CN106296127A - A kind of dynamic construction system and method for intelligent substation operation flow - Google Patents
A kind of dynamic construction system and method for intelligent substation operation flow Download PDFInfo
- Publication number
- CN106296127A CN106296127A CN201610654301.5A CN201610654301A CN106296127A CN 106296127 A CN106296127 A CN 106296127A CN 201610654301 A CN201610654301 A CN 201610654301A CN 106296127 A CN106296127 A CN 106296127A
- Authority
- CN
- China
- Prior art keywords
- company information
- intelligent substation
- information data
- operation flow
- role
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 53
- 238000010276 construction Methods 0.000 title claims abstract description 27
- 230000008569 process Effects 0.000 claims abstract description 22
- 230000008676 import Effects 0.000 claims abstract description 10
- 238000007726 management method Methods 0.000 claims description 37
- 230000000694 effects Effects 0.000 claims description 17
- 238000011160 research Methods 0.000 claims description 5
- 238000013499 data model Methods 0.000 claims description 2
- 238000005516 engineering process Methods 0.000 abstract description 3
- 230000008520 organization Effects 0.000 description 15
- 230000006978 adaptation Effects 0.000 description 4
- 230000008901 benefit Effects 0.000 description 4
- 238000012795 verification Methods 0.000 description 4
- 230000032683 aging Effects 0.000 description 3
- 230000009471 action Effects 0.000 description 2
- 230000003044 adaptive effect Effects 0.000 description 2
- 238000004458 analytical method Methods 0.000 description 2
- 230000008859 change Effects 0.000 description 2
- 238000004891 communication Methods 0.000 description 2
- 230000007547 defect Effects 0.000 description 2
- 238000011161 development Methods 0.000 description 2
- 230000018109 developmental process Effects 0.000 description 2
- 230000008030 elimination Effects 0.000 description 2
- 238000003379 elimination reaction Methods 0.000 description 2
- 238000004519 manufacturing process Methods 0.000 description 2
- 230000008521 reorganization Effects 0.000 description 2
- 230000009466 transformation Effects 0.000 description 2
- 230000006399 behavior Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000006835 compression Effects 0.000 description 1
- 238000007906 compression Methods 0.000 description 1
- 239000000470 constituent Substances 0.000 description 1
- 230000009133 cooperative interaction Effects 0.000 description 1
- 238000001514 detection method Methods 0.000 description 1
- 230000005611 electricity Effects 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 239000004615 ingredient Substances 0.000 description 1
- 238000007689 inspection Methods 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 230000006855 networking Effects 0.000 description 1
- 238000011144 upstream manufacturing Methods 0.000 description 1
- 239000011800 void material Substances 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
Landscapes
- Business, Economics & Management (AREA)
- Engineering & Computer Science (AREA)
- Human Resources & Organizations (AREA)
- Strategic Management (AREA)
- Economics (AREA)
- Tourism & Hospitality (AREA)
- Health & Medical Sciences (AREA)
- Marketing (AREA)
- Entrepreneurship & Innovation (AREA)
- Theoretical Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- Data Mining & Analysis (AREA)
- Quality & Reliability (AREA)
- Operations Research (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Supply And Distribution Of Alternating Current (AREA)
Abstract
The present invention relates to Automated Technology in Office field, particularly relate to the dynamic construction system and method for a kind of intelligent substation operation flow.The invention provides the dynamic fixing method of a kind of intelligent substation operation flow, including: step 1, the company information of management will be needed to be compiled as company information data import system data base;Step 2, company information data are analyzed, set up business events flow path model, and product process definition file;Step 3, according to the different service node in business events flow path model, flow definition file creates corresponding Role Information;Step 4, flow definition file is preserved to system, configure, according to configuration Role Information, the role that each service node is corresponding;Step 5, run the operation flow of each role being configured service node.The dynamic fixing method that the application provides makes intelligent substation operation flow management and control more effectively reliable, improves work efficiency, it is ensured that the construction of intelligent substation and safe operation.
