CN104015257B - Method for adjusting gap between concrete formworks - Google Patents
Method for adjusting gap between concrete formworks Download PDFInfo
- Publication number
- CN104015257B CN104015257B CN201410261824.4A CN201410261824A CN104015257B CN 104015257 B CN104015257 B CN 104015257B CN 201410261824 A CN201410261824 A CN 201410261824A CN 104015257 B CN104015257 B CN 104015257B
- Authority
- CN
- China
- Prior art keywords
- concrete blinding
- steel pipe
- gap
- concrete
- latch
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B7/00—Moulds; Cores; Mandrels
- B28B7/0002—Auxiliary parts or elements of the mould
- B28B7/0014—Fastening means for mould parts, e.g. for attaching mould walls on mould tables; Mould clamps
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B7/00—Moulds; Cores; Mandrels
- B28B7/0002—Auxiliary parts or elements of the mould
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B7/00—Moulds; Cores; Mandrels
- B28B7/02—Moulds with adjustable parts specially for modifying at will the dimensions or form of the moulded article
Abstract
The invention provides a method for adjusting the gap between concrete formworks. The method is easy to operate, wide in adjusting range and applicable to adjustment of the gap between the concrete formworks of shearing walls or floorslabs, due to the cooperation between a gap adjusting device and a connecting piece the gap between the whole row of concrete formworks can be adjusted just by operating one gap adjusting device, operation is easy to perform, and the adjusting range is wide. The invention further provides the gap adjusting device. The gap adjusting device comprises a body, an adjusting block and a first plug pin, wherein an adjusting part is arranged at one end of the body, a connecting part connected with one concrete formwork is arranged at the other end of the body, a guiding groove for placing the adjusting block and a long groove used for connecting the concrete formworks are formed in the adjusting part, the direction of the depth of the guiding groove is perpendicular to the direction of the length of the long groove, the interior of the guiding groove is communicated with the interior of the long groove, the first plug pin penetrates through the long groove to be connected with the concrete formworks, and the adjusting block is provided with an inclined guiding face used for pushing the first plug pin.
Description
Technical field
The present invention relates to a kind of concrete mould method of plate installation, especially a kind of concrete mould sheet separation is adjusted
Joint method.
Background technology
Template is used in a large number, owing to difform building makes during precast concrete
Concrete blinding different, the most most template can not be reused and cause significant wastage;
Have employed standardized modular unit for this, modular unit is reusable and can be spliced into variously-shaped
Concrete blinding.But existing concrete blinding is when splicing, between two concrete blindings
Gap is changeable, when its gap is bigger, may produce leakage when of placing concrete, or
Produce relatively greatly local to expand due to gap.
The applicant once submitted one entitled " a kind of strong roof pressing type concrete blinding locker " to
Patent of invention, Patent No. ZL 201310228656.4, this locker includes fastener, clamp spiral shell
Bolt and roof bolt;Have arc-shaped notch on fastener, fastener connects clamp by helicitic texture respectively
Bolt and roof bolt, the end of roof bolt is provided with top board part, and top board part is relative to roof bolt
Shaft is in expanding shape.Use this device, pouring pillar, Liang Shi, splice concrete by required form
Template, sets up fixing pipe relatively enclosing the concrete blinding periphery set, makes concrete blinding tightly be pressed from both sides
Admittedly live together, the gap between concrete blinding is less.But this device must use in pairs, and
Sphere of action is less for profile more particularly shear wall, and owing to using in pairs, this device is also
Inapplicable, need the gap regulating between the concrete blinding of shear wall with additive method.
Summary of the invention
It is an object of the invention to provide a kind of simple to operate, range of accommodation wide and can be suitably used for shear wall
Or floorslab concrete die clearance regulation concrete blinding gap adjusting method and device.
To achieve these goals, the method for the present invention adopts the following technical scheme that
A kind of concrete blinding gap adjusting method, comprises the following steps:
S1, installing steel pipe on concrete blinding, after installation, described steel pipe can edge under predetermined force
Its length direction to jump;
S2, described concrete blinding is spliced into predetermined shear wall formwork plane or slab form plane,
During splicing, the described steel pipe on the described concrete blinding in same horizontal or same longitudinal direction is linked to be one
Straight line, shape is in a row or more than row steel pipe;
S3, in the described steel pipe of each row, select two adjacent described steel pipes, use gap to adjust
The described fastener for connection that regulating device will be selected, passes through connector between other adjacent described steel pipes
Couple together;
S4, use the described slack adjuster in steel pipe described in each row by described gap adjustment successively
The described steel pipe on device both sides is in opposite directions to drawing, and corresponding concrete blinding is mutually drawn close so that gap subtracts
Little or eliminate, then proceed to use described slack adjuster so that it is pulling force reaches predetermined active force
Force value, pulls the described steel pipe on described slack adjuster both sides to move relative to concrete blinding, directly
Gap reduction between the concrete blinding that described steel pipe is corresponding reaches predefined size or is completely eliminated;
S5, described steel pipe is completely fixed with described concrete blinding, completes gap adjustment process.
