CN106228484A - A kind of medium tunnel intelligent total management system and management method - Google Patents

A kind of medium tunnel intelligent total management system and management method Download PDF

Info

Publication number
CN106228484A
CN106228484A CN201610553578.9A CN201610553578A CN106228484A CN 106228484 A CN106228484 A CN 106228484A CN 201610553578 A CN201610553578 A CN 201610553578A CN 106228484 A CN106228484 A CN 106228484A
Authority
CN
China
Prior art keywords
tunnel
data
coordinated signals
handling system
information
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610553578.9A
Other languages
Chinese (zh)
Inventor
冯凤江
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hebei Shangyuan Industrial Comtrol Ltd
Original Assignee
Hebei Shangyuan Industrial Comtrol Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hebei Shangyuan Industrial Comtrol Ltd filed Critical Hebei Shangyuan Industrial Comtrol Ltd
Priority to CN201610553578.9A priority Critical patent/CN106228484A/en
Publication of CN106228484A publication Critical patent/CN106228484A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/10Services
    • G06Q50/26Government or public services
    • GPHYSICS
    • G08SIGNALLING
    • G08BSIGNALLING OR CALLING SYSTEMS; ORDER TELEGRAPHS; ALARM SYSTEMS
    • G08B17/00Fire alarms; Alarms responsive to explosion
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04NPICTORIAL COMMUNICATION, e.g. TELEVISION
    • H04N7/00Television systems
    • H04N7/18Closed-circuit television [CCTV] systems, i.e. systems in which the video signal is not broadcast

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Tourism & Hospitality (AREA)
  • Educational Administration (AREA)
  • Primary Health Care (AREA)
  • Health & Medical Sciences (AREA)
  • Economics (AREA)
  • General Health & Medical Sciences (AREA)
  • Human Resources & Organizations (AREA)
  • Marketing (AREA)
  • Development Economics (AREA)
  • Strategic Management (AREA)
  • General Business, Economics & Management (AREA)
  • Emergency Management (AREA)
  • Theoretical Computer Science (AREA)
  • Multimedia (AREA)
  • Signal Processing (AREA)
  • Alarm Systems (AREA)

Abstract

The invention discloses a kind of medium tunnel intelligent total management system, fire occur for long tunnel, the event of vehicle accident processes in time, including data handling system, data display system and the some data collection and control unit being arranged in tunnel, data collection and control unit includes zone controller, some data acquisition units and some linkage control devices, and data acquisition unit includes the video equipment of join domain controller, tunnel environment collecting device and the network equipment respectively;Coordinated signals equipment includes the EMERGENCY PHONE of join domain control system, IP broadcast, variable information board, blower fan apparatus respectively;Data handling system includes work station, server and memorizer;Data display system includes connecting the display of work station, printer;The described network equipment connects the server of data handling system by communication system.