Description
Technical field
The present invention relates to Automated Technology in Office field, particularly relate to the dynamic construction of a kind of intelligent substation operation flow
System and method, is specifically related to a kind of management and control accuracy, ageing and run that can significantly improve intelligent substation operation flow
The dynamic construction system and method for reliability.
Background technology
Entering 21 century, intelligent grid characteristic advanced with it, intelligentized, as the new side of electric power industry development
To.As ingredient crucial in intelligent grid, intelligent substation is by using advanced, reliable, the integrated and intelligence of environmental protection
Equipment, is standardized as basic demand with information digitalization of entirely standing, communications platform networking, information sharing, it is achieved information automatic
Gather, measure, control, protect, measure and the basic function such as detection, meanwhile, possess that support electrical network automatically controls in real time, intelligence is adjusted
The Premium Features such as joint, on-line analysis decision-making and collaborative interaction.
Owing to the new techniques such as IEC61850 standard are extensively applied, intelligent substation construction, debug, check and accept, the link such as O&M
Work flow complicated, activity scene is adulterated mutually, and management activity is difficult to carry out, and outstanding behaviours is: lack dynamic adaptation
Management and control flow process is effectively adaptive and linking designing unit, management unit, debugging unit, inspection unit, O&M unit are complicated and changeable
Activity.Trans-departmental, transannular saves, operates and stream compression difficulty across the business applied, and upstream fundamental operation counts after completing
According to difficult with business linking, and single business management and control flow process is difficult in adapt to the change of intelligent substation miscellaneous service scene,
Causing work efficiency to reduce, link up cost and increase, the construction period is elongated, and construction quality cannot ensure, it is difficult to support intelligence power transformation
Large scale construction of standing is carried out, it is difficult to guarantee substation safety reliability service.
In sum, the artificial operating type linked up of constituent parts doping is accurate to the management and control of intelligent substation operation flow
Property low, ageing weak, integrity degree is low, business collaboration and data sharing difficulty, it is difficult to the development adapting to modern intelligent substation is wanted
Ask.
Summary of the invention
(1) to solve the technical problem that
It is an object of the invention to: provide a kind of and can significantly improve the management and control accuracy of intelligent substation operation flow, timeliness
Property and the dynamic construction system and method for operational reliability, with solve existing with artificial communication way to intelligent substation business
Flow process carries out management and control, there is accuracy low, ageing weak, and integrity degree is low and business collaboration and the problem of data sharing difficulty.
(2) technical scheme
In order to solve above-mentioned technical problem, the invention provides the dynamic construction side of a kind of intelligent substation operation flow
Method, comprises the following steps:
Step 1, the company information of management will be needed to be compiled as company information data, and described company information data will be imported
System database;
Step 2, described company information data are analyzed, set up business events flow path model, and product process definition
File;Described business events flow path model includes that different service nodes, each described service node all include corresponding service
Workflow;
Step 3, according to the different service node in described business events flow path model, in described flow definition file
Create corresponding Role Information;
Step 4, preserving described flow definition file to system database, according to configuring, the configuration of described Role Information is each
The role that described service node is corresponding;
Step 5, run the operation flow of each role being configured described service node.
Wherein, in step 1, described company information data include that functional department of State Grid Corporation of China is for intelligent substation
The service link of electrical secondary system configuration file management and control and employee's personal information.
Wherein, functional department of described State Grid Corporation of China includes Yun Jian department, bouw/infra, traffic department and power science
Academy.
Wherein, in step 2, use Activiti engine that described company information data are analyzed, generate enterprise's letter
Breath data pattern file;And use Modeler modeling device based on Activiti according to described company information data pattern file,
Set up described business events flow path model.
Wherein, in step 2, described business events flow path model includes that drawing typing node, drawing check node and figure
Paper examination & verification node.
