CN106228338B - A kind of distribution engineering intelligentized design integrated service system and application method - Google Patents

A kind of distribution engineering intelligentized design integrated service system and application method Download PDF

Info

Publication number
CN106228338B
CN106228338B CN201610564811.3A CN201610564811A CN106228338B CN 106228338 B CN106228338 B CN 106228338B CN 201610564811 A CN201610564811 A CN 201610564811A CN 106228338 B CN106228338 B CN 106228338B
Authority
CN
China
Prior art keywords
design
module
investor
application method
client
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610564811.3A
Other languages
Chinese (zh)
Other versions
CN106228338A (en
Inventor
柯峰
柯永达
梁哲铭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Power Grid Co Ltd
Original Assignee
Guangdong Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Power Grid Co Ltd filed Critical Guangdong Power Grid Co Ltd
Priority to CN201610564811.3A priority Critical patent/CN106228338B/en
Publication of CN106228338A publication Critical patent/CN106228338A/en
Application granted granted Critical
Publication of CN106228338B publication Critical patent/CN106228338B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/06Electricity, gas or water supply
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • Economics (AREA)
  • Theoretical Computer Science (AREA)
  • Health & Medical Sciences (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Marketing (AREA)
  • General Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • Public Health (AREA)
  • Primary Health Care (AREA)
  • General Health & Medical Sciences (AREA)
  • Data Mining & Analysis (AREA)
  • Water Supply & Treatment (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention relates to a kind of distribution engineering intelligentized design integrated service system and application method, including client, platform service unit, Database Unit and subscriber unit;Client is connected by network with platform service unit;Database Unit and platform service unit are located at cloud server end, by accurately calling the various modular design modules on Cloud Server, intelligence generation design drawing, export material information table simultaneously, there is the operating efficiency for improving power engineering design using the distribution engineering intelligentized design integrated service system and application method of said structure, reduce the mistake on design drawing, realize that each designer can pass through collaborative design, improve the operating efficiency of designer, increasing user contains design side simultaneously, the promptly and accurately errorless communication of the information of construction party etc. and engineering relevant party, improve the speed and efficiency of processing engineering links problem, save time cost, to ensure construction quality and progress, ensure the high level of management.

