CN107989355B - A kind of support platform and window construction method of floaing for window construction of floaing - Google Patents
A kind of support platform and window construction method of floaing for window construction of floaing Download PDFInfo
- Publication number
- CN107989355B CN107989355B CN201711339771.3A CN201711339771A CN107989355B CN 107989355 B CN107989355 B CN 107989355B CN 201711339771 A CN201711339771 A CN 201711339771A CN 107989355 B CN107989355 B CN 107989355B
- Authority
- CN
- China
- Prior art keywords
- plate
- floaing
- backup pad
- support platform
- floats
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
- E04G3/28—Mobile scaffolds; Scaffolds with mobile platforms
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G13/00—Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills
- E04G13/06—Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills for stairs, steps, cornices, balconies, or other parts corbelled out of the wall
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G13/00—Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills
- E04G13/06—Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills for stairs, steps, cornices, balconies, or other parts corbelled out of the wall
- E04G13/066—Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills for stairs, steps, cornices, balconies, or other parts corbelled out of the wall for overhangs
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
- E04G3/28—Mobile scaffolds; Scaffolds with mobile platforms
- E04G2003/286—Mobile scaffolds; Scaffolds with mobile platforms mobile vertically
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)
Abstract
The invention discloses a kind of support platform for window construction of floaing and window construction methods of floaing, its key points of the technical solution are that firstly, upper backup pad is pulled up by hoisting machine, or being jacked up upwards by oil cylinder when needing to build support platform;Until upper abutting plate abuts plate under and is in same plane;At this point, upper abutting side wall offsets with upper backup pad, and upper abutting plate is mutually perpendicular to upper backup pad;Meanwhile lower abutting side wall offsets with lower supporting plate, and lower abutting plate is mutually perpendicular to lower supporting plate;Then, it will make to abut plate that abut plate under relatively fixed in the end insertion fixing pipe of fixed link, and then upper backup pad is fixed with respect to lower supporting plate, realizes building for support platform, due to adjusting tapered end without rotating synchronously, only need the effect that fixed link is inserted into fixing pipe, therefore is realized convenient for building.
Description
Technical field
The present invention relates to residential building technical field of buildings, more specifically, it relates to a kind of support for window construction of floaing
Platform and window construction method of floaing.
Background technique
Residential building is equipped with the window that floats, and people is made to have the broader visual field, assigns life more with romantic warm color.
Existing Authorization Notice No. provides a kind of flat for the support that window is constructed of floaing for the Chinese patent of CN105040974B
Platform and window construction method of floaing comprising two support frames, support frame rectangular frame structure, support frame are made of angle steel welding;
There are four support devices, four support devices to be respectively positioned on four right angles of support frame for setting between two support frames.Support dress
It sets including casing, screw rod and adjusts tapered end, screw rod is plugged in casing, is adjusted tapered end by rotation and is inserted into casing to adjust screw rod
Interior depth.The upper end of screw rod and the support frame of top weld, and the lower end of casing and the support frame of lower section weld.When needs are built
When support platform, need simultaneously to adjust four screw rods to identical height, and keep the support frame of top and the support of lower section
Frame is parallel to each other, until the support frame of top is moved to desired position, in order to pour to the plate that above floats.
When rotation adjusts height of the tapered end to adjust screw rod, there are a certain distance between four adjusting tapered ends, and need
It to be rotated simultaneously;But each tapered end that adjusts is rotated by different operators, it is difficult to ensure that adjusting tapered end velocity of rotation
Unanimously, the phenomenon for be easy to causeing the height of each screw rod different;And the upper end of four screw rods is welded on the support frame simultaneously, therefore meeting
Lead to the skew of support frame and screw rod, the external screw thread on screw rod is engaged with the internal screw thread for adjusting tapered end, causes screw rod is stuck to show
As;Therefore, it is not easy to build support platform, thus it is to be improved.
Summary of the invention
In view of the deficienciess of the prior art, first invention of the invention be designed to provide it is a kind of for float window construction
Support platform has the advantage convenient for building.
