CN106223566A - A kind of construction method for indoor light blockwork stone material dry suspending - Google Patents

A kind of construction method for indoor light blockwork stone material dry suspending Download PDF

Info

Publication number
CN106223566A
CN106223566A CN201610554423.7A CN201610554423A CN106223566A CN 106223566 A CN106223566 A CN 106223566A CN 201610554423 A CN201610554423 A CN 201610554423A CN 106223566 A CN106223566 A CN 106223566A
Authority
CN
China
Prior art keywords
stone material
rearmounted
construction method
blockwork
cement mortar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610554423.7A
Other languages
Chinese (zh)
Inventor
叶家豪
方季屏
夏鸿云
李强
王世丹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHENZHEN QIXIN CONSTRUCTION GROUP CO Ltd
Original Assignee
SHENZHEN QIXIN CONSTRUCTION GROUP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHENZHEN QIXIN CONSTRUCTION GROUP CO Ltd filed Critical SHENZHEN QIXIN CONSTRUCTION GROUP CO Ltd
Priority to CN201610554423.7A priority Critical patent/CN106223566A/en
Publication of CN106223566A publication Critical patent/CN106223566A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F13/00Coverings or linings, e.g. for walls or ceilings
    • E04F13/07Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
    • E04F13/08Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements
    • E04F13/0801Separate fastening elements
    • E04F13/0832Separate fastening elements without load-supporting elongated furring elements between wall and covering elements
    • E04F13/0833Separate fastening elements without load-supporting elongated furring elements between wall and covering elements not adjustable
    • E04F13/0835Separate fastening elements without load-supporting elongated furring elements between wall and covering elements not adjustable the fastening elements extending into the back side of the covering elements

Abstract

The present invention describes a kind of construction method for indoor light blockwork stone material dry suspending, it is applied to the stone material dry suspending technical field of indoor wall basic unit, its innovative point is, working procedure by body of wall rearmounted mortar embedded part, rearmounted hole is i.e. set on body of wall and in hole, pours expansive cement mortar, again full thread screw portion is embedded in expansive cement mortar, by increasing the tension area of body of wall and then improving tensile strength, meet the pulling test strength of rearmounted mortar embedded part, the most again stone material is anchored with body of wall by rearmounted mortar embedded part;Present invention saves substantial amounts of material and artificial, reduce cost, suitably add the clear space of indoor, and energy-conserving and environment-protective.