Description

A kind of distribution engineering intelligentized design integrated service system and application method
Technical field
The invention belongs to distribution design service technology field, more particularly to a kind of applied in 10kV typical distribution engineerings Distribution engineering intelligentized design integrated service system and application method.
Background technology
National electric power system and power distribution system network are increasingly complicated, and the design of power engineering seems more and more important.At present, Power engineering class design field, the intelligent design solution of power engineering design field is realized, be all common standalone version Software for editing system, in designer's work, it is not easily accomplished a point rights management in early stage design process so that different location Designer be difficult design that large project is completed in collaboration, in mid-term design process, it is difficult to according to the change of external environment condition to phase The data and design document answered are changed, and it is inconsistent to easily cause module release, can cause the problem of various potential.Cause whole Individual design imperfection, while make it that the Scalable Performance of system is poor, influence the sustainable operation of system.
Cloud platform technology can carry low-cost high-efficiency as a kind of new network operational pattern to various network applications It is the new of Distributed Calculation, parallel computation and grid computing development for calculating, storing, the resource-sharing and service of network, software Stage, as one of important trend of computer science development.Intelligence is designed by the power engineering of " cloud platform " technique construction It system can be changed can integrate all kinds of energy, technology, organizational environment etc. and be integrated, promote efficiency information interchange and knowledge sharing, carry The reusability and efficiency of high design, it is favorably improved the productivity ratio of big Project design.
Distribution engineering, which is one, needs investor, design side, embodiment party etc. to coordinate the large-engineering that could be completed in many ways, from work Journey item purpose starts to the communication of completion intermediate demand each side, nowadays goes back neither one and provides the ditch for surrounding distribution engineering each side Logical design platform.
The content of the invention
It can not standardize it is an object of the invention to solving prior art distribution design, procedure, around distribution engineering item The problem of purpose each side neither one unimpeded intercourse platform, and provide strengthen Standardized Design, help to realize collaborative design, The reusability of design, a kind of distribution engineering intelligentized design of the operating efficiency of lifting power engineering design can also be improved simultaneously Integrated service system and application method.
The technical solution adopted in the present invention is:
A kind of distribution engineering intelligentized design integrated service system, including platform service unit, Database Unit, Yong Hudan Member and client;
The client is connected by network with platform service unit, is data-interface interactive between client and system;
The Database Unit provides data for the platform service unit and supported, positioned at cloud server end, storage is passed through The modular design file of processing, the characteristics of also various types of electrical equipments, while what is stored also has design drawing File is simultaneously stored the relevant information of drawing by tables of data;
The platform service unit, positioned at cloud server end, for the processing of the information inputted to subscriber unit, including Authority management module, design treatment module, drawing operation module;
The subscriber unit, refer to the role relation of system, including design side's module, investor's module, construction party module;
The authority management module, for setting different database-access rights to each side's user identity;
The design treatment module, for the data parameters inputted according to design side, driving drawing operation module is done accordingly Action;
The drawing operation module, is connected with the physical layer interface of CAD design software, is existed according to the instruction of design treatment module Simultaneously drawing system installation diagram, and the parameter extracted in database can be filled out drawing relevant position is created in CAD, and exports material Expect table;
Investor's module, the model works of browsing Design side after being logged in for investor, on-line selection design side, prison Reason side, construction party and equipment supplier, and place an order, supervise the whole process of project progress;
Design side's module, pass through design treatment module Design Works after being logged in for the side of design;
The construction party module, for receiving the order of owner, the design provided according to design side is constructed, and Timely replacement construction speed;
Further improve, the client includes cell phone application, web page windows or computer client.
Further improve, the subscriber unit also includes electricity consumption side's module, management side's module and supply of equipment and materials side Module;
Management side's module, for Project Surveillance as the communication between investor and supplier, design side, construction party Bridge, supervise projects progress, timely processing problem;
Electricity consumption side's module, for electricity consumption side's tracking project process, propose conductive suggestion;
The supply of equipment and materials quotient module block, by handling owner's order after being logged in for supplier, tie up simultaneously Protect its brand article information.
A kind of application method of distribution engineering intelligentized design integrated service system as described above, including design side use Method, investor's application method, construction party application method, electricity consumption side's application method, management side's application method and equipment and materials Supplier's application method;
Design side's application method following steps:
Step 1), designer log in client by the side's of design module, and authority management module is set in back designer distribution The authority of construction drawing is counted, into after system, designer inputs relevant parameter according to the actual conditions of supply project;