As a kind of improvement of the method for the present invention, in step s 2, described steel pipe is put down with horizontal plane
OK.
As a kind of improvement of the method for the present invention, in step s3, described slack adjuster connects
Between two described steel pipes that gap is maximum.
As a kind of improvement of the method for the present invention, use the process of slack adjuster in step s 4
In, predefined size or described concrete blinding very close to each other have been reached for mutual gap,
First by corresponding concrete blinding and the most solid with the described steel pipe that this concrete blinding is installed together
Fixed.
Use technique scheme, the method have the advantages that
1, by slack adjuster and the cooperation of connector, as long as one slack adjuster of operation can
To regulate the gap between the concrete blinding of an entire row, simple to operate, range of accommodation is wide, simultaneously this
Concrete blinding can be spliced into shear wall formwork or floor by the concrete gap adjusting method of invention
Carry out gap adjustment after template again, i.e. can be applicable to the gap adjustment of shear wall formwork or slab form.
2, slack adjuster is connected between the steel pipe that gap is maximum, so that gap adjustment is fast
Degree is faster.
3, during regulation gap, first gap has been reached on two concrete blindings of requirement
Steel pipe fix seat, facilitate regulation to make its gap, be also greatly reduced slack adjuster required for draw
Power.
To achieve these goals, assembly of the invention adopts the following technical scheme that
A kind of concrete blinding slack adjuster, including body, regulating block and the first latch, described
One end of body is provided with regulation portion, and the other end is provided with the connecting portion being connected with concrete blinding,
It is provided with in described regulation portion and places the gathering sill of described regulating block and for connecting the length of concrete blinding
Groove, the depth direction of described gathering sill is perpendicular with the length direction of described elongated slot, described gathering sill and
The inside of described elongated slot is connected, and described first latch can be connected through described elongated slot with concrete blinding
Connecing, described regulating block has the oblique surface for promoting described first latch.
Use such scheme, by control and regulation block in the position of gathering sill depth direction so that tiltedly lead
Face promotes the first latch opposing body in elongated slot to move, so that be connected to body connecting portion
Concrete blinding and be connected to the concrete blinding in regulation portion and draw close in opposite directions, it is achieved to concrete blinding
The regulation in gap, owing to need not be supported with the corner of concrete blinding, goes for regulation
Gap between the concrete blinding of shear wall.
As a kind of improvement of assembly of the invention, the concrete blinding slack adjuster of the present invention is also
Including the second latch, described connecting portion being provided with connecting hole, described second latch can pass described company
Connect hole to want to be connected with concrete blinding.By above-mentioned improvement so that connecting portion can be with concrete blinding
Preferably connect.
It is cone as a kind of improvement of assembly of the invention, described first latch and/or described second latch
Shape pin.By above-mentioned improvement, facilitate the first latch and/or the assembling of the second latch.
As a kind of improvement of assembly of the invention, the bottom of described gathering sill is provided with elastic component, institute
Stating elastic component one end to contact with described regulating block, the other end touches with the bottom connection of described gathering sill.
By above-mentioned improvement so that regulating block can be with automatic rebounding, convenient use.
One as assembly of the invention is preferred, and described elastic component is spring or rubber.
As a kind of improvement of assembly of the invention, described gathering sill is provided with guide rail, described regulation
The chute matched with described guide rail it is provided with on block.By above-mentioned improvement so that regulating block is guiding
The direction of motion in groove is not likely to produce deviation.
As a kind of improvement of assembly of the invention, also include mounting seat, described mounting seat is provided with
Installing hole, described regulation portion is arranged in described mounting seat by described installing hole, and described mounting seat exists
The position that described regulating block is corresponding is additionally provided with regulation bolt, and described regulating block is in described gathering sill
Range of activity controlled by described regulation bolt.By above-mentioned improvement, facilitate user that regulating block is existed
The regulation of position in gathering sill.