Description

A kind of medium tunnel intelligent total management system and management method
Technical field
The present invention relates to intelligent management system, for long tunnel, fire occurs, the event of vehicle accident processes in time.
Background technology
Tunnel monitoring system the most all includes video monitoring, traffic control, information issue, EMERGENCY PHONE and broadcast, fire Multiple subsystems such as warning, power monitoring.Most cases is that subsystems uses managing independently of each equipment vendors oneself Contact the most too much between system platform, and other subsystems.The most only due between subsystems management system platform Stand, and major part all uses oneself self-defining communications protocol, causes and cannot be directly realized by data sharing between subsystem, only The operation of subsystems can be realized by manual hand manipulation's mode.Just find the most in time if there is accident staff Easily go wrong, cause serious consequence.
Summary of the invention
The technical problem to be solved in the present invention is to provide a kind of medium tunnel intelligent total management system and management method, energy Enough in monitoring tunnel, vehicle travels and the operation of equipment, processes the accident such as fire, vehicle accident in time.
For solving above-mentioned technical problem, the technical solution used in the present invention is:
A kind of medium tunnel intelligent total management system, including data handling system, data display system be arranged in tunnel Some data collection and control unit, data collection and control unit include zone controller, some data acquisition units and Some linkage control devices, data acquisition unit includes that the video equipment of join domain controller, tunnel environment collection set respectively Standby and the network equipment;Coordinated signals equipment includes the EMERGENCY PHONE of join domain control system, IP broadcast, variable information respectively Plate, blower fan apparatus;Data handling system includes work station, server and memorizer;Data display system includes connecting work station Display, printer;The described network equipment connects the server of data handling system by communication system.
Further improvement of the present invention is: described video equipment includes fixing video camera, remote control camera, HD recording Machine, Network Personal Video Recorder and large screen display.
Further improvement of the present invention is: tunnel environment collecting device includes vehicle detector, smoke detector, can see Degree detector, flame detector, hygrosensor and wind speed and direction detector, described tunnel environment collecting device bonding pad respectively Domain controller.
A kind of medium tunnel intelligent total management method, realizes based on a kind of medium tunnel intelligent total management system, bag Include following steps,
Step A, arranges tunnel event prediction scheme in a data processing system;Set the relevant parameter range of normal value of tunnel event, Set coordinated signals scheme;
Step B, data acquisition unit gathers the video information in tunnel and ambient parameter, by the video information gathered and environment ginseng Number is sent to zone controller, and zone controller is delivered to data handling system, data handling system analysis after data being processed Ambient parameter and with set range of normal value compared with, if ambient parameter is in range of normal value, data display system Display and storage data;If ambient parameter is in outside range of normal value, send coordinated signals prompting to staff;
Step C, if staff confirms after sending coordinated signals prompting, performs coordinated signals scheme;If staff Do not confirm then to wait for a period of time, the most do not confirm after terminating during this period of time, automatically perform coordinated signals scheme;
Step D, performs coordinated signals scheme, by running EMERGENCY PHONE, IP broadcast, variable information board, blower fan apparatus to tunnel Interior traffic and fire condition are controlled, guide, and execution information is passed to data handling system, until at tunnel event Reason completes.
Further improvement of the present invention is: the management method of tunnel fire alarm event comprises the following steps,
Step A1, arranges tunnel Fire action in a data processing system;Set temperature normals scope in tunnel, flame normal Value scope, smog range of normal value, set fire alarm coordinated signals scheme;
Step B1, smoke detector, flame detector and hygrosensor in data acquisition unit gather the fire-fighting in tunnel Signal parameter, video equipment monitors the fire condition in tunnel, video information and the fire-fighting signal parameter of collection is sent to district Domain controller, zone controller is delivered to data handling system after data being processed, data handling system analyzes fire-fighting signal ginseng Count and compared with the range of normal value set, if the temperature in tunnel, smog value and flame value are in range of normal value Then data display system shows numerical value, video information and stores data;If the temperature in tunnel, smog value and flame value are in Then the prompting of fire alarm coordinated signals is sent to staff outside range of normal value;
Step C1, if staff confirms after sending the prompting of fire alarm coordinated signals, performs fire alarm coordinated signals scheme;As Really staff does not confirm, waits for a period of time, and does not the most confirm after terminating during this period of time, automatically performs fire alarm linkage Control program;
