CN218406201U CN202221579714.9U CN202221579714U CN218406201U CN 218406201 U CN218406201 U CN 218406201U CN 202221579714 U CN202221579714 U CN 202221579714U CN 218406201 U CN218406201 U CN 218406201U
Authority
CN
China
Prior art keywords
connecting piece
ceramic tile
corner
vertical keel
corner connecting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221579714.9U
Other languages
Chinese (zh)
Inventor
丁欣欣
丁泽成
王文广
钟诚
李建斌
李秋彤
任美璇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Yasha Decoration Co Ltd
Original Assignee
Zhejiang Yasha Decoration Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Yasha Decoration Co Ltd filed Critical Zhejiang Yasha Decoration Co Ltd
Priority to CN202221579714.9U priority Critical patent/CN218406201U/en
Application granted granted Critical
Publication of CN218406201U publication Critical patent/CN218406201U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model relates to a building decoration field especially relates to a ceramic tile top is hung and is installed assembly. This installation assembly is hung on ceramic tile top, include with wall basic unit dismantle the vertical keel of being connected, with ceramic tile connecting piece and the ceramic tile that vertical keel is connected, the ceramic tile connecting piece includes flush joint connecting piece and corner connecting piece, flush joint connecting piece with vertical keel fixed connection, flush joint connecting piece is used for connecting and is in parallel and adjacent the ceramic tile, the corner connecting piece with vertical keel dismantles the connection, the corner connecting piece is used for connecting and is in corner and mutually perpendicular the ceramic tile. This installation assembly is hung on ceramic tile top is through being provided with ceramic tile connection structure between wall basic unit and ceramic tile for the ceramic tile sets up on wall basic unit, and the design is favorable to ceramic tile installation and dismantlement like this, and when the furred ceiling ceramic tile appears damaged need to be overhauld, can dismantle the change to damaged ceramic tile, can not influence adjacent ceramic tile simultaneously.