As a kind of improvement of assembly of the invention, described regulation bolt is additionally provided with clamp nut,
Described clamp nut is between the nut of described mounting seat and described regulation bolt.By clamp nut,
Regulating block can be made to be fixed on the position regulated, prevent regulating block from being rebounded by pulling force.
As a kind of improvement of assembly of the invention, described mounting seat is also equipped with adapter sleeve, described
Adapter sleeve one end is arranged in described mounting seat, and the other end is connected with the steel pipe on concrete blinding.
By above-mentioned improvement so that the steel pipe on two concrete blindings can dock placement relatively, it is not necessary to
Dislocation is placed, and connects more stable.
Accompanying drawing explanation
Fig. 1 is the mated condition schematic diagram of concrete blinding of the present invention and steel pipe;
Fig. 2 is the concrete blinding structural representation used in the embodiment of the present invention;
Fig. 3 is concrete blinding gap adjustment process schematic of the present invention;
Fig. 4 is the connecting-piece structure schematic diagram used in the embodiment of the present invention;
Fig. 5 is the structural representation of slack adjuster embodiment one of the present invention;
Fig. 6 is the structural representation of body in slack adjuster embodiment one of the present invention;
Fig. 7 is the structural representation of regulating block in slack adjuster embodiment one of the present invention;
Fig. 8 is the use view of slack adjuster embodiment one of the present invention;
Fig. 9 is the structural representation of slack adjuster embodiment two of the present invention;
Figure 10 is the use state diagram of slack adjuster embodiment three of the present invention;
Figure 11 is the structural representation of adapter sleeve in slack adjuster embodiment three of the present invention;
Figure 12 is the use view of slack adjuster embodiment three of the present invention;
Figure 13 is concrete blinding and the another kind of modes of emplacement of steel pipe in gap adjusting method of the present invention.
In figure, corresponding sign is as follows:
100-slack adjuster;200-concrete blinding;
300-steel pipe;400-screw;
500-connector;
1-body;11-regulation portion;
12-connecting portion;13-gathering sill;
14-elongated slot;15-connecting hole;
16-guide rail;2-regulating block;
21-oblique surface;22-chute;
3-the first latch;4-the second latch;
9-mounting seat;91-installing hole;
92-regulates bolt;93-clamp nut;
10-adapter sleeve;101-installing hole;
102-elongated slot.
Detailed description of the invention
The present invention is described further with specific embodiment below in conjunction with the accompanying drawings.
The concrete blinding gap adjusting method that the present invention provides, comprises the following steps:
S1 is as it is shown in figure 1, install steel pipe 300, coagulation on the concrete blinding 200 of normal size
Clay model plate 200 can be concrete blinding of the prior art, but is necessary to ensure that its one side is shiny surface,
When casting concrete is starched, contact and formed the surface of building element after condensation with concrete grout, separately
Need on Yi Mian to be provided with fast access slot or similar structures, in order to steel pipe 300 can be installed, in the present embodiment
The concrete blinding used be disclosed in Chinese utility model patent ZL201220200056.8 mixed
Solidifying clay model plate, its structure is as in figure 2 it is shown, size can be arranged according to actual needs.Each concrete
The position installing steel pipe 300 in template 200 is preferably identical, in order to can be standardized installing.Peace
After dress, steel pipe 300 can alongst jump under predetermined force, and concrete mounting means is,
By screw 400, steel pipe 300 is locked on concrete blinding 200, suitably controls the lock of screw 400
Clamp force so that it is will not lock the tightest with concrete blinding 200 by steel pipe 300, in order to make steel after installation
Pipe 300 can alongst jump under predetermined force, steel pipe 300 is used for lock screw 400
Installing hole need the external diameter slightly larger than screw, be preferably designed to length direction and steel pipe length direction
Consistent mounting hole.Additionally, the length of steel pipe 300 is preferably able to slightly shorter than concrete blinding 200
Length.
S2, concrete blinding 200 is spliced into predetermined shear wall formwork plane or slab form plane,
During splicing, the steel pipe 300 on the concrete blinding 200 in same horizontal or same longitudinal direction is linked to be one
Straight line, shape is in a row or more than row steel pipe.In view of the concrete blinding 200 on vertical direction
Gap can be reduced under gravity, or direct beaing from top to bottom reduces gap, in this reality
Executing in example, steel pipe is arranged to and plane-parallel, it should be noted that the method that the present invention provides
Also can be used for the gap adjustment between the concrete blinding of non-horizontal directions splicing.
