CN109767083A - A kind of data processing system applied to assembled electric design - Google Patents

A kind of data processing system applied to assembled electric design Download PDF

Info

Publication number
CN109767083A
CN109767083A CN201811592151.5A CN201811592151A CN109767083A CN 109767083 A CN109767083 A CN 109767083A CN 201811592151 A CN201811592151 A CN 201811592151A CN 109767083 A CN109767083 A CN 109767083A
Authority
CN
China
Prior art keywords
task
project
data processing
processing system
module
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811592151.5A
Other languages
Chinese (zh)
Inventor
董浩
鹿松
姜波
肖军明
张力伟
卢宪斐
刘平儒
杨洋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANDONG AIPU ELECTRICAL EQUIPMENT CO Ltd
Original Assignee
SHANDONG AIPU ELECTRICAL EQUIPMENT CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANDONG AIPU ELECTRICAL EQUIPMENT CO Ltd filed Critical SHANDONG AIPU ELECTRICAL EQUIPMENT CO Ltd
Priority to CN201811592151.5A priority Critical patent/CN109767083A/en
Publication of CN109767083A publication Critical patent/CN109767083A/en
Pending legal-status Critical Current

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

Present disclose provides a kind of data processing systems applied to assembled electric design, including client and server end;The server end, comprising: authority management module is used to configure corresponding authority for different role;Task allocating module is used to receive the task distribution order with task distribution permission user, is allocated to project task, forming project subtask and being sent to accordingly there is task to receive permission user;Project tracking module is used for tracking project task, according to current tracking time point compared with the plan of project task preset time and subtask deadline point, generates project task current schedules result;Item file memory module, is used to be formed by file during to finished item task and stores according to Uniform Name, and carries out classification storage according to disparity items.