Step D1, performs fire alarm coordinated signals scheme, runs blower fan apparatus according to the wind speed information of wind speed and direction detector detection, The wind direction making blower fan is identical with natural wind direction, controls blower fan velocity of rotation according to smoke data, by IP broadcast car in tunnel Circular fire condition send point duty information, variable information board provides the information of fire condition, and EMERGENCY PHONE carries out 119 Reporting to the police, execution information is passed to data handling system by zone controller, until tunnel fire hazard has processed.
Further improvement of the present invention is: the management method of tunnel traffic accident comprises the following steps,
Step A1, arranges tunnel traffic accident prediction scheme in a data processing system;Set transport information range of normal value in tunnel, Set vehicle accident coordinated signals scheme;
Step B1, the vehicle detector in data acquisition unit, visibility detector gather the vehicle running signal ginseng in tunnel Number, video equipment monitors the vehicle travel situations in tunnel, video information and the vehicle running signal parameter of collection is sent to Zone controller, zone controller is delivered to data handling system after data being processed, data handling system is analyzed vehicle and travelled Signal parameter compared with the range of normal value set, and analysis video information, if vehicle running signal parameter is just in In the range of constant value, video information analysis does not has vehicle accident then data display system display numerical value, video information and stores data; Vehicle running signal parameter is in outside range of normal value, and video information analysis is found to have vehicle accident and then sends friendship to staff Interpreter's event coordinated signals prompting;
Step C1, if staff confirms after sending the prompting of vehicle accident coordinated signals, performs vehicle accident coordinated signals Scheme;If staff does not confirm, wait for a period of time, the most do not confirm after terminating during this period of time, automatically perform Vehicle accident coordinated signals scheme;
Step D1, performs vehicle accident coordinated signals scheme, circulates a notice of vehicle accident situation also by IP broadcast vehicle in tunnel Sending point duty information, variable information board provides the information of vehicle accident situation, and EMERGENCY PHONE carries out telephone call, and region is controlled Execution information is passed to data handling system by device processed, until tunnel traffic accident has processed.
Owing to using technique scheme, have the beneficial effects that produced by the present invention:
In the present invention can monitor tunnel, vehicle travels and the operation of equipment, processes the accident such as fire, vehicle accident in time.
The present invention is by distribution subsystem, fire alarm subsystem, video acquisition and analyzing subsystem, friendship in the application in tunnel Logical subsystem, traffic guidance subsystem, EMERGENCY PHONE and broadcast subsystem, ventilation subsystem, illumination subsystems, the environment of controlling is adopted These subsystem organic integration such as subsystem together, and realize effective linkage, give full play to the ability of each subsystem, subtract The labor intensity of little on-site supervision personnel, improves control ability.The present invention by the automatic function such as coordinated signals control illumination and Blower fan, it is achieved that the optimization ventilated and illuminate, has saved operation energy consumption.Due to the fact that a set of software system of employing, can realize Multiple subsystem centralized displaying to one client computer scheme, decreases client relative to the scheme of multiple independent particle systems and calculates The quantity of machine, reduces the hardware size of system, has saved the construction cost of hardware system.Simultaneously because the minimizing of hardware also may be used Reduce, safeguard and the cost of overhaul.Owing to the present invention possesses ability of second development, when tunnel system upgrading, former software system System can carry out the modification of program of correspondence on the original basis, need not the most again develop, save time and fund, it is to avoid wave Take.The present invention enhances the stability of system also by redundancy scheme, it is to avoid owing to hardware problem causes system-down.In a word, The present invention not only reduce on hardware waste, more achieve the function of energy-saving and emission-reduction, have significant economic benefit, social benefit and Environmental benefit.
Accompanying drawing explanation
Fig. 1 is present configuration schematic diagram;
Fig. 2 is data collection and control cellular construction schematic diagram of the present invention;
Fig. 3 is linked system schematic diagram of the present invention.
Detailed description of the invention
Below in conjunction with the accompanying drawings the present invention is described in further details:
A kind of medium tunnel intelligent total management system, including data handling system, data display system be arranged in tunnel Some data collection and control unit.Data collection and control unit include zone controller, some data acquisition units and Some linkage control devices, data acquisition unit includes that the video equipment of join domain controller, tunnel environment collection set respectively Standby and the network equipment;Coordinated signals equipment includes the EMERGENCY PHONE of join domain control system, IP broadcast, variable information respectively Plate, blower fan apparatus.Communications protocol uses the agreements such as ModbusTcp, ProfiNet, Controlnet or LonWorks.Data acquisition Acquisition means also includes miscellaneous equipment, such as Electric Intelligent Monitoring System, the electric power thus supplied of monitoring device, it is ensured that equipment is properly functioning.