Description

A kind of construction method for indoor light blockwork stone material dry suspending
Technical field
The present invention relates to the stone material dry suspending decorative cover of indoor wall basic unit, particularly relate to the stone of a kind of indoor light blockwork The construction method that material is cladding.
Background technology
At present, Decorative Building Stone mainly includes lithotome and artificial stone, and wherein lithotome mainly includes Dali Stone and granite, especially natural marble enjoy the good reputation of " building epic ", have luxurious air, splendid and tall and big sky Between visual effect, therefore, lithotome is as indoor wall decorative cover, and its utilization is more and more extensive.
Nowadays, the common mounting means in indoor wall stone decoration face has wet combining and cladding two kinds of methods, wherein, cladding with Wet combining is compared, and can install big specification, heavy weight stone material, and overcome the drawbacks such as the easy accumulation of salt in the surface soil of wet combining, variable color and hollowing, carry The quality of high stone decoration and effect.In general, the decorative effect of stone material dry suspending is better than stone material wet combining.
Stone material is fixed on body of wall by traditional indoor stone material dry suspending by expansion bolt is fixing, big along with skyscraper Power develops, and frame type house has become as building main flow structure, and steam pressure concrete light blockwork commonly uses in China, If this light block wall uses traditional anchorage style, owing to light block tensile strength is low, body of wall and expanding screw bolt Contacting surface is amassed little, it is clear that its withdrawal resistance can not bear stone material own wt;Although, lightgage steel joist frame and Zhou Bianliang can be passed through The mode of post anchoring solves, but owing to span is big, substantially increases the cross dimensions of lightgage steel joist, causes material with artificial A large amount of wastes and the prolongations of duration.Therefore prior art existing defects, is further improved.
Goal of the invention
The present invention describes a kind of construction method for indoor light blockwork stone material dry suspending, uses at light block wall Arranging rearmounted mortar embedded part on body, the tensile strength increasing body of wall strengthens the pulling test strength of rearmounted mortar embedded part, last stone material Anchored with body of wall by rearmounted mortar embedded part again, and without anchoring on peripheral structure beam column, thus saved substantial amounts of material Manually, cost is reduced, it is also possible to suitably increase indoor clear space, energy-conserving and environment-protective.
Summary of the invention
A kind of construction method for indoor light blockwork stone material dry suspending is the invention provides in order to solve the problems referred to above, Comprise the following steps:
Step 1, basal plane process, and remove the attachment on body of wall basal plane, laitance, dust etc.;
Step 2, according to construction drawing, determine boring, built-in fitting, corner brace, suspension member, the position of stone material stone material successively, and with Cross hairs mode is identified on basal plane;
Step 3, rearmounted mortar embedded part working procedure, described operation comprises the steps,
Step 31, rearmounted hole drilling operation, use drill hammer to bore 32mm, deep 100mm on metope pre-embedded part anchor point Rearmounted hole;
Step 32, the cleaning of rearmounted hole and drying process, after completing rearmounted hole drilling operation described in described step 31, use inflator Remove break flour in described rearmounted hole, and keep duct to be dried;
Step 33, full thread screw mandrel fixed work order, after completing the cleaning of step 32 rearmounted hole and drying process, in rearmounted hole The zinc-plated full thread screw mandrel of the most embedding 4.8 level length 150mm diameter 6mm after pouring M20 expansive cement mortar, and press stone material Node location indwelling screw mandrel protruded length;
Step 34, expansive cement mortar intensity maintenance operation, complete described step 33 full thread zinc-plated screw mandrel anchoring operation After, the expansive cement mortar poured is carried out water seasoning until intensity reaches 80%;
Step 4, installation corner brace operation, use the nut supporting with described zinc-plated full thread screw mandrel that corner brace is fixed on body of wall On basal plane;
Step 5, mounting suspension member operation, after completing to install corner brace operation described in step 4, pass through supporting by suspension member and corner brace Stainless steel bolt connects;
Step 6, installation stone material operation, comprise the steps:
