CN201206333Y - Novel dry concrete big template connecting piece device - Google Patents
Novel dry concrete big template connecting piece device Download PDFInfo
- Publication number
- CN201206333Y CN201206333Y CNU2008200009398U CN200820000939U CN201206333Y CN 201206333 Y CN201206333 Y CN 201206333Y CN U2008200009398 U CNU2008200009398 U CN U2008200009398U CN 200820000939 U CN200820000939 U CN 200820000939U CN 201206333 Y CN201206333 Y CN 201206333Y
- Authority
- CN
- China
- Prior art keywords
- fair
- faced concrete
- templates
- clamp
- flatness
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 41
- 239000010959 steel Substances 0.000 claims abstract description 41
- 238000005266 casting Methods 0.000 claims abstract description 5
- 238000009415 formwork Methods 0.000 claims description 26
- 229910000746 Structural steel Inorganic materials 0.000 claims 1
- 238000010276 construction Methods 0.000 abstract description 8
- 238000009434 installation Methods 0.000 abstract description 5
- 238000003908 quality control method Methods 0.000 abstract description 4
- 238000000034 method Methods 0.000 abstract description 3
- 238000004519 manufacturing process Methods 0.000 abstract 1
- 238000010586 diagram Methods 0.000 description 4
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 4
- 241000357293 Leptobrama muelleri Species 0.000 description 3
- 230000006870 function Effects 0.000 description 2
- 230000008447 perception Effects 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000009435 building construction Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000002023 wood Substances 0.000 description 1
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/20—Hydro energy
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
Description
技术领域 technical field
本实用新型涉及建筑施工领域,特别涉及一种新型的清水混凝土大模板连接件装置。The utility model relates to the field of building construction, in particular to a novel large formwork connector device for fair-faced concrete.
背景技术 Background technique
清水混凝土建筑在国内是近几年刚刚兴起的建筑形式,它常以精心设计安排的明缝、禅缝(即模板间拼缝)和对拉螺栓孔组合形成自然状态作为装饰面,是建筑师展现建筑美学的重要设计手法。它对混凝土结构施工观感质量要求较高,因此设计师往往不敢轻易尝试。根据目前国内普遍参考使用的《清水混凝土施工工艺标准》(中国建筑工业出版社)要求,清水混凝土禅缝(模板间拼缝)错台不大于2mm,因此模板间拼缝错台是清水混凝土模板施工质量控制的重点和难点之一。Fair-faced concrete building is a building form that has just emerged in China in recent years. It often uses carefully designed and arranged open joints, Zen joints (that is, joints between templates) and the combination of tension bolt holes to form a natural state as a decorative surface. An important design method to show architectural aesthetics. It has high requirements on the quality of concrete structure construction perception, so designers often dare not try it lightly. According to the requirements of "Construction Technology Standards for Fair-faced Concrete" (China Construction Industry Press), which is widely used in China at present, the gap between the fair-faced concrete Zen joints (joints between the templates) is not more than 2mm, so the gap between the templates is the fair-faced concrete formwork It is one of the key and difficult points of construction quality control.
目前国内清水混凝土墙体结构施工多采用钢木体系模板,相邻大模板用连接夹具连接固定。现在广泛使用的连接夹具只有保证相邻清水墙体模板连接锁紧的功能,不具备保证相邻大模板拼接平整和进行模板错台调节校正的功能。因此,在清水混凝土结构施工中模板拼缝施工质量控制困难,操作不便。At present, steel-wood system formwork is mostly used in the construction of fair-faced concrete wall structures in China, and adjacent large formworks are connected and fixed with connecting fixtures. The connecting fixtures widely used now only have the function of ensuring the connection and locking of adjacent clear water wall formworks, and do not have the functions of ensuring the smooth splicing of adjacent large formworks and the adjustment and correction of formwork misalignment. Therefore, in the construction of fair-faced concrete structures, it is difficult to control the quality of formwork joint construction and inconvenient to operate.
实用新型的内容Contents of utility models
本实用新型的目的是提供一种新型的清水混凝土大模板连接件装置,可保证清水混凝土墙体大模板接缝拼接严密平整,错台控制在2mm以内,达到清水混凝土墙体结构观感要求。The purpose of this utility model is to provide a new type of large formwork connector device for fair-faced concrete, which can ensure that the joints of large formworks of clear-faced concrete walls are spliced tightly and evenly, and the staggering control is within 2mm, so as to meet the structural perception requirements of clear-faced concrete walls.
本实用新型包括“T”形连接件和紧固卡具,还包括平整度调节器,所述平整度调节器安装在“T”形连接件和紧固卡具的上方200mm处。The utility model includes a "T"-shaped connector and a fastening fixture, and also includes a flatness adjuster, and the flatness regulator is installed at 200mm above the "T"-shaped connector and the fastening fixture.