To achieve the above object, the present invention provides the following technical scheme that
A kind of support platform for window construction of floaing, including lower supporting plate and upper backup pad, the lower supporting plate, which runs through, to be set
It is equipped with irrigation hole;The lower supporting plate upper surface rotates along the two sides of its width direction and is provided with lower abutting plate;It is supported under described
Be provided on fishplate bar can offset with lower supporting plate so that under abut plate it is orthogonal with lower supporting plate under abut side wall;On described
Support plate lower surface rotates along the two sides of its width direction and is provided with upper abutting plate;The upper abutting plate is provided with can be with upper branch
Fagging offsets on so that upper abutting plate is orthogonal with upper backup pad and abuts side wall;The upper abutting plate abuts plate one by one under
Corresponding, the upper abutting plate is rotatablely connected with corresponding lower abutting plate;The lower abutting plate is provided with fixing pipe, it is described on support
Fishplate bar is provided with the installing pipe coaxial with fixing pipe, on the inside of the installing pipe wall slip be provided in pluggable fixing pipe so that on
It abuts plate and abuts the relatively-stationary fixed link of plate under;The upper end of the fixed link is provided with the anticreep to offset with installing pipe end wall
End.
By using above-mentioned technical proposal, when needing to build support platform, firstly, by upper backup pad by hoisting machine to
Upper pulling, or jacked up upwards by oil cylinder;Until upper abutting plate abuts plate under and is in same plane;At this point, upper abutting side wall
It offsets with upper backup pad, and upper abutting plate is mutually perpendicular to upper backup pad;Meanwhile lower abutting side wall offsets with lower supporting plate, and
Lower abutting plate is mutually perpendicular to lower supporting plate;Then, will fixed link end insertion fixing pipe in, make abut plate abutted under
Plate is relatively fixed, and then upper backup pad is fixed with respect to lower supporting plate, realizes building for support platform, due to adjusting without rotating synchronously
Save tapered end, it is only necessary to the effect that fixed link is inserted into fixing pipe, therefore is realized convenient for building.On the other hand, when fixed link insertion is solid
After in fixed pipe, upper backup pad is parallel to each other with lower supporting plate, without correction, realizes the effect of fast construction.In addition, building platform
After disassembly, upper backup pad, upper abutting plate, lower abutting plate and lower supporting plate are successively bonded, so that space hold face can be greatly reduced
Product, is readily transported.
Further, the fixed link is provided with tapered guide surface far from one end of anticreep end.
By using above-mentioned technical proposal, tapered guide surface is guided in fixed link insertion fixing pipe, in order to which fixed link is inserted
Enter in fixing pipe.
Further, the anticreep end is provided through relief hole;The upper abutting plate is provided with opposite with relief hole
The mounting hole answered, the interior sliding of the mounting hole are provided with the hook bar that fixed link is fixed in pluggable relief hole, the installation
It is connected with through elastic force between hole inner sidewall and hook bar the elastic component released out of mounting hole bar one end will be linked up with.
By using above-mentioned technical proposal, after the end of fixed link is pulled out out of fixing pipe, hook bar, which can be inserted, to be allowed
In the hole of position, fixed link to be fixed.
Further, the anticreep end is provided with can abut the standstill face that plate offsets on.
By using above-mentioned technical proposal, when anticreep end is to be rotated, standstill face abuts plate on and offsets, and sliding is fixed
When bar, it can guarantee that mounting hole is corresponding with relief hole, so that hook bar is automatically inserted into relief hole.
Further, the hook bar be located at one end outside mounting hole be tiltedly installed with can offset with anticreep end so that
Hook bar is pressed into the press surface in mounting hole.
By using above-mentioned technical proposal, during anticreep end slides upwards, anticreep end offsets with press surface;It is anti-
During sliding is continued in de- end, hook bar is pressed into mounting hole automatically.
Further, the upper backup pad lower surface is provided with while for the placement of fixed link, installing pipe and anticreep end
Upper recessing groove.
By using above-mentioned technical proposal, when fixed link, installing pipe and anticreep end are located in upper recessing groove, upper abutting
Plate fits with upper backup pad.
Further, the lower supporting plate upper surface is provided with the lower recessing groove placed for fixing pipe.
By using above-mentioned technical proposal, when fixing pipe is located in lower recessing groove, lower abutting plate fits with lower supporting plate.
Another goal of the invention of the invention is to provide a kind of window construction method of floaing using above-mentioned support platform, have
The advantage of platform building easy to support.