Step 61, stone material are slotted, and stone material upper and lower end parts position to be installed is respectively opened two slotted eyes, and is cleaned by slotted eye aggregate chips Totally;
The examination of step 62, stone material is spelled, and carries out pre-splicing according to stone material typesetting processing numbering and the on-the-spot snap the line location drawing, and numbers standby With;
Step 63, stone material are installed, to stone material end slotted eye injection ring oxygen adhesive, by suspension member insertion groove described in step 5 In hole, and utilize the adjustment hole in suspension member and corner brace to carry out up and down, front and back with left and right three-dimensional adjust, it is ensured that the flatness of stone material and After perpendicularity meets the requirements, corner brace and the zinc-plated screw mandrel of full thread are tightened and spot welding, suspension member and corner brace are tightened and spot welding, will overflow The adhesive gone out is cleaned out;
Preferably, described working procedure also includes step 7, wipes tailor's sequence, by design the caulking material kind of requirement, color Carrying out filleting with form, the sizing material of spilling is wiped clean by limit panel, makes that gap is closely knit, width consistent and uniform is straight, the most whole Together, color coordination.
Preferably, described construction method also includes step 8, the grinding and buffing operation to dry-hang stone.
Preferably, described expansive cement mortar is M20 expansive cement mortar.
Preferably, described expansive cement mortar includes that common M20 cement mortar is mixed 10%UEA extender and constituted.
Preferably, described suspension member is T-shaped plugboard suspender or dish suspension member.
Preferably, described slotted eye length >=100 in step 61, width is 6mm, degree of depth 15mm, and notch
Polish chamfering at 45 °.
Beneficial effect:
The present invention describes a kind of construction method for indoor light blockwork stone material dry suspending, uses at light block wall Rearmounted mortar embedded part is set on body, i.e. by holing on light block wall, and pours expansive cement mortar, add body of wall certainly The tensile strength of body strengthens the pulling test strength of rearmounted mortar embedded part, is used for realizing stone material rearmounted mortar embedded part and carries out anchor with body of wall Gu, and without anchoring on peripheral structure beam column by lightgage steel joist frame, thus saved substantial amounts of material and artificial, reduce Cost, simultaneously, it is also possible to suitably increase indoor clear space, energy-conserving and environment-protective.
Accompanying drawing explanation
Fig. 1 present invention completes the structural representation after rearmounted mortar embedded part operation;
Fig. 2 is corner brace structural representation in Fig. 1;
Fig. 3 is hanger structure schematic diagram in Fig. 1;
Fig. 4 is stone material slotted hole structure part-structure schematic diagram in Fig. 1.
Fig. 5 is 7A part-structure schematic diagram in Fig. 1
Detailed description of the invention
The present invention is described in further details by 1-Fig. 5 and detailed description of the invention below in conjunction with the accompanying drawings.
A kind of construction method for indoor light blockwork stone material dry suspending is the invention provides in order to solve the problems referred to above, Comprise the following steps:
Step 1, basal plane process, and remove the attachment on body of wall basal plane 1, laitance, dust etc.;
Step 2, according to construction drawing, determine boring, built-in fitting, corner brace, suspension member, the position of stone material stone material successively, and with Cross hairs mode is identified on basal plane;
Step 3, rearmounted mortar embedded part working procedure, described operation comprises the steps,
Step 31, rearmounted hole drilling operation, use drill hammer to bore 32mm, deep 100mm on metope pre-embedded part anchor point Rearmounted hole 2;
Step 32, the cleaning of rearmounted hole and drying process, after completing rearmounted hole drilling operation described in described step 31, use inflator Remove break flour in described rearmounted hole, and keep duct to be dried;
Step 33, full thread screw mandrel fixed work order, after completing the cleaning of step 32 rearmounted hole and drying process, in rearmounted hole The zinc-plated full thread screw mandrel 3 of the most embedding 4.8 level length 150mm diameter 6mm after pouring M20 expansive cement mortar, and press stone Material node location indwelling screw mandrel protruded length;
Step 34, expansive cement mortar intensity maintenance operation, complete described step 33 full thread zinc-plated screw mandrel anchoring operation After, the expansive cement mortar poured is carried out water seasoning until intensity reaches 80%;
