motion in gathering sill is not likely to produce partially
From.
As a kind of improvement of assembly of the invention, also include mounting seat, described mounting seat is provided with installing hole, institute
Stating regulation portion to be arranged in described mounting seat by described installing hole, described mounting seat is in position corresponding to described regulating block also
Being provided with regulation bolt, described regulating block range of activity in described gathering sill is controlled by described regulation bolt.By above-mentioned
Improve, facilitate user to regulating block regulation of position in gathering sill.
As a kind of improvement of assembly of the invention, described regulation bolt is additionally provided with clamp nut, described fastening spiral shell
Female between the nut of described mounting seat and described regulation bolt.By clamp nut, regulating block can be made to be fixed on regulation
On good position, prevent regulating block from being rebounded by pulling force.
As a kind of improvement of assembly of the invention, described mounting seat is also equipped with adapter sleeve, described adapter sleeve one end
Being arranged in described mounting seat, the other end is connected with the steel pipe on concrete blinding.By above-mentioned improvement so that two coagulations
Steel pipe on clay model plate can dock placement relatively, it is not necessary to dislocation is placed, and connects more stable.
Accompanying drawing explanation
Fig. 1 is the mated condition schematic diagram of concrete blinding of the present invention and steel pipe;
Fig. 2 is the concrete blinding structural representation used in the embodiment of the present invention;
Fig. 3 is concrete blinding gap adjustment process schematic of the present invention;
Fig. 4 is the connecting-piece structure schematic diagram used in the embodiment of the present invention;
Fig. 5 is the structural representation of slack adjuster embodiment one of the present invention;
Fig. 6 is the structural representation of body in slack adjuster embodiment one of the present invention;
Fig. 7 is the structural representation of regulating block in slack adjuster embodiment one of the present invention;
Fig. 8 is the use view of slack adjuster embodiment one of the present invention;
Fig. 9 is the structural representation of slack adjuster embodiment two of the present invention;
Figure 10 is the use state diagram of slack adjuster embodiment three of the present invention;
Figure 11 is the structural representation of adapter sleeve in slack adjuster embodiment three of the present invention;
Figure 12 is the use view of slack adjuster embodiment three of the present invention;
Figure 13 is concrete blinding and the another kind of modes of emplacement of steel pipe in gap adjusting method of the present invention.
In figure, corresponding sign is as follows:
100-slack adjuster;200-concrete blinding;
300-steel pipe;400-screw;
500-connector;
1-body;11-regulation portion;
12-connecting portion;13-gathering sill;
14-elongated slot;15-connecting hole;
16-guide rail;2-regulating block;
21-oblique surface;22-chute;
3-the first latch;4-the second latch;
9-mounting seat;91-installing hole;
92-regulates bolt;93-clamp nut;
10-adapter sleeve;101-installing hole;
102-elongated slot.
Detailed description of the invention
The present invention is described further with specific embodiment below in conjunction with the accompanying drawings.
The concrete blinding gap adjusting method that the present invention provides, comprises the following steps:
S1 is as it is shown in figure 1, install steel pipe 300 on the concrete blinding 200 of normal size, and concrete blinding 200 is permissible
Concrete blinding of the prior art, but be necessary to ensure that its one side for shiny surface, when casting concrete is starched and concrete
Slurry contacts and is formed the surface of the building element after condensation, another side needs be provided with fast access slot or similar structures, in order to energy
Steel pipe 300 is installed, public affairs that the concrete blinding used in the present embodiment is Chinese invention patent ZL201220200056.8
Open concrete blinding, its structure is as in figure 2 it is shown, size can be arranged according to actual needs.On each concrete blinding 200
The position installing steel pipe 300 is preferably identical, in order to can be standardized installing.After installation, steel pipe 300 is under predetermined force
Can alongst jump, concrete mounting means is, is locked on concrete blinding 200 by steel pipe 300 by screw 400,
Suitably control the coupling mechanism force of screw 400 so that it is will not lock the tightest by steel pipe 300 with concrete blinding 200, after making installation
Steel pipe 300 can alongst jump under predetermined force, and installing hole steel pipe 300 being used for lock screw 400 needs slightly
More than the external diameter of screw, it is preferably designed to the mounting hole that length direction is consistent with steel pipe length direction.Additionally, steel pipe 300
Length is preferably able to the length of slightly shorter than concrete blinding 1.
