CN106228338A - A kind of distribution engineering intelligentized design integrated service system and using method - Google Patents

A kind of distribution engineering intelligentized design integrated service system and using method Download PDF

Info

Publication number
CN106228338A
CN106228338A CN201610564811.3A CN201610564811A CN106228338A CN 106228338 A CN106228338 A CN 106228338A CN 201610564811 A CN201610564811 A CN 201610564811A CN 106228338 A CN106228338 A CN 106228338A
Authority
CN
China
Prior art keywords
design
module
investor
management
engineering
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610564811.3A
Other languages
Chinese (zh)
Other versions
CN106228338B (en
Inventor
柯峰
柯永达
梁哲铭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Power Grid Co Ltd
Original Assignee
Guangdong Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Power Grid Co Ltd filed Critical Guangdong Power Grid Co Ltd
Priority to CN201610564811.3A priority Critical patent/CN106228338B/en
Publication of CN106228338A publication Critical patent/CN106228338A/en
Application granted granted Critical
Publication of CN106228338B publication Critical patent/CN106228338B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • Economics (AREA)
  • Theoretical Computer Science (AREA)
  • Health & Medical Sciences (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Marketing (AREA)
  • General Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • Public Health (AREA)
  • Primary Health Care (AREA)
  • General Health & Medical Sciences (AREA)
  • Data Mining & Analysis (AREA)
  • Water Supply & Treatment (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention relates to a kind of distribution engineering intelligentized design integrated service system and using method, including client, platform service unit, Database Unit and subscriber unit;Client is connected with platform service unit by network;Database Unit and platform service unit are positioned at cloud server end, by accurately calling the various modular design modules on Cloud Server, intelligence generates design drawing, output material information table simultaneously, the distribution engineering intelligentized design integrated service system and the using method that use said structure have the work efficiency improving power engineering design, reduce the mistake on design drawing, realize each designer and can pass through collaborative design, improve the work efficiency of designer, increase user containing design side simultaneously, the communication that construction party etc. are the most errorless with the information of engineering relevant party, raising processes speed and the efficiency of engineering links problem, save time cost, to guarantee construction quality and progress, guarantee the high level of management.