Video equipment includes fixing video camera, remote control camera, DVR, Network Personal Video Recorder and large screen display Device.
Tunnel environment collecting device includes vehicle detector, smoke detector, visibility detector, flame detector, temperature Degree detector and wind speed and direction detector, described tunnel environment collecting device join domain controller respectively.
Data handling system includes work station, server and memorizer;The network equipment is connected at data by communication system The server of reason system.Software design patterns multiple linkage prediction scheme in data handling system, is collected by data acquisition unit Data carry out processing, analyze, report to the police, store and forwarding.Divided by the algorithm fire alarm to collecting, the event of video data Analysis result, tunnel environment data etc. are called corresponding data and are processed, and are allowed to produce corresponding process action.Software inhouse is built-in many Plant tunnel event linkage and process prediction scheme, as on video near fire point, wall, environmental data difference are closed when starting blower ventilation, fire Track etc..These prediction schemes user can be realized by self-defined mode.All prediction schemes just can really start after manual confirmation to be held OK.
Data display system includes connecting the equipment such as the display of work station, printer;The functional packet of data display system Include data output, configuration, trend curve, data sheet, data query.Data output refers to be changed by device driver be somebody's turn to do The data of equipment, parameter, state etc., and make a series of action of generation of this equipment, thus the operation that accomplishes the end in view.Configuration is Refer to by system configuration modularity, functionalization, cordwood mode and by simple modification coding develop by the way of Building system, the object facilitating user quickly to build system and institute's configuration can possess one-to-one relationship with field apparatus, Reflect distribution and the duty of tunnel internal field apparatus more intuitively.Trend curve comprises real-time tendency and history becomes Gesture, the operation changing condition of the data parameters that can be can be visually seen by trend curve.Data sheet comprises alert data and event Analytical data, can intuitively reflect, by data sheet, the abnormal conditions that tunnel runs.Data query comprises the note to various data Record wherein has equipment running status, ambient parameter, Video Events analysis result, various alarm logging, broadcast, phone, advices plate Issue and the information of change, the logining and publishing of operator, can by these records can by inquiry by the way of adjust Read.
The present invention passes through a set of soft in realizing the identification to equipment and control, data handling system by device driver Part realizes the management to relevant devices all in tunnel and monitoring;Provide the user secondary development function and expansion interface simultaneously, Facilitate user that engineering is customized exploitation.Software inhouse built-in multiple tunnel event linkage prediction scheme, as pre-in tunnel fire alarm linkage Case, tunnel traffic accident linkage prediction schemes etc., when event occurs, it is achieved carry out the connection of equipment inter-subsystem, many according to predetermined scheme Dynamic control, provides prediction scheme User Defined configuration system simultaneously.
The present invention is also provided that picture configuration, centralized management, data query, affair alarm, coordinated signals, rights management etc. Several functions.The most integrated GIS GIS-Geographic Information System, can determine relevant interlocking equipment according to geographical position. Management software in data handling system uses C/S+B/S framework, is divided into client and server end and configuration end, and supports system System redundancy feature.
Data processing system software integrated GIS GIS-Geographic Information System, in tunnel each equipment relative position on map. Equipment linkage and block functions can determine the equipment with required linkage or packet by GIS algorithm.Can be straight from map interface Watch the information such as the distribution of the actual trend in tunnel, internal unit, wagon flow traffic status, it is possible to select from this interface individually to look into See the more detailed running status of certain equipment in system.
Software uses C/S+B/S framework, is divided into client, server end and configuration end, configuration end configuration configuration file and Server end and client is installed to, it is possible to publish in Web system, Web client and C/S client merit under picture file Can be completely the same with effect;By updating server end, client can realize automatically updating of picture, picture library, configuration file etc..
Redundancy feature includes hardware redundancy, network redundancy and service redundant.Hardware redundancy refers to be had in tunnel system The zone controller of standby redundant manipulator.Network redundancy refers to the slack looped network in tunnel applications.Service redundant is Refer to the present invention support to self redundancy, including configurable server redundancy: can switch rapidly when a station server breaks down On another platform, do not affect the operation of system;Mutual redundancy between client, and be independent of each other.Redundancy feature also includes externally Portion's redundant hardware and the support of redundant network.Redundancy feature realizes simple and convenient, user can according to practical situation select use or Do not use redundancy feature.