S2, concrete blinding 200 is spliced into predetermined shear wall formwork plane or slab form plane, will be with during splicing
One is horizontal or steel pipe 300 on concrete blinding 200 in same longitudinal direction draws a straight line, and shape is in a row or more than a row
Steel pipe.Gap can be reduced under gravity in view of the concrete blinding 200 on vertical direction, or directly from upper past
Under beat and reduce gap, in the present embodiment, steel pipe is arranged to and plane-parallel, it should be noted that the present invention carries
The method of confession also can be used for the gap adjustment between the concrete blinding of non-horizontal directions splicing.
S3, as it is shown on figure 3, select two adjacent steel pipes 300 in the steel pipe of each row, uses slack adjuster
The steel pipe 300 selected is coupled together by 100, in order to enable faster gap to be adjusted, in the present embodiment, and slack adjuster
100 are connected between two steel pipes 300 that gap is maximum.Connected by connector 600 between other adjacent steel pipes 300
Come.Slack adjuster 100 and connector 600 can be slack adjuster of the prior art and connector, in this enforcement
The novel slack adjuster of one that slack adjuster 100 used in example designs for applicant, its structure such as Fig. 5 institute
Showing, connector 600 is also a kind of novel connector that applicant designs, and its structure is as shown in Figure 4.
It should be noted that in Fig. 1 and Fig. 3, the length direction that steel pipe 300 is placed and the T-shaped on concrete blinding 200
Groove is parallel, but as shown in figure 13, the length direction that steel pipe 300 is placed also is can be with the T-shaped on concrete blinding 200
Groove is vertical, and both placement direction differences can't affect the use of this method.
S4, use the slack adjuster 100 in each row's steel pipe successively, by the steel pipe on slack adjuster 100 both sides
300 in opposite directions to drawing, and transmits pulling force by connector 600 between steel pipe 300, and corresponding concrete blinding 200 is mutually drawn close so that
Gap is reduced or eliminated, now, between the gap between part concrete blinding 200 has reached predefined size or eliminated
Gap, but still have between part concrete blinding 200 and remain bigger gap, then proceed to use slack adjuster
100 so that it is pulling force reaches predetermined active force force value, pull the steel pipe 300 on slack adjuster 100 both sides relative to concrete
Template 200 moves, after steel pipe 300 moves to extreme position relative to concrete blinding 200, its with concrete blinding 200 it
Between stop relative movement, and then pull on corresponding concrete blinding 200, until the concrete blinding 200 that steel pipe is corresponding
Between gap reduce all reach predefined size or be completely eliminated.
It should be noted that steel pipe 300 can also be pulled relative to concrete blinding using slack adjuster 100
Before 200 move, first gap is had been decreased to the steel pipe 300 in predefined size or the two block concrete templates 200 that eliminated
It is completely fixed with this concrete blinding 200.
S5, all steel pipes 300 are completely fixed with concrete blinding 200, complete gap adjustment process.
The slack adjuster 100 provided the present invention below by four embodiments is described further.
Embodiment one:
As it is shown in figure 5, the present embodiment provide concrete blinding slack adjuster 100, including body 1, regulating block 2,
First latch 3 and the second latch 4, in the present embodiment, the first latch 3 and the second latch 4 are all cone pin or flat-sale.Body 1
Structure as shown in Figure 6, its one end is provided with regulation portion 11, and the other end is provided with the connecting portion being connected with concrete blinding
12, regulation portion 11 is provided with and places the gathering sill 13 of regulating block 2 and for connecting the elongated slot 14 of concrete blinding, elongated slot 14
Length direction is identical with the stitching direction of the two block concrete templates in gap to be regulated, the depth direction of gathering sill 13 and elongated slot 14
Length direction perpendicular, gathering sill 13 is connected with the inside of elongated slot 14, and the first latch 3 is interspersed on elongated slot 14.Connecting portion
Being provided with connecting hole 15 on 12, the second latch 4 is interspersed on connecting hole 15.