所述“T”形连接件包括第一角钢、第二角钢和方形钢片,所述第一角钢和第二角钢通过所述方形钢片相焊接。The "T"-shaped connecting piece includes a first angle steel, a second angle steel and a square steel sheet, and the first angle steel and the second angle steel are welded through the square steel sheet.
所述紧固卡具包括碟形垫片、楔形钢片和卡具拉杆,所述卡具拉杆上凿有方形小孔,将所述楔形钢片的一端卡入卡具拉杆上的方形小孔,将所述碟形垫片固定在卡具拉杆上。The fastening fixture includes a dish-shaped gasket, a wedge-shaped steel sheet and a clamp pull rod. A small square hole is chiseled on the clamp pull rod, and one end of the wedge-shaped steel sheet is snapped into the square small hole on the clamp pull rod. , and fix the dish washer on the clamp rod.
所述平整度调节器包括丝杠、夹具,所述夹具的下方装有夹具螺母,所述丝杆通过夹具螺母固定在夹具上。The flatness adjuster includes a lead screw and a clamp. A clamp nut is arranged below the clamp, and the screw rod is fixed on the clamp through the clamp nut.
所述第一角钢和第二角钢均为长度为550mm,厚度为5mm的角钢。Both the first angle steel and the second angle steel are angle steels with a length of 550 mm and a thickness of 5 mm.
所述紧固卡具为定型制作铸钢件。The fastening jig is a steel casting made of stereotypes.
所述平整度调节器为定型制作铸钢件。The flatness adjuster is a steel casting made of stereotypes.
相对于现有技术,本实用新型的有益效果是:Compared with the prior art, the beneficial effects of the utility model are:
1)模板拼缝错台质量控制效果好,达到清水混凝土对模板错台不大于2mm的要求;1) The quality control effect of formwork seams and staggering is good, meeting the requirement of fair-faced concrete for formwork staggering not greater than 2mm;
2)操作简单;2) Simple operation;
3)可周转使用,降低成本;3) It can be used repeatedly to reduce costs;
4)通用性强,也可应用于普通混凝土结构模板安装质量控制。4) It has strong versatility and can also be applied to the quality control of ordinary concrete structure formwork installation.
附图说明 Description of drawings
图1为本实用新型各部件名称及结构示意图。Fig. 1 is the name and structure schematic diagram of each part of the utility model.
图2为本实用新型安装使用示意图。Fig. 2 is a schematic diagram of installation and use of the utility model.
具体实施方式 Detailed ways
下面结合附图对本实用新型作进一步的描述。Below in conjunction with accompanying drawing, the utility model is further described.
图1为本实用新型的总体结构示意图。“T”形连接件1包括第一角钢4、第二角钢5,方形钢片6,第一角钢4和第二角钢5通过方形钢片6相焊接;紧固卡具2包括碟形垫片7、楔形钢片8和卡具拉杆9,卡具拉杆9上凿有方形小孔,将楔形钢片8的一端卡入卡具拉杆9上的方形小孔,将碟形垫片7固定在卡具拉杆9上;平整度调节器3包括丝杠10、夹具11,夹具11的下方装有夹具螺母12,所述丝杠10通过夹具螺母12固定在夹具11上。Fig. 1 is the overall structure schematic diagram of the present utility model. "T"-
图2为本实用新型安装使用示意图,具体安装步骤为:Fig. 2 is a schematic diagram of installation and use of the utility model, and the specific installation steps are:
1)清水混凝土墙体大模板吊装就位,用钢管临时支撑,将图1所示“T”形连接件1与清水混凝土大模板槽钢背楞靠紧。1) The large formwork of the fair-faced concrete wall is hoisted in place, temporarily supported by steel pipes, and the "T"-
2)安装紧固卡具2:操作人员先用卡具拉杆9将“T”形连接件1与清水混凝土大模板槽钢背楞拉紧,再将碟形垫片7戴在卡具拉杆9上,然后将楔形钢片8插入卡具拉杆9上的方洞,通过用铁锤敲击楔形钢片8使紧固卡具9能将“T”型连接件与清水混凝土大模板槽钢背楞卡紧,把相邻大模板连成整体。2) Install the fastening clamp 2: the operator first uses the clamp rod 9 to tighten the "T"-
3)安装平整度调节器3:“T”形连接件1和紧固卡具2安装完成后,在其上方200mm位置安装平整度调节器3;平整度调节器3的夹具卡槽与两块相邻清水混凝土大模板其中之一的槽钢边肋卡紧;平整度调节器3的丝杠10穿过夹具上的夹具螺母12,其端头将另一块清水混凝土大模板槽钢边肋顶紧。3) Install the flatness adjuster 3: After the "T"-
4)检查相邻大模板间拼缝错台情况,拧动平整度调节器3的丝杠手柄13通过放松或拧紧丝杠10来调节相邻大模板的槽钢边肋达到调节模板错台的目的,保证模板拼缝错台不大于2mm。4) Check the seam misalignment between adjacent large templates, turn the
Claims (7)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CNU2008200009398U CN201206333Y (en) | 2008-01-09 | 2008-01-09 | Novel dry concrete big template connecting piece device |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CNU2008200009398U CN201206333Y (en) | 2008-01-09 | 2008-01-09 | Novel dry concrete big template connecting piece device |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN201206333Y true CN201206333Y (en) | 2009-03-11 |
Family
ID=40465401
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CNU2008200009398U Expired - Lifetime CN201206333Y (en) | 2008-01-09 | 2008-01-09 | Novel dry concrete big template connecting piece device |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN201206333Y (en) |