Present invention also offers the dynamic construction system of a kind of intelligent substation operation flow, including:
First module, for being compiled as company information data by the company information needing management, and by described company information
Data import system data base;
Second module, for being analyzed described company information data, sets up business events flow path model, and generates stream
Cheng Dingyi file;
Three module, for according to the different service node in described business events flow path model, fixed in described flow process
Justice file creates corresponding Role Information;
4th module, for preserving described flow definition file to system database, according to configuring described Role Information
Configure the role that each described service node is corresponding;
5th module, for running the operation flow of each role being configured described service node.
Wherein, described first module includes first module and second unit, and described first module is for believing described enterprise
Breath data edition is described company information data, and described second unit is for importing described system number by described company information data
According to storehouse.
Wherein, described company information data include that functional department of State Grid Corporation of China joins for secondary system of intelligent substation
Put service link and employee's personal information of file management and control.
Wherein, functional department of described State Grid Corporation of China includes Yun Jian department, bouw/infra, traffic department and power science
Academy.
Wherein, described second module includes that Unit the 3rd, described Unit the 3rd use Activiti engine to described enterprise
Information data is analyzed, and generates company information data pattern file;And use Modeler modeling device root based on Activiti
According to described company information data pattern file, set up described business events flow path model.
(3) beneficial effect
The technique scheme of the present invention has the advantage that and the invention provides a kind of intelligent substation operation flow
Dynamic fixing method, comprises the following steps: step 1, the company information of management will be needed to be compiled as company information data, and will enterprise
Industry information data import system data base;Step 2, company information data are analyzed, set up business events flow path model, and
Product process definition file;Business events flow path model includes that different service nodes, each service node all include corresponding industry
The workflow of business;Step 3, according to the different service node in business events flow path model, in flow definition file create
Build corresponding Role Information;Step 4, flow definition file is preserved to system database, every according to configuration Role Information configuration
The role that individual service node is corresponding;Step 5, run the operation flow of each role being configured service node.The application
The dynamic fixing method provided is applicable to various dimensions, seamless, the omnibearing management that intelligent substation business is carried out, and becomes intelligence
The business in power station carries out orderly management, dynamic adaptation and the effectively each operational action of linking, makes intelligent substation operation flow pipe
Control is more effectively reliable, specifies the responsibilities of each functional department, is effectively improved the work efficiency of each functional department, and then
Ensure that construction and the safe operation of intelligent substation, social benefit can effectively improve.
Accompanying drawing explanation
Fig. 1 is the enforcement steps flow chart of the dynamic fixing method of the embodiment of the present invention a kind of intelligent substation operation flow
Figure;
Fig. 2 be the embodiment of the present invention a kind of intelligent substation operation flow dynamic construction system in business events flow path joint
Point circulation figure.
Detailed description of the invention
For making the purpose of the embodiment of the present invention, technical scheme and advantage clearer, below in conjunction with the embodiment of the present invention
In accompanying drawing, the technical scheme in the embodiment of the present invention is clearly and completely described, it is clear that described embodiment is
A part of embodiment of the present invention rather than whole embodiments.Based on the embodiment in the present invention, ordinary skill people
The every other embodiment that member is obtained on the premise of not making creative work, broadly falls into the scope of protection of the invention.
As shown in Figure 1 to Figure 2, the dynamic construction side of a kind of intelligent substation operation flow is embodiments provided
Method, it comprises the following steps:
Step 1, the company information of management will be needed to be compiled as company information data by edit tool, and by importing work
Tool is by company information data import system data base;By will editor after company information data import system data base in, with
Data supporting is provided for follow-up business workflow management;Step 2, above-mentioned company information data are analyzed, set up business event
Procedural model, and product process definition file;Business events flow path model includes different service nodes, and each service node is equal
Including the workflow of corresponding service, in the present embodiment, flow process mould is built according to different business scene, different operating type
Type, adapts to newly-built, reorganization and expansion, defect elimination, the amendment of empty loop, the anti-configuration file workflow different business such as arranging movable;Step
3, according to the different service node in business events flow path model, flow definition file creates corresponding Role Information
(i.e. virtual organization);Step 4, flow definition file is preserved to system database, configure each industry according to configuration Role Information
The role that business node is corresponding, will be associated with the Role Information of corresponding configuration by service node;Step 5, run each
Configure the operation flow of the role of service node.Wherein, operation flow can be with flexible configuration, treatment in accordance with local conditions, according to actual feelings
Condition is adjusted, and increases or deletes service node;And customization can be completed by areal according to different electric pressures
Service node enables or disables, it is achieved obtain more flexible.
Due to intelligent substation fortune build, debug, check and accept, O&M is a complicated production process, intelligent substation mistake
Journey need the item coordinated the most numerous and diverse, and higher to the competency profiling of coordinated management personnel.The application is by based on void
Intend the dynamic fixing method of operation flow of tissue, solve that single management and control flow process cannot adaptation service scene be changeable, work class
The difficult problem that type is changeable.Meanwhile, the application is by based on the adaptive each intermediate links of operation flow dynamic construction, it is achieved that " work has
According to, user can participate in, process can be supervised, flow process can management and control ", improve the specification of secondary system of intelligent substation configuration file
Change degree and accuracy, greatly reduce potential safety hazard, significant for improving electric power netting safe running level.
Based on the above-mentioned dynamic fixing method to intelligent substation operation flow, especially by intelligent substation secondary system
The depth analysis of system configuration file management and control, for intelligent substation construction, debug, check and accept, O&M such a through multiple rank
Section, by many ways participating in, the complicated manufacture process of common cooperation, it is proposed that integrative solution, for instructing domestic intelligence
The standardization construction of transformer station, debug, check and accept, O&M has realistic meaning.The method of this solution problem and thinking are for row
Similar Problems has reference and exemplary role in the industry, promotes technological progress.
Specifically, in step 1, company information data include that functional department of State Grid Corporation of China is for intelligent substation two
The service link of subsystem configuration file management and control and employee's personal information.In the present embodiment, functional department of State Grid Corporation of China
Including Yun Jian department, bouw/infra, traffic department and Electric Power Research Institute.It addition, company information data are above-mentioned except including
Functional department of State Grid Corporation of China, may also include organization based on three collection five big systems of State Grid Corporation of China.
Preferably, in step 2, use Activiti engine that company information data are analyzed, generate company information
Data pattern file;And use Modeler modeling device based on Activiti according to company information data pattern file, set up enterprise
Industry business process model.The method of Business Stream driving data stream based on Activiti engine, the dynamic construction that the application provides
Method is applicable to different business scene, the flow instance of different operating type, it is achieved the business datum of different business scene is not
Seamless exchange between same department, different node with share at any time.
Specifically, in step 2, business events flow path model includes that drawing typing node, drawing check node and drawing
Examination & verification node.In the present embodiment, illustrate as a example by State Grid Hunan Electric Power Company, particularly as follows:
First, national grid Hunan Electric Power Company is for the circulation industry of secondary system of intelligent substation configuration file management and control
Business node has drawing typing node, drawing to check node and drawing examination node, these three service node is fabricated to one complete
Whole management and control flow process, concrete circulation process, as in figure 2 it is shown, i.e. click on and start, being introduced into drawing typing node, if passing through, then entering
Enter drawing and check node, if not passing through, then return drawing typing node and re-type;After entering drawing check node, if passing through,
Then enter drawing examination node, if not passing through, then return drawing typing node and re-type;After entering drawing examination node, if
Passing through, the most whole management and control flow process terminates;
Secondly, it is respectively created three corresponding Role Informations (i.e. virtual organization), respectively according to above three circulation node
For organization unit, check unit and reviewing authority;
Furthermore, the electrical secondary system of the intelligent substation of national grid Hunan Electric Power Company 220kV and following electric pressure
Configuration file circulation needs not move through drawing examination node just can complete filing, then just can be by the drawing in service node
Examination & verification node disabling, only retains two service nodes, after determining service node, then virtual organization and service node is carried out one
One is corresponding, i.e. drawing typing node correspondence organization unit, and drawing is checked node correspondence and checked unit, and drawing examination node correspondence is examined
Vouching position;
Finally, according to the service node that each virtual organization of step is corresponding, determine the actual executable unit of each virtual organization, compile
Unit processed is Yun Jian department of electric company of prefectures and cities, and checking unit is traffic department of electric company of prefectures and cities, and reviewing authority is electricity
Power research institute.
After above-mentioned steps having been performed by management personnel, it is possible to put in formal use, become in certain intelligence
After power station enters the O&M maintenance stage, it is possible to be initiated through the electrical secondary system configuration file management and control of above-mentioned steps by organization unit
Flow process, is then carried out data check by check unit, is finally carried out examination & verification by reviewing authority and complete filing.
Corresponding to the dynamic fixing method of above-mentioned intelligent substation operation flow, present invention also offers the power transformation of a kind of intelligence
The dynamic construction system of operation flow of standing, including:
First module, for being compiled as company information data by the company information needing management, and by company information data
Import system data base;Second module, for being analyzed company information data, sets up business events flow path model, and raw
Become flow definition file;In the present embodiment, build procedural model according to different business scene, different operating type, adapt to new
Build, reorganization and expansion, defect elimination, the amendment of empty loop, the anti-configuration file workflow different business such as arranging movable;
Three module, for according to the different service node in business events flow path model, in flow definition file
Create corresponding Role Information;In the present embodiment, create corresponding Role Information and be the corresponding virtual organization of establishment, such as figure
The Role Information (i.e. virtual organization) that paper typing node is corresponding is organization unit;Drawing checks Role Information corresponding to node (i.e.
Virtual organization) for checking unit;The Role Information (i.e. virtual organization) that drawing examination node is corresponding is reviewing authority;
4th module, for being preserved by flow definition file to system, configures each business joint according to configuration Role Information
The role that point is corresponding, will be associated with the Role Information of corresponding configuration by service node;
5th module, for running the operation flow of each role being configured service node.Wherein, operation flow
Can be with flexible configuration, treatment in accordance with local conditions, it is adjusted according to practical situation, increases or delete service node;And areal
The service node that customization completes can be enabled or disables according to different electric pressures, it is achieved obtain more flexible.
Specifically, the first module includes first module and second unit, and first module is for by company information data edition
For company information data, second unit is for by company information data import system data base, by company information data being led
Enter system database, think that follow-up business workflow management provides data supporting.
Further, company information data include that functional department of State Grid Corporation of China joins for secondary system of intelligent substation
Put service link and employee's personal information of file management and control;Specifically, functional department of State Grid Corporation of China includes Yun Jian department, base
Build department, traffic department and Electric Power Research Institute.It addition, company information data are except including above-mentioned State Grid Corporation of China function
Department, may also include organization based on three collection five big systems of State Grid Corporation of China.
Specifically, the second module includes Unit the 3rd, it is preferable that Unit the 3rd uses Activiti engine to company information
Data are analyzed, and generate company information data pattern file;And use Modeler modeling device based on Activiti according to enterprise
Industry Information Data model file, sets up business events flow path model.By using Activiti engine, the application can be provided
Dynamic fixing method is applicable to different business scene, the flow instance of different operating type, and then realizes different business scene
Business datum seamless exchange between different departments, different node with share at any time.
In sum, the invention provides the dynamic fixing method of a kind of intelligent substation operation flow, including following step
Rapid: step 1, the company information of management will to be needed to be compiled as company information data, and by company information data import system data
Storehouse;Step 2, company information data are analyzed, set up business events flow path model, and product process definition file;Enterprise
Business process model includes that different service nodes, each service node all include the workflow of corresponding service;Step 3, root
According to the different service node in business events flow path model, flow definition file creates corresponding Role Information;Step
4, flow definition file is preserved to system database, configure, according to configuration Role Information, the role that each service node is corresponding;
Step 5, run the operation flow of each role being configured service node.The dynamic fixing method that the application provides is suitable for
The various dimensions carried out in intelligent substation business, seamless, omnibearing management, carry out procedure pipe to the business of intelligent substation
Reason, dynamic adaptation and the effectively each operational action of linking, make intelligent substation operation flow management and control more effectively reliable, specify each duty
The responsibilities of energy department, is effectively improved the work efficiency of each functional department, and then ensure that the construction of intelligent substation
And safe operation, social benefit can effectively improve.
Last it is noted that above example is only in order to illustrate technical scheme, it is not intended to limit;Although
With reference to previous embodiment, the present invention is described in detail, it will be understood by those within the art that: it still may be used
So that the technical scheme described in foregoing embodiments to be modified, or wherein portion of techniques feature is carried out equivalent;
And these amendment or replace, do not make appropriate technical solution essence depart from various embodiments of the present invention technical scheme spirit and
Scope.
Claims (10)
1. the dynamic fixing method of an intelligent substation operation flow, it is characterised in that comprise the following steps:
Step 1, the company information of management will be needed to be compiled as company information data, and by described company information data import system
Data base;
Step 2, described company information data are analyzed, set up business events flow path model, and product process definition file;
Described business events flow path model includes that different service nodes, each described service node all include the workflow of corresponding service
Journey;
Step 3, according to the different service node in described business events flow path model, in described flow definition file create
Corresponding Role Information;
Step 4, described flow definition file is preserved to system database, each described according to configuring the configuration of described Role Information
The role that service node is corresponding;
Step 5, run the operation flow of each role being configured described service node.
The dynamic fixing method of intelligent substation operation flow the most according to claim 1, it is characterised in that: in step 1
In, described company information data include that functional department of State Grid Corporation of China is for secondary system of intelligent substation configuration file management and control
Service link and employee's personal information.
The dynamic fixing method of intelligent substation operation flow the most according to claim 2, it is characterised in that: described country
Grid company functional department includes Yun Jian department, bouw/infra, traffic department and Electric Power Research Institute.
The dynamic fixing method of intelligent substation operation flow the most according to claim 1, it is characterised in that: in step 2
In, use Activiti engine that described company information data are analyzed, generate company information data pattern file;And use
Modeler modeling device based on Activiti, according to described company information data pattern file, sets up described business events flow path
Model.
5. according to the dynamic fixing method of the intelligent substation operation flow described in claim 1 or 4, it is characterised in that: in step
In rapid 2, described business events flow path model includes that drawing typing node, drawing check node and drawing examination node.
6. the dynamic construction system of an intelligent substation operation flow, it is characterised in that including:
First module, for being compiled as company information data by the company information needing management, and by described company information data
Import system data base;
Second module, for being analyzed described company information data, sets up business events flow path model, and product process is fixed
Justice file;
Three module, for according to the different service node in described business events flow path model, at described flow definition literary composition
Part creates corresponding Role Information;
4th module, for preserving described flow definition file to system database, according to configuring the configuration of described Role Information
The role that each described service node is corresponding;
5th module, for running the operation flow of each role being configured described service node.
The dynamic construction system of intelligent substation operation flow the most according to claim 6, it is characterised in that: described first
Module includes first module and second unit, and it is described enterprise letter that described first module is used for described company information data edition
Breath data, described second unit is for importing described system database by described company information data.
The dynamic construction system of intelligent substation operation flow the most according to claim 7, it is characterised in that: described enterprise
Information data includes the functional department of the State Grid Corporation of China service link for secondary system of intelligent substation configuration file management and control
And employee's personal information.
The dynamic construction system of intelligent substation operation flow the most according to claim 8, it is characterised in that: described country
Grid company functional department includes Yun Jian department, bouw/infra, traffic department and Electric Power Research Institute.
The dynamic construction system of intelligent substation operation flow the most according to claim 6, it is characterised in that: described
Two modules include Unit the 3rd, and described Unit the 3rd uses Activiti engine to be analyzed described company information data, raw
Become company information data pattern file;And use Modeler modeling device based on Activiti according to described company information data
Model file, sets up described business events flow path model.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610654301.5A CN106296127A (en) | 2016-08-10 | 2016-08-10 | A kind of dynamic construction system and method for intelligent substation operation flow |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610654301.5A CN106296127A (en) | 2016-08-10 | 2016-08-10 | A kind of dynamic construction system and method for intelligent substation operation flow |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106296127A true CN106296127A (en) | 2017-01-04 |
Family
ID=57668735
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610654301.5A Pending CN106296127A (en) | 2016-08-10 | 2016-08-10 | A kind of dynamic construction system and method for intelligent substation operation flow |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106296127A (en) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107480882A (en) * | 2017-08-11 | 2017-12-15 | 陕西合友网络科技有限公司 | A kind of system and method for generating BPM |
CN108108959A (en) * | 2017-12-27 | 2018-06-01 | 徐彬 | A kind of car dealer's collaboration platform based on workflow engine |
CN109241119A (en) * | 2018-08-14 | 2019-01-18 | 杭州市商务委员会(杭州市粮食局) | Trans-departmental data sharing method and system |
CN110175741A (en) * | 2019-04-17 | 2019-08-27 | 云南电网有限责任公司 | A kind of information value chain construction method and storage medium based on power industry |
CN111311185A (en) * | 2020-02-17 | 2020-06-19 | 北京南凯自动化系统工程有限公司 | Cross-platform automatic flow operation method and system |
CN112328222A (en) * | 2020-11-26 | 2021-02-05 | 天津市鑫联兴科技有限公司 | Dynamic process service interface method and dynamic process service interface engine |
CN113222332A (en) * | 2021-03-30 | 2021-08-06 | 海尔数字科技(青岛)有限公司 | Bidding process configuration method and device, electronic equipment and storage medium |
CN113342861A (en) * | 2021-07-06 | 2021-09-03 | 云南中烟工业有限责任公司 | Data management method and device in business scene |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20020144256A1 (en) * | 2001-03-30 | 2002-10-03 | Navin Budhiraja | Method of deployment for concurrent execution of multiple versions of an integration model on an integration server |
US20080010082A1 (en) * | 2006-06-27 | 2008-01-10 | International Business Machines Corporation | System and method for business process management |
CN103166316A (en) * | 2013-02-20 | 2013-06-19 | 山东电力集团公司烟台供电公司 | Intellectualization transformer substation configuration file management method and system based on error-closing-prevention lock |
CN103679384A (en) * | 2013-12-25 | 2014-03-26 | 武汉武船信息集成有限公司 | Method for workflow cooperative office work |
-
2016
- 2016-08-10 CN CN201610654301.5A patent/CN106296127A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20020144256A1 (en) * | 2001-03-30 | 2002-10-03 | Navin Budhiraja | Method of deployment for concurrent execution of multiple versions of an integration model on an integration server |
US20080010082A1 (en) * | 2006-06-27 | 2008-01-10 | International Business Machines Corporation | System and method for business process management |
CN103166316A (en) * | 2013-02-20 | 2013-06-19 | 山东电力集团公司烟台供电公司 | Intellectualization transformer substation configuration file management method and system based on error-closing-prevention lock |
CN103679384A (en) * | 2013-12-25 | 2014-03-26 | 武汉武船信息集成有限公司 | Method for workflow cooperative office work |
Non-Patent Citations (1)
Title |
---|
吴俊等: "基于业务流程管理的智能变电站配置文件全寿命周期管控工程化应用", 《电气工艺》 * |
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107480882A (en) * | 2017-08-11 | 2017-12-15 | 陕西合友网络科技有限公司 | A kind of system and method for generating BPM |
CN108108959A (en) * | 2017-12-27 | 2018-06-01 | 徐彬 | A kind of car dealer's collaboration platform based on workflow engine |