As shown in Figure 6, the depth direction of gathering sill 13 is additionally provided with guide rail 16, as it is shown in fig. 7, arrange on regulating block 2
Having the chute 22 matched with described guide rail 16, regulating block 2 also has the oblique surface 21 for promoting described first latch 3.Lead
The bottom of groove 13 is provided with elastic component (not shown), and one end of elastic component is tactile with the bottom connection of regulating block 2, the other end
Touch with the bottom connection of gathering sill 13, its objective is so that regulating block 2 is when moving toward the depth direction of gathering sill 13, elastic component
Compressed, a reciprocal active force bottom it, can be produced, after using, needed dismantling concrete die clearance adjusting means
When 100, as long as cancelling the active force promoting regulating block 2 to move, regulating block 2 will spring back to initial bit under the effect of elastic component
Putting, convenient next time uses.Elastic component can be elastic component commonly used in the art, and in the present embodiment, elastic component is spring or rubber
Glue.
As shown in Figure 8, before the concrete blinding slack adjuster 100 of the present embodiment uses, need first at two concrete
Steel pipe 300 is installed in template 200, steel pipe 300 offers the pin hole coordinated with the first latch 3 or the second latch 4, steel pipe
The length direction of 300 is vertical with the Mosaic face of the concrete blinding 200 in corresponding pre-adjustment gap, then by the first latch 3
Regulation portion 11 is linked together with the steel pipe 300 on one of them concrete blinding 200, by the second latch 4 by connecting portion
12 link together with the steel pipe 300 on another concrete blinding 200, the i.e. first latch 4 be interspersed in simultaneously elongated slot 14 and its
In on a steel pipe 300, the second latch 4 is interspersed on connecting hole 15 and another steel pipe 300 simultaneously, it is achieved between concrete blinding
Gap adjusting means 100 and the connection of two concrete blindings 200.During use, pressing regulating block 2 makes it toward the degree of depth of gathering sill 13
Direction is moved, and in this process, the oblique surface on regulating block 2 can promote the first latch 3 to move toward the direction of the second latch 4,
Owing to the first latch 3 is interspersed on steel pipe 300, steel pipe 300 is installed together with one of them concrete blinding 200 again, and first
Latch 3 can drive concrete blinding 200 close toward another block concrete template 200, it is achieved the regulation to concrete mould sheet separation.
Need not use time, it is only necessary to cancel pressing regulating block 2 by pressure, at the beginning of allowing regulating block 2 recoil under the effect of elastic component
Beginning position.It should be noted that need between two concrete blindings regulation gap less time, press regulating block 2
Pressure can be bigger, it may be necessary to press by other instruments.
Embodiment two:
The present embodiment is distinguished as with embodiment one, as it is shown in figure 9, the concrete blinding slack adjuster of the present embodiment
100 also include mounting seat 9, and mounting seat 9 is provided with installing hole 91, and the first latch 3 will regulation through installing hole 91 and elongated slot 14
Portion 11 is arranged in mounting seat 9, and connecting portion 12 exposes mounting seat 9 to be connected with concrete blinding, and concrete mounting means is, will
The regulation portion 11 of concrete blinding slack adjuster 100 is placed in mounting seat 9, and the first latch 3 is through installing hole 91 and elongated slot
The regulation portion 11 of mounting seat 9 and concrete blinding slack adjuster 100 is linked together by 14, the connected mode of connecting portion 12
Identical with embodiment one, the most no longer describe in detail.Mounting seat 9 is additionally provided with regulation bolt 92 in the position of regulating block 2 correspondence, adjusts
The locking nub 2 range of activity in gathering sill 13 is controlled by regulating bolt 92, and regulating block 2 can be welded into one with regulation bolt 92
Part, it is also possible to being separate two parts, by the cooperation that contacts with each other, concrete annexation can set according to actual needs
Put.
In order to cost-effective, the mounting seat 9 in the present embodiment is reequiped on rectangular steel tube, the rectangular steel tube of employing
Specification is best, and is arranged on steel pipe 300 same size on concrete blinding, convenient assembles with concrete blinding 200, or with installation
Steel pipe 300 on concrete blinding assembles.
In the present embodiment, regulation bolt 92 being additionally provided with clamp nut 93, clamp nut 93 is positioned at mounting seat 9 and adjusts
Between the nut of joint bolt 92, its effect is the position fixing regulation bolt 92.
