CN106204786A - Operating condition of transformer station equipment one key inspection method - Google Patents
Operating condition of transformer station equipment one key inspection method Download PDFInfo
- Publication number
- CN106204786A CN106204786A CN201610556146.3A CN201610556146A CN106204786A CN 106204786 A CN106204786 A CN 106204786A CN 201610556146 A CN201610556146 A CN 201610556146A CN 106204786 A CN106204786 A CN 106204786A
- Authority
- CN
- China
- Prior art keywords
- inspection
- tour
- inspection tour
- region
- transformer station
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000007689 inspection Methods 0.000 title claims abstract description 132
- 238000000034 method Methods 0.000 title claims abstract description 37
- 238000004891 communication Methods 0.000 claims description 3
- 239000007943 implant Substances 0.000 claims description 3
- 238000009434 installation Methods 0.000 claims 1
- 238000005516 engineering process Methods 0.000 description 2
- 238000012423 maintenance Methods 0.000 description 2
- 230000005856 abnormality Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 230000009466 transformation Effects 0.000 description 1
Classifications
-
- G—PHYSICS
- G07—CHECKING-DEVICES
- G07C—TIME OR ATTENDANCE REGISTERS; REGISTERING OR INDICATING THE WORKING OF MACHINES; GENERATING RANDOM NUMBERS; VOTING OR LOTTERY APPARATUS; ARRANGEMENTS, SYSTEMS OR APPARATUS FOR CHECKING NOT PROVIDED FOR ELSEWHERE
- G07C1/00—Registering, indicating or recording the time of events or elapsed time, e.g. time-recorders for work people
- G07C1/20—Checking timed patrols, e.g. of watchman
-
- H02J13/0006—
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04N—PICTORIAL COMMUNICATION, e.g. TELEVISION
- H04N7/00—Television systems
- H04N7/18—Closed-circuit television [CCTV] systems, i.e. systems in which the video signal is not broadcast
- H04N7/181—Closed-circuit television [CCTV] systems, i.e. systems in which the video signal is not broadcast for receiving images from a plurality of remote sources
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E60/00—Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/16—Electric power substations
Abstract
The present invention provides a kind of operating condition of transformer station equipment one key inspection method, belong to inspection method field, including inspection tour system, equipment in transformer station is divided into different tour region according to placing region by inspection tour system, make an inspection tour and set up inspection point provided at the equipment in region, inspection tour system can set the important level making an inspection tour region, inspection tour system is order according to the important level making an inspection tour region, tour region is linked to be tour path, and according to the order making an inspection tour path, the inspection point provided maked an inspection tour in region is maked an inspection tour, by inspection tour system, inspection point provided information is carried out record, improve work efficiency and the job security of substation inspection.
Description
Technical field
The present invention provides a kind of operating condition of transformer station equipment one key inspection method, belongs to inspection method field.
Background technology
It is the major issue being related to national economy that substation safety runs, and the stability of station equipment running status decides change
The safe operation index height in power station.In order to ensure the healthy and safe operation of transformer station, in power transformation operation maintenance personnel needs periodically to arrive at a station
Make an inspection tour, check machine operation.
At present, the tour process of attendant is as follows:
1, in station, set fixing patrol route, determine emphasis equipment to be maked an inspection tour and data;
2, visit program is formulated;
3, according to schedule, make an inspection tour according to patrol route in station within the stipulated time to transformer station;
4, manual record makes an inspection tour data and abnormality;
5, formation report is manually collected;
Said process, based on manual patrol, record data, consolidated statement, inefficiency.The most basic
Ensure that tour puts in place, but there is the tour blank phase.It addition, the difficulty of manual patrol increases in inclement weather
Add, accuracy and promptness it cannot be guaranteed that.
Summary of the invention
Present invention aim at providing a kind of operating condition of transformer station equipment one key inspection method, improve substation inspection
Work efficiency and job security.
Operating condition of transformer station equipment one key inspection method of the present invention, including inspection tour system, inspection tour system will become
Equipment in power station is divided into different region of making an inspection tour according to placing region, sets up inspection point provided, make an inspection tour at the equipment in tour region
System can set the important level making an inspection tour region, and inspection tour system is order according to the important level making an inspection tour region, will make an inspection tour district
Territory is linked to be tour path, and makes an inspection tour, the inspection point provided maked an inspection tour in region by inspection tour system pair according to the order making an inspection tour path
Inspection point provided information carries out record.