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102003067A (en) * | 2010-11-04 | 2011-04-06 | 中建三局建设工程股份有限公司 | Fair-faced concrete structure beam and column joint formwork reinforcement system |
| CN104015257A (en) * | 2014-06-13 | 2014-09-03 | 富于安(福建)环保模板有限公司 | A method and device for adjusting the gap between concrete formwork |
| CN106812306A (en) * | 2016-11-14 | 2017-06-09 | 河南省第二建筑工程发展有限公司 | A kind of cast-in-situ clear-water concrete fire prevention wall form |
| CN111395756A (en) * | 2020-03-14 | 2020-07-10 | 绵阳美索尔建筑装备科技有限公司 | Clamping belt for building |
| CN112647605A (en) * | 2020-12-04 | 2021-04-13 | 北京奥克森节能环保科技有限公司 | External wall heat insulation construction method |
-
2008
- 2008-01-09 CN CNU2008200009398U patent/CN201206333Y/en not_active Expired - Lifetime
Cited By (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102003067A (en) * | 2010-11-04 | 2011-04-06 | 中建三局建设工程股份有限公司 | Fair-faced concrete structure beam and column joint formwork reinforcement system |
| CN102003067B (en) * | 2010-11-04 | 2012-07-04 | 中建三局建设工程股份有限公司 | Fair-faced concrete structure beam and column joint formwork reinforcement system |
| CN104015257A (en) * | 2014-06-13 | 2014-09-03 | 富于安(福建)环保模板有限公司 | A method and device for adjusting the gap between concrete formwork |
| CN104015257B (en) * | 2014-06-13 | 2017-01-11 | 富于安(福建)环保模板有限公司 | A method for adjusting the gap between concrete formwork |
| CN106812306A (en) * | 2016-11-14 | 2017-06-09 | 河南省第二建筑工程发展有限公司 | A kind of cast-in-situ clear-water concrete fire prevention wall form |
| CN111395756A (en) * | 2020-03-14 | 2020-07-10 | 绵阳美索尔建筑装备科技有限公司 | Clamping belt for building |
| CN112647605A (en) * | 2020-12-04 | 2021-04-13 | 北京奥克森节能环保科技有限公司 | External wall heat insulation construction method |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN201206333Y (en) | Novel dry concrete big template connecting piece device | |
| CN204983634U (en) | Y shape split bolt reinforced structure of waterproof position concrete wall bight form setting | |
| CN201050190Y (en) | Formwork clamp for building construction | |
| CN203531385U (en) | Mold for plugging gap between reserved hole and pipeline | |
| CN210713235U (en) | A prefabricated wall panel connection structure | |
| CN203911846U (en) | Color steel tile clamp | |
| CN215760444U (en) | A reinforcement tool for anti-sill formwork | |
| CN111350350B (en) | A kind of steel formwork integrated wall formwork broken bridge pair tension connecting rod | |
| CN201924595U (en) | Beam side template section steel fixture | |
| CN207776184U (en) | A kind of flat jam-packed controller of precast facade hanging plate perps folder | |
| CN209323958U (en) | Dismountable aluminum alloy mould plate | |
| CN223937659U (en) | Connecting piece suitable for building templates class | |
| CN210917800U (en) | A combined fixture for insulation board | |
| CN209468891U (en) | Device for supporting non-dismantling composite heat-insulation external template | |
| CN215407446U (en) | An L-shaped angle aluminum alloy formwork composite structure | |
| CN223767164U (en) | A lateral formwork reinforcement device for cantilever slabs in concrete structures | |
| KR100620253B1 (en) | Formwork panel for formwork installation and its manufacturing method | |
| CN221856201U (en) | A concrete formwork reinforcement device | |
| CN217975402U (en) | A new type of water supply pipe pressure groove with built-in aluminum formwork | |
| CN206655474U (en) | Fixative composition pin-connected panel stair template | |
| CN111827583A (en) | A color steel tile for installing photovoltaic panels, a color steel tile fixture and an installation tool | |
| CN224063915U (en) | A novel fixing clamp for casting formwork | |
| CN108385974B (en) | Method for fixing side mold through single pipe of wall-penetrating screw | |
| CN222893798U (en) | A joint control device for composite panels | |
| CN223867637U (en) | Concrete reserved hole steel sleeve positioning device |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CX01 | Expiry of patent term |
Granted publication date: 20090311 |
|
| CX01 | Expiry of patent term |