Description

Ceramic tile top hanging installation assembly
Technical Field
The utility model relates to a building decoration field especially relates to a ceramic tile top is hung and is installed assembly.
Background
In the existing wall decoration process, firstly, pre-waterproofing treatment needs to be carried out on a wall body, and a decorative layer is installed on the pre-waterproofing basis, so that the construction time is prolonged, and the decoration cost is increased. The decoration layer mainly comprises tiles and stones, and the tiles and the stones are mainly paved and pasted in a wet pasting mode. The wet pasting is mainly realized by adopting a treatment mode of cement mortar or ceramic tile adhesive on ceramic tiles or stone materials to be pasted and fixed with a wall body. The main problems of the above wet pasting method are as follows: the wet-pasting mode has the problems of more construction operation, long construction period, complex process, large workload, large pollution on construction sites, easy hollowing, cracking and the like on wall surfaces, difficult maintenance and repair in the later period and the like, and difficult satisfaction of the requirements of assembly decoration development.
SUMMERY OF THE UTILITY MODEL
To the not enough of prior art, this application provides a ceramic tile top is hung and is installed assembly to solve the problem that proposes among the above-mentioned background art.
The scheme of this application is as follows, this installation assembly is hung on ceramic tile top, include with wall basic unit dismantle the centre keel of being connected, with ceramic tile connecting piece and the ceramic tile that the centre keel is connected, the ceramic tile connecting piece includes butt joint connecting piece and corner connecting piece, the butt joint connecting piece with centre keel fixed connection, the butt joint connecting piece is used for connecting and is in parallel and adjacent the ceramic tile, the corner connecting piece with the centre keel dismantles the connection, the corner connecting piece is used for connecting and is in corner and mutually perpendicular the ceramic tile.
Furthermore, the vertical keel with all be provided with the opening on the corner connecting piece, the vertical keel with be provided with connection structure between the corner connecting piece, connection structure include middleware, montant and set up in lug on the montant, the montant set up in middleware both ends, the lug stretches out the montant terminal surface makes the lug passes behind the opening, the lug bottom surface can with vertical keel bottom upper surface or wall corner connecting piece top lower surface looks butt.
Furthermore, the connecting structure is made of high-molecular structure materials, and the corner connecting piece is made of carbon steel.
Furthermore, corner connector base angle is provided with first draw-in groove, first draw-in groove is used for one of them mutually perpendicular of joint the ceramic tile, another the ceramic tile set up in corner connector bottom.
Furthermore, the bottom of the first clamping groove, the bottom end of the corner connecting piece and the ceramic tile arranged at the bottom end of the corner connecting piece form a process seam.
Further, the butt joint connecting piece includes support piece and set up in the joint spare of support piece bottom, the symmetry is provided with the second draw-in groove on the joint spare, the second draw-in groove is used for the joint to be in parallel and adjacent the ceramic tile.
Furthermore, a bolt is arranged on the vertical keel, and the bolt penetrates through the vertical keel and drills into the wall surface base layer.
Furthermore, the fixing device is clamped in the vertical keel, a threaded hole is formed in the fixing device, and the bolt penetrates into the threaded hole.
The utility model provides a beneficial effect of installation assembly is hung on ceramic tile top: this installation assembly is hung on ceramic tile top is through being provided with ceramic tile connection structure between wall basic unit and ceramic tile for the ceramic tile sets up on wall basic unit, and the design is favorable to ceramic tile installation and dismantlement like this, and when the furred ceiling ceramic tile appears damaged need to be overhauld, can dismantle the change to damaged ceramic tile, can not influence adjacent ceramic tile simultaneously.
Drawings
The accompanying drawings, which are incorporated in and constitute a part of the specification, illustrate embodiments of the invention and together with the description, serve to explain the principles of the invention. In the drawings, like reference numerals are used to indicate like elements. The drawings in the following description are illustrative of some, but not all embodiments of the invention. For a person skilled in the art, other figures can be derived from these figures without inventive effort.
FIG. 1 is an elevation view of a tile ceiling mounting assembly of the present application;
FIG. 2 is an elevational view of the corner connector and the furring channel;
FIG. 3 is a front view of the attachment structure;
FIG. 4 is a front view of a corner connector;
FIG. 5 is an elevation view of a butt connector and a mullion;
in the figure: 1. a vertical keel; 11. an opening; 2. butt-joint connecting pieces; 21. a support member; 22. a clamping piece; 23. a second card slot; 3. a corner connector; 31. a first card slot; 32. performing process sewing; 4. a connecting structure; 41. a middleware; 42. a vertical rod; 43. a bump; 5. a bolt; 6. a fixing device; 7. and (5) ceramic tiles.
Detailed Description
In order to make the objects, technical solutions and advantages of the embodiments of the present invention clearer, the drawings in the embodiments of the present invention are combined below to clearly and completely describe the technical solutions in the embodiments of the present invention, and obviously, the described embodiments are some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention. It should be noted that the embodiments and features of the embodiments in the present application may be arbitrarily combined with each other without conflict.