The following steps are included:
S100 sets up the structural beam slab support frame wait pour the window floor that floats;
S200, the end template for the plate that floats in the case where structural beam slab support frame upper surface is laid with;
S300, float slab muscle under installing on the end template of plate that floats under;
S400, slab muscle upper surface of floaing under set up the installation support platform, and the lower supporting plate floats plate under being fixed on
On reinforcing bar;
S500, installs the end template for the plate that floats, and the end template for the plate that floats by is mounted on upper backup pad;
S600 installs the slab muscle that floats in the end template upper surface of the upper plate that floats, and installs the side template for the plate that floats;
S700, disposable building float plate concrete.
By using above-mentioned technical proposal, when building support platform, due to adjusting tapered end without rotating synchronously, it is only necessary to will
Fixed link is inserted into fixing pipe, therefore the effect realized convenient for building.
Further, float on described plate side template and meanwhile fit with upper backup pad and lower supporting plate side wall.
By using above-mentioned technical proposal, when casting concrete, the side template for the plate that above floats receives the lateral pressure of concrete
Power;On float plate side template simultaneously with upper backup pad, lower supporting plate, on abut plate and lower abutting plate offsets, therefore effectively reduce
Float plate side template deformation.
In conclusion the invention has the following advantages:
1, using the fixed form of fixing pipe and fixed link, and it is provided with tapered guide surface in fixed link, plays
Convenient for fixed link to be inserted into the effect in fixing pipe;
2, it is provided with press surface on hook member, and is provided with standstill face on anticreep end, when anticreep end is upward
During sliding, mounting hole is corresponding with relief hole, and under the action of compressed spring elastic force, hook bar is automatically inserted into relief hole
It is interior.
Detailed description of the invention
Fig. 1 is a kind of dismantling schematic diagram of the support platform for window construction of floaing in embodiment 1;
Fig. 2 is a kind of bending state schematic diagram of the support platform for window construction of floaing in embodiment 1;
Fig. 3 is the upper cross-sectional view for abutting plate in embodiment 1;
Fig. 4 is the window construction schematic diagram that floats of application support platform in embodiment 2.
In figure: 1, lower supporting plate;11, lower recessing groove;12, irrigation hole;2, lower abutting plate;21, lower abutting side wall;22, solid
Fixed pipe;3, upper backup pad;31, upper recessing groove;4, upper abutting plate;41, upper abutting side wall;42, installing pipe;43, mounting hole;431,
Elastic component;432, bar is linked up with;4321, press surface;5, fixed link;51, tapered guide surface;52, anticreep end;521, relief hole;
522, standstill face;6, structural beam slab support frame;61, floor;7, float plate under;71, float the end template of plate under;72, float slab muscle under;
8, float plate on;81, float the end template of plate on;82, float slab muscle on;84, float the side template of plate on.
Specific embodiment
Below in conjunction with attached drawing, invention is further described in detail.
Embodiment 1:
A kind of support platform for window construction of floaing, referring to Fig.1 comprising lower supporting plate 1 and upper backup pad 3, lower support
Plate 1 and upper backup pad 3 are rectangular configuration;Lower supporting plate 1 and the welding of the equal angle steel of upper backup pad 3 and iron sheet are made;Lower supporting plate 1
It is provided through irrigation hole 12.
Referring to Figures 1 and 2,1 upper surface of lower supporting plate is supported under two by hinge rotation setting there are two lower abutting plate 2
Fishplate bar 2 is located at the two sides of 1 width direction of lower supporting plate;Lower abutting plate 2 is made of angle steel and iron sheet welding;Lower abutting plate 2
It is less than the length dimension of lower supporting plate 1 along the size of 1 length direction of lower supporting plate, is provided with lower abutting side wall on lower abutting plate 2
21;After lower abutting plate 2 is by rotation, lower abutting side wall 21 offsets with lower supporting plate 1;At this point, lower abutting plate 2 and lower supporting plate 1
It is mutually perpendicular to.
Referring to Figures 1 and 2,3 lower surface of upper backup pad is supported on two by hinge rotation setting there are two upper abutting plate 4
Fishplate bar 4 is located at the two sides of 3 width direction of upper backup pad;Upper abutting plate 4 is made of angle steel and iron sheet welding;Upper abutting plate 4
It is provided with and abuts side wall 41, upper abutting plate 4 is offseted by rotation, upper abutting side wall 41 with upper backup pad 3;At this point, upper abutting
Plate 4 is mutually perpendicular to upper backup pad 3.