A kind of medium tunnel intelligent total management method, realizes based on a kind of medium tunnel intelligent total management system, bag Include following steps,
Step A, arranges tunnel event prediction scheme in a data processing system;Set the relevant parameter range of normal value of tunnel event, Set coordinated signals scheme;
Step B, data acquisition unit gathers the video information in tunnel and ambient parameter, by the video information gathered and environment ginseng Number is sent to zone controller, and zone controller is delivered to data handling system, data handling system analysis after data being processed Ambient parameter and with set range of normal value compared with, if ambient parameter is in range of normal value, data display system Display and storage data;If ambient parameter is in outside range of normal value, send coordinated signals prompting to staff;
Step C, if staff confirms after sending coordinated signals prompting, performs coordinated signals scheme;If staff Do not confirm then to wait for a period of time, the most do not confirm after terminating during this period of time, automatically perform coordinated signals scheme;
Step D, performs coordinated signals scheme, by running EMERGENCY PHONE, IP broadcast, variable information board, blower fan apparatus to tunnel Interior traffic and fire condition are controlled, guide, and execution information is passed to data handling system, until at tunnel event Reason completes.
Embodiment 1
The management method of tunnel fire alarm event comprises the following steps,
Step A1, arranges tunnel Fire action in a data processing system;Set temperature normals scope in tunnel, flame normal Value scope, smog range of normal value, set fire alarm coordinated signals scheme;
Step B1, smoke detector, flame detector and hygrosensor in data acquisition unit gather the fire-fighting in tunnel Signal parameter, video equipment monitors the fire condition in tunnel, video information and the fire-fighting signal parameter of collection is sent to district Domain controller, zone controller is delivered to data handling system after data being processed, data handling system analyzes fire-fighting signal ginseng Count and compared with the range of normal value set, if the temperature in tunnel, smog value and flame value are in range of normal value Then data display system shows numerical value, video information and stores data;If the temperature in tunnel, smog value and flame value are in Then the prompting of fire alarm coordinated signals is sent to staff outside range of normal value;
Step C1, if staff confirms after sending the prompting of fire alarm coordinated signals, performs fire alarm coordinated signals scheme;As Really staff does not confirm, waits for a period of time, and does not the most confirm after terminating during this period of time, automatically performs fire alarm linkage Control program;
Step D1, performs fire alarm coordinated signals scheme, runs blower fan apparatus according to the wind speed information of wind speed and direction detector detection, The wind direction making blower fan is identical with natural wind direction, controls blower fan velocity of rotation according to smoke data, by IP broadcast car in tunnel Circular fire condition send point duty information, variable information board provides the information of fire condition, and EMERGENCY PHONE carries out 119 Reporting to the police, execution information is passed to data handling system by zone controller, until tunnel fire hazard has processed.
Embodiment 2
The management method of tunnel traffic accident comprises the following steps,
Step A2, arranges tunnel traffic accident prediction scheme in a data processing system;Set transport information range of normal value in tunnel, Set vehicle accident coordinated signals scheme;
Step B2, the vehicle detector in data acquisition unit, visibility detector gather the vehicle running signal ginseng in tunnel Number, video equipment monitors the vehicle travel situations in tunnel, video information and the vehicle running signal parameter of collection is sent to Zone controller, zone controller is delivered to data handling system after data being processed, data handling system is analyzed vehicle and travelled Signal parameter compared with the range of normal value set, and analysis video information, if vehicle running signal parameter is just in In the range of constant value, video information analysis does not has vehicle accident then data display system display numerical value, video information and stores data; Vehicle running signal parameter is in outside range of normal value, and video information analysis is found to have vehicle accident and then sends friendship to staff Interpreter's event coordinated signals prompting;
Step C2, if staff confirms after sending the prompting of vehicle accident coordinated signals, performs vehicle accident coordinated signals Scheme;If staff does not confirm, wait for a period of time, the most do not confirm after terminating during this period of time, automatically perform Vehicle accident coordinated signals scheme;
Step D2, performs vehicle accident coordinated signals scheme, circulates a notice of vehicle accident situation also by IP broadcast vehicle in tunnel Sending point duty information, variable information board provides the information of vehicle accident situation, and EMERGENCY PHONE carries out telephone call, and region is controlled Execution information is passed to data handling system by device processed, until tunnel traffic accident has processed.