After the relevant parameter that step 2), the designer of design treatment module obtaining step 1 input, processing module obtains these numbers According to rear, each supplemental characteristic is judged and classified respectively, then looked into according to the drawing control table for being sorted in Database Unit Suitable drawing masterplate is ask, then goes out the drawing from data base call;
Step 3), processing module are analyzed the specifying information of drawing, are shown that drawing processing instructs, are sent an instruction to Drawing operation module;
The instruction that step 4), drawing operation module are performed in step 3 is completed to process to drawing, while if selection output material If expecting table, system can automatically open up an electrical form, and fill in the related specifications parameter of respective material inside;
Investor's application method is:After investor logs into system by client, authority management module according to For the corresponding authority of investor's module assignment to investor, investor may browse through the historical work of design side, browse construction party, prison Reason side and whole data of supply of equipment and materials business, and select to place an order;
The construction party application method is:After construction party is by client login system, according to placing an order for investor, from setting Project drawing is obtained at the side's of counting module, and in real time project progress renewal into system;
Electricity consumption side's application method is:After login system, engineering situation and construction drawing are browsed, and combine and put into operation in the future Operation afterwards needs to propose the opinion rationalized;
Management side's application method is:
1), management side personnel are responsible for the supervision of construction quality and the examination of line quality at the construction field (site), log in management mould Block is online to link up with each side stage by stage;
2), progress and relevant issues are fed back with investor at any time.
Supply of equipment and materials side's application method is:
1) after supplier logs in supplier's module, the merchandise news managed to it is managed maintenance;
2) after supplier receives order prompting, sequence information is checked in platform, and links up and delivers with investor.
The beneficial effects of the present invention are:
1. system according to the input of parameter can Intelligent generation meet the drawing of practical engineering application, contribute to the rule of design Generalized, improve design efficiency;
2. the present invention is provides an interaction platform around each side of distribution engineering, various to what is run into engineering project The express delivery of problem energy solves, and improves construction quality, speeds up the work, cost-effective;
3. a server moves cloud platform to, all kinds of energy, technology, organizational environment etc. can be integrated and be integrated, promote efficiency Information interchange and knowledge sharing, the reusability and efficiency of design are improved, be favorably improved the productivity ratio of big Project design;
4. client uses the form of cell phone application, web page windows and computer client, user-friendly;
Brief description of the drawings
Fig. 1 is a kind of functional module structure of distribution engineering intelligentized design integrated service system provided by the invention Figure.
Embodiment
The invention will be further described with specific embodiment below in conjunction with the accompanying drawings.
Embodiment, a kind of distribution engineering intelligentized design integrated service system, including platform service unit, database list Member, subscriber unit and client;
The client is connected by network with platform service unit, is data-interface interactive between user and system, The client includes cell phone application, web page windows or computer client;
The Database Unit provides data for the platform service unit and supported, positioned at cloud server end, storage is passed through The modular design file of processing, the characteristics of also various types of electrical equipments, while what is stored also has design drawing File is simultaneously stored the relevant information of drawing by tables of data;Tables of data in database is largely divided into two parts, and one Part is drawing information table, and functional independence is realized in processing and calling in order to facilitate drawing information, and drawing information table is divided into three Sublist, including drawing control table, drawing coordinate table, drawing material quantity table.Another part is electrical equipment information table, Including:Switch cubicle table, transformer table, current transformer table, voltage transformer table, cable meter, bus table.
The platform service unit, positioned at cloud server end, for the processing of the information inputted to subscriber unit, including Authority management module, design treatment module, drawing operation module;
The subscriber unit, refers to the role relation of system, including design side's module, investor's module, construction party module, Electricity side's module, management side's module and supply of equipment and materials side's module;
The authority management module, for setting different database-access rights to each side's user identity;
The design treatment module, for the data parameters inputted according to design side, driving drawing operation module is done accordingly Action;The drawing operation module, is connected with the physical layer interface of CAD design software, is existed according to the instruction of design treatment module Simultaneously drawing system installation diagram, and the parameter extracted in database can be filled out drawing relevant position is created in CAD, and exports material Expect table;
Investor's module, the model works of browsing Design side after being logged in for investor, on-line selection design side, prison Reason side, construction party and equipment supplier, and place an order, supervise the whole process of project progress;
Design side's module, pass through design treatment module Design Works after being logged in for the side of design;
The construction party module, for receiving the order of owner, the design provided according to design side is constructed, and Timely replacement construction speed;
Management side's module, for Project Surveillance as the communication between investor and supplier, design side, construction party Bridge, supervise projects progress, timely processing problem;
Electricity consumption side's application method is:After login system, engineering situation and construction drawing are browsed, and combine and put into operation in the future Operation afterwards needs to propose the opinion rationalized;