CN109241119A (en) * | 2018-08-14 | 2019-01-18 | 杭州市商务委员会(杭州市粮食局) | Trans-departmental data sharing method and system |
CN109241119B (en) * | 2018-08-14 | 2020-09-04 | 杭州市商务委员会(杭州市粮食局) | Cross-department data sharing method and system |
CN110175741A (en) * | 2019-04-17 | 2019-08-27 | 云南电网有限责任公司 | A kind of information value chain construction method and storage medium based on power industry |
CN111311185A (en) * | 2020-02-17 | 2020-06-19 | 北京南凯自动化系统工程有限公司 | Cross-platform automatic flow operation method and system |
CN111311185B (en) * | 2020-02-17 | 2023-04-07 | 北京南凯自动化系统工程有限公司 | Cross-platform automatic flow operation method and system |
CN112328222A (en) * | 2020-11-26 | 2021-02-05 | 天津市鑫联兴科技有限公司 | Dynamic process service interface method and dynamic process service interface engine |
CN113222332A (en) * | 2021-03-30 | 2021-08-06 | 海尔数字科技(青岛)有限公司 | Bidding process configuration method and device, electronic equipment and storage medium |
CN113342861A (en) * | 2021-07-06 | 2021-09-03 | 云南中烟工业有限责任公司 | Data management method and device in business scene |
CN113342861B (en) * | 2021-07-06 | 2022-11-11 | 云南中烟工业有限责任公司 | Data management method and device in service scene |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106296127A (en) | A kind of dynamic construction system and method for intelligent substation operation flow | |
CN104166942B (en) | Trans-regional supply district searching method and its system based on CIM | |
CN102545213B (en) | System and method for managing line loss of power grid in real time | |
CN105427039A (en) | Efficient processing method of distribution network repair work orders based on responsibility areas | |
CN109284346A (en) | Cloud computing-based power distribution network planning method and device | |
CN103578039B (en) | A kind of power networks risk prewarning analysis system | |
CN109635127A (en) | A kind of power equipment portrait knowledge mapping construction method based on big data technology | |
CN105574593B (en) | Track state static detection and control system and method based on cloud computing and big data | |
CN104133443A (en) | Method for automatically generating power grid dispatching operation order through power grid overhaul application forms | |
CN103050931A (en) | Power system hierarchical data matching and relay protection setting merging method | |
CN109241169A (en) | The multi-source heterogeneous data fusion geo-database integration method of power distribution network operation information | |
CN104933631A (en) | Power distribution network operation online analysis and evaluation system | |
CN102968691B (en) | Power failure planning decision-making system and application process thereof | |
CN103199521A (en) | Power network planning construction method based on network reconstruction and optimized load-flow simulating calculation | |
CN110647567A (en) | Power failure plan auxiliary decision system based on end data fusion | |
CN105447175A (en) | Power grid model sharing method applicable to distributed computation of power system | |
CN103887792B (en) | A kind of low-voltage distribution network modeling method containing distributed power source | |
CN109614706A (en) | A kind of numeral simulation analysis management system | |
Golub | Reliability control of failure-free operation of power supply system of railroad and its components by methods of intellectualization and informatization. | |
CN114548800A (en) | Future-state power grid maintenance risk identification method and device based on power grid knowledge graph | |
CN104484546A (en) | Method for generating automatic power flow check file of power grid planning project | |
CN107169180A (en) | A kind of power grid regulation model center system of two-stage deployment | |
CN104332992B (en) | Power distribution network looped network figure security verification method | |
CN107392506A (en) | A kind of self-study line status evaluation system and evaluation method for merging development of Mobile Internet technology | |
CN109962529A (en) | A kind of on-line monitoring of electrical secondary equipment and O&M device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170104 |