Referring to Figures 1 and 2, upper abutting plate 4 abuts the one-to-one correspondence of plate 2 under;Upper abutting plate 4 and corresponding lower abutting plate
2 are rotatablely connected by hinge.Lower abutting plate 2 is provided with fixing pipe 22, and fixing pipe 22 is welded in the lower inner sidewall for abutting plate 2;On
It abuts plate 4 and is provided with installing pipe 42 by welding, installing pipe 42 and fixing pipe 22 are coaxially disposed.
Referring to Figure 1 and Figure 3,42 inside wall slip of installing pipe is provided with fixed link 5, and fixed link 5 can be inserted into solid by sliding
Determine in pipe 22, so as to abut plate 2 under relatively fixed for upper abutting plate 4;When fixed link 5 is inserted into fixing pipe 22, the fixation
5 lateral wall of bar fits with 22 inner sidewall of fixing pipe.
Referring to Fig. 3, the upper end of fixed link 5 is provided with anticreep end 52, and anticreep end 52 offsets with 42 end wall of installing pipe, with
Prevent fixed link 5 out of installing pipe 42 and fixing pipe 22(referring to Fig.1) in slide.
Referring to Figure 1 and Figure 3, fixed link 5 is provided with tapered guide surface 51 far from one end of anticreep end 52, since taper is led
Point diameter to face 51 is smaller, to guide fixed link 5 to be smoothly inserted into fixing pipe 22.
Referring to Fig. 3, anticreep end 52 is provided through relief hole 521, and upper abutting plate 4 is provided with mounting hole 43, mounting hole
43 is corresponding with relief hole 521;Sliding is provided with hook bar 432 in mounting hole 43, and one end of hook bar 432 can be inserted into relief hole
In 521, fixed link 5 to be fixed;It is connected with compressed spring between 43 inner sidewall of mounting hole and hook bar 432, compresses bullet
Spring is as elastic component 431;Compressed spring is by elastic force to release the one end for linking up with bar 432 out of mounting hole 43.
Referring to Fig. 3, anticreep end 52 is provided with standstill face 522, and when fixed link 5 rotates, standstill face 522 can abut plate on
4 offset, to keep the state corresponding with mounting hole 43 of relief hole 521.
Referring to Fig. 3, one end that hook bar 432 is located at outside mounting hole 43 is tiltedly installed with press surface 4321, when fixed link 5
When with 52 upward sliding of anticreep end, press surface 4321 offsets with anticreep end 52;It is continued to move up in anticreep end 52
In the process, hook bar 432 is gradually pressed into mounting hole 43 by anticreep end 52;When mounting hole 43 is corresponding with relief hole 521,
Under the action of compressed spring elastic force, hook bar 432 is pushed into relief hole 521 by compressed spring automatically, to carry out to fixed link 5
It is fixed;It is abutted on plate 4 at this point, fixed link 5 is fully located at.
Referring to Figure 1 and Figure 3,3 lower surface of upper backup pad is provided with recessing groove 31, when upper abutting plate 4 is to close to upper support
When 3 direction of plate rotates, upper recessing groove 31 for fixed link 5, installing pipe 42 and anticreep end 52 to place simultaneously;So that upper abutting plate
4 fit with upper backup pad 3.1 upper surface of lower supporting plate is provided with lower recessing groove 11, abuts plate 2 instantly to close to lower supporting plate 1
Direction close to when, lower recessing groove 11 for fixing pipe 22 place so that lower abutting plate 2 can fit with lower supporting plate 1;Convenient for pair
The carrying of support platform and regular.
Working principle is as follows:
When needing to build support platform, upper backup pad 3 is pulled up first;While upper backup pad 3 moves up, on
Plate 4 is abutted gradually to rotate to far from 3 direction of upper backup pad;Until upper abutting side wall 41 offsets with upper backup pad 3;It is supported at this point,
Fishplate bar 4 is mutually perpendicular to upper backup pad 3.Meanwhile lower abutting plate 2 is rotated to far from 1 direction of lower supporting plate;Until lower abutting side wall
21 offset with lower supporting plate 1;At this point, lower abutting plate 2 is mutually perpendicular to lower supporting plate 1.