S3, as it is shown on figure 3, select two adjacent steel pipes 300 in the steel pipe of each row, uses
The steel pipe 300 selected is coupled together by slack adjuster 100, in order to enable faster to adjust gap
Joint, in the present embodiment, slack adjuster 100 be connected to two maximum steel pipes 300 of gap it
Between.Coupled together by connector 600 between other adjacent steel pipes 300.Slack adjuster 100
Can be slack adjuster of the prior art and connector with connector 600, in the present embodiment
A kind of slack adjuster that the slack adjuster 100 used designs for applicant, its structure is such as
Shown in Fig. 5, connector 600 is also a kind of connector that applicant designs, and its structure is as shown in Figure 4.
It should be noted that in Fig. 1 and Fig. 3, the length direction of steel pipe 300 placement and concrete
T-slot in template 200 is parallel, but as shown in figure 13, the length side that steel pipe 300 is placed
To being also can be vertical with the T-slot on concrete blinding 200, both placement direction differences be also
Do not interfere with the use of this method.
S4, use the slack adjuster 100 in each row's steel pipe successively, by slack adjuster 100
The steel pipe 300 on both sides, in opposite directions to drawing, transmits pulling force, accordingly by connector 600 between steel pipe 300
Concrete blinding 200 mutually draw close so that gap is reduced or eliminated, now, part concrete mould
Gap between plate 200 has reached predefined size or has eliminated gap, but still has part coagulation
Remain bigger gap between clay model plate 200, then proceed to use slack adjuster 100,
Make its pulling force reach predetermined active force force value, pull the steel pipe 300 on slack adjuster 100 both sides
Move relative to concrete blinding 200, when steel pipe 300 moves to pole relative to concrete blinding 200
After extreme position, stop relative movement between itself and concrete blinding 200, and then pull on corresponding
Concrete blinding 200, reduces until the gap between the concrete blinding 200 that steel pipe is corresponding and all reaches
Predefined size or be completely eliminated.
It should be noted that can also use slack adjuster 100 pull steel pipe 300 relative to
Before concrete blinding 200 moves, first gap is had been decreased to predefined size or two pieces eliminated
Steel pipe 300 on concrete blinding 200 is completely fixed with this concrete blinding 200.
S5, all steel pipes 300 are completely fixed with concrete blinding 200, complete gap adjustment process.
The slack adjuster 100 provided the present invention below by four embodiments does furtherly
Bright.
Embodiment one:
As it is shown in figure 5, the concrete blinding slack adjuster 100 that the present embodiment provides, including body
1, regulating block the 2, first latch 3 and the second latch 4, in the present embodiment, the first latch 3 and
Two latches 4 are all cone pin or flat-sale.As shown in Figure 6, its one end is provided with tune to the structure of body 1
Joint portion 11, the other end is provided with the connecting portion 12 being connected with concrete blinding, regulation portion 11 sets
It is equipped with and places the gathering sill 13 of regulating block 2 and for connecting the elongated slot 14 of concrete blinding, elongated slot 14
Length direction identical with the stitching direction of the two block concrete templates in gap to be regulated, namely be intended to adjust
The Mosaic face of two block concrete templates of internode gap is vertical, the depth direction of gathering sill 13 and elongated slot 14
Length direction perpendicular, gathering sill 13 is connected with the inside of elongated slot 14, and the first latch 3 interts
On elongated slot 14.Being provided with connecting hole 15 on connecting portion 12, the second latch 4 is interspersed in connecting hole 15
On.
As shown in Figure 6, the depth direction of gathering sill 13 is additionally provided with guide rail 16, as it is shown in fig. 7,
Being provided with the chute 22 matched with described guide rail 16 on regulating block 2, regulating block 2 also has for pushing away
The oblique surface 21 of dynamic described first latch 3.The bottom of gathering sill 13 is provided with elastic component and (does not shows in figure
Go out), one end of elastic component is tactile with the bottom connection of regulating block 2, the other end and the bottom of gathering sill 13
Contact, its objective is so that regulating block 2 is when moving toward the depth direction of gathering sill 13, elastic component
Compressed, a reciprocal active force bottom it, can be produced, after using, needed dismantling concrete mould
During the adjusting means 100 of sheet separation, as long as cancelling the active force promoting regulating block 2 to move, regulating block 2
Initial position will be sprung back under the effect of elastic component, use convenient next time.Elastic component can be this
The elastic component that field is conventional, in the present embodiment, elastic component is spring or rubber.