Description

A kind of data processing system applied to assembled electric design
Technical field
The disclosure belongs to data processing field more particularly to a kind of data processing system applied to assembled electric design.
Background technique
Only there is provided background technical informations relevant to the disclosure for the statement of this part, it is not necessary to so constitute first skill Art.
With the fast development of company, more and more customer engineering projects obviously experience conventional items management Bring is inconvenient.Previous project information is all registered in excel table or in word document by special messenger substantially, and worker tasks arrange Also basic to be enter into word, project more than one makes the inconvenience for significantly realizing management, inquiry in this way more.
Circulation for usually all kinds of papery quality lists, typically prints and fills in or beat after filling in word It prints off and, to go to multiple department's signature confirmations and modification repeatedly toward contact, it is time-consuming and laborious.About the examination of performance, originally then Mainly summarized by special messenger's counting statistics, not only to take a lot of time to count and calculate, sometimes malfunction and be all difficult to find out, It is easy to be influenced by human factor.Management for drawing file has been substantially carried out the archive of archives of paper quality file, electronic chart Paper file is then stored on the computer or the public computer of data of designer, if staff redeployment or computer damage, electronics occurs The probability of drawing file loss will greatly increase.
Summary of the invention
According to one or more other embodiments of the present disclosure, a kind of data processing system applied to assembled electric design is provided System can facilitate record, storage and the progress and the inquiry of file of project, improve the data management effect of assembled electric design Rate.
A kind of data processing system applied to assembled electric design of the disclosure, including client and server end;Institute State server end, comprising:
Authority management module is used to configure corresponding authority for different role;
Task allocating module is used to receive the task distribution order with task distribution permission user, to project task It is allocated, forming project subtask and being sent to accordingly there is task to receive permission user;
Project tracking module is used for tracking project task, according to current tracking time point and project task preset time Plan and subtask deadline point compare, and generate project task current schedules result;
Item file memory module is used to be formed by file according to Uniform Name during to finished item task It is stored, and carries out classification storage according to disparity items.
In one or more embodiments, in the authority management module, role includes design portion manager, is electrically responsible for People, metal plate responsible person, Electric Designer and sheet metal designing person;Design portion manager, electrical responsible person and metal plate responsible person have item The permission of mesh task distribution;Electric Designer and sheet metal designing person only have the permission of reception project subtask.
In one or more embodiments, in the authority management module, to being stored in item file memory module File carries out classification priority assignation, specifies personnel at different levels and reads grade range and data downloading and browse right, and automatically records all Operation note to file.
In one or more embodiments, in the item file memory module, appoint according to affiliated project name-project Stage-project task title-project subtask title-self-defined title belonging to being engaged in is named file.
In one or more embodiments, the server end, further includes:
Task reminders module is used to remind the timely processing item subtask of the user of reception project subtask.
In one or more embodiments, the server end, further includes:
Performance programming count module is used to be calculated automatically according to completion efficiency situation of each role to project task Corresponding performance.
In one or more embodiments, in the performance programming count module, performance=a* project of each role Task completes time+b* project task used and completes quality score;Wherein, a and b is constant coefficient.
In one or more embodiments, the server end, further includes:
CAD intelligence tool packet memory module, is used to store the CAD intelligence tool of mating exploitation, in order to assembled electric Calling in design process.
In one or more embodiments, the CAD intelligence tool of the mating exploitation, comprising:
Standard drawing confines justice, is inserted into picture frame, is automatically filled in title block information, batch updating title block, tears figure, automatic reading open automatically Title block information, drawing compare, the conversion of drawing format, automatically generate list of drawings, print automatic archiving, printing bar code drawing is returned Shelves and version management and CAD electronic signature.
The beneficial effect of the disclosure is:
(1) disclosure is directed to assembled electric equipment design work, and relatively former special messenger is registered in excel table or word Work registration in file, facilitates record and the storage of engineering, and inquiry is convenient, and previous registration is because being busy with one's work and manually remembering Record, which inevitably will appear work mistake, causes later period inquiry difficult, the data processing system for being applied to assembled electric design of the disclosure Eliminate the time in process, it is only necessary to circulate from line by the good process sequence of software set, eliminate signature Time.
(2) data processing system for being applied to assembled electric design of the disclosure solves the drawing money of traditional papery Material achieve occupied space, be easily lost, manage it is cumbersome, if having other people to borrow certain engineering data does not give back loss, this engineering Data will be inquired nowhere;And designer computer outlet failure or leave office situations such as, then electronic drawings and archives can then lose or Person inquires cumbersome random problem, and the disclosure can then avoid above situation in server end archive completely, and use is searched Rope functional inquiry is convenient and efficient.
(3) data processing system for being applied to assembled electric design of the disclosure, enables to project leader or department Manager understands job schedule in real time, grasps engineering development situation to manage as a whole.
Detailed description of the invention