Claims (6)

1. a medium tunnel intelligent total management system, it is characterised in that: include data handling system, data display system and The some data collection and control unit being arranged in tunnel, data collection and control unit includes zone controller, some numbers According to harvester and some linkage control devices, data acquisition unit includes the video equipment of join domain controller, tunnel respectively Road environment collecting device and the network equipment;Coordinated signals equipment includes that the difference EMERGENCY PHONE of join domain control system, IP are wide Broadcast, variable information board, blower fan apparatus;Data handling system includes work station, server and memorizer;Data display system includes Connect the display of work station, printer;The described network equipment connects the server of data handling system by communication system.
A kind of medium tunnel intelligent total management system the most according to claim 1, it is characterised in that: described video equipment Including fixing video camera, remote control camera, DVR, Network Personal Video Recorder and large screen display.
A kind of medium tunnel intelligent total management system the most according to claim 1, it is characterised in that: tunnel environment collection Equipment includes vehicle detector, smoke detector, visibility detector, flame detector, hygrosensor and wind speed and direction inspection Survey device, described tunnel environment collecting device join domain controller respectively.
4. a medium tunnel intelligent total management method, it is characterised in that: based on a kind of medium tunnel intelligent total management system System realizes, and comprises the following steps,
Step A, arranges tunnel event prediction scheme in a data processing system;Set the relevant parameter range of normal value of tunnel event, Set coordinated signals scheme;
Step B, data acquisition unit gathers the video information in tunnel and ambient parameter, by the video information gathered and environment ginseng Number is sent to zone controller, and zone controller is delivered to data handling system, data handling system analysis after data being processed Ambient parameter and with set range of normal value compared with, if ambient parameter is in range of normal value, data display system Display and storage data;If ambient parameter is in outside range of normal value, send coordinated signals prompting to staff;
Step C, if staff confirms after sending coordinated signals prompting, performs coordinated signals scheme;If staff Do not confirm then to wait for a period of time, the most do not confirm after terminating during this period of time, automatically perform coordinated signals scheme;
Step D, performs coordinated signals scheme, by running EMERGENCY PHONE, IP broadcast, variable information board, blower fan apparatus to tunnel Interior traffic and fire condition are controlled, guide, and execution information is passed to data handling system, until at tunnel event Reason completes.
A kind of medium tunnel intelligent total management method the most according to claim 4, it is characterised in that: tunnel fire alarm event Management method comprise the following steps,
Step A1, arranges tunnel Fire action in a data processing system;Set temperature normals scope in tunnel, flame normal Value scope, smog range of normal value, set fire alarm coordinated signals scheme;
Step B1, smoke detector, flame detector and hygrosensor in data acquisition unit gather the fire-fighting in tunnel Signal parameter, video equipment monitors the fire condition in tunnel, video information and the fire-fighting signal parameter of collection is sent to district Domain controller, zone controller is delivered to data handling system after data being processed, data handling system analyzes fire-fighting signal ginseng Count and compared with the range of normal value set, if the temperature in tunnel, smog value and flame value are in range of normal value Then data display system shows numerical value, video information and stores data;If the temperature in tunnel, smog value and flame value are in Then the prompting of fire alarm coordinated signals is sent to staff outside range of normal value;
Step C1, if staff confirms after sending the prompting of fire alarm coordinated signals, performs fire alarm coordinated signals scheme;As Really staff does not confirm, waits for a period of time, and does not the most confirm after terminating during this period of time, automatically performs fire alarm linkage Control program;
Step D1, performs fire alarm coordinated signals scheme, runs blower fan apparatus according to the wind speed information of wind speed and direction detector detection, The wind direction making blower fan is identical with natural wind direction, controls blower fan velocity of rotation according to smoke data, by IP broadcast car in tunnel Circular fire condition send point duty information, variable information board provides the information of fire condition, and EMERGENCY PHONE carries out 119 Reporting to the police, execution information is passed to data handling system by zone controller, until tunnel fire hazard has processed.
A kind of medium tunnel intelligent total management method the most according to claim 1, it is characterised in that: tunnel traffic accident Management method comprise the following steps,
Step A1, arranges tunnel traffic accident prediction scheme in a data processing system;Set transport information range of normal value in tunnel, Set vehicle accident coordinated signals scheme;
Step B1, the vehicle detector in data acquisition unit, visibility detector gather the vehicle running signal ginseng in tunnel Number, video equipment monitors the vehicle travel situations in tunnel, video information and the vehicle running signal parameter of collection is sent to Zone controller, zone controller is delivered to data handling system after data being processed, data handling system is analyzed vehicle and travelled Signal parameter compared with the range of normal value set, and analysis video information, if vehicle running signal parameter is just in In the range of constant value, video information analysis does not has vehicle accident then data display system display numerical value, video information and stores data; Vehicle running signal parameter is in outside range of normal value, and video information analysis is found to have vehicle accident and then sends friendship to staff Interpreter's event coordinated signals prompting;
Step C1, if staff confirms after sending the prompting of vehicle accident coordinated signals, performs vehicle accident coordinated signals Scheme;If staff does not confirm, wait for a period of time, the most do not confirm after terminating during this period of time, automatically perform Vehicle accident coordinated signals scheme;
Step D1, performs vehicle accident coordinated signals scheme, circulates a notice of vehicle accident situation also by IP broadcast vehicle in tunnel Sending point duty information, variable information board provides the information of vehicle accident situation, and EMERGENCY PHONE carries out telephone call, and region is controlled Execution information is passed to data handling system by device processed, until tunnel traffic accident has processed.
CN201610553578.9A 2016-07-14 2016-07-14 A kind of medium tunnel intelligent total management system and management method Pending CN106228484A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610553578.9A CN106228484A (en) 2016-07-14 2016-07-14 A kind of medium tunnel intelligent total management system and management method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610553578.9A CN106228484A (en) 2016-07-14 2016-07-14 A kind of medium tunnel intelligent total management system and management method