The supply of equipment and materials quotient module block, by handling owner's order after being logged in for supplier, tie up simultaneously Protect its brand article information.
A kind of application method of distribution engineering intelligentized design integrated service system as described above, including design side use Method, investor's application method, construction party application method, electricity consumption side's application method, management side's application method and equipment and materials Supplier's application method;
Design side's application method following steps:
Step 1), designer log in client by the side's of design module, and authority management module is set in back designer distribution The authority of construction drawing is counted, into after system, designer inputs relevant parameter according to the actual conditions of supply project;Relevant parameter bag The load level of whole supply project is included, the required high tension loop number divided according to designer, also each high tension loop In calculated charge and electric current etc.;
After the relevant parameter that step 2), the designer of design treatment module obtaining step 1 input, processing module obtains these numbers According to rear, each supplemental characteristic is judged and classified respectively, then looked into according to the drawing control table for being sorted in Database Unit Suitable drawing masterplate is ask, then goes out the drawing from data base call;Drawing masterplate is to set drawing by the allusion quotation of working process, Corresponding to the data such as the inside switch cubicle model specification, current transformer, place capacity/calculating current, the model of wire and specification Position is empty, it is also necessary to is inputted again by drawing operation module;
Step 3), design treatment module are analyzed the specifying information of drawing, show that drawing processing instructs, instruction is sent out Give drawing operation module;
The instruction that step 4), drawing operation module are performed in step 3 is completed to process to drawing, while if selection output material If expecting table, system can automatically open up an electrical form, and fill in the related specifications parameter of respective material inside;
Drawing operation module during executing instruction operations, creates a drawing, set font sample in CAD first in CAD Formula, then access the allusion quotation that database draws selected by design treatment module and set address where drawing, be then loaded into drawing, then from The data exported required for being obtained in the instruction of design treatment module on drawing, and the position of output, are completed defeated on drawing Go out, thus complete to set an allusion quotation operation of drawing, drawing operation module is by obtaining the information above operational order, then Drawing can just be generated in CAD and store into database by performing operation.
Derived materials information table is the important ring in Electric Design, material information table summarise design engineering used it is assorted Material, use how many.Material information table is the basis of Budgetary Estimates, and user implements a Guide Book of design.System The each allusion quotation of data-base recording of uniting sets the species and number of the required electrical equipment of drawing, and it is being handled by core algorithm Afterwards, the specification information of each electrical equipment is all had stored among database.Generation material is have selected in parameter inputting interface Expect table, this module will be activated in program, generated in CAD software drawing while, one electronic watch of automatic spring Lattice, this form are exactly so-called material information table.
Title, model, specification, the quantity of each electrical equipment are contained in material information table.Wherein electrical equipment has:Open Close cabinet, vacuum circuit breaker, current transformer, voltage transformer, high-tension fuse, transformer, bus, cable etc..Each of which The identity element of kind different size is shown separately.
The material information table of output needs to be successfully connected the effect of the spreadsheet such as excel competence exertion, needs before proceeding To first have to be defined electrical form in a program, just start to connect spreadsheet after completing definition, after being successfully connected just Can be according to the component specification parameter that core algorithm provides, and modular design drawing is entered with scale to electrical form in database Row input, the material information table exported;
Investor's application method is:After investor logs into system by client, authority management module according to For the corresponding authority of investor's module assignment to investor, investor may browse through the historical work of design side, browse construction party, prison Reason side and whole data of supply of equipment and materials business, and select to place an order;
The construction party application method is:After construction party is by client login system, according to placing an order for investor, from setting Project drawing is obtained at the side's of counting module, and in real time project progress renewal into system;
Electricity consumption side's application method is:After login system, project progress and construction drawing are browsed;
Management side's application method is:
1), management side personnel are responsible for the supervision of construction quality and the examination of line quality at the construction field (site), log in management mould Block is online to link up with each side stage by stage;
2), progress and relevant issues are fed back with investor at any time.
Supply of equipment and materials side's application method is:
1) after supplier logs in supplier's module, the merchandise news managed to it is managed maintenance;
2) after supplier receives order prompting, sequence information is checked in platform, and links up and delivers with investor.
A kind of distribution engineering intelligentized design synthesis clothes provided by the invention it can be seen from embodiment more than Business system and application method improve electric power work with the design drawing and the associated materials of engineering that accurately generate needed for engineering The operating efficiency of journey design, reduces the mistake on design drawing, improves the reusability of design, realize that each designer can lead to Collaborative design is crossed, improves the operating efficiency of designer, while increases user, design side exchanges with construction party information, saves Time cost advantage.