The Figure of description for constituting a part of this disclosure is used to provide further understanding of the disclosure, and the disclosure is shown Meaning property embodiment and its explanation do not constitute the improper restriction to the disclosure for explaining the disclosure.
Fig. 1 is a kind of data processing system structural schematic diagram applied to assembled electric design of the disclosure.
Specific embodiment
It is noted that following detailed description is all illustrative, it is intended to provide further instruction to the disclosure.Unless another It indicates, all technical and scientific terms used herein has usual with disclosure person of an ordinary skill in the technical field The identical meanings of understanding.
It should be noted that term used herein above is merely to describe specific embodiment, and be not intended to restricted root According to the illustrative embodiments of the disclosure.As used herein, unless the context clearly indicates otherwise, otherwise singular Also it is intended to include plural form, additionally, it should be understood that, when in the present specification using term "comprising" and/or " packet Include " when, indicate existing characteristics, step, operation, device, component and/or their combination.
Fig. 1 is a kind of data processing system structural schematic diagram applied to assembled electric design of the disclosure.
As shown in Figure 1, a kind of data processing system applied to assembled electric design of the disclosure, including client kimonos Business device end;The server end, comprising:
(1) authority management module is used to configure corresponding authority for different role.
In specific implementation, in the authority management module, role includes design portion manager, electrical responsible person, metal plate Responsible person, Electric Designer and sheet metal designing person;Design portion manager, electrical responsible person and metal plate responsible person are with project task point The permission matched;Electric Designer and sheet metal designing person only have the permission of reception project subtask.
In another embodiment, in the authority management module, role further include:
Process part manager and technological design person, wherein process part manager arranges design objective to technological design person;
Process part manager has the permission of project task distribution.
Technological design person, which has, receives technological design task, and designs drawing.
In the authority management module, role further include: technique proofreader, permission are check and correction drawing.
In specific implementation, electrical responsible person and metal plate responsible person are respectively provided with the power for auditing the drawing of corresponding department's design Limit.
In the authority management module, classification priority assignation is carried out to the file for being stored in item file memory module, It specifies personnel at different levels and reads grade range and data downloading and browse right, and automatically record the operation note of all pairs of files.
(2) task allocating module is used to receive the task distribution order with task distribution permission user, appoints to project Business is allocated, and forming project subtask and being sent to accordingly there is task to receive permission user.
In specific implementation, it can be used based on the task allocation algorithms of average thought and realize the distribution of project task.
Wherein, the main thought of the task allocation algorithms based on average thought is: finding out all reception task personnel first In at hand do not complete the maximum auditor of number of tasks, then other reception task personnel with reception task personnel do not complete appoint Business number is mark post, calculates oneself open ended number of tasks, and finally the sum of all open ended number of tasks of reception task personnel are Total accommodates number of tasks (ava_task).
Here there are two types of situations, the first situation is:
Total accommodates the number of tasks number of tasks to be allocated less than or equal to n, and all reception task personnel are at this time with most Unfinished greatly number of tasks (max_task) is mark post, receives task to be allocated.If just distributed, algorithm terminates; If m task of remaining task extraction is distributed to each and receives task personnel by that there are also remaining task is unallocated, according to It is secondary to analogize, until remaining unallocated number of tasks is less than m, this task less than m is then randomly assigned to respective counts again The auditor of amount.
Second situation is:
Total accommodates the number of tasks number of tasks to be allocated greater than n, reduces the mark post (max_ of a unit at this time Task-1), the then open ended number of tasks of cycle calculations, until exiting circulation (loop termination condition are as follows: ava_task-task_ The reception task personnel for being less than current mark post that num≤lower_List.size (), lower_List.size () are indicated Number).
Project task can be equally distributed to reception task personnel by the task allocation algorithms based on average thought.
It should be noted that other algorithms can also be used to realize the distribution of project task, such as greedy algorithm.Wherein, Greedy selection is always to select the deadline of next task at least in remaining task and time started in greedy algorithm More than or equal to the deadline of former selection task, therefore can be according to task completion time, always to think next Task is the task of minimum completion time.
(3) project tracking module is used for tracking project task, when according to current tracking time point and default project task Between plan and subtask deadline point compare, generate project task current schedules result.
Such as: project task includes the first subtask, the second subtask and third subtask, when entire preset time plan Between are as follows:
First subtask: sart point in time is on January 1st, 2017, and the end time is on June 30th, 2017;Second son is appointed Business: sart point in time is on July 1st, 2017, and the end time is on December 31st, 2017.
And each subtask can segment timing node, such as: the second subtask again according to refined grid every month, Then currently tracking time point is on August 10th, 2017, if actual first subtask and the second subtask and third subtask Preceding 8 months tasks with complete, then the progress of entire project be completed 2/3.
(4) item file memory module is used to be formed by file during to finished item task according to unified Title is stored, and carries out classification storage according to disparity items.
In specific implementation, in the item file memory module, according to the affiliated affiliated rank of project name-project task Section-project task title-project subtask title-self-defined title is named file.