Embodiment three:
The present embodiment is distinguished as with embodiment two, as shown in Figure 10, and the concrete blinding gap adjustment dress of the present embodiment
Put 100 and also include that adapter sleeve 10, one end of adapter sleeve 10 are arranged in mounting seat 9, the other end and the steel pipe on concrete blinding
It is connected.As shown in figure 11, its one end being connected with mounting seat 9 has installing hole 101 to the structure of adapter sleeve 10, and the other end has
Size elongated slot 102 as elongated slot 14.The concrete mounting means of adapter sleeve 10 is, is sleeved in mounting seat 9 by adapter sleeve 10,
First latch 3 passes the installing hole 101 of adapter sleeve 10, the installing hole 91 of mounting seat 9 and elongated slot 14 by adapter sleeve 10, mounting seat
9 and the regulation portion 11 of concrete blinding slack adjuster 100 link together, the second latch 4 slot is at connecting hole 15 and long
On groove 102.
It is the use state of the present embodiment as shown in figure 12, during use, only mounting seat 9 need to be fixed on a concrete mould
On plate 200, then use the second latch 4 by the steel pipe 300 on another concrete blinding 200 and connecting portion 12 and adapter sleeve
10 link together.
Above in conjunction with accompanying drawing, the present invention is described in detail, but embodiments of the present invention are not limited in above-mentioned
Embodiment, the present invention can be made various deformation according to prior art by those skilled in the art, as used round steel pipe generation
For the rectangular steel tube of display in accompanying drawing of the present invention, oblique surface 21 is changed to arc surface etc. by the inclined-plane in above-described embodiment, this
Broadly fall into protection scope of the present invention.
Claims (9)
1. a concrete blinding slack adjuster, it is characterised in that include body, regulating block and the first latch, described
One end of body is provided with regulation portion, and the other end is provided with the connecting portion being connected with concrete blinding, and described regulation portion is arranged
Have and place the gathering sill of described regulating block and for connecting the elongated slot of concrete blinding, the length direction of described elongated slot and concrete
The stitching direction of template is identical, and the depth direction of described gathering sill is perpendicular with the length direction of described elongated slot, described gathering sill
Being connected with the inside of described elongated slot, described first latch can be connected through described elongated slot with concrete blinding, described regulation
Block has the oblique surface for promoting described first latch.
2. concrete blinding slack adjuster as claimed in claim 1, it is characterised in that also include the second latch, described
Being provided with connecting hole on connecting portion, described second latch can be connected through described connecting hole with concrete blinding.
3. concrete blinding slack adjuster as claimed in claim 2, it is characterised in that described first latch and/or institute
Stating the second latch is cone pin or flat-sale.
4. concrete blinding slack adjuster as claimed in claim 1, it is characterised in that the bottom of described gathering sill is arranged
Flexible part, described elastic component one end contacts with described regulating block, and the other end touches with the bottom connection of described gathering sill.
5. concrete blinding slack adjuster as claimed in claim 4, it is characterised in that described elastic component is spring or rubber
Glue.
6. the concrete blinding slack adjuster as described in any claim in claim 1-5, it is characterised in that described
It is provided with guide rail on gathering sill, described regulating block is provided with the chute matched with described guide rail.
7. the concrete blinding slack adjuster as described in any claim in claim 1-5, it is characterised in that also wrap
Including mounting seat, described mounting seat is provided with installing hole, described regulation portion is arranged in described mounting seat by described installing hole,
Described mounting seat is additionally provided with regulation bolt in the position that described regulating block is corresponding, and described regulating block is in described gathering sill
Range of activity is controlled by described regulation bolt.
8. concrete blinding slack adjuster as claimed in claim 7, it is characterised in that also set up on described regulation bolt
Having clamp nut, described clamp nut is between the nut of described mounting seat and described regulation bolt.