As shown in Figure 8, before the concrete blinding slack adjuster 100 of the present embodiment uses, elder generation is needed
On two concrete blindings 200 install steel pipe 300, steel pipe 300 offers with the first latch 3 or
The pin hole that second latch 4 coordinates, the length direction of steel pipe 300 is mixed with corresponding pre-adjustment gap
The Mosaic face of solidifying clay model plate 200 is vertical, then by the first latch 3 by regulation portion 11 and one of them
Steel pipe 300 on concrete blinding 200 links together, by the second latch 4 by connecting portion 12 with
Steel pipe 300 on another concrete blinding 200 links together, and the i.e. first latch 3 interts simultaneously
On elongated slot 14 and one of them steel pipe 300, the second latch 4 is interspersed in connecting hole 15 with another simultaneously
On one steel pipe 300, it is achieved concrete blinding slack adjuster 100 and two concrete blindings 200
Connection.During use, pressing regulating block 2 makes it move toward the depth direction of gathering sill 13, at this
During, the oblique surface on regulating block 2 can promote the first latch 3 to move toward the direction of the second latch 4,
Owing to the first latch 3 is interspersed on steel pipe 300, steel pipe 300 again with one of them concrete blinding 200
Being installed together, the first latch 3 can drive concrete blinding 200 toward another block concrete template 200
Close, it is achieved the regulation to concrete mould sheet separation.When need not use, it is only necessary to cancel pressing and adjust
Locking nub 2 by pressure, allow regulating block 2 recoil to initial position under the effect of elastic component.Need
It is noted that when the gap needing to regulate between two concrete blindings is less, presses regulating block 2
Pressure can be bigger, it may be necessary to press by other instruments.
Embodiment two:
The present embodiment is distinguished as with embodiment one, as it is shown in figure 9, the concrete blinding of the present embodiment
Slack adjuster 100 also includes mounting seat 9, and mounting seat 9 is provided with installing hole 91, and first inserts
Regulation portion 11 is arranged in mounting seat 9 by pin 3 through installing hole 91 and elongated slot 14, connecting portion 12
Exposing mounting seat 9 to be connected with concrete blinding, concrete mounting means is, by between concrete blinding
The regulation portion 11 of gap adjusting means 100 is placed in mounting seat 9, and the first latch 3 is through installing hole 91
With elongated slot 14, the regulation portion 11 of mounting seat 9 and concrete blinding slack adjuster 100 is connected to
Together, the connected mode of connecting portion 12 is identical with embodiment one, the most no longer describes in detail.Mounting seat 9 exists
The position of regulating block 2 correspondence is additionally provided with regulation bolt 92, the regulating block 2 work in gathering sill 13
Dynamic scope is controlled by regulating bolt 92, and regulating block 2 can be welded into a part with regulation bolt 92,
Can also be separate two parts, by the cooperation that contacts with each other, concrete annexation can basis
It is actually needed setting.
In order to cost-effective, the mounting seat 9 in the present embodiment is reequiped on rectangular steel tube, uses
Rectangular steel tube specification best, and be arranged on steel pipe 300 same size on concrete blinding, convenient with
Concrete blinding 200 assembles, or assembles with the steel pipe 300 being arranged on concrete blinding.
In the present embodiment, regulation bolt 92 is additionally provided with clamp nut 93, clamp nut 93
Between the nut of mounting seat 9 and regulation bolt 92, its effect is the position fixing regulation bolt 92
Put.
Embodiment three:
The present embodiment is distinguished as with embodiment two, as shown in Figure 10, and the concrete blinding of the present embodiment
Slack adjuster 100 also includes that adapter sleeve 10, one end of adapter sleeve 10 are arranged in mounting seat 9,
The other end is connected with the steel pipe on concrete blinding.The structure of adapter sleeve 10 as shown in figure 11, its
The one end being connected with mounting seat 9 has installing hole 101, and the other end has size length as elongated slot 14
Groove 102.The concrete mounting means of adapter sleeve 10 is, is sleeved in mounting seat 9 by adapter sleeve 10, the
One latch 3 is through the installing hole 101 of adapter sleeve 10, the installing hole 91 of mounting seat 9 and elongated slot 14
The regulation portion 11 of adapter sleeve 10, mounting seat 9 and concrete blinding slack adjuster 100 is connected to
Together, the second latch 4 slot is on connecting hole 15 and elongated slot 102.