Description

A kind of distribution engineering intelligentized design integrated service system and using method
Technical field
The invention belongs to distribution design service technology field, particularly relate to a kind of in 10kV typical distribution engineering application Distribution engineering intelligentized design integrated service system and using method.
Background technology
Country's electric power system and power distribution system network are the most complicated, and the design of power engineering seems more and more important.At present, Power engineering class design field, it is achieved the intelligent design solution of power engineering design field, is all common uniprocessor version Software for editing system, in designer's work, is not easily accomplished a point rights management so that different location in early stage design process Designer be difficult to work in coordination with the design of large project, in mid-term design process, be difficult to the change according to external environment condition to phase Data and the design document answered are changed, and easily cause module release inconsistent, can cause various potential problem.Cause whole Individual design imperfection, the Scalable Performance simultaneously making system is poor, affects the sustainable operation of system.
Cloud platform technology is as a kind of new network operational pattern, it is possible to carry to various network applications low-cost high-efficiency For calculating, storage, network, the resource-sharing of software and service, it is the new of Distributed Calculation, parallel computation and grid computing development In the stage, become one of important trend of computer science development.Intelligence is designed by " cloud platform " technique construction power engineering System can be changed can integrate all kinds of energy, technology, organizational environment etc. and be integrated, promote efficiency communication for information and knowledge sharing, carry The reusability of high design and efficiency, be favorably improved the productivity ratio of big Project design.
Distribution engineering is one needs investor, design side, embodiment party etc. in many ways to coordinate the large-engineering that just can complete, from work Journey item purpose starts to the communication of completion intermediate demand each side, nowadays goes back neither one and is provided about the ditch of distribution engineering each side Logical design platform.
Summary of the invention
It is an object of the invention to solve prior art distribution design can not standardize, procedure, around distribution engineering item The problem of the intercourse platform that purpose each side neither one is unimpeded, and provide reinforcement Standardized Design, contribute to realizing collaborative design, The reusability of design can also be improved simultaneously, promote a kind of distribution engineering intelligentized design of the work efficiency of power engineering design Integrated service system and using method.
The technical solution adopted in the present invention is:
A kind of distribution engineering intelligentized design integrated service system, including platform service unit, Database Unit, subscriber unit with And client;
Described client is connected with platform service unit by network, is data-interface interactive between client and system;
Described Database Unit provides data support for described platform service unit, is positioned at cloud server end, and storage is through processing Modular design file, the characteristics of the most various types of electrical equipments, store simultaneously also have design drawing file And the relevant information of drawing is stored by tables of data;
Described platform service unit, is positioned at cloud server end, and the process of the information for being inputted subscriber unit, including authority Management module, Design Treatment module, drawing operation module;
Described subscriber unit, refers to the role relation of system, including the side's of design module, investor's module, construction party module;
Described authority management module, for arranging different database-access rights to each side's user identity;
Described Design Treatment module, for the data parameters according to the input of design side, drives drawing operation module to do corresponding dynamic Make;
Described drawing operation module, is connected with the physical layer interface of CAD design software, according to the instruction of Design Treatment module at CAD Middle establishment drawing system installation diagram, it is possible to the parameter extracted in data base is filled out drawing relevant position, and exports material Table;
Described investor's module, the model works of browsing Design side, on-line selection design side, management after investor logs in Side, construction party and supply of equipment side, and place an order, the whole process of supervision project progress;
Described design side module, is used for after the side of design logs in by Design Treatment module Design Works;
Described construction party module, for receiving the order of owner, constructs according to the design that design side provides, and in good time Update construction speed;
Improving further, described client includes mobile phone A PP, web page windows or computer client.
Improving further, described subscriber unit also includes electricity consumption side's module, management side's module and supply of equipment and materials side Module;
Described management side module, for Project Surveillance as the communication bridge between investor and supplier, design side, construction party Beam, supervises projects progress, processes problem in time;
Described electricity consumption side module, follows the tracks of project process, proposes conductive suggestion for electricity consumption side;
Described supply of equipment and materials quotient module block, by processing owner's order after supplier logs in, safeguards it simultaneously Brand article information.
The using method of a kind of distribution engineering intelligentized design integrated service system as above, including the use of the side of design Method, investor's using method, construction party using method, electricity consumption side's using method, management side's using method and equipment and materials Supplier's using method;
Described design side using method following steps:
Step 1), designer by design side's module log in client, authority management module is executed in back designer's distribution design The authority of work figure, after entrance system, designer inputs relevant parameter according to the practical situation of supply project;
Step 2), Design Treatment module obtaining step 1 designer input relevant parameter after, processing module obtains these data After, respectively each supplemental characteristic judged and classify, then according to the drawing control table inquiry being sorted in Database Unit To suitable drawing masterplate, then go out this drawing from data base call;
Step 3), processing module the specifying information of drawing is analyzed, show that drawing processing instructs, send an instruction to drawing Operation module;
Step 4), drawing operation module performs the instruction in step 3 and drawing completes processing, if select output material list simultaneously If, system can automatically open up an electrical form, and fills in the relevant specifications parameter of respective material inside;
Described investor's using method is: after investor logs into system by client, authority management module is according to investment Side's corresponding authority of module assignment is to investor, and investor may browse through the historical work of design side, browses construction party, management side With whole data of supply of equipment and materials business, and select place an order;
Described construction party using method is: construction party is by after client login system, and placing an order according to investor, from design side Obtain project drawing at module, and in real time project progress is updated in system;
Described electricity consumption side using method is: after login system, browses engineering situation and construction drawing, and after combining and putting into operation in the future Run the suggestion needing to propose to rationalize;
Described management side using method is:
1), management side personnel be responsible for the supervision of construction quality and the examination of line quality at the construction field (site), log in management module and exist Line is linked up with each side stage by stage;
2), progress and relevant issues are fed back at any time with investor.
Described supply of equipment and materials side using method is:
1), after supplier logs in supplier's module, it is managed its merchandise news managed safeguarding;
2), after supplier receives order prompting, platform is checked sequence information, and links up with investor and delivery.
The beneficial effects of the present invention is:
1. system can meet the drawing of practical engineering application by Intelligent generation according to the input of parameter, contributes to the specification of design Change, improve design efficiency;
2. the present invention is to provide an interaction platform, to the various problems run in engineering project around each side of distribution engineering Express delivery can solve, improve construction quality, speed up the work, cost-effective;
3. server is moved to cloud platform, it is possible to integrate all kinds of energy, technology, organizational environment etc. and be integrated, promote efficiency information Exchange and knowledge sharing, improve reusability and the efficiency of design, be favorably improved the productivity ratio of big Project design;
4. client uses mobile phone A PP, web page windows and the form of computer client, user-friendly;
Accompanying drawing explanation
The functional module structure of a kind of distribution engineering intelligentized design integrated service system that Fig. 1 provides for the present invention Figure.
Detailed description of the invention
The invention will be further described with specific embodiment below in conjunction with the accompanying drawings.
Embodiment, a kind of distribution engineering intelligentized design integrated service system, including platform service unit, data base is single Unit, subscriber unit and client;
Described client is connected with platform service unit by network, is data-interface interactive between user and system, described Client includes mobile phone A PP, web page windows or computer client;
Described Database Unit provides data support for described platform service unit, is positioned at cloud server end, and storage is through processing Modular design file, the characteristics of the most various types of electrical equipments, store simultaneously also have design drawing file And the relevant information of drawing is stored by tables of data;Tables of data in data base is largely divided into two parts, a part It is drawing information table, the process of drawing information and calling for convenience, it is achieved functional independence, drawing information table is divided into three sons Table, including drawing control table, drawing coordinate table, drawing material quantity table.Another part is electrical equipment information table, its Include: switch cubicle table, transformator table, current transformer table, voltage transformer table, cable meter, bus table.
Described platform service unit, is positioned at cloud server end, the process of the information for being inputted subscriber unit, including Authority management module, Design Treatment module, drawing operation module;
Described subscriber unit, refers to the role relation of system, including the side's of design module, investor's module, construction party module, electricity side Module, management side's module and supply of equipment and materials side's module;
Described authority management module, for arranging different database-access rights to each side's user identity;
Described Design Treatment module, for the data parameters according to the input of design side, drives drawing operation module to do corresponding dynamic Make;Described drawing operation module, is connected with the physical layer interface of CAD design software, according to the instruction of Design Treatment module in CAD Create and drawing system installation diagram, it is possible to the parameter extracted in data base is filled out drawing relevant position, and exports material list;
Described investor's module, the model works of browsing Design side, on-line selection design side, management after investor logs in Side, construction party and supply of equipment side, and place an order, the whole process of supervision project progress;
Described design side module, is used for after the side of design logs in by Design Treatment module Design Works;
Described construction party module, for receiving the order of owner, constructs according to the design that design side provides, and in good time Update construction speed;
Described management side module, for Project Surveillance as the communication bridge between investor and supplier, design side, construction party Beam, supervises projects progress, processes problem in time;
Described electricity consumption side using method is: after login system, browses engineering situation and construction drawing, and after combining and putting into operation in the future Run the suggestion needing to propose to rationalize;
Described supply of equipment and materials quotient module block, by processing owner's order after supplier logs in, safeguards it simultaneously Brand article information.
The using method of a kind of distribution engineering intelligentized design integrated service system as above, including the use of the side of design Method, investor's using method, construction party using method, electricity consumption side's using method, management side's using method and equipment and materials Supplier's using method;
Described design side using method following steps:
Step 1), designer by design side's module log in client, authority management module is executed in back designer's distribution design The authority of work figure, after entrance system, designer inputs relevant parameter according to the practical situation of supply project;Relevant parameter includes whole The load level of individual supply project, the required high tension loop number divided according to designer, in the most each high tension loop Calculated charge and electric current etc.;
Step 2), Design Treatment module obtaining step 1 designer input relevant parameter after, processing module obtains these data After, respectively each supplemental characteristic judged and classify, then according to the drawing control table inquiry being sorted in Database Unit To suitable drawing masterplate, then go out this drawing from data base call;Drawing masterplate is to set drawing through the allusion quotation of processed, inner Face switch cubicle model specification, current transformer, place capacity/calculating current, the model position corresponding with data such as specifications of wire It is empty for putting, in addition it is also necessary to input through drawing operation module again;
Step 3), Design Treatment module the specifying information of drawing is analyzed, show that drawing processing instructs, send an instruction to Drawing operation module;
Step 4), drawing operation module performs the instruction in step 3 and drawing completes processing, if select output material list simultaneously If, system can automatically open up an electrical form, and fills in the relevant specifications parameter of respective material inside;
Drawing operation module during executing instruction operations, first creates a drawing in CAD in CAD, and set font pattern, connects Access data base and show that the allusion quotation selected by Design Treatment module sets the address at drawing place, be then loaded into drawing, then from design The instruction of processing module obtains the required data of output on drawing, and the position of output, drawing completes output, this Sample just completes to set an allusion quotation operation of drawing, and drawing operation module, by obtaining the information above operational order, then performs Operation just can generate drawing in CAD and store in data base.
Derived materials information table is the important ring in Electric Design, and material information table summarises design engineering and used assorted Material, has used how many.Material information table is the basis of Budgetary Estimates, be also user implement design a Guide Book.System The each allusion quotation of data-base recording of uniting sets kind and the number of the required electrical equipment of drawing, is processing it through core algorithm After, the specification information of each electrical equipment all has stored among data base.Generation material is have selected in parameter inputting interface Material table, in program, this module will be activated, while generating drawing in CAD software, one electronic watch of automatic spring Lattice, this form is exactly so-called material information table.
Material information table contains the title of each electrical equipment, model, specification, quantity.Wherein electrical equipment has: open Close cabinet, vacuum circuit breaker, current transformer, voltage transformer, high-tension fuse, transformator, bus, cable etc..Each of which The identity element planting different size is shown separately.
The material information table of output needs to be successfully connected the spreadsheet competence exertion effects such as excel, needs before proceeding To first have in a program electrical form is defined, just start to connect spreadsheet, after being successfully connected just after completing definition The component specification parameter that can be given according to core algorithm, and electrical form being entered with scale of modular design drawing in data base Row input, obtains the material information table of output;
Described investor's using method is: after investor logs into system by client, authority management module is according to investment Side's corresponding authority of module assignment is to investor, and investor may browse through the historical work of design side, browses construction party, management side With whole data of supply of equipment and materials business, and select place an order;
Described construction party using method is: construction party is by after client login system, and placing an order according to investor, from design side Obtain project drawing at module, and in real time project progress is updated in system;
Described electricity consumption side using method is: after login system, browse project progress and construction drawing;
Described management side using method is:
1), management side personnel be responsible for the supervision of construction quality and the examination of line quality at the construction field (site), log in management module and exist Line is linked up with each side stage by stage;
2), progress and relevant issues are fed back at any time with investor.
Described supply of equipment and materials side using method is:
1), after supplier logs in supplier's module, it is managed its merchandise news managed safeguarding;
2), after supplier receives order prompting, platform is checked sequence information, and links up with investor and delivery.
By above detailed description of the invention it can be seen that a kind of distribution engineering intelligentized design that the present invention provides comprehensively takes Business system and using method have the associated materials of the design drawing needed for accurately generating engineering and engineering to improve electric power work The work efficiency of journey design, reduces the mistake on design drawing, improves the reusability of design, it is achieved each designer can be led to Crossing collaborative design, improve the work efficiency of designer, increase user simultaneously, design side exchanges with construction party information, saves Time cost advantage.

Claims (4)

1. a distribution engineering intelligentized design integrated service system, it is characterised in that include client, platform service unit, Database Unit and subscriber unit;
Described client is connected with platform service unit by network, is data-interface interactive between client and system;
Described Database Unit provides data support for described platform service unit, is positioned at cloud server end, and storage is through processing Modular design file, the characteristics of the most various types of electrical equipments, store simultaneously also have design drawing file And the relevant information of drawing is stored by tables of data;
Described platform service unit, is positioned at cloud server end, and the process of the information for being inputted user, including rights management Module, Design Treatment module, drawing operation module;
Described subscriber unit, refers to the role relation of system, including the side's of design module, investor's module, construction party module;
Described authority management module, for arranging different database-access rights to each side's user identity;
Described Design Treatment module, for the data parameters according to the input of design side, drives drawing operation module to do corresponding dynamic Make;
Described drawing operation module, is connected with the physical layer interface of CAD design software, according to the instruction of Design Treatment module at CAD Middle establishment drawing system installation diagram, it is possible to the parameter extracted in data base is filled out drawing relevant position, and exports material Table;
Described investor's module, the model works of browsing Design side, on-line selection design side, management after investor logs in Side, construction party and supply of equipment side, and place an order, the whole process of supervision project progress;
Described design side module, is used for after the side of design logs in by Design Treatment module Design Works;
Described construction party module, for receiving the order of owner, constructs according to the design that design side provides, and in good time Update construction details and progress.
A kind of distribution engineering intelligentized design integrated service system the most according to claim 1, it is characterised in that described visitor Family end includes mobile phone A PP, web page windows or computer client.
A kind of distribution engineering intelligentized design integrated service system the most according to claim 1, it is characterised in that described use Family unit also includes electricity consumption side's module, management side's module and supply of equipment and materials side's module;
Described management side module, for Project Surveillance as the communication bridge between investor and supplier, design side, construction party Beam, supervises projects progress, processes problem in time;
Described electricity consumption side module, follows the tracks of project process, proposes conductive suggestion for electricity consumption side;
Described supply of equipment and materials quotient module block, by processing owner's order after supplier logs in, safeguards it simultaneously Brand article information.
4. the distribution engineering intelligentized design integrated service system as described in any one of claim 1 to claim 3 Using method, it is characterised in that include that the side's of design using method, investor's using method, construction party using method, electricity consumption side make By method, management side's using method and supply of equipment and materials side's using method;
Described design side using method following steps:
Step 1), designer by design side's module log in client, authority management module is executed in back designer's distribution design The authority of work figure, after entrance system, designer inputs relevant parameter according to the practical situation of supply project;
Step 2), Design Treatment module obtaining step 1 designer input relevant parameter after, processing module obtains these data After, respectively each supplemental characteristic judged and classify, then according to the drawing control table inquiry being sorted in Database Unit To suitable drawing masterplate, then go out this drawing from data base call;
Step 3), processing module the specifying information of drawing is analyzed, show that drawing processing instructs, send an instruction to drawing Operation module;
Step 4), drawing operation module performs the instruction in step 3 and drawing completes processing, if select output material list simultaneously If, system can automatically open up an electrical form, and fills in the relevant specifications parameter of respective material inside;
Described investor's using method is: after investor logs into system by client, authority management module is according to investment Side's corresponding authority of module assignment is to investor, and investor may browse through the historical work of design side, browses construction party, management side With whole data of supply of equipment and materials business, and select place an order;
Described construction party using method is: construction party is by after client login system, and placing an order according to investor, from design side Obtain project drawing at module, and in real time project progress is updated in system;
Described electricity consumption side using method is: after login system, browses engineering situation and construction drawing, and after combining and putting into operation in the future Run the suggestion needing to propose to rationalize;
Described management side using method is:
1), management side personnel be responsible for the supervision of construction quality and the examination of line quality at the construction field (site), log in management module and exist Line is linked up with each side stage by stage;
2), progress and relevant issues are fed back at any time with investor;
Described supply of equipment and materials side using method is:
1), after supplier logs in supplier's module, it is managed its merchandise news managed safeguarding;
2), after supplier receives order prompting, platform is checked sequence information, and links up with investor and delivery.
CN201610564811.3A 2016-07-15 2016-07-15 A kind of distribution engineering intelligentized design integrated service system and application method Active CN106228338B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610564811.3A CN106228338B (en) 2016-07-15 2016-07-15 A kind of distribution engineering intelligentized design integrated service system and application method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610564811.3A CN106228338B (en) 2016-07-15 2016-07-15 A kind of distribution engineering intelligentized design integrated service system and application method

Publications (2)

Publication Number Publication Date
CN106228338A true CN106228338A (en) 2016-12-14
CN106228338B CN106228338B (en) 2018-03-06

Family

ID=57519207

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610564811.3A Active CN106228338B (en) 2016-07-15 2016-07-15 A kind of distribution engineering intelligentized design integrated service system and application method

Country Status (1)

Country Link
CN (1) CN106228338B (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107302568A (en) * 2017-06-06 2017-10-27 云南电网有限责任公司 A kind of live shipping and receiving operating system of the Power Material based on mobile
CN107526870A (en) * 2017-07-18 2017-12-29 巧夺天宫(深圳)科技有限公司 The design system and its design method of fire-fighting spraying pipeline
CN109118164A (en) * 2018-07-19 2019-01-01 西安昆仑工业(集团)有限责任公司 A kind of technological procedure Digitalization management system and management method
CN109117983A (en) * 2018-07-09 2019-01-01 南京邮电大学 Build method for managing resource and system, computer readable storage medium and terminal
CN109165916A (en) * 2018-08-09 2019-01-08 中国电力工程顾问集团西北电力设计院有限公司 A kind of electric operator intelligent power distribution and drawing creation method
CN109242360A (en) * 2018-10-29 2019-01-18 广东电网有限责任公司 One kind being based on Distribution Network Communication net engineering construction tracking control of full process management-control method
CN109767083A (en) * 2018-12-25 2019-05-17 山东爱普电气设备有限公司 A kind of data processing system applied to assembled electric design
CN110110307A (en) * 2019-04-19 2019-08-09 国网天津市电力公司 A kind of engineering previous information editor's shared system based on cloud
CN110244584A (en) * 2019-06-18 2019-09-17 深圳市简工智能科技有限公司 Breaker control method, apparatus, computer readable storage medium and system
CN110880096A (en) * 2019-11-20 2020-03-13 广西越知网络股份有限公司 Multi-party cooperative office system for constructional engineering
CN111260328A (en) * 2020-01-20 2020-06-09 深圳市赛易特信息技术有限公司 Gas engineering drawing generation method, intelligent terminal and storage medium

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102915488A (en) * 2012-10-26 2013-02-06 李香存 Online intelligent design system of engineering project and method of system
CN105160534A (en) * 2015-08-19 2015-12-16 河南鑫山信息科技有限公司 Home decoration network platform system and use method

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102915488A (en) * 2012-10-26 2013-02-06 李香存 Online intelligent design system of engineering project and method of system
CN105160534A (en) * 2015-08-19 2015-12-16 河南鑫山信息科技有限公司 Home decoration network platform system and use method

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107302568A (en) * 2017-06-06 2017-10-27 云南电网有限责任公司 A kind of live shipping and receiving operating system of the Power Material based on mobile
CN107526870A (en) * 2017-07-18 2017-12-29 巧夺天宫(深圳)科技有限公司 The design system and its design method of fire-fighting spraying pipeline
CN109117983A (en) * 2018-07-09 2019-01-01 南京邮电大学 Build method for managing resource and system, computer readable storage medium and terminal
CN109118164A (en) * 2018-07-19 2019-01-01 西安昆仑工业(集团)有限责任公司 A kind of technological procedure Digitalization management system and management method
CN109165916B (en) * 2018-08-09 2022-03-22 中国电力工程顾问集团西北电力设计院有限公司 Intelligent power distribution and drawing generation method for electric actuating mechanism
CN109165916A (en) * 2018-08-09 2019-01-08 中国电力工程顾问集团西北电力设计院有限公司 A kind of electric operator intelligent power distribution and drawing creation method
CN109242360A (en) * 2018-10-29 2019-01-18 广东电网有限责任公司 One kind being based on Distribution Network Communication net engineering construction tracking control of full process management-control method
CN109767083A (en) * 2018-12-25 2019-05-17 山东爱普电气设备有限公司 A kind of data processing system applied to assembled electric design
CN110110307A (en) * 2019-04-19 2019-08-09 国网天津市电力公司 A kind of engineering previous information editor's shared system based on cloud
CN110244584A (en) * 2019-06-18 2019-09-17 深圳市简工智能科技有限公司 Breaker control method, apparatus, computer readable storage medium and system
CN110244584B (en) * 2019-06-18 2020-12-01 深圳市简工智能科技有限公司 Circuit breaker control method, device, computer readable storage medium and system
CN110880096A (en) * 2019-11-20 2020-03-13 广西越知网络股份有限公司 Multi-party cooperative office system for constructional engineering
CN110880096B (en) * 2019-11-20 2023-10-31 广西越知网络股份有限公司 Multi-party collaborative office system for building engineering
CN111260328A (en) * 2020-01-20 2020-06-09 深圳市赛易特信息技术有限公司 Gas engineering drawing generation method, intelligent terminal and storage medium
CN111260328B (en) * 2020-01-20 2023-11-07 深圳市赛易特信息技术有限公司 Gas engineering drawing generation method, intelligent terminal and storage medium

Also Published As

Publication number Publication date
CN106228338B (en) 2018-03-06

Similar Documents

Publication Publication Date Title
CN106228338B (en) A kind of distribution engineering intelligentized design integrated service system and application method
CN104133953B (en) Intelligent substation secondary design system
CN102722764B (en) Integration network optimization computer-aided decision support System
CN104615617B (en) A kind of substation equipment dispatching and monitoring information processing system
CN102611199B (en) Design and configuration integrated system for intelligent substation
US10169528B2 (en) Method and device for generating engineering topology of digital substation
CN108153996B (en) Method for realizing electric wiring group cabinet by COMOS platform
CN105022874A (en) Digital simulation automatic modeling method and system for power distribution network
CN105760272B (en) Monitoring backstage business customizing method and its system based on plug-in unit
CN105447611A (en) OMS equipment transaction management and control information system supported by GID platform
CN106126528B (en) A kind of moonlet test basic information generation method based on platform model
CN101527455B (en) Interconnected electric network distributed current calculating method on the basis of alternation and iteration of current module
CN102819557B (en) Data query treating apparatus and data query disposal route
CN103927693A (en) Distribution network line loss management system
CN108520163A (en) Three-dimensional net rack method for automatic modeling based on CIM model and SVG figures
CN109146253A (en) A kind of intelligent automatic interactive operating system for making out an invoice and protecting locking
CN107844936A (en) Variation, device, terminal and the computer-readable recording medium of BOM
CN105302954A (en) Multiplayer online intelligent transformer substation design system
CN103455554A (en) Intelligent power distribution network model base system
CN103488726A (en) Method for establishing unified grid data platform based on WEB-SERVICE
CN105305619A (en) Method and device for three-remote configuration based on distribution automation
CN113642850A (en) Data fusion method and terminal for power distribution network planning
CN104243218B (en) A kind of communication of power system mode list preparation method based on more schedule constraints
CN115879742A (en) Power distribution network transformation method and system, electronic equipment and storage medium
CN104463462A (en) Power grid future state model maintenance tool

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: A comprehensive service system for intelligent design of distribution engineering and its application method

Effective date of registration: 20201112

Granted publication date: 20180306

Pledgee: Development Zone sub branch of Bank of Guangzhou Co.,Ltd.

Pledgor: GUANGDONG ZHONGWANG ELECTRIC POWER Co.,Ltd.

Registration number: Y2020980007814

PE01 Entry into force of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20211103

Granted publication date: 20180306

Pledgee: Development Zone sub branch of Bank of Guangzhou Co.,Ltd.

Pledgor: GUANGDONG ZHONGWANG ELECTRIC POWER CO.,LTD.

Registration number: Y2020980007814

PC01 Cancellation of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: A comprehensive service system for intelligent design of power distribution engineering and its application method

Effective date of registration: 20211110

Granted publication date: 20180306

Pledgee: Development Zone sub branch of Bank of Guangzhou Co.,Ltd.

Pledgor: GUANGDONG ZHONGWANG ELECTRIC POWER CO.,LTD.

Registration number: Y2021980012195

PE01 Entry into force of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20220721

Granted publication date: 20180306

Pledgee: Development Zone sub branch of Bank of Guangzhou Co.,Ltd.

Pledgor: GUANGDONG ZHONGWANG ELECTRIC POWER CO.,LTD.

Registration number: Y2021980012195

PC01 Cancellation of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: A comprehensive service system for intelligent design of power distribution engineering and its use method

Effective date of registration: 20220817

Granted publication date: 20180306

Pledgee: Bank of China Limited Guangzhou Pearl River Branch

Pledgor: GUANGDONG ZHONGWANG ELECTRIC POWER CO.,LTD.

Registration number: Y2022980012821

PE01 Entry into force of the registration of the contract for pledge of patent right