In another embodiment, the server end, further includes:
Task reminders module is used to remind the timely processing item subtask of the user of reception project subtask.
In another embodiment, the server end, further includes:
Performance programming count module is used to be calculated automatically according to completion efficiency situation of each role to project task Corresponding performance.
Specifically, in the performance programming count module, performance=a* project task of each role is completed used Time+b* project task completes quality score;Wherein, a and b is constant coefficient.
Such as: a 0.4, b 0.6, project task completion time and project task used, which complete quality score, can lead to Cross the data acquisition transferred in item file memory module.
It should be noted that the value of a and b can be next customized according to the actual situation.
In another embodiment, the server end, further includes:
CAD intelligence tool packet memory module, is used to store the CAD intelligence tool of mating exploitation, in order to assembled electric Calling in design process.
Specifically, the CAD intelligence tool of the mating exploitation, comprising:
Standard drawing confines justice, is inserted into picture frame, is automatically filled in title block information, batch updating title block, tears figure, automatic reading open automatically Title block information, drawing compare, the conversion of drawing format, automatically generate list of drawings, print automatic archiving, printing bar code drawing is returned Shelves and version management and CAD electronic signature.
In another embodiment, the server end, further includes:
Work log module is used to record the daily focus of designer.
Work log can help designer to record daily focus, facilitate when there is the problems such as query to work Consult questions and prospect.The work habit for helping employee to be formed.
The disclosure is directed to assembled electric equipment design work, and special messenger is registered in excel table in the past relatively or word is literary Work registration in part, facilitates record and the storage of engineering, and inquiry is convenient, and previous registration is because being busy with one's work and manual record Inevitably will appear work mistake causes later period inquiry difficult, and the data processing system for being applied to assembled electric design of the disclosure saves Gone the time in process, it is only necessary to from line by software set it is good process sequence circulate, eliminate signature when Between.
The data processing system for being applied to assembled electric design of the disclosure, the drawing data for solving traditional papery are deposited Shelves occupied space, be easily lost, manage it is cumbersome, if having other people to borrow certain engineering data does not give back loss, the data of this engineering It will nowhere inquire;And then electronic drawings and archives then can be lost or look into the computer outlet failure of designer situations such as perhaps leaving office Cumbersome random problem is ask, the disclosure can then avoid above situation in server end archive completely, and use search function It can inquire convenient and efficient.
The data processing system for being applied to assembled electric design of the disclosure, enables to project leader or line manager Job schedule is understood in real time, grasps engineering development situation to manage as a whole.
It should be understood by those skilled in the art that, embodiment of the disclosure can provide as method, system or computer program Product.Therefore, the shape of hardware embodiment, software implementation or embodiment combining software and hardware aspects can be used in the disclosure Formula.Moreover, the disclosure, which can be used, can use storage in the computer that one or more wherein includes computer usable program code The form for the computer program product implemented on medium (including but not limited to magnetic disk storage and optical memory etc.).
The disclosure be referring to according to the method for the embodiment of the present invention, the process of equipment (system) and computer program product Figure and/or block diagram describe.It should be understood that every one stream in flowchart and/or the block diagram can be realized by computer program instructions The combination of process and/or box in journey and/or box and flowchart and/or the block diagram.It can provide these computer programs Instruct the processor of general purpose computer, special purpose computer, Embedded Processor or other programmable data processing devices to produce A raw machine, so that being generated by the instruction that computer or the processor of other programmable data processing devices execute for real The device for the function of being specified in present one or more flows of the flowchart and/or one or more blocks of the block diagram.
These computer program instructions, which may also be stored in, is able to guide computer or other programmable data processing devices with spy Determine in the computer-readable memory that mode works, so that it includes referring to that instruction stored in the computer readable memory, which generates, Enable the manufacture of device, the command device realize in one box of one or more flows of the flowchart and/or block diagram or The function of being specified in multiple boxes.
These computer program instructions also can be loaded onto a computer or other programmable data processing device, so that counting Series of operation steps are executed on calculation machine or other programmable devices to generate computer implemented processing, thus in computer or The instruction executed on other programmable devices is provided for realizing in one or more flows of the flowchart and/or block diagram one The step of function of being specified in a box or multiple boxes.
Those of ordinary skill in the art will appreciate that realizing all or part of the process in above-described embodiment method, being can be with Relevant hardware is instructed to complete by computer program, the program can be stored in a computer-readable storage medium In, the program is when being executed, it may include such as the process of the embodiment of above-mentioned each method.Wherein, the storage medium can be magnetic Dish, CD, read-only memory (Read-Only Memory, ROM) or random access memory (Random AccessMemory, RAM) etc..
Although above-mentioned be described in conjunction with specific embodiment of the attached drawing to the disclosure, model not is protected to the disclosure The limitation enclosed, those skilled in the art should understand that, on the basis of the technical solution of the disclosure, those skilled in the art are not Need to make the creative labor the various modifications or changes that can be made still within the protection scope of the disclosure.