Described operating condition of transformer station equipment one key inspection method, inspection point provided includes data mode point position and picture point
Position, data mode point position can remotely receive the operation information of the equipment corresponding to region that patrols;Video-unit is installed at corresponding device,
Picture point is for setting up video communication by video channel and video-unit, and staff is by the video of viewing video-unit feedback
Information is checked with operation information.
Described operating condition of transformer station equipment one key inspection method, carries out making an inspection tour according to making an inspection tour path at inspection tour system
Cheng Zhong, can manually suspend tour process, it is possible to by manually Artificial Intervention state or data at the step suspended.
Described operating condition of transformer station equipment one key inspection method, makes an inspection tour result and carries out record in a tabular form.
Described operating condition of transformer station equipment one key inspection method, inspection tour system control mode in order, by reality
Example object pattern sets up the inspection point provided position sequence list in all regions in internal memory, then starts tour task, according to sequence list
Content is maked an inspection tour successively, makes an inspection tour delay time and give tacit consent to 10 seconds between consecutive points position.
Described operating condition of transformer station equipment one key inspection method, concrete execution process is:
(1) read a key and make an inspection tour region point position table, internal memory creates control scheme list i.e. inspection point provided position sequence list;
(2) create execution task, perform tour task according to inspection point provided position sequence list order;
(3) wait time delay, carry out state or data check;
(4) some position tour result automatically generates or manually implants;
(5) process terminates, and preserves result and generates tour report.
The present invention compared with prior art has the beneficial effect that
Described operating condition of transformer station equipment one key inspection method, it is achieved the automatization of substation operation plant maintenance and
Intellectuality, whole process can be monitored by this technology property performance period and manual operation, solve transformer station's manual patrol and deposit
Problem, improve work efficiency and the job security of substation inspection.
Accompanying drawing explanation
Fig. 1 is flow chart of the present invention.
Detailed description of the invention
Below in conjunction with the present invention, the embodiment of the present invention is described further:
As it is shown in figure 1, operating condition of transformer station equipment one key inspection method of the present invention, including inspection tour system, patrol
Equipment in transformer station is divided into different tour region according to placing region by viewing system, and each is maked an inspection tour region and gives importance etc.
Level attribute, sets up inspection point provided in making an inspection tour region, and inspection point provided is tour content, and staff can be set by inspection tour system and patrol
The important level of viewed area, inspection tour system is order according to the important level making an inspection tour region, and tour region is linked to be tour path,
And form tour control scheme list, and according to the order making an inspection tour path maked an inspection tour in the control scheme list tour to making an inspection tour in region
Point is maked an inspection tour, inspection tour system inspection point provided information is carried out record.
Inspection tour system is preserved: (1) transformer station sets up different group areas tables;(2) inspection point provided is added in each packet
Position table;(3) inspection point provided position includes data mode point position table and video image point position table, and these three table is the basic data of this invention
Table, creates a key in internal memory by data in these tables and makes an inspection tour control scheme list, and strategically table carries out substation equipment fortune
Row state is maked an inspection tour.
Described operating condition of transformer station equipment one key inspection method, inspection point provided includes data mode point position and picture point
Position, data mode point position can remotely receive makes an inspection tour the operation information of equipment corresponding to region, it is possible to by implanting letter manually
Breath;Installing video-unit at corresponding device, picture point is for setting up video communication by video channel and video-unit, and work people
Member is checked with operation information by the video information of viewing video-unit feedback, it is possible to according to video information to automatically obtaining
The operation information taken is modified and marks.
Described operating condition of transformer station equipment one key inspection method, carries out making an inspection tour according to making an inspection tour path at inspection tour system
Cheng Zhong, can manually suspend tour process, it is possible to by manually Artificial Intervention state or data at the step suspended.
Described operating condition of transformer station equipment one key inspection method, makes an inspection tour result and carries out record in a tabular form.
Described operating condition of transformer station equipment one key inspection method, inspection tour system control mode in order, by reality
Example object pattern sets up the inspection point provided position sequence list in all regions in internal memory, then starts tour task, according to sequence list
Content is maked an inspection tour successively, makes an inspection tour delay time and give tacit consent to 10 seconds between consecutive points position.
Described operating condition of transformer station equipment one key inspection method, concrete execution process is:
(1) read a key and make an inspection tour region point position table, internal memory creates control scheme list i.e. inspection point provided position sequence list;
(2) create execution task, perform tour task according to inspection point provided position sequence list order;
(3) wait time delay, carry out state or data check;
(4) some position tour result automatically generates or manually implants;
(5) process terminates, and preserves result and generates tour report.