Then, by manually pressing hook bar 432, until hook bar 432 is fully located in mounting hole 43;At this point, due to
Gravity, fixed link 5 and anticreep end 52 slide downwards, until fixed link 5 is inserted into fixing pipe 22, anticreep end 52 and solid
The upper end wall for determining pipe 22 offsets;Upper abutting plate 4 and lower abutting plate 2 are relatively fixed, and upper backup pad 3 and lower supporting plate 1 are relatively fixed,
Realize building for support platform;Compared with the existing technology, tapered end is adjusted without rotating synchronously, only needs respectively to be inserted into fixed link 5
In fixing pipe 22, realize convenient for building the effect of support platform.
When support platform needs to take out, first by 5 upward sliding of fixed link, anticreep end 52 with fixed link 5 to
Upper movement;While 52 upward sliding of anticreep end, anticreep end 52 will link up with bar 432 and be pressed into mounting hole 43;Work as mounting hole
43 it is corresponding with relief hole 521 when, link up with bar 432 under the action of compressed spring elastic force, one end is pushed into relief hole 521
It is interior, so that anticreep end 52 is fixed;Meanwhile fixed link 5 is fixed on and abuts on plate 4.
Then, lower abutting plate 2 being pushed to 22 direction of fixing pipe, lower abutting plate 2 is rotated to close to 1 direction of lower supporting plate,
Until fixing pipe 22 turns in lower recessing groove 11;At this point, lower abutting plate 2 fits with lower supporting plate 1.Meanwhile upper abutting plate 4
It is rotated to close to 3 direction of upper backup pad, until fixed link 5, installing pipe 42 and anticreep end 52 turn in recessing groove 31;This
When, upper abutting plate 4 fits with upper backup pad 3.At this point, upper backup pad 3, upper abutting plate 4, lower abutting plate 2 and lower supporting plate 1 according to
Secondary fitting, then takes out support platform.
Embodiment 2:
The window construction method of floaing of support platform in a kind of Application Example 1, referring to Fig. 4, comprising the following steps:
S100 sets up the structural beam slab support frame 6 wait pour the window floor that floats;
S200, the end template 71 for the plate that floats in the case where 6 upper surface of structural beam slab support frame is laid with;Then, float the bed die of plate by under
Plate 71 is fixed by screws on structural beam slab support frame 6;
S300, float slab muscle 72 under installing on the end template 71 for the plate that floats under;Under the slab muscle 72 that floats tied up by iron wire;
S400, sets up support platform in embodiment 1 on the slab muscle 72 that floats under, and lower supporting plate 1 floats slab muscle under being fixed on
On 72, lower supporting plate 1 is fixed on down by iron wire and is floatd on slab muscle 72;Lower supporting plate 1 and under float plate end template 71 between
To pour down 7 region of plate of floaing;
S500 installs the end template 81 for the plate that floats, and the end template 81 for the plate that floats by is mounted on upper backup pad 3, and is passed through
Screw is fixed;
S600 installs the slab muscle 82 that floats in 81 upper surface of end template of the upper plate that floats, and the slab muscle 82 that above floats is tied by iron wire
It pricks;And install the side template 84 for the plate that floats;On float plate side template 84 simultaneously with the side wall of upper backup pad 3 and lower supporting plate 1
Side wall fits;Meanwhile plate 4 is abutted on for the side template 84 for the plate that above floats and the lower side wall for abutting plate 2 fits;Pouring coagulation
When native, the deformation of the side template 84 for the plate that floats is effectively reduced;Then, the side template 84 of plate of being floatd by by screw is fixed on and supports
On fishplate bar 4 and lower abutting plate 2;
S700, disposable building float plate concrete;It is poured from 61 region of floor, until the entire floor 61 of Concrete Filled;
Meanwhile floaing downwards through irrigation hole 12 and being poured at slab muscle 72, make 7 region of plate of floaing under Concrete Filled is entire;It floats from above 8 region of plate
Top is poured, make Concrete Filled it is entire on float 8 region of plate;Realize be completed at the same time float plate 8 and under float the pouring of plate 7,
And floor 61 pours.
This specific embodiment is only explanation of the invention, is not limitation of the present invention, those skilled in the art
Member can according to need the modification that not creative contribution is made to the present embodiment after reading this specification, but as long as at this
All by the protection of Patent Law in the scope of the claims of invention.