Referring to fig. 1 to 5, the tile top-hanging installation assembly provided by the present application comprises a vertical keel 1 detachably connected with a wall surface base layer, a tile connecting member and tiles 7 connected with the vertical keel 1, wherein the tile connecting member comprises a butt connecting member 2 and a corner connecting member 3, the butt connecting member 2 is used for connecting the tiles 7 adjacent to each other in parallel, and the tiles 7 perpendicular to each other in the corner are connected through the corner connecting member 3; when the flush joint connecting piece 2 is installed, because no side wall leans against, the flush joint connecting piece 2 is usually fixedly connected with the vertical keel 1, and the arrangement is convenient for installing adjacent and parallel ceramic tiles 7; when the corner connecting piece 3 is installed, because of leaning and protection of the side wall, the corner connecting piece 3 and the vertical keel 1 can be detachably connected in a connecting mode, so that the component is convenient to carry and install.
The mode that corner connecting piece 3 and vertical joist 1 specifically dismantled and be connected does, all be provided with opening 11 on vertical joist 1 and corner connecting piece 3, be provided with connection structure 4 between vertical joist 1 and corner connecting piece 3 simultaneously, connection structure 4 then plays the effect of connecting vertical joist 1 and corner connecting piece 3, connection structure 4 includes middleware 41, montant 42 and the lug 43 that sets up on montant 42, montant 42 sets up in middleware 41 both ends, the montant 42 terminal surface should still stretch out to lug 43, set up like this and make lug 43 pass opening 11 after, lug 43 bottom surface can with vertical joist 1 bottom upper surface or 3 top lower surface looks butt of corner connecting piece. The connecting structure 4 is made of ABS injection molding, is heat-resistant, has certain surface hardness, has high elasticity and toughness, and the corner connecting piece 3 is made of carbon steel, is corrosion-resistant and has high hardness.
The side surface of the bump 43 can be a vertical surface, preferably, the side surface of the bump 43 is an inclined surface, the inclined surface gradually inclines towards the middle of the bump 43 from bottom to top, the upper surface of the bump 43 is narrower, the lower surface of the bump 43 is wider, the inclined surface is a gradually transitional inclined surface, the upper surface of the inclined surface is narrower, the bump 43 can conveniently penetrate through the opening 11, and the wider lower surface is provided to ensure that the bump 43 can still be abutted against the upper surface of the bottom of the vertical keel 1 or the lower surface of the top of the corner connector 3 after penetrating through the opening 11.
The concrete structure of the corner connecting piece 3 is that a first clamping groove 31 is arranged at the bottom corner of the corner connecting piece, the first clamping groove 31 is used for clamping one of the ceramic tiles 7 which are perpendicular to each other, and the other ceramic tile 7 is arranged at the bottom of the corner connecting piece 3.
The process seam 32 is formed between the bottom of the first clamping groove 31, the bottom of the corner connecting piece 3 and the ceramic tile 7 arranged at the bottom of the corner connecting piece 3, the width of the process seam 32 is usually 10mm-15mm, the process seam 32 is arranged in the sense that the edge of the ceramic tile 7 is uneven, and in order to eliminate visual defects caused by errors of products, the process seam 32 is formed between two ceramic tiles 7 which are perpendicular to each other in the above mode, the uneven edge of the ceramic tile 7 and the visual defects caused by the uneven edge of the ceramic tile 7 are eliminated through the process seam 32, and a seam beautifying agent is filled in the process seam 32 in the later period to fill the process seam 32.
The concrete structure of the butt joint connecting piece 2 comprises a supporting piece 21 and a clamping piece 22 arranged at the bottom of the supporting piece 21, the clamping piece 22 is generally I-shaped, second clamping grooves 23 are symmetrically arranged on the clamping piece 22, and the second clamping grooves 23 are used for clamping and connecting parallel and adjacent ceramic tiles 7.
The mode that centre keel 1 and wall basic unit are specifically dismantled and are connected does, is provided with bolt 5 on centre keel 1, and bolt 5 passes centre keel 1 and bores into the wall basic unit to realize that centre keel 1 is fixed in on the wall basic unit.
Preferably, this application still includes fixing device 6, and the fixing device joint is provided with the screw hole in fixing device 6 in vertical joist 1, and bolt 5 passes vertical joist 1 and penetrates in the screw hole and bore into the wall basal layer, and fixing device 6's setting can effectual protection set up bolt 5 on vertical joist 1, prevents that bolt 5 from damaging, but also can reinforce bolt 5's fixed effect.
The above-described embodiments can be implemented individually or in various combinations, and such variations are within the scope of the present invention.
The terms of orientation of up, down, left, right, front, back, top, bottom, and the like as referred to or as may be referred to in this specification are defined with respect to the configuration shown in the drawings, and the terms "inner" and "outer" refer to directions toward and away from the geometric center of a particular component and are relative terms, and thus may be changed accordingly depending on the position and the state of use of the particular component. Therefore, these and other directional terms should not be construed as limiting terms.
Finally, it should be noted that: the above embodiments are only used to illustrate the technical solution of the present invention, and not to limit it. Although the present invention has been described in detail with reference to the foregoing embodiments, it should be understood by those skilled in the art that: the technical solutions described in the foregoing embodiments may still be modified, or some technical features may be equivalently replaced; such modifications and substitutions do not depart from the spirit and scope of the present invention in its corresponding aspects.