It is the use state of the present embodiment as shown in figure 12, during use, only mounting seat 9 need to be fixed on
On one concrete blinding 200, then use the second latch 4 by another concrete blinding 200
Steel pipe 300 and connecting portion 12 and adapter sleeve 10 link together.
Above in conjunction with accompanying drawing, the present invention is described in detail, but embodiments of the present invention are not
Being only limitted to above-mentioned embodiment, the present invention can be made respectively by those skilled in the art according to prior art
Planting deformation, the rectangular steel tube as shown in use round steel pipe to replace in accompanying drawing of the present invention, by oblique surface 21
Being changed to arc surface etc. by the inclined-plane in above-described embodiment, these broadly fall into protection scope of the present invention.
Claims (12)
1. a concrete blinding gap adjusting method, it is characterised in that comprise the following steps:
S1, on the concrete blinding of normal size install steel pipe, after installation, described steel pipe is being designed as
Can jump along its length direction under Yong Li;
S2, described concrete blinding is spliced into predetermined shear wall formwork plane or slab form plane,
During splicing, the described steel pipe on the described concrete blinding in same horizontal or same longitudinal direction is linked to be one
Straight line, shape is in a row or more than row steel pipe;
S3, in the described steel pipe of each row, select two adjacent described steel pipes, use gap to adjust
The described fastener for connection that regulating device will be selected, passes through connector between other adjacent described steel pipes
Couple together;
Described slack adjuster includes body, regulating block and the first latch, and one end of described body sets
Being equipped with regulation portion, the other end is provided with the connecting portion being connected with concrete blinding, in described regulation portion
It is provided with and places the gathering sill of described regulating block and for connecting the elongated slot of concrete blinding, described guiding
The depth direction of groove is perpendicular with the length direction of described elongated slot, described gathering sill and described elongated slot interior
Portion is connected, and described first latch can be connected through described elongated slot with concrete blinding, described regulation
Block has the oblique surface for promoting described first latch;
S4, use the described slack adjuster in steel pipe described in each row by described gap adjustment successively
The described steel pipe on device both sides is in opposite directions to drawing, and corresponding concrete blinding is mutually drawn close so that gap subtracts
Little or eliminate, then proceed to use described slack adjuster so that it is pulling force reaches predetermined active force
Force value, pulls the described steel pipe on described slack adjuster both sides to move relative to concrete blinding, directly
Gap reduction between the concrete blinding that described steel pipe is corresponding reaches predefined size or is completely eliminated;
S5, described steel pipe is completely fixed with described concrete blinding, completes gap adjustment process.
2. concrete blinding gap adjusting method as claimed in claim 1, it is characterised in that in step
In rapid S2, described steel pipe and plane-parallel.
3. concrete blinding gap adjusting method as claimed in claim 1 or 2, it is characterised in that
In step s3, described slack adjuster is connected between two described steel pipes that gap is maximum.
4. concrete blinding gap adjusting method as claimed in claim 1 or 2, it is characterised in that
During using slack adjuster in step s 4, mutual gap is reached predetermined
Size or described concrete blinding very close to each other, first by corresponding concrete blinding and with this concrete
Model sheetinstallat described steel pipe together is completely fixed.
5. concrete blinding gap adjusting method as claimed in claim 1, it is characterised in that also wrap
Including the second latch, described connecting portion is provided with connecting hole, described second latch can pass described connection
Hole is connected with concrete blinding.
6. concrete blinding gap adjusting method as claimed in claim 5, it is characterised in that described
First latch and/or described second latch are cone pin or flat-sale.
7. concrete blinding gap adjusting method as claimed in claim 1, it is characterised in that described
The bottom of gathering sill is provided with elastic component, and described elastic component one end contacts with described regulating block, another
End touches with the bottom connection of described gathering sill.
8. concrete blinding gap adjusting method as claimed in claim 7, it is characterised in that described
Elastic component is spring or rubber.
9. the concrete blinding gap adjusting method as described in any claim in claim 5-8,
It is characterized in that, described gathering sill is provided with guide rail, described regulating block is provided with and described guide rail
The chute matched.