Publications (1)

Publication Number Publication Date
CN106228484A true CN106228484A (en) 2016-12-14

Family

ID=57519218

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610553578.9A Pending CN106228484A (en) 2016-07-14 2016-07-14 A kind of medium tunnel intelligent total management system and management method

Country Status (1)

Country Link
CN (1) CN106228484A (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107067725A (en) * 2017-05-26 2017-08-18 安徽皖通科技股份有限公司 Tunnel road conditions dynamic early-warning and linkage method of disposal
CN107146410A (en) * 2017-05-26 2017-09-08 安徽皖通科技股份有限公司 Freeway tunnel integrated information acquisition method
CN108038812A (en) * 2017-12-29 2018-05-15 中铁局集团电务工程有限公司 A kind of municipal tunnel intelligent comprehensive commander's managing and control system based on deep layer intergration model
CN109426209A (en) * 2017-08-29 2019-03-05 南京理工大学 A kind of electrical system for freeway tunnel
CN110264660A (en) * 2019-07-11 2019-09-20 上海腾盛智能安全科技股份有限公司 A kind of accurate positioning intelligent fiber grating fire detecting system
CN110879566A (en) * 2019-12-31 2020-03-13 青岛国信城市信息科技有限公司 Configuration software-based plan control system
CN111325977A (en) * 2020-02-25 2020-06-23 创捷运维智能科技有限责任公司 Tunnel intelligence edge calculation management and control system
CN111720168A (en) * 2020-06-15 2020-09-29 河南隧安智能科技有限公司 Regional control center for highway tunnel electromechanical facility comprehensive management and control system
CN113589726A (en) * 2021-07-28 2021-11-02 北京融安特智能科技股份有限公司 Storehouse control system, method and computing equipment
CN114333303A (en) * 2021-12-20 2022-04-12 武汉微创光电股份有限公司 Highway tunnel monitoring data fusion processing system
CN114495524A (en) * 2021-12-24 2022-05-13 深圳领创智能控制有限公司 Tunnel intelligent traffic control system, method, storage medium and electronic equipment
CN115097777A (en) * 2022-06-16 2022-09-23 中交一航局安装工程有限公司 Comprehensive information board warning system based on PLC system

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102023599A (en) * 2010-02-11 2011-04-20 北京瑞华赢科技发展有限公司 Tunnel monitoring system
CN103077609A (en) * 2012-12-26 2013-05-01 上海市城市建设设计研究总院 Tunnel traffic accident monitoring method and system based on sensing of multiple sensors
CN105427519A (en) * 2015-12-08 2016-03-23 刘兴 Intelligent three-in-one alarm system for tunnel

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102023599A (en) * 2010-02-11 2011-04-20 北京瑞华赢科技发展有限公司 Tunnel monitoring system
CN103077609A (en) * 2012-12-26 2013-05-01 上海市城市建设设计研究总院 Tunnel traffic accident monitoring method and system based on sensing of multiple sensors
CN105427519A (en) * 2015-12-08 2016-03-23 刘兴 Intelligent three-in-one alarm system for tunnel

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
吴婧 等: "公路隧道灾害预警救援一体化系统及算法实现", 《福建工程学院学报》 *

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107067725A (en) * 2017-05-26 2017-08-18 安徽皖通科技股份有限公司 Tunnel road conditions dynamic early-warning and linkage method of disposal
CN107146410A (en) * 2017-05-26 2017-09-08 安徽皖通科技股份有限公司 Freeway tunnel integrated information acquisition method
CN109426209A (en) * 2017-08-29 2019-03-05 南京理工大学 A kind of electrical system for freeway tunnel
CN108038812A (en) * 2017-12-29 2018-05-15 中铁局集团电务工程有限公司 A kind of municipal tunnel intelligent comprehensive commander's managing and control system based on deep layer intergration model
CN110264660A (en) * 2019-07-11 2019-09-20 上海腾盛智能安全科技股份有限公司 A kind of accurate positioning intelligent fiber grating fire detecting system
CN110879566A (en) * 2019-12-31 2020-03-13 青岛国信城市信息科技有限公司 Configuration software-based plan control system
CN111325977A (en) * 2020-02-25 2020-06-23 创捷运维智能科技有限责任公司 Tunnel intelligence edge calculation management and control system
CN111720168A (en) * 2020-06-15 2020-09-29 河南隧安智能科技有限公司 Regional control center for highway tunnel electromechanical facility comprehensive management and control system
CN113589726A (en) * 2021-07-28 2021-11-02 北京融安特智能科技股份有限公司 Storehouse control system, method and computing equipment
CN114333303A (en) * 2021-12-20 2022-04-12 武汉微创光电股份有限公司 Highway tunnel monitoring data fusion processing system
CN114495524A (en) * 2021-12-24 2022-05-13 深圳领创智能控制有限公司 Tunnel intelligent traffic control system, method, storage medium and electronic equipment
CN115097777A (en) * 2022-06-16 2022-09-23 中交一航局安装工程有限公司 Comprehensive information board warning system based on PLC system

Similar Documents

Publication Publication Date Title
CN106228484A (en) A kind of medium tunnel intelligent total management system and management method
CN207096762U (en) Wisdom chemical industry ground monitoring system
CN107807593B (en) Power distribution room master control device, master control system and detection control method
CN105425711A (en) Integrated management system of intelligent building
CN106097642A (en) A kind of city integrated piping lane intelligent monitoring and alarm device
CN103107601A (en) Web of Things smart power grid operation and maintenance system
CN109687588A (en) The substation inspection method of matrix form intelligent linkage
CN101656020A (en) System and method for evaluating urban road traffic zone servings levels based on actual measurements
CN107612779A (en) The dispatch data net secondary safety protection network equipment and service operation monitoring system
CN106126750A (en) Communal bathroom based on Internet of Things management system
CN114153167A (en) A safety protection management monitoring system and management platform for wisdom garden
KR101900557B1 (en) System and method of integrated control
CN211015113U (en) Intelligent type pipe control system for underground comprehensive pipe gallery
CN117451109A (en) Intelligent tunnel monitor based on big data and monitoring method thereof
Tomar et al. PLC and SCADA based real time monitoring and train control system for the metro railways infrastructure
CN105739472A (en) Monitoring system
CN112583769A (en) Operation monitoring system of station
CN117895649A (en) Intelligent digital station house operation and maintenance system based on 5G communication and operation and maintenance method thereof
CN117670296A (en) Internet of things-based intelligent management system and method for hydrogen station
CN206440987U (en) Property installations and facilities remote monitoring platform
KR101900556B1 (en) Apparatus and method of integrated control
CN206292788U (en) Communal bathroom management system based on Internet of Things
CN116437054A (en) Video monitoring management system based on intelligent terminal
CN112769913A (en) Microenvironment on-site monitoring system and microenvironment monitoring system of electric cabinet
CN205596232U (en) Information kiosk supervisory control

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Feng Fengjiang

Inventor after: Zhang Jialong

Inventor after: Cheng Xinping

Inventor after: Cheng Zhiheng

Inventor after: Wang Qunyan

Inventor after: Fu Zenghui

Inventor after: Song Gang

Inventor before: Feng Fengjiang

CB03 Change of inventor or designer information
CB02 Change of applicant information

Address after: 1012 room 050000 Sun Shine Hotel, Hebei, Shijiazhuang

Applicant after: Hebei Shangyuan intelligent Polytron Technologies Inc

Address before: 1012 room 050000 Sun Shine Hotel, Hebei, Shijiazhuang

Applicant before: HEBEI SHANGYUAN INDUSTRIAL COMTROL LTD.

CB02 Change of applicant information
CB03 Change of inventor or designer information

Inventor after: Feng Fengjiang

Inventor after: Hu Lihua

Inventor after: Yang Suli

Inventor after: Yang Fan

Inventor after: Wu Bingjun

Inventor after: Zhang Jialong

Inventor after: Cheng Xinping

Inventor after: Yang Chunshuo

Inventor after: Xiao Feng

Inventor before: Feng Fengjiang

Inventor before: Zhang Jialong

Inventor before: Cheng Xinping

Inventor before: Cheng Zhiheng

Inventor before: Wang Qunyan

Inventor before: Fu Zenghui

Inventor before: Song Gang

CB03 Change of inventor or designer information
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20161214

WD01 Invention patent application deemed withdrawn after publication