Claims (8)

1. The utility model provides a ceramic tile top hangs installation assembly which characterized in that: include with wall basic unit dismantle be connected vertical keel (1), with ceramic tile connecting piece and ceramic tile (7) that vertical keel (1) is connected, the ceramic tile connecting piece includes flush joint connecting piece (2) and corner connecting piece (3), flush joint connecting piece (2) with vertical keel (1) fixed connection, flush joint connecting piece (2) are used for connecting and are in parallel and adjacent ceramic tile (7), corner connecting piece (3) with vertical keel (1) is dismantled and is connected, corner connecting piece (3) are used for connecting and are located corner and mutually perpendicular ceramic tile (7).
2. A tile top-hang installation assembly as defined in claim 1, wherein: erect fossil fragments (1) with all be provided with opening (11) on corner connecting piece (3), erect fossil fragments (1) with be provided with connection structure (4) between corner connecting piece (3), connection structure (4) including middleware (41), montant (42) and set up in lug (43) on montant (42), montant (42) set up in middleware (41) both ends, lug (43) stretch out montant (42) terminal surface makes lug (43) pass behind opening (11), lug (43) bottom surface can with erect fossil fragments (1) bottom upper surface or corner connecting piece (3) top lower surface looks butt.
3. A tile top-hang installation assembly as defined in claim 2, wherein: the connecting structure (4) is made of high-molecular structure materials, and the corner connecting piece (3) is made of carbon steel.
4. A tile top-hang installation assembly as defined in claim 1, wherein: corner connecting piece (3) base angle is provided with first draw-in groove (31), first draw-in groove (31) are used for one of them joint to be in mutually perpendicular ceramic tile (7), another ceramic tile (7) set up in corner connecting piece (3) bottom.
5. The tile top-hang mounting assembly of claim 4, wherein: the bottom of the first clamping groove (31) is connected with the bottom end of the corner connecting piece (3) and a process seam (32) is formed in the ceramic tile (7) at the bottom end of the corner connecting piece (3).
6. A tile top-hang installation assembly as defined in claim 1, wherein: the butt joint connecting piece (2) include support piece (21) and set up in joint spare (22) of support piece (21) bottom, the symmetry is provided with second draw-in groove (23) on joint spare (22), second draw-in groove (23) are used for the joint to be in parallel and adjacent ceramic tile (7).
7. The tile top-hang mounting assembly of claim 1, wherein: the wall surface base layer is characterized in that a bolt (5) is arranged on the vertical keel (1), and the bolt (5) penetrates through the vertical keel (1) and penetrates into the wall surface base layer.
8. The tile top-hang mounting assembly of claim 7, wherein: still include fixing device (6), fixing device (6) joint in vertical keel (1), be provided with the screw hole in fixing device (6), bolt (5) penetrate in the screw hole.
CN202221579714.9U 2022-06-23 2022-06-23 Ceramic tile top hanging installation assembly Active CN218406201U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221579714.9U CN218406201U (en) 2022-06-23 2022-06-23 Ceramic tile top hanging installation assembly

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221579714.9U CN218406201U (en) 2022-06-23 2022-06-23 Ceramic tile top hanging installation assembly

Publications (1)

Publication Number Publication Date
CN218406201U true CN218406201U (en) 2023-01-31

Family

ID=85009758

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221579714.9U Active CN218406201U (en) 2022-06-23 2022-06-23 Ceramic tile top hanging installation assembly

Country Status (1)

Country Link
CN (1) CN218406201U (en)

Similar Documents

Publication Publication Date Title
CN104746828A (en) Dovetail pin pendant and drying hanging construction technology of decorative sheet adopting the dovetail pin pendant
CN104805912A (en) Connecting node of prefabricated air conditioner panel and prefabricated shear wall
CN209066791U (en) A kind of wall surface dry-hang device
CN106223566A (en) A kind of construction method for indoor light blockwork stone material dry suspending
CN205348652U (en) Ceramic tile is system of hanging futilely
CN218406201U (en) Ceramic tile top hanging installation assembly
CN214786028U (en) Template squeezing locking flat device and template connecting structure
CN107747367A (en) A kind of autoclaved lightweight sand aerated concrete(AAC)Sheet material construction method
CN205046791U (en) Artificial stone plate material connection structure convenient to hang dress
CN204059661U (en) A kind of ALC body of wall assembly
CN105781057A (en) Skeleton-type recyclable tile wall surface
CN205604629U (en) Framework can recycle ceramic tile wall surface
CN111962789A (en) Wall surface hanging flush joint system and mounting method thereof
CN210395980U (en) Wall brick dry hanging connection structure
CN204876449U (en) Anti - decorative structure that supports of dry link plate material of wall foaming polyurethane
CN104929285A (en) Dry hanging component suitable for aerated concrete block walls and construction technology thereof
CN209837564U (en) Novel wall ceramic tile dry-hanging bracket
CN214995519U (en) Wall brick dry-hanging structure easy to construct
CN205444782U (en) Install pendant structure of wall ceramic tile fast
CN205134642U (en) Use interior partition wall of ALC panel as main part
CN210239018U (en) Wall brick mounting structure
CN104831929A (en) Hanging and pasting construction method of inner wall decorative board non-support framework
CN111519857A (en) Special landscape wall stone-grain-imitating polished brick dry-hanging construction technology
CN212104927U (en) Ceramic tile convenient to install fast
CN218562866U (en) Wall veneer dry hanging structure assembly