Claims (9)

1. a kind of data processing system applied to assembled electric design, which is characterized in that including client and server end;Institute State server end, comprising:
Authority management module is used to configure corresponding authority for different role;
Task allocating module is used to receive the task distribution order with task distribution permission user, carries out to project task Distribution, forming project subtask and being sent to accordingly there is task to receive permission user;
Project tracking module is used for tracking project task, according to current tracking time point and the plan of project task preset time And subtask deadline point compares, and generates project task current schedules result;
Item file memory module, is used to be formed by file during to finished item task and carries out according to Uniform Name Storage, and classification storage is carried out according to disparity items.
2. a kind of data processing system applied to assembled electric design as described in claim 1, which is characterized in that described In authority management module, role includes design portion manager, electrical responsible person, metal plate responsible person, Electric Designer and sheet metal designing Member;Design portion manager, electrical responsible person and metal plate responsible person have the permission of project task distribution;Electric Designer and metal plate are set Meter person only has the permission of reception project subtask.
3. a kind of data processing system applied to assembled electric design as described in claim 1, which is characterized in that described In authority management module, classification priority assignation is carried out to the file for being stored in item file memory module, personnel at different levels is specified and reads Shelves range and data downloading and browse right, and automatically record the operation note of all pairs of files.
4. a kind of data processing system applied to assembled electric design as described in claim 1, which is characterized in that described In item file memory module, according to the affiliated stage-project task title-project subtask of affiliated project name-project task Title-self-defined title is named file.
5. a kind of data processing system applied to assembled electric design as described in claim 1, which is characterized in that the clothes Business device end, further includes:
Task reminders module is used to remind the timely processing item subtask of the user of reception project subtask.
6. a kind of data processing system applied to assembled electric design as described in claim 1, which is characterized in that the clothes Business device end, further includes:
Performance programming count module is used to be calculated automatically accordingly according to completion efficiency situation of each role to project task Performance.
7. a kind of data processing system applied to assembled electric design as claimed in claim 6, which is characterized in that described In performance programming count module, performance=a* project task of each role completes time+b* project task used and completes matter Amount scoring;Wherein, a and b is constant coefficient.
8. a kind of data processing system applied to assembled electric design as described in claim 1, which is characterized in that the clothes Business device end, further includes:
CAD intelligence tool packet memory module, is used to store the CAD intelligence tool of mating exploitation, in order to assembled electric design Calling in the process.
9. a kind of data processing system applied to assembled electric design as claimed in claim 8, which is characterized in that described to match Cover the CAD intelligence tool of exploitation, comprising:
Standard drawing confines justice, is inserted into picture frame, is automatically filled in title block information, batch updating title block, tears figure open automatically, read title block automatically Information, drawing compare, the conversion of drawing format, automatically generate list of drawings, printing automatic archiving, printing bar code drawing filing and Version management and CAD electronic signature.
CN201811592151.5A 2018-12-25 2018-12-25 A kind of data processing system applied to assembled electric design Pending CN109767083A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811592151.5A CN109767083A (en) 2018-12-25 2018-12-25 A kind of data processing system applied to assembled electric design

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811592151.5A CN109767083A (en) 2018-12-25 2018-12-25 A kind of data processing system applied to assembled electric design

Publications (1)