10. the concrete blinding gap adjusting method as described in any claim in claim 5-8,
It is characterized in that, also include mounting seat, described mounting seat is provided with installing hole, described regulation portion leads to
Crossing described installing hole to be arranged in described mounting seat, described mounting seat is in position corresponding to described regulating block
Place is additionally provided with regulation bolt, and described regulating block range of activity in described gathering sill is by described regulation
Bolt controls.
11. concrete blinding gap adjusting methods as claimed in claim 10, it is characterised in that institute
Stating and be additionally provided with clamp nut on regulation bolt, described clamp nut is positioned at described mounting seat and described tune
Between the nut of joint bolt.
12. concrete blinding gap adjusting methods as claimed in claim 10, it is characterised in that institute
Stating and be also equipped with adapter sleeve in mounting seat, described adapter sleeve one end is arranged in described mounting seat, another
End is connected with the steel pipe on concrete blinding.
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610683150.6A CN106239704A (en) | 2014-06-13 | 2014-06-13 | A kind of concrete blinding slack adjuster |
CN201410261824.4A CN104015257B (en) | 2014-06-13 | 2014-06-13 | Method for adjusting gap between concrete formworks |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410261824.4A CN104015257B (en) | 2014-06-13 | 2014-06-13 | Method for adjusting gap between concrete formworks |
Related Child Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610683150.6A Division CN106239704A (en) | 2014-06-13 | 2014-06-13 | A kind of concrete blinding slack adjuster |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104015257A CN104015257A (en) | 2014-09-03 |
CN104015257B true CN104015257B (en) | 2017-01-11 |
Family
ID=51432407
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410261824.4A Expired - Fee Related CN104015257B (en) | 2014-06-13 | 2014-06-13 | Method for adjusting gap between concrete formworks |
CN201610683150.6A Pending CN106239704A (en) | 2014-06-13 | 2014-06-13 | A kind of concrete blinding slack adjuster |
Family Applications After (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610683150.6A Pending CN106239704A (en) | 2014-06-13 | 2014-06-13 | A kind of concrete blinding slack adjuster |
Country Status (1)
Country | Link |
---|---|
CN (2) | CN104015257B (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106003409A (en) * | 2016-05-24 | 2016-10-12 | 安徽海澄德畅电子科技有限公司 | Operating component gap and relative movement regulation and control device of hollow brick machine |
CN108385973A (en) * | 2018-04-03 | 2018-08-10 | 佛山市穗远恒科建材有限公司 | A kind of concrete-pouring moulding template |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB1301662A (en) * | 1969-01-20 | 1973-01-04 | ||
DE19525082A1 (en) * | 1995-06-30 | 1997-01-02 | Ralf Sebald | Prefabricated reinforced wall elements for high bulldings |
CN2348043Y (en) * | 1998-12-17 | 1999-11-10 | 朱幸荣 | Locating assembly for concrete pouring building shuttering |
CN201206333Y (en) * | 2008-01-09 | 2009-03-11 | 中建三局建设工程股份有限公司 | Novel dry concrete big template connecting piece device |
CN101450508A (en) * | 2008-12-31 | 2009-06-10 | 广州市市政集团有限公司 | Outer mold for casting concrete nuclear waste bin |
JP2011127361A (en) * | 2009-12-18 | 2011-06-30 | Takahashi Kanri:Kk | Temporary frame rc-0 (zero) with no gap to adjacent land |
CN102514088A (en) * | 2011-12-09 | 2012-06-27 | 许金锔 | Novel concrete formwork |
CN102658589A (en) * | 2012-05-07 | 2012-09-12 | 许金锔 | Quick-assembly concrete formwork unit |
CN202925898U (en) * | 2012-11-28 | 2013-05-08 | 中天建设集团有限公司天津分公司 | Template joint connecting structure |
Family Cites Families (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US1545338A (en) * | 1924-12-15 | 1925-07-07 | Roy P M Davis | Adjustable mold |
US4004874A (en) * | 1974-06-19 | 1977-01-25 | Span-Deck, Inc. | Apparatus for production of cast concrete members |
CN2254928Y (en) * | 1996-01-16 | 1997-05-28 | 曾绍强 | Gap type quick erecting tool shuttering for concrete shear wall column electrical lift well |
CN201539099U (en) * | 2009-09-24 | 2010-08-04 | 北京中建柏利工程技术发展有限公司 | Adjusting seam plate template |