9. concrete blinding slack adjuster as claimed in claim 7, it is characterised in that be also equipped with in described mounting seat
Adapter sleeve, described adapter sleeve one end is arranged in described mounting seat, and the other end is connected with the steel pipe on concrete blinding.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610683150.6A CN106239704A (en) | 2014-06-13 | 2014-06-13 | A kind of concrete blinding slack adjuster |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410261824.4A CN104015257B (en) | 2014-06-13 | 2014-06-13 | Method for adjusting gap between concrete formworks |
CN201610683150.6A CN106239704A (en) | 2014-06-13 | 2014-06-13 | A kind of concrete blinding slack adjuster |
Related Parent Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410261824.4A Division CN104015257B (en) | 2014-06-13 | 2014-06-13 | Method for adjusting gap between concrete formworks |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106239704A true CN106239704A (en) | 2016-12-21 |
Family
ID=51432407
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610683150.6A Pending CN106239704A (en) | 2014-06-13 | 2014-06-13 | A kind of concrete blinding slack adjuster |
CN201410261824.4A Expired - Fee Related CN104015257B (en) | 2014-06-13 | 2014-06-13 | Method for adjusting gap between concrete formworks |
Family Applications After (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410261824.4A Expired - Fee Related CN104015257B (en) | 2014-06-13 | 2014-06-13 | Method for adjusting gap between concrete formworks |
Country Status (1)
Country | Link |
---|---|
CN (2) | CN106239704A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108385973A (en) * | 2018-04-03 | 2018-08-10 | 佛山市穗远恒科建材有限公司 | A kind of concrete-pouring moulding template |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106003409A (en) * | 2016-05-24 | 2016-10-12 | 安徽海澄德畅电子科技有限公司 | Operating component gap and relative movement regulation and control device of hollow brick machine |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US1545338A (en) * | 1924-12-15 | 1925-07-07 | Roy P M Davis | Adjustable mold |
US4004874A (en) * | 1974-06-19 | 1977-01-25 | Span-Deck, Inc. | Apparatus for production of cast concrete members |
CN2254928Y (en) * | 1996-01-16 | 1997-05-28 | 曾绍强 | Gap type quick erecting tool shuttering for concrete shear wall column electrical lift well |
CN201539099U (en) * | 2009-09-24 | 2010-08-04 | 北京中建柏利工程技术发展有限公司 | Adjusting seam plate template |
CN201848520U (en) * | 2010-11-18 | 2011-06-01 | 沈阳维用精密机械有限公司 | Gap-adjustable trimming die |
CN102529055A (en) * | 2012-01-19 | 2012-07-04 | 浙江宏振机械模具集团有限公司 | Template adjusting device for adjusting space between templates |
CN103029205A (en) * | 2012-12-21 | 2013-04-10 | 蒋卓 | Movable in-row template |
CN203076467U (en) * | 2012-12-17 | 2013-07-24 | 安徽吉峰技研有限公司 | Die fine-adjustment structure |
CN103556815A (en) * | 2013-10-31 | 2014-02-05 | 林德亮 | Building template system |
CN203919339U (en) * | 2014-06-13 | 2014-11-05 | 富于安(福建)环保模板有限公司 | A kind of concrete blinding slack adjuster |
Family Cites Families (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB1301662A (en) * | 1969-01-20 | 1973-01-04 | ||
DE19525082C2 (en) * | 1995-06-30 | 1999-09-30 | Ralf Sebald | Wall element for buildings and process for its manufacture |
CN2348043Y (en) * | 1998-12-17 | 1999-11-10 | 朱幸荣 | Locating assembly for concrete pouring building shuttering |
CN201206333Y (en) * | 2008-01-09 | 2009-03-11 | 中建三局建设工程股份有限公司 | Novel dry concrete big template connecting piece device |
CN101450508B (en) * | 2008-12-31 | 2011-03-30 | 广州市市政集团有限公司 | Outer mold for casting concrete nuclear waste bin |
JP5610263B2 (en) * | 2009-12-18 | 2014-10-22 | 株式会社 ▲高▼▲橋▼監理 | Temporary frame structure for forming outer walls of reinforced concrete buildings |
CN102514088B (en) * | 2011-12-09 | 2014-11-05 | 许金锔 | Novel concrete formwork |
CN102658589A (en) * | 2012-05-07 | 2012-09-12 | 许金锔 | Quick-assembly concrete formwork unit |
CN202925898U (en) * | 2012-11-28 | 2013-05-08 | 中天建设集团有限公司天津分公司 | Template joint connecting structure |
-
2014
- 2014-06-13 CN CN201610683150.6A patent/CN106239704A/en active Pending
- 2014-06-13 CN CN201410261824.4A patent/CN104015257B/en not_active Expired - Fee Related
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US1545338A (en) * | 1924-12-15 | 1925-07-07 | Roy P M Davis | Adjustable mold |
US4004874A (en) * | 1974-06-19 | 1977-01-25 | Span-Deck, Inc. | Apparatus for production of cast concrete members |
CN2254928Y (en) * | 1996-01-16 | 1997-05-28 | 曾绍强 | Gap type quick erecting tool shuttering for concrete shear wall column electrical lift well |
CN201539099U (en) * | 2009-09-24 | 2010-08-04 | 北京中建柏利工程技术发展有限公司 | Adjusting seam plate template |
CN201848520U (en) * | 2010-11-18 | 2011-06-01 | 沈阳维用精密机械有限公司 | Gap-adjustable trimming die |
CN102529055A (en) * | 2012-01-19 | 2012-07-04 | 浙江宏振机械模具集团有限公司 | Template adjusting device for adjusting space between templates |
CN203076467U (en) * | 2012-12-17 | 2013-07-24 | 安徽吉峰技研有限公司 | Die fine-adjustment structure |
CN103029205A (en) * | 2012-12-21 | 2013-04-10 | 蒋卓 | Movable in-row template |
CN103556815A (en) * | 2013-10-31 | 2014-02-05 | 林德亮 | Building template system |
CN203919339U (en) * | 2014-06-13 | 2014-11-05 | 富于安(福建)环保模板有限公司 | A kind of concrete blinding slack adjuster |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108385973A (en) * | 2018-04-03 | 2018-08-10 | 佛山市穗远恒科建材有限公司 | A kind of concrete-pouring moulding template |
Also Published As
Publication number | Publication date |
---|---|
CN104015257A (en) | 2014-09-03 |
CN104015257B (en) | 2017-01-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207314724U (en) | Can three-dimensional regulation formula wallboard suspension member and wallboard installing structure | |
WO2018170934A1 (en) | Early-stripping system for plastic formwork | |
CN105756243A (en) | Anti-seismic exterior wall cladding for building | |
CN204920240U (en) | Curtain cement link plate positioning adjustment device | |
CN104975666A (en) | Double-curved-surface metal plate curtain wall three-dimensional adjustment installing structure and double-curved-surface metal plate curtain wall three-dimensional adjustment installing method | |
CN204238506U (en) | For the pre-buried type fixture of decorative panel | |
CN106239704A (en) | A kind of concrete blinding slack adjuster | |
CN205743046U (en) | Verticality-regulating system installed by automatization's prefabrication component | |
CN216305424U (en) | Temporary inclined support rod piece regulated and controlled at high precision and multiple angles | |
CN203919339U (en) | A kind of concrete blinding slack adjuster | |
CN207003748U (en) | A kind of upper connecting node of precast concrete out-hung panel | |
CN112047251A (en) | Auxiliary type installation equipment for road and bridge embedded parts | |
CN209384469U (en) | A kind of Curtain wall frame fixation kit | |
CN207144485U (en) | A kind of socket joint type slide tray installed for shear wall formwork | |
CN207419921U (en) | A kind of installation node of cladding panel | |
CN205496451U (en) | Precast shear wall board exposes bar straightening and positioner | |
CN211499216U (en) | Prefabricated wallboard and precast beam erection joint structure | |
CN207761303U (en) | Prefabricated concrete walls lift joint bar aligner | |
CN113550567A (en) | Plastic formwork reinforcing system | |
CN207582750U (en) | The mounting structure of Architecture Outer Curtain Wall | |
CN209066623U (en) | Can bidirectional modulation assembled superimposed sheet seam mortar leakage prevention plugging device | |
CN206987272U (en) | Cladding leveling structure part | |
CN207553588U (en) | A kind of forming template structure for wall construction | |
CN107989355B (en) | A kind of support platform and window construction method of floaing for window construction of floaing | |
CN107201816B (en) | Hanging plate, hanging piece, mounting node of hanging plate and preparation method of hanging plate |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
AD01 | Patent right deemed abandoned |
Effective date of abandoning: 20190705 |
|
AD01 | Patent right deemed abandoned |