Publication Number Publication Date
CN109767083A true CN109767083A (en) 2019-05-17

Family

ID=66451608

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811592151.5A Pending CN109767083A (en) 2018-12-25 2018-12-25 A kind of data processing system applied to assembled electric design

Country Status (1)

Country Link
CN (1) CN109767083A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110222402A (en) * 2019-05-30 2019-09-10 中国科学院自动化研究所 Electrical design system and method
CN113570220A (en) * 2021-07-14 2021-10-29 深圳市创茶网络科技有限公司 Task management method and device, computer equipment and storage medium

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1741046A (en) * 2004-08-27 2006-03-01 鸿富锦精密工业(深圳)有限公司 Sheet metal component Engineering Design Management System and method
CN105260858A (en) * 2015-11-16 2016-01-20 苏州天地微易智能科技有限公司 Oa intelligent office system and management method thereof
CN106228338A (en) * 2016-07-15 2016-12-14 广东中网电力有限公司 A kind of distribution engineering intelligentized design integrated service system and using method

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1741046A (en) * 2004-08-27 2006-03-01 鸿富锦精密工业(深圳)有限公司 Sheet metal component Engineering Design Management System and method
CN105260858A (en) * 2015-11-16 2016-01-20 苏州天地微易智能科技有限公司 Oa intelligent office system and management method thereof
CN106228338A (en) * 2016-07-15 2016-12-14 广东中网电力有限公司 A kind of distribution engineering intelligentized design integrated service system and using method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110222402A (en) * 2019-05-30 2019-09-10 中国科学院自动化研究所 Electrical design system and method
CN110222402B (en) * 2019-05-30 2021-05-11 中国科学院自动化研究所 Electrical design system and method
CN113570220A (en) * 2021-07-14 2021-10-29 深圳市创茶网络科技有限公司 Task management method and device, computer equipment and storage medium
CN113570220B (en) * 2021-07-14 2024-01-12 深圳市创茶网络科技有限公司 Task management method, device, computer equipment and storage medium

Similar Documents

Publication Publication Date Title
CN108090225B (en) Database instance running method, device and system and computer readable storage medium
CN107832901A (en) Method for allocating tasks, device, terminal device and storage medium
CN108170655A (en) Production method, device, terminal device and the storage medium of Visual Report Forms
CN110399420A (en) A kind of deriving method, electronic equipment and the medium of configurableization Excel format
CN110298539A (en) Task data processing method, device, computer equipment and storage medium
CN105069134A (en) Method for automatically collecting Oracle statistical information
CN104471595A (en) Workflow management device and workflow management method
CN103701934A (en) Resource optimal scheduling method and virtual machine host machine optimal selection method
CN107657051A (en) A kind of generation method of picture tag, terminal device and storage medium
CN103327124A (en) File synchronization method, file synchronization method device, client, server side and equipment
CN109767083A (en) A kind of data processing system applied to assembled electric design
CN110490761A (en) A kind of power grid distribution net equipment account data model modelling approach
CN110019437A (en) A kind of method and system exporting data
CN108011764A (en) A kind of method for predicting more cloud platform storage resource increments
JP5681456B2 (en) Method, system and computer program for integrated volume management workflow (integrated volume management workflow)
CN109242298A (en) Work order distribution method and device during a kind of Intelligent worker assigning
CN108388753A (en) A kind of design method, device, system and the storage medium of the wiring of SIS cabinets
CN106250467A (en) A kind of method and device realizing dynamically extracting index
CN110389817A (en) Dispatching method, device and the computer program product of cloudy system
CN109325615A (en) A kind of Intelligent worker assigning method and device
CN108171481A (en) Intellectual property business management system and method
Hu Information lifecycle modeling framework for construction project lifecycle management
CN117196530A (en) Digital intelligent scheduling method and system for software project set and human resource pool
CN107247715A (en) The synchronous method of WMS systems and ERP system
CN103366258A (en) Method for evaluating indexes of hydroelectric production management system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination