CN109962529A - A kind of on-line monitoring of electrical secondary equipment and O&M device - Google Patents
A kind of on-line monitoring of electrical secondary equipment and O&M device Download PDFInfo
- Publication number
- CN109962529A CN109962529A CN201910195465.XA CN201910195465A CN109962529A CN 109962529 A CN109962529 A CN 109962529A CN 201910195465 A CN201910195465 A CN 201910195465A CN 109962529 A CN109962529 A CN 109962529A
- Authority
- CN
- China
- Prior art keywords
- secondary device
- model
- static
- equipment
- substation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000012544 monitoring process Methods 0.000 title claims abstract description 36
- 238000012423 maintenance Methods 0.000 claims abstract description 46
- 238000000034 method Methods 0.000 claims abstract description 26
- 230000008569 process Effects 0.000 claims abstract description 24
- 238000013499 data model Methods 0.000 claims abstract description 10
- 230000007246 mechanism Effects 0.000 claims abstract description 6
- 230000003068 static effect Effects 0.000 claims description 76
- 238000012986 modification Methods 0.000 claims description 15
- 230000004048 modification Effects 0.000 claims description 15
- 238000007726 management method Methods 0.000 claims description 8
- 230000033228 biological regulation Effects 0.000 claims description 7
- 230000008676 import Effects 0.000 claims description 4
- 238000012217 deletion Methods 0.000 claims description 3
- 230000037430 deletion Effects 0.000 claims description 3
- 230000001276 controlling effect Effects 0.000 abstract description 6
- 238000005516 engineering process Methods 0.000 abstract description 6
- 230000001105 regulatory effect Effects 0.000 abstract description 4
- 238000010200 validation analysis Methods 0.000 abstract description 4
- 238000001514 detection method Methods 0.000 description 2
- 238000011161 development Methods 0.000 description 2
- 230000018109 developmental process Effects 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 238000012545 processing Methods 0.000 description 2
- 230000001681 protective effect Effects 0.000 description 2
- 238000004458 analytical method Methods 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 230000005611 electricity Effects 0.000 description 1
- 238000007689 inspection Methods 0.000 description 1
- 230000008092 positive effect Effects 0.000 description 1
- 230000006641 stabilisation Effects 0.000 description 1
- 238000011105 stabilization Methods 0.000 description 1
- 230000009466 transformation Effects 0.000 description 1
- 230000032258 transport Effects 0.000 description 1
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J13/00—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
-
- H02J13/0006—
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B90/00—Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
- Y02B90/20—Smart grids as enabling technology in buildings sector
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S40/00—Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them
- Y04S40/12—Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment
- Y04S40/128—Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment involving the use of Internet protocol
Landscapes
- Engineering & Computer Science (AREA)
- Power Engineering (AREA)
- Supply And Distribution Of Alternating Current (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
Abstract
The invention discloses a kind of on-line monitorings of electrical secondary equipment and O&M device, by building supervision object on-line checking, automated validation, configuration dynamic generation and it is lower dress, state it is real-time on send automatically access process, realize that secondary device crosses over the plug and play of safety zone and regulating and controlling mechanism, it is inaccurate, inconsistent, not in time effectively to solve the maintenance of information of device model manual creation bring, the problems such as heavy workload.Substation secondary device model automatically configures technology and is increased newly, updated by the substation secondary device that maintenance end automatically initiates, and moves back the processes such as fortune, to realize that long-range monitor of transformer substation end secondary device provides the support of data model.
Description
Technical field
The present invention relates to electric equipment management technical field, more particularly to a kind of electrical secondary equipment on-line monitoring with
O&M device.
Background technique
Electrical equipment can be divided into primary equipment and secondary device according to function difference.Electrical secondary equipment mainly includes relay
The equipment that protection, observing and controlling, automatic safety device, fault oscillograph, telemechanical etc. realize electrical quantity acquisition, analysis, processing, control.
Secondary device and associated loop constitute the electrical secondary system of operation of power networks, or referred to as grid control system, normal reliable fortune
Row is the key that ensure the stabilization of power grids and power equipment safety.Status monitoring is mainly implemented on primary equipment at present, is promoted, electricity
There are no developments substantially for the status monitoring of power secondary device.
Substation secondary device in-service monitoring and remote maintenance are that collection secondary device operating condition, fault information collection are whole
Reason, secondary device management and statistics, relay protection fault information remote transmitting and automatic archiving, protective relaying device remote auto patrol
Inspection, protective device be remotely controlled in integrated information system, for improve relay protection profession information system management level with
And the following smart grid development is adapted to positive effect.
Summary of the invention
The purpose of the present invention is provided to solve in place of above-mentioned the deficiencies in the prior art a kind of electrical secondary equipment
Line monitoring and O&M device.
Technology of the invention is achieved through the following technical solutions: a kind of on-line monitoring and O&M of electrical secondary equipment
Device, comprising:
Scheduling station, data network secondary device model automatically configure module, for constructing supervision object on-line checking, automatic
Certification, configuration dynamic generation and lower dress, state it is real-time on send automatically access process, realize that secondary device crosses over safety zone and tune
Control the plug and play of mechanism;
Substation secondary device model automatically configures module, and the substation secondary device for safeguarding that end automatically initiates is new
Increase, update, and move back the processes such as fortune, to realize that the long-range monitoring of transformer substation end secondary device provides the support of data model.
Wherein, it includes: including storage, newly-increased tune that the scheduling station, data network secondary device model, which automatically configure module,
Control master device model maintenance unit, newly added equipment business, component maintenance unit, apparatus assembly, business datum not on send unit,
Node traffic, component move back fortune maintenance unit and node moves back fortune maintenance unit;
Substation secondary device model automatically configures module, including substation increases unit newly, and equipment increases unit newly, and equipment is more
New unit, device model maintenance unit and substation and equipment move back transportation unit.
Wherein, storage, newly-increased regulation master device model maintenance unit are used for according to newly-increased master device basic static letter
Breath distributes corresponding unique ID, needs to select business model information in conjunction with business, generates the static models text of XML file form
Part, and will be by static models file distributing to corresponding device node;Wherein, corresponding equipment is counted according to static models file
According to acquisition;Newly added equipment business, component maintenance unit are used for during equipment actual acquired data, are modified according to business demand
Static models file.
Wherein, apparatus assembly, business datum not on send unit for being repaired according to business demand to static models file
Change, to realize the shielding acquired to specified data.
Wherein, node traffic, component move back fortune maintenance unit for sending on monitoring the apparatus assembly, business datum not
When unit has carried out the modification greater than preset threshold number according to same position of the same business demand to static models file, delete
Except sentence corresponding with business demand in static models file, new static models file is generated;Node moves back fortune maintenance unit and uses
In after the modification that the node traffic, component move back fortune maintenance unit completion static models file, secondary device stopping pair being controlled
The acquisition of corresponding data.
Wherein, substation increases unit newly and is used to be added to the SCD file of newly-increased substation just in newly-increased substation
Begin to create SCD version management substation, and be included in static secondary device model SCD version in static secondary device model
In control;Wherein, the initial static secondary device model is the initial SCD file that whole electrical secondary equipments are formed.
Wherein, equipment increases unit newly and is used to select existing substation data model in static secondary device model, import,
The SCD model of the substation is parsed, newly-increased static models and collection model are established, in secondary device parameter configuration after being successfully established
In model, secondary device parameter configuration is created, then equipment newly-added information is issued by static secondary device model.
Wherein, equipment updating unit is used to select existing substation data model in static secondary device model, import,
The SCD model of the substation is parsed, modification needs the secondary device model updated;In secondary device parameter configuration after being successfully established
In model, secondary device parameter configuration is updated, then equipment more new information is issued by static secondary device model.
Wherein, device model maintenance unit in static secondary device model for selecting the secondary device mould for needing to modify
Type updates static models information, and static models more new information is issued after the completion of updating;Secondary device parameter configuration model is in static state
After the model that secondary device model chooses needs to modify, undated parameter configuration information, and issue the update of secondary device allocation models
Information.
Wherein, substation and equipment move back transportation unit and move back fortune device model for selecting in static secondary device model, more
New static models information, secondary device parameter configuration model receive after static secondary device model moves back fortune information, delete part and join
Number configuration information;Static secondary device model issues plant stand, equipment stop information after deletion.
It is different from the prior art, on-line monitoring and O&M device the building supervision object of electrical secondary equipment of the invention exist
Line detection, automated validation, configuration dynamic generation and lower dress, state it is real-time on send automatically access process, realize secondary device across
The more plug and play of safety zone and regulating and controlling mechanism, effectively solve the maintenance of information of device model manual creation bring inaccuracy, no
Unanimously, not in time, the problems such as heavy workload.Substation secondary device model automatically configures technology by safeguarding what end automatically initiated
Substation secondary device is newly-increased, updates, and moves back the processes such as fortune, to realize that the long-range monitoring of transformer substation end secondary device provides number
According to the support of model.
Detailed description of the invention
Fig. 1 is a kind of on-line monitoring of electrical secondary equipment provided by the invention and the structural schematic diagram of O&M device.
Specific embodiment
In the following description, numerous specific details are set forth in order to facilitate a full understanding of the present invention.But the present invention can be with
Much it is different from other way described herein to implement, those skilled in the art can be without prejudice to intension of the present invention the case where
Under do similar popularization, therefore the present invention is not limited to the specific embodiments disclosed below.
Secondly, the present invention is described in detail using schematic diagram, when describing the embodiments of the present invention, for purposes of illustration only, showing
It is intended to be example, the scope of protection of the invention should not be limited herein.
Refering to fig. 1, Fig. 1 is that the structure of the on-line monitoring and O&M device of a kind of electrical secondary equipment provided by the invention is shown
It is intended to.Include:
Scheduling station, data network secondary device model automatically configure module 110, for construct supervision object on-line checking,
Automated validation, configuration dynamic generation and lower dress, state it is real-time on send automatically access process, realize that secondary device crosses over safety zone
With the plug and play of regulating and controlling mechanism;
Substation secondary device model automatically configures module 120, the substation secondary device automatically initiated for safeguarding end
Newly-increased, update, and the processes such as fortune are moved back, to realize that the long-range monitoring of transformer substation end secondary device provides the support of data model.
Scheduling station, data network secondary device model, which automatically configure, to be referred to through collection terminal either OMS assets protection mould
Newly-increased, the update that type end automatically initiates, and move back the automatic configuration technology of fortune equipment and business.Fujian Province one secondary set
Standby on-line monitoring and the device model of intelligent operation platform are broadly divided into two parts, and a part is the device model of platform monitoring,
All collection period and index are all using the model as standard;Another part is the model of assets protection, which is and Fujian
OMS asset management platform carries out real-time synchronization, realizes and transports to all with being included in province integrated secondary device on-line monitorings with intelligence
The assets for tieing up platform carry out Life cycle control and security control.Fujian Province ground integrated secondary device on-line monitoring and intelligence simultaneously
Resource-sharing and complementation also may be implemented in two parts model of energy operation platform, owns to realize in Fujian Province's scheduling institution
The equipment to have put into operation is managed and monitors.
Secondary device model automatically configures process and is divided into five parts, realizes the automatic configuration to various situations, this
Five parts include: storage, newly-increased regulation master device model maintenance process, newly added equipment business, component maintenance process, equipment
Component, business datum not on send process, node traffic, component to move back fortune maintenance process, node to move back fortune maintenance process.Substantially cover
From equipment, component or business from increasing newly, put into operation, safeguard, and the whole circumstances of fortune are moved back, realized to equipment, component and industry
The Life cycle of business is managed and security control.