Claims (9)
1. a kind of support platform for window construction of floaing, including lower supporting plate (1) and upper backup pad (3), it is characterised in that: described
Lower supporting plate (1) is provided through irrigation hole (12);Lower supporting plate (1) upper surface is rotated along the two sides of its width direction
It is provided with lower abutting plate (2);Be provided on the lower abutting plate (2) can offset with lower supporting plate (1) so that under abut plate (2) with
The orthogonal lower abutting side wall (21) of lower supporting plate (1);Upper backup pad (3) lower surface is equal along the two sides of its width direction
Rotation, which is provided with, abuts plate (4);The upper abutting plate (4) be provided with can offset with upper backup pad (3) so that on abut plate (4)
Side wall (41) are abutted on orthogonal with upper backup pad (3);The upper abutting plate (4) abuts plate (2) one-to-one correspondence, institute under
It states and abuts plate (4) and corresponding lower abutting plate (2) rotation connection;The lower abutting plate (2) is provided with fixing pipe (22), institute
It states abutting plate (4) and is provided with the installing pipe (42) coaxial with fixing pipe (22), wall slip setting on the inside of the installing pipe (42)
Have in pluggable fixing pipe (22) so that upper abutting plate (4) abuts plate (2) relatively-stationary fixed link (5) under;The fixation
The upper end of bar (5) is provided with the anticreep end (52) to offset with installing pipe (42) end wall.
2. a kind of support platform for window construction of floaing according to claim 1, it is characterised in that: the fixed link (5)
One end far from anticreep end (52) is provided with tapered guide surface (51).
3. a kind of support platform for window construction of floaing according to claim 1, it is characterised in that: the anticreep end
(52) relief hole (521) are provided through;The upper abutting plate (4) is provided with mounting hole corresponding with relief hole (521)
(43), sliding is provided with the hook bar that fixed link (5) is fixed in pluggable relief hole (521) in the mounting hole (43)
(432), it is connected with through elastic force between mounting hole (43) inner sidewall and hook bar (432) bar (432) one end will be linked up with
The elastic component (431) released in from mounting hole (43).
4. a kind of support platform for window construction of floaing according to claim 3, it is characterised in that: the anticreep end
(52) standstill face (522) that plate (4) offsets can be abutted on by being provided with.
5. a kind of support platform for window construction of floaing according to claim 4, it is characterised in that: the hook bar
(432) one end for being located at mounting hole (43) outside is tiltedly installed with and can offset with anticreep end (52) so as to link up with bar (432) quilt
The press surface (4321) being pressed into mounting hole (43).
6. a kind of support platform for window construction of floaing according to claim 1, it is characterised in that: the upper backup pad
(3) lower surface is provided with while for the upper recessing groove (31) of fixed link (5), installing pipe (42) and anticreep end (52) placement.
7. a kind of support platform for window construction of floaing according to claim 1, it is characterised in that: the lower supporting plate
(1) upper surface is provided with the lower recessing groove (11) placed for fixing pipe (22).
8. a kind of window construction method of floaing using any one of the claim 1-7 support platform, which is characterized in that including following
Step:
S100 sets up the structural beam slab support frame (6) wait pour the window floor that floats;
S200, the end template (71) for the plate that floats in the case where structural beam slab support frame (6) upper surface is laid with;
S300 floats slab muscle (72) under installing on the end template (71) for the plate that floats under;
S400, slab muscle (72) upper surface of floaing under set up any one of the claim 1-7 installation support platform, the lower branch
Fagging (1) is floatd under being fixed on slab muscle (72);
S500, installs the end template (81) for the plate that floats, and the end template (81) for the plate that floats by is mounted on upper backup pad (3);
S600 installs float slab muscle (82) in end template (81) upper surface of the upper plate that floats, and installs the side template for the plate that floats
(84);
S700, disposable building float plate concrete.