Claims (2)

  1. A kind of 1. distribution engineering intelligentized design integrated service system, it is characterised in that including client, platform service unit, Database Unit and subscriber unit;
    The client is connected by network with platform service unit, is data-interface interactive between client and system;
    The Database Unit provides data for the platform service unit and supported, positioned at cloud server end, storage is by processing Modular design file, the characteristics of also various types of electrical equipments, at the same store also have design drawing file And the relevant information of drawing is stored by tables of data;The tables of data is divided into drawing information table and electrical equipment information Table, the drawing information table include drawing control table, drawing coordinate table, drawing material quantity table, the electrical equipment information table Including switch cubicle table, transformer table, current transformer table, voltage transformer table, cable meter, bus table;
    The platform service unit, positioned at cloud server end, for the processing of the information inputted to user, including rights management Module, design treatment module, drawing operation module;
    The subscriber unit, refer to the role relation of system, including design side's module, investor's module, construction party module, electricity consumption Square module, management side's module and supply of equipment and materials side's module;
    The authority management module, for setting different database-access rights to each side's user identity;
    The design treatment module, for the data parameters inputted according to design side, driving drawing operation module is done corresponding dynamic Make;
    The drawing operation module, is connected with the physical layer interface of CAD design software, according to the instruction of design treatment module in CAD It is middle to create simultaneously drawing system installation diagram, the parameter extracted in database is filled out into drawing relevant position, and export material table;
    Investor's module, the model works of browsing Design side, on-line selection design side, management after being logged in for investor Side, construction party and equipment supplier, and place an order, supervise the whole process of project progress;Investor's application method is:Throw After capital logs into system by client, authority management module is according to the corresponding authority of investor's module assignment to investment Side, investor may browse through the historical work of design side, browse whole moneys of construction party, management side and supply of equipment and materials business Material, and select to place an order;
    Design side's module, pass through design treatment module Design Works after being logged in for the side of design;The side's of design application method is such as Lower step:
    Step 1), designer log in client by the side's of design module, and authority management module is applied in back designer's distribution design The authority of work figure, into after system, designer inputs relevant parameter according to the actual conditions of supply project;Relevant parameter includes supplying The load level of electric project, the required high tension loop number divided according to designer, and each calculating in high tension loop Electric charge and electric current;
    After the relevant parameter that step 2), the designer of design treatment module obtaining step 1 input, processing module obtains these data Afterwards, each supplemental characteristic is judged and classified respectively, then according to the drawing control table inquiry for being sorted in Database Unit To suitable drawing masterplate, then go out the drawing from data base call;Drawing masterplate is to set drawing by the allusion quotation of working process, its Middle switch cubicle model specification, current transformer, place capacity, calculating current, wire type and specification data corresponding to position It is sky, it is necessary to be inputted again by drawing operation module;
    Step 3), design treatment module are analyzed the specifying information of drawing, are shown that drawing processing instructs, are sent an instruction to Drawing operation module;
    The instruction that step 4), drawing operation module are performed in step 3 is completed to process to drawing, while if selection output material table If, system can automatically open up an electrical form, and fill in the related specifications parameter of respective material inside;
    Drawing operation module during executing instruction operations, creates a drawing, set font pattern, connects in CAD first in CAD And access the allusion quotation that database draws selected by design treatment module and set address where drawing, be then loaded into drawing, then from design The data exported required for being obtained in the instruction of processing module on drawing and the position of output, output is completed on drawing, it is complete A paired allusion quotation sets the operation of drawing, and for drawing operation module by obtaining the information of operational order, then performing operation just can be Drawing is generated in CAD and is stored into database;
    Have selected in parameter inputting interface generation material table, in CAD software generate drawing while, automatic spring one Electrical form, the electrical form are material information tables;Contained in material information table the title of each electrical equipment, model, Specification, quantity, the electrical equipment include switch cubicle, vacuum circuit breaker, current transformer, voltage transformer, high-tension fuse, Transformer, bus, cable, the identity element of each of which different size are shown separately;The material information table of output needs into The spreadsheet competence exertion effects such as work(connection excel, need to first have to carry out electrical form in a program before proceeding Definition, complete just to start connection spreadsheet after defining, the component specification parameter provided according to core algorithm after being successfully connected, and Modular design drawing is inputted with scale to electrical form in database, the material information table that is exported;
    The construction party module, for receiving the order of owner, the design provided according to design side is constructed, and in good time Renewal construction details and progress;The construction party application method is:After construction party is by client login system, according to investor Place an order, at design side's module obtain project drawing, and in real time project progress renewal into system;
    Management side's module, for Project Surveillance as the communication bridge between investor and supplier, design side, construction party Beam, supervise projects progress, timely processing problem;Management side's application method is:
    1), management side personnel are responsible for the supervision of construction quality and the examination of line quality at the construction field (site), log in management module and exist Line is linked up with each side stage by stage;
    2), progress and relevant issues are fed back with investor at any time;
    Supply of equipment and materials side's application method is:
    1) after supplier logs in supplier's module, the merchandise news managed to it is managed maintenance;
    2) after supplier receives order prompting, sequence information is checked in platform, and links up and delivers with investor.
    Electricity consumption side's application method is:After login system, engineering situation and construction drawing are browsed, and after combine and put into operation in the future Operation needs to propose the opinion rationalized;
    The supply of equipment and materials quotient module block, by handling owner's order after being logged in for supplier, while safeguard it Brand article information.
  2. A kind of 2. distribution engineering intelligentized design integrated service system according to claim 1, it is characterised in that the visitor Family end includes cell phone application, web page windows or computer client.
CN201610564811.3A 2016-07-15 2016-07-15 A kind of distribution engineering intelligentized design integrated service system and application method Active CN106228338B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610564811.3A CN106228338B (en) 2016-07-15 2016-07-15 A kind of distribution engineering intelligentized design integrated service system and application method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610564811.3A CN106228338B (en) 2016-07-15 2016-07-15 A kind of distribution engineering intelligentized design integrated service system and application method