Claims (6)
1. an operating condition of transformer station equipment one key inspection method, it is characterised in that include inspection tour system, inspection tour system will become
Equipment in power station is divided into different region of making an inspection tour according to placing region, sets up inspection point provided, make an inspection tour at the equipment in tour region
System can set the important level making an inspection tour region, and inspection tour system is order according to the important level making an inspection tour region, will make an inspection tour district
Territory is linked to be tour path, and makes an inspection tour, the inspection point provided maked an inspection tour in region by inspection tour system pair according to the order making an inspection tour path
Inspection point provided information carries out record.
Operating condition of transformer station equipment one key inspection method the most according to claim 1, it is characterised in that inspection point provided includes
Data mode point position and picture point position, data mode point position can remotely receive the operation information of the equipment corresponding to region that patrols;Right
Answering installation video-unit at equipment, picture point is for setting up video communication by video channel and video-unit, and staff passes through
The video information of viewing video-unit feedback is checked with operation information.
Operating condition of transformer station equipment one key inspection method the most according to claim 1, it is characterised in that at inspection tour system
During making an inspection tour according to tour path, can manually suspend tour process, it is possible to by manually at the step suspended
Artificial Intervention state or data.
Operating condition of transformer station equipment one key inspection method the most according to claim 1, it is characterised in that make an inspection tour result with
Form carries out record.
Operating condition of transformer station equipment one key inspection method the most according to claim 1, it is characterised in that inspection tour system is pressed
According to sequential control mode, in internal memory, set up the inspection point provided position sequence list in all regions by instance object pattern, then open
Dynamic tour task, makes an inspection tour successively according to sequence list content, makes an inspection tour the delay time acquiescence 1-100 second between consecutive points position.
Operating condition of transformer station equipment one key inspection method the most according to claim 1, it is characterised in that specifically performed
Cheng Wei:
(1) read a key and make an inspection tour region point position table, internal memory creates control scheme list i.e. inspection point provided position sequence list;
(2) create execution task, perform tour task according to inspection point provided position sequence list order;
(3) wait time delay, carry out state or data check;
(4) some position tour result automatically generates or manually implants;
(5) process terminates, and preserves result and generates tour report.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610556146.3A CN106204786A (en) | 2016-07-15 | 2016-07-15 | Operating condition of transformer station equipment one key inspection method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610556146.3A CN106204786A (en) | 2016-07-15 | 2016-07-15 | Operating condition of transformer station equipment one key inspection method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106204786A true CN106204786A (en) | 2016-12-07 |
Family
ID=57474300
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610556146.3A Pending CN106204786A (en) | 2016-07-15 | 2016-07-15 | Operating condition of transformer station equipment one key inspection method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106204786A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109461225A (en) * | 2018-10-19 | 2019-03-12 | 山东智洋电气股份有限公司 | Substation's active inspection method |
CN109698555A (en) * | 2019-01-11 | 2019-04-30 | 云南电网有限责任公司保山供电局 | A kind of one key distant place inspection tour system of unattended operation transformer station and inspection method |
CN111683229A (en) * | 2020-06-22 | 2020-09-18 | 杭州海康威视系统技术有限公司 | Cruise monitoring method, device, equipment and storage medium |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100780450B1 (en) * | 2007-08-08 | 2007-11-28 | 합자회사 대광전기 | Management system for distribution system of power degradation in connection with new distribution information system and method thereof |
CN201846134U (en) * | 2010-07-14 | 2011-05-25 | 山东电力集团公司泰安供电公司 | Automatic inspecting system for transformer substation |
CN202309216U (en) * | 2011-09-28 | 2012-07-04 | 华北电网有限公司张家口供电公司 | Unattended transformer station remote patrol system |
CN103699075A (en) * | 2013-12-11 | 2014-04-02 | 国家电网公司 | Video-monitoring-based transformer substation tour-inspection intelligent-scheduling and control system |