9. window construction method according to claim 8 of floaing, it is characterised in that: the side template (84) of the plate that floats on described simultaneously with
Upper backup pad (3) and lower supporting plate (1) side wall fit.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711339771.3A CN107989355B (en) | 2017-12-14 | 2017-12-14 | A kind of support platform and window construction method of floaing for window construction of floaing |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711339771.3A CN107989355B (en) | 2017-12-14 | 2017-12-14 | A kind of support platform and window construction method of floaing for window construction of floaing |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107989355A CN107989355A (en) | 2018-05-04 |
CN107989355B true CN107989355B (en) | 2019-09-06 |
Family
ID=62038518
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711339771.3A Expired - Fee Related CN107989355B (en) | 2017-12-14 | 2017-12-14 | A kind of support platform and window construction method of floaing for window construction of floaing |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107989355B (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110056184B (en) * | 2019-03-26 | 2023-12-26 | 中国五冶集团有限公司 | Adjustable formwork support installation device |
CN112012482A (en) * | 2020-08-31 | 2020-12-01 | 晟通科技集团有限公司 | Corner C groove and template combination |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN203008372U (en) * | 2013-03-06 | 2013-06-19 | 陕西建工集团第五建筑工程有限公司 | Construction structure molded by fluttered window plate, insulation plate and drip line at a time |
CN204645623U (en) * | 2015-04-16 | 2015-09-16 | 重庆建工第三建设有限责任公司 | Aluminium alloys wafts window template system |
CN204662966U (en) * | 2015-05-28 | 2015-09-23 | 中天建设集团有限公司 | One is waftd window formwork support structure |
CN105040974A (en) * | 2015-07-15 | 2015-11-11 | 中国建筑第二工程局有限公司 | Elastic supporting platform for bay window construction and bay window construction method |
CN105040975A (en) * | 2015-07-15 | 2015-11-11 | 中国建筑第二工程局有限公司 | Support platform for bay window construction and bay window construction method |
-
2017
- 2017-12-14 CN CN201711339771.3A patent/CN107989355B/en not_active Expired - Fee Related
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN203008372U (en) * | 2013-03-06 | 2013-06-19 | 陕西建工集团第五建筑工程有限公司 | Construction structure molded by fluttered window plate, insulation plate and drip line at a time |
CN204645623U (en) * | 2015-04-16 | 2015-09-16 | 重庆建工第三建设有限责任公司 | Aluminium alloys wafts window template system |
CN204662966U (en) * | 2015-05-28 | 2015-09-23 | 中天建设集团有限公司 | One is waftd window formwork support structure |
CN105040974A (en) * | 2015-07-15 | 2015-11-11 | 中国建筑第二工程局有限公司 | Elastic supporting platform for bay window construction and bay window construction method |
CN105040975A (en) * | 2015-07-15 | 2015-11-11 | 中国建筑第二工程局有限公司 | Support platform for bay window construction and bay window construction method |
Also Published As
Publication number | Publication date |
---|---|
CN107989355A (en) | 2018-05-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101956438B (en) | Three-dimensionally adjustable disconnectable curtain wall connecting device and construction method thereof | |
CN107989355B (en) | A kind of support platform and window construction method of floaing for window construction of floaing | |
CN211735957U (en) | Building curtain wall fixing frame | |
CN203821867U (en) | Shear wall body assembling and aligning device | |
CN110039641A (en) | Precast stair shaping mould and application method | |
CN107476586A (en) | The erecting device of house PC prefabricated components and the installation method of PC prefabricated components | |
CN106639305B (en) | Slidable lifting type constructional column steel formwork and construction method thereof | |
CN107476587A (en) | Accessory | |
CN216157259U (en) | Adjustable supporting device with safety for constructional engineering | |
CN105888243B (en) | The anti-flare device of building template | |
CN208009891U (en) | Assembled template for elevator | |
CN208184278U (en) | A kind of novel building template support | |
CN204138087U (en) | Guide rail bracket of elevator | |
CN208996446U (en) | A kind of column mould strengthening frame structure | |
CN206319628U (en) | One kind building assembled wallboard fitting machine | |
CN212535143U (en) | Masonry wall mortar joint thickness control device | |
CN209261011U (en) | The laminated floor slab of adjustable terminal box | |
CN204475877U (en) | Infilled wall mortar joint flatness control device | |
KR102156971B1 (en) | Gang form lifting device and outdoor wall construction method of building using the same | |
CN109853647B (en) | Reinforcing construction method for assembled corrugated pipe gallery substrate | |
CN207988499U (en) | A kind of building template supporting rod | |
CN209906186U (en) | Building template cross-floor transportation equipment | |
CN207330227U (en) | A kind of air duct installation lifter | |
CN209011542U (en) | A kind of mold plate of the adjustable radian of civil construction | |
CN204882109U (en) | Three -dimensional direction distortion capability test equipment of building curtain |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190906 Termination date: 20201214 |