Publications (2)

Publication Number Publication Date
CN106228338A CN106228338A (en) 2016-12-14
CN106228338B true CN106228338B (en) 2018-03-06

Family

ID=57519207

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610564811.3A Active CN106228338B (en) 2016-07-15 2016-07-15 A kind of distribution engineering intelligentized design integrated service system and application method

Country Status (1)

Country Link
CN (1) CN106228338B (en)

Families Citing this family (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107302568A (en) * 2017-06-06 2017-10-27 云南电网有限责任公司 A kind of live shipping and receiving operating system of the Power Material based on mobile
CN107526870A (en) * 2017-07-18 2017-12-29 巧夺天宫(深圳)科技有限公司 The design system and its design method of fire-fighting spraying pipeline
CN109117983A (en) * 2018-07-09 2019-01-01 南京邮电大学 Build method for managing resource and system, computer readable storage medium and terminal
CN109118164A (en) * 2018-07-19 2019-01-01 西安昆仑工业(集团)有限责任公司 A kind of technological procedure Digitalization management system and management method
CN109165916B (en) * 2018-08-09 2022-03-22 中国电力工程顾问集团西北电力设计院有限公司 Intelligent power distribution and drawing generation method for electric actuating mechanism
CN109242360A (en) * 2018-10-29 2019-01-18 广东电网有限责任公司 One kind being based on Distribution Network Communication net engineering construction tracking control of full process management-control method
CN109767083A (en) * 2018-12-25 2019-05-17 山东爱普电气设备有限公司 A kind of data processing system applied to assembled electric design
CN110110307A (en) * 2019-04-19 2019-08-09 国网天津市电力公司 A kind of engineering previous information editor's shared system based on cloud
CN110244584B (en) * 2019-06-18 2020-12-01 深圳市简工智能科技有限公司 Circuit breaker control method, device, computer readable storage medium and system
CN110880096B (en) * 2019-11-20 2023-10-31 广西越知网络股份有限公司 Multi-party collaborative office system for building engineering
CN111260328B (en) * 2020-01-20 2023-11-07 深圳市赛易特信息技术有限公司 Gas engineering drawing generation method, intelligent terminal and storage medium