CN103824233A (en) * | 2014-03-07 | 2014-05-28 | 国家电网公司 | Unmanned aerial vehicle electric power circuit polling scheduling platform and method based on GIS (geographic information system) |
CN104143248A (en) * | 2014-08-01 | 2014-11-12 | 江苏恒创软件有限公司 | Forest fire detection, prevention and control method based on unmanned aerial vehicle |
CN104167818A (en) * | 2014-08-20 | 2014-11-26 | 深圳供电局有限公司 | Intelligent remote inspection system in linkage with GIS substation integrated automation system and method |
-
2016
- 2016-07-15 CN CN201610556146.3A patent/CN106204786A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100780450B1 (en) * | 2007-08-08 | 2007-11-28 | 합자회사 대광전기 | Management system for distribution system of power degradation in connection with new distribution information system and method thereof |
CN201846134U (en) * | 2010-07-14 | 2011-05-25 | 山东电力集团公司泰安供电公司 | Automatic inspecting system for transformer substation |
CN202309216U (en) * | 2011-09-28 | 2012-07-04 | 华北电网有限公司张家口供电公司 | Unattended transformer station remote patrol system |
CN103699075A (en) * | 2013-12-11 | 2014-04-02 | 国家电网公司 | Video-monitoring-based transformer substation tour-inspection intelligent-scheduling and control system |
CN103824233A (en) * | 2014-03-07 | 2014-05-28 | 国家电网公司 | Unmanned aerial vehicle electric power circuit polling scheduling platform and method based on GIS (geographic information system) |
CN104143248A (en) * | 2014-08-01 | 2014-11-12 | 江苏恒创软件有限公司 | Forest fire detection, prevention and control method based on unmanned aerial vehicle |
CN104167818A (en) * | 2014-08-20 | 2014-11-26 | 深圳供电局有限公司 | Intelligent remote inspection system in linkage with GIS substation integrated automation system and method |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109461225A (en) * | 2018-10-19 | 2019-03-12 | 山东智洋电气股份有限公司 | Substation's active inspection method |
CN109698555A (en) * | 2019-01-11 | 2019-04-30 | 云南电网有限责任公司保山供电局 | A kind of one key distant place inspection tour system of unattended operation transformer station and inspection method |
CN111683229A (en) * | 2020-06-22 | 2020-09-18 | 杭州海康威视系统技术有限公司 | Cruise monitoring method, device, equipment and storage medium |
CN111683229B (en) * | 2020-06-22 | 2021-10-26 | 杭州海康威视系统技术有限公司 | Cruise monitoring method, device, equipment and storage medium |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2019095910A1 (en) | Daily patrol working method and system in substation | |
CN106204786A (en) | Operating condition of transformer station equipment one key inspection method | |
CN109034509A (en) | Operating personnel's evaluation system, operating personnel's evaluating apparatus and evaluation method | |
CN107844892A (en) | A kind of equipment O&M plan Dynamic Scheduling system and optimization method | |
CN110264095A (en) | A kind of Distribution Network Equipment visualization auxiliary O&M method based on GIS-Geographic Information System | |
CN108536770A (en) | A kind of distribution looped network account automatic generation method based on Distributing Network GIS model | |
CN108647894A (en) | One kind being based on the assembling type steel structure construction method of " BIM+RFID " technology | |
CN104076767B (en) | Railway signal equipment overhauling control system and method | |
CN103618382A (en) | Transformer substation operation and maintenance integration field work data collection and field work instruction system | |
CN108767851A (en) | A kind of substation's O&M intelligent operation command methods and system | |
CN110197443A (en) | A kind of intelligent safety helmet risk management and control system | |
CN106296127A (en) | A kind of dynamic construction system and method for intelligent substation operation flow | |
CN105071535B (en) | A kind of the time synchronization management system and implementation method of network system | |
CN103050049A (en) | Generation method and system for DTS (Dispatcher Training Simulator) training lesson plan and simulated grid system | |
CN107247837A (en) | A kind of shaft tower information modelling approach of transmission line of electricity | |
SA118400295B1 (en) | Automatic Train Control System | |
CN104575108A (en) | Air traffic control automatic transfer system and method based on petri network | |
CN104333130A (en) | Identity identification method of relay protection equipment | |
CN107734458A (en) | A kind of residential property personnel management methods and system | |
CN104346839A (en) | Electronic employee attendance system based on local area network | |
CN110995660A (en) | Railway emergency cooperation support and inspection system based on AR technology | |
CN104504768A (en) | Real-time monitoring system for mobile operation of high-voltage transmission line and monitoring method of real-time monitoring system | |
CN101957942A (en) | Accident planning expert system applied to steel mill | |
CN109885361A (en) | A kind of set state statistics timing diagram visual presentation method | |
CN105007174B (en) | A kind of automatic acceptance method of dispatching automation main website down order |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20161207 |