CN201848520U (en) * | 2010-11-18 | 2011-06-01 | 沈阳维用精密机械有限公司 | Gap-adjustable trimming die |
CN102529055B (en) * | 2012-01-19 | 2014-07-30 | 浙江宏振机械模具集团有限公司 | Template adjusting device for adjusting space between templates |
CN203076467U (en) * | 2012-12-17 | 2013-07-24 | 安徽吉峰技研有限公司 | Die fine-adjustment structure |
CN103029205B (en) * | 2012-12-21 | 2015-04-22 | 蒋卓 | Movable in-row template |
CN103556815A (en) * | 2013-10-31 | 2014-02-05 | 林德亮 | Building template system |
CN203919339U (en) * | 2014-06-13 | 2014-11-05 | 富于安(福建)环保模板有限公司 | A kind of concrete blinding slack adjuster |
-
2014
- 2014-06-13 CN CN201410261824.4A patent/CN104015257B/en not_active Expired - Fee Related
- 2014-06-13 CN CN201610683150.6A patent/CN106239704A/en active Pending
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB1301662A (en) * | 1969-01-20 | 1973-01-04 | ||
DE19525082A1 (en) * | 1995-06-30 | 1997-01-02 | Ralf Sebald | Prefabricated reinforced wall elements for high bulldings |
CN2348043Y (en) * | 1998-12-17 | 1999-11-10 | 朱幸荣 | Locating assembly for concrete pouring building shuttering |
CN201206333Y (en) * | 2008-01-09 | 2009-03-11 | 中建三局建设工程股份有限公司 | Novel dry concrete big template connecting piece device |
CN101450508A (en) * | 2008-12-31 | 2009-06-10 | 广州市市政集团有限公司 | Outer mold for casting concrete nuclear waste bin |
JP2011127361A (en) * | 2009-12-18 | 2011-06-30 | Takahashi Kanri:Kk | Temporary frame rc-0 (zero) with no gap to adjacent land |
CN102514088A (en) * | 2011-12-09 | 2012-06-27 | 许金锔 | Novel concrete formwork |
CN102658589A (en) * | 2012-05-07 | 2012-09-12 | 许金锔 | Quick-assembly concrete formwork unit |
CN202925898U (en) * | 2012-11-28 | 2013-05-08 | 中天建设集团有限公司天津分公司 | Template joint connecting structure |
Also Published As
Publication number | Publication date |
---|---|
CN106239704A (en) | 2016-12-21 |
CN104015257A (en) | 2014-09-03 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104015257B (en) | Method for adjusting gap between concrete formworks | |
CN205713146U (en) | A kind of quick location and installation attachment structure of PC prefabricated panel | |
CN103953119A (en) | Three-dimensional adjustable mounting connecting structure of assembled wallboard and laminated beam | |
CN204920240U (en) | Curtain cement link plate positioning adjustment device | |
CN205743046U (en) | Verticality-regulating system installed by automatization's prefabrication component | |
CN207211747U (en) | A kind of civil engineering building template link | |
CN203919339U (en) | A kind of concrete blinding slack adjuster | |
CN112047251A (en) | Auxiliary type installation equipment for road and bridge embedded parts | |
CN209384471U (en) | A kind of curtain wall built-in fitting | |
CN207177173U (en) | A kind of plasterboard with built-in connection | |
CN207048148U (en) | A kind of fixed mechanism for being used to connect curtain-wall stand-column and major structure of construction | |
CN205496451U (en) | Precast shear wall board exposes bar straightening and positioner | |
CN205791363U (en) | A kind of electrical engineering positioning installation apparatus | |
CN210562989U (en) | Assembled steel structure post is connected grout anchor joint with post | |
CN202416574U (en) | Embedded interconnection type lacing bar component with external protrusive inside screwed hole | |
CN217789234U (en) | Simple device for pre-installing strong and weak current boxes of masonry wall | |
CN207553588U (en) | A kind of forming template structure for wall construction | |
CN206359149U (en) | Derrick crane attachment support | |
CN201148741Y (en) | Large tonnage correcting and securing device | |
CN205242707U (en) | Integral mobile home's wall connection structure | |
CN110803664A (en) | Aluminum template dismounting device and method capable of reducing deformation | |
CN110778118A (en) | Interception device for concrete with different grades and construction method thereof | |
CN213774443U (en) | Combined frame of square building template | |
CN220548780U (en) | Glass ceramic plate | |
CN217028057U (en) | A template bearing structure for shear force wall outer wall |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170111 Termination date: 20170613 |
|
CF01 | Termination of patent right due to non-payment of annual fee |