Step 4, installation corner brace operation, use the nut supporting with described zinc-plated full thread screw mandrel that corner brace 4 is fixed on wall On body basal plane;
Step 5, mounting suspension member operation, after completing to install corner brace operation described in step 4, pass through supporting by suspension member and corner brace Stainless steel bolt connects;
Step 6, installation stone material operation, comprise the steps:
Step 61, stone material 6 are slotted, and stone material upper and lower end parts position to be installed is respectively opened two slotted eyes 61, and by slotted eye aggregate chips Clean up;
The examination of step 62, stone material is spelled, and carries out pre-splicing according to stone material typesetting processing numbering and the on-the-spot snap the line location drawing, and numbers standby With;
Step 63, stone material are installed, to stone material end slotted eye injection ring oxygen adhesive, by the insertion groove of suspension member 5 described in step 5 In hole, and utilize the adjustment hole in suspension member and corner brace to carry out up and down, front and back adjust with left and right three-dimensional, it is ensured that the flatness of stone material 6 After meeting the requirements with perpendicularity, corner brace and the zinc-plated screw mandrel of full thread are tightened and spot welding, suspension member and corner brace are tightened and spot welding, will The adhesive overflowed is cleaned out;
Step 7, wiping seam, first embed sticking plaster 72 in gap 7, be then injected into caulking agent 71, by the filleting of design requirement Description of materials, color and form carry out filleting, and the sizing material of spilling is wiped clean by limit panel, make that gap 7 is closely knit, width consistent, all Even straight, neatly and orderly, color coordination.
Specifically, in the present embodiment, step 3, rearmounted mortar embedded part fixed work order is critical process, including following sub-work Sequence i.e. step 31 rearmounted hole drilling operation, use drill hammer bore on metope pre-embedded part anchor point 32mm, deep 100mm rearmounted Hole, the cleaning of step 32 rearmounted hole and drying process are after completing rearmounted hole drilling operation described in described step 31 step, clear with inflator Except break flour in described rearmounted hole, and duct is kept to be dried;And step 33, full thread screw mandrel fixed work order, after completing step 32 After putting hole cleaning and drying process, embedment length 150mm diameter 6mm placed in the middle again after pouring expansive cement mortar in rearmounted hole Zinc-plated full thread screw mandrel, and press stone material node location reservation screw mandrel protruded length;Its role is to, overcome light block wall Stretching resistance is inadequate, and then makes the hypodynamic technological deficiency of connector resistance to plucking being anchored on this light block body of wall.By Rearmounted mortar embedded part operation is used, it is achieved that be applicable to the stone material dry suspending of this body of wall on this light block body of wall.
Further, described expansive cement mortar is M20 expansive cement mortar.
Further, described expansive cement mortar includes that common M20 cement mortar is mixed 10%UEA extender and constituted.
Further, described suspension member 5 is T-shaped plugboard suspender or dish suspension member.
Further, described slotted eye length >=100 in step 61, width is that 6mm, degree of depth 15mm, and notch are polished into 45 ° of chamferings.
Further, described construction method also includes step 8, the grinding and buffing operation to dry-hang stone.
Shown in sum up, technical scheme action principle is the working procedure by body of wall rearmounted mortar embedded part, Rearmounted hole is i.e. set on base course wall and in hole, pours expansive cement mortar, and then full thread screw portion is embedded in expansion In cement mortar, for increasing the tensile strength of body of wall to strengthen the pulling test strength of rearmounted mortar embedded part, it is achieved stone material and lightweight The anchoring of blockwork light block wall, present invention saves substantial amounts of material and artificial, reduces cost, suitably increases indoor clean Space, energy-conserving and environment-protective.
As known by the technical knowledge, the present invention can be by other essence without departing from its spirit or the embodiment party of essential feature Case realizes.Therefore, embodiment disclosed above, for each side, all it is merely illustrative, is not only.Institute The change within the scope of the present invention or within being equal to the scope of the present invention is had all to be included in the invention.

Claims (7)

1. the construction method for indoor light blockwork stone material dry suspending, it is characterised in that: comprise the following steps,
Step 1, basal plane process, and remove the attachment on body of wall basal plane, laitance, dust etc.;
Step 2, according to construction drawing, determine boring, built-in fitting, corner brace, suspension member, the position of stone material stone material successively, and with cross Line mode is identified on basal plane;
Step 3, rearmounted mortar embedded part working procedure, described operation comprises the steps,
Step 31, rearmounted hole drilling operation, after using drill hammer to bore 32mm, deep 100mm on metope pre-embedded part anchor point Put hole;
Step 32, the cleaning of rearmounted hole and drying process, after completing rearmounted hole drilling operation described in described step 31, remove with inflator Break flour in described rearmounted hole, and keep duct to be dried;
Step 33, full thread screw mandrel fixed work order, after completing the cleaning of step 32 rearmounted hole and drying process, pour in rearmounted hole The zinc-plated full thread screw mandrel of the most embedding 4.8 level length 150mm diameter 6mm after M20 expansive cement mortar, and press stone material node Position indwelling screw mandrel protruded length;
Step 34, expansive cement mortar intensity maintenance operation are after completing described step 33 full thread zinc-plated screw mandrel anchoring operation, right The expansive cement mortar poured carries out water seasoning until intensity reaches 80%;
Step 4, installation corner brace operation, use the nut supporting with described zinc-plated full thread screw mandrel that corner brace is fixed on body of wall basal plane On;
Step 5, mounting suspension member operation, complete to install after corner brace operation described in step 4, by suspension member and corner brace by supporting stainless Steel bolt connects;
Step 6, installation stone material operation, comprise the steps:
Step 61, stone material are slotted, and stone material upper and lower end parts position to be installed is respectively opened two slotted eyes, and is cleaned by slotted eye aggregate chips dry Only;
The examination of step 62, stone material is spelled, and carries out pre-splicing according to stone material typesetting processing numbering and the on-the-spot snap the line location drawing, and numbers standby;
Step 63, stone material are installed, and to stone material end slotted eye injection ring oxygen adhesive, are inserted by suspension member described in step 5 in slotted eye, And utilize the adjustment hole in suspension member and corner brace to carry out up and down, front and back adjust with left and right three-dimensional, it is ensured that the flatness of stone material is with vertical After degree meets the requirements, corner brace and the zinc-plated screw mandrel of full thread are tightened and spot welding, suspension member and corner brace are tightened and spot welding, by overflow Adhesive is cleaned out.
A kind of construction method for indoor light blockwork stone material dry suspending the most according to claim 1, it is characterised in that Shown construction method also includes step 7, wipes tailor's sequence, carries out by caulking material kind, color and the form of construction work of design requirement Filleting, the caulking material of spilling wiped clean by limit panel, makes that gap is closely knit, width consistent and uniform is straight, neatly and orderly, color Coordinate.
A kind of construction method for indoor light blockwork stone material dry suspending the most according to claim 1 and 2, described construction Method also includes step 8, the grinding and buffing operation to dry-hang stone.
A kind of construction method for indoor light blockwork stone material dry suspending the most according to claim 2, it is characterised in that Described expansive cement mortar is M20 expansive cement mortar.
A kind of construction method for indoor light blockwork stone material dry suspending the most according to claim 1 and 2, its feature exists In, described expansive cement mortar includes that common M20 cement mortar is mixed 10%UEA extender and constituted.
A kind of construction method for indoor light blockwork stone material dry suspending the most according to claim 1, described suspension member For T-shaped plugboard suspender or dish suspension member.
A kind of construction method for indoor light blockwork stone material dry suspending the most according to claim 1, in step 61 Described slotted eye length >=100, width is 6mm, degree of depth 15mm, and notch polishing chamfering at 45 °.
CN201610554423.7A 2016-07-13 2016-07-13 A kind of construction method for indoor light blockwork stone material dry suspending Pending CN106223566A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610554423.7A CN106223566A (en) 2016-07-13 2016-07-13 A kind of construction method for indoor light blockwork stone material dry suspending

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610554423.7A CN106223566A (en) 2016-07-13 2016-07-13 A kind of construction method for indoor light blockwork stone material dry suspending

Publications (1)

Publication Number Publication Date
CN106223566A true CN106223566A (en) 2016-12-14

Family

ID=57520619

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610554423.7A Pending CN106223566A (en) 2016-07-13 2016-07-13 A kind of construction method for indoor light blockwork stone material dry suspending

Country Status (1)

Country Link
CN (1) CN106223566A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107386568A (en) * 2017-07-29 2017-11-24 无为县鑫品石业有限公司 A kind of marble coating dry hanging construction technique
CN107842130A (en) * 2017-11-27 2018-03-27 重庆大业新型建材集团有限公司 A kind of Side fascia and main building attachment structure
CN110006178A (en) * 2019-04-01 2019-07-12 上海聚通装饰集团有限公司 Ruggedized construction and its mounting process are hidden in a kind of installation load-bearing of light weight wall
CN113585572A (en) * 2021-08-26 2021-11-02 潮峰钢构集团有限公司 Supporting system for fixing curtain wall keel by using wall-penetrating anchor rod and supporting method thereof
CN114776132A (en) * 2022-04-20 2022-07-22 中建八局第三建设有限公司 T-shaped steel plate drawknot city wall construction method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2499463Y (en) * 2001-10-16 2002-07-10 北京市第一建筑工程公司 Wind-proof anti-shock hanging piece for stone curtain wall
CN1407192A (en) * 2001-09-07 2003-04-02 郭祥山 Process for arranging decorative panels onto walls by riveting nails implanted into walls
JP2004232414A (en) * 2003-01-31 2004-08-19 Gantan Beauty Ind Co Ltd Wall structure of building and construction method therefor
CN101806134A (en) * 2010-04-29 2010-08-18 江苏嘉洋华联建筑装饰有限公司 Method for constructing blue brick-decorated wall surface
CN103669788A (en) * 2013-12-20 2014-03-26 广东省第四建筑工程公司 Paving method for polished face brick wall

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1407192A (en) * 2001-09-07 2003-04-02 郭祥山 Process for arranging decorative panels onto walls by riveting nails implanted into walls
CN2499463Y (en) * 2001-10-16 2002-07-10 北京市第一建筑工程公司 Wind-proof anti-shock hanging piece for stone curtain wall
JP2004232414A (en) * 2003-01-31 2004-08-19 Gantan Beauty Ind Co Ltd Wall structure of building and construction method therefor
CN101806134A (en) * 2010-04-29 2010-08-18 江苏嘉洋华联建筑装饰有限公司 Method for constructing blue brick-decorated wall surface
CN103669788A (en) * 2013-12-20 2014-03-26 广东省第四建筑工程公司 Paving method for polished face brick wall

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
冶金部建筑研究总院: "《地脚螺栓锚固方法》", 31 March 1983, 冶金工业出版社 *
熊维: "《建筑工程施工》", 30 September 2014, 清华大学出版社 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107386568A (en) * 2017-07-29 2017-11-24 无为县鑫品石业有限公司 A kind of marble coating dry hanging construction technique
CN107842130A (en) * 2017-11-27 2018-03-27 重庆大业新型建材集团有限公司 A kind of Side fascia and main building attachment structure
CN110006178A (en) * 2019-04-01 2019-07-12 上海聚通装饰集团有限公司 Ruggedized construction and its mounting process are hidden in a kind of installation load-bearing of light weight wall
CN113585572A (en) * 2021-08-26 2021-11-02 潮峰钢构集团有限公司 Supporting system for fixing curtain wall keel by using wall-penetrating anchor rod and supporting method thereof
CN114776132A (en) * 2022-04-20 2022-07-22 中建八局第三建设有限公司 T-shaped steel plate drawknot city wall construction method

Similar Documents

Publication Publication Date Title
CN106223566A (en) A kind of construction method for indoor light blockwork stone material dry suspending
CN102644362B (en) Method for architectural decoration plastering construction
CN103470067B (en) Transformation and construction method used for facing bare concrete of existing building outer wall
CN201801979U (en) Aerated concrete building block heat insulating wall
CN109267671A (en) A kind of decoration method of indoor wall system
CN106284706A (en) The construction method of external wall outer insulation rock cotton board
CN106193499A (en) A kind of combined heat-insulating integral plate anchoring torr hanging hang structure and process
CN100376755C (en) Dry hanging external and internal wall surface decoration structure of fibrous porcelain plate back lining and it's construction method
CN103669788B (en) Polishing face brick metope laying method
CN106351450B (en) A kind of construction centre mounted type pours leveling unit and casting method
CN203430029U (en) Drip groove formwork
CN102587611A (en) Natural rock block fake-dry-masonry decorating wall and construction method
CN104652786A (en) Fire-retardant expanded polyphenyl board molding construction method for external wall of building
CN205976290U (en) Compound incubation intergral template anchor is held in palm and is hung structure
CN201908415U (en) Wall decorative board layer structure
CN103628602B (en) Building curtain wall glass fiber reinforced composite plate installation component
CN214169600U (en) Laminated floor slab
CN102182323A (en) Process for dry laying of autoclaved aerated concrete blocks in low-latitude plateaus
CN109424143A (en) A kind of ceramic thin plate heat insulation decoration integrated plate and its installation method
CN205399697U (en) Superfine inorganic fiber spraying heat preservation
CN109610764B (en) Granite facade paving construction technology
CN104831929B (en) Decorated construction method of the interior wall plaque without scaffold
CN218406201U (en) Ceramic tile top hanging installation assembly
CN203499190U (en) Novel suspension member for connecting metope and decorative surface
CN106088620A (en) Super thick EPS moulding fluting or the thinning construction technique in hole

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20161214

WD01 Invention patent application deemed withdrawn after publication