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102915488A (en) * 2012-10-26 2013-02-06 李香存 Online intelligent design system of engineering project and method of system
CN105160534A (en) * 2015-08-19 2015-12-16 河南鑫山信息科技有限公司 Home decoration network platform system and use method

Also Published As

Publication number Publication date
CN106228338A (en) 2016-12-14

Similar Documents

Publication Publication Date Title
CN106228338B (en) A kind of distribution engineering intelligentized design integrated service system and application method
Gao et al. Robust coordinated optimization of active and reactive power in active distribution systems
CN104133953B (en) Intelligent substation secondary design system
CN108153996B (en) Method for realizing electric wiring group cabinet by COMOS platform
Xu et al. A decomposition-based practical approach to transient stability-constrained unit commitment
CN108345739B (en) Method for identifying CIME and SVG model file information to realize protection fixed value on-line check function and obtain model
CN103927693A (en) Distribution network line loss management system
CN104123271A (en) Secondary design system for intelligent substation on basis of Excel
CN105447611A (en) OMS equipment transaction management and control information system supported by GID platform
CN104166944B (en) A kind of grid switching operation bill automatic generation method of railway substation
CN103729734A (en) Distribution network intelligent operation ticket issuing system
CN105760272B (en) Monitoring backstage business customizing method and its system based on plug-in unit
CN108520163A (en) Three-dimensional net rack method for automatic modeling based on CIM model and SVG figures
CN105302954A (en) Multiplayer online intelligent transformer substation design system
CN109146253A (en) A kind of intelligent automatic interactive operating system for making out an invoice and protecting locking
CN101527454A (en) Method for automatically generating annual running mode report of power grid
CN104578049B (en) A kind of transient power quality analysis system of electromechanical electromagnetic transient hybrid simulation
CN103488726A (en) Method for establishing unified grid data platform based on WEB-SERVICE
CN111444664A (en) Power distribution network closed loop current calculation method and system containing multi-branch line
CN105305619B (en) A kind of three distant collocation methods and device based on power distribution automation
Chen et al. Multi-source and heterogeneous data integration model for big data analytics in power DCS
CN103676839B (en) The design and manufacture of bay typical based on IEC61850 and integrated method and system
CN108492660A (en) Substation's peace arranges analogy method, device and system
CN103606023A (en) Graph platform-based management method for materials of newly input electric power system
CN104915523B (en) A kind of regulation full-service unified modeling method based on time series

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: A comprehensive service system for intelligent design of distribution engineering and its application method

Effective date of registration: 20201112

Granted publication date: 20180306

Pledgee: Development Zone sub branch of Bank of Guangzhou Co.,Ltd.

Pledgor: GUANGDONG ZHONGWANG ELECTRIC POWER Co.,Ltd.

Registration number: Y2020980007814

PE01 Entry into force of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20211103

Granted publication date: 20180306

Pledgee: Development Zone sub branch of Bank of Guangzhou Co.,Ltd.

Pledgor: GUANGDONG ZHONGWANG ELECTRIC POWER CO.,LTD.

Registration number: Y2020980007814

PC01 Cancellation of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: A comprehensive service system for intelligent design of power distribution engineering and its application method

Effective date of registration: 20211110

Granted publication date: 20180306

Pledgee: Development Zone sub branch of Bank of Guangzhou Co.,Ltd.

Pledgor: GUANGDONG ZHONGWANG ELECTRIC POWER CO.,LTD.

Registration number: Y2021980012195

PE01 Entry into force of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20220721

Granted publication date: 20180306

Pledgee: Development Zone sub branch of Bank of Guangzhou Co.,Ltd.

Pledgor: GUANGDONG ZHONGWANG ELECTRIC POWER CO.,LTD.

Registration number: Y2021980012195

PC01 Cancellation of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: A comprehensive service system for intelligent design of power distribution engineering and its use method

Effective date of registration: 20220817

Granted publication date: 20180306

Pledgee: Bank of China Limited Guangzhou Pearl River Branch

Pledgor: GUANGDONG ZHONGWANG ELECTRIC POWER CO.,LTD.

Registration number: Y2022980012821

PE01 Entry into force of the registration of the contract for pledge of patent right