It includes: including storage, newly-increased regulation that the scheduling station, data network secondary device model, which automatically configure module 110,
Master device model maintenance unit 111, newly added equipment business, component maintenance unit 112, apparatus assembly, business datum not on give
Unit 113, node traffic, component move back fortune maintenance unit 114 and node moves back fortune maintenance unit 115;
Substation secondary device model automatically configures module 120, including substation increases unit 121 newly, and equipment increases unit newly
122, equipment updating unit 123, device model maintenance unit 124 and substation and equipment move back transportation unit 125.
Wherein, storage, newly-increased regulation master device model maintenance unit 111 are used for according to newly-increased master device basic static
Information distributes corresponding unique ID, needs to select business model information in conjunction with business, generates the static models of XML file form
File, and will be by static models file distributing to corresponding device node;Wherein, corresponding equipment is carried out according to static models file
Data acquisition;Newly added equipment business, component maintenance unit 112 are used for during equipment actual acquired data, according to business need
Seek modification static models file.
Wherein, apparatus assembly, business datum not on send unit 113 for according to business demand to static models file carry out
Modification, to realize the shielding acquired to specified data.
Wherein, node traffic, component move back fortune maintenance unit 114 for monitoring the apparatus assembly, business datum not
On send unit to carry out the modification greater than preset threshold number according to same position of the same business demand to static models file
When, sentence corresponding with business demand in static models file is deleted, new static models file is generated;It is single that node moves back O&M shield
Member 115 is for controlling secondary device after the modification that the node traffic, component move back fortune maintenance unit completion static models file
Stop the acquisition to corresponding data.
Substation secondary device model, which automatically configures, to be referred to that the substation automatically initiated by maintenance end is newly-increased, updates, with
And newly-increased, update the automation modeling technology of secondary device.Its object range is substation secondary device, it is intended to newly-increased power transformation
It stands, on secondary device and other maintenance sex works, realizes automatically configuring for secondary device model to the full extent, reduce artificial work
It measures.
It saves the integrated secondary device on-line monitoring in ground and obtains substation SCD text using online calling mode with intelligent operation platform
Part, after obtaining substation's SCD file, secondary device model automatically configures module and parses to SCD file, uses simultaneously
The information such as secondary device therein are carried out objectification processing, and are abstracted into independent individual, while to a by the thought of Decoupling design
Logical relation between body is combed, and data relationship model is established, and ultimately forms complete secondary device object model.
It includes four parts that plant stand secondary device model, which automatically configures process: plant stand increases process newly, equipment increases process newly, sets
Standby more new technological process, device model maintenance process, plant stand and equipment move back convection journey.Substantially cover from plant stand or equipment from it is newly-increased,
The whole circumstances for putting into operation, safeguarding and moving back fortune realize model maintenance and management to plant stand and equipment, and in model maintenance mistake
Cheng Zhong does not influence the operation of normal device.
All model maintenance processes are on the basis of plant stand SCD file, to keep main station side and plant stand end model data one
Cause property, effectively prevent because model it is inconsistent caused by bad data, invalid data generate.
Wherein, substation increases unit 121 newly and is used to add the SCD file of newly-increased substation in newly-increased substation
Into initial static secondary device model, SCD version management substation is created, and be included in static secondary device model SCD
In version pipe control;Wherein, the initial static secondary device model is the initial SCD file that whole electrical secondary equipments are formed.
Wherein, equipment increases unit 122 newly for selecting existing substation data model in static secondary device model, leads
Enter, parse the SCD model of the substation, newly-increased static models and collection model is established, in secondary device parameter after being successfully established
In allocation models, secondary device parameter configuration is created, then equipment newly-added information is issued by static secondary device model.
Wherein, equipment updating unit 123 is led for selecting existing substation data model in static secondary device model
Enter, parse the SCD model of the substation, modification needs the secondary device model updated;In secondary device parameter after being successfully established
In allocation models, secondary device parameter configuration is updated, then equipment more new information is issued by static secondary device model.
Wherein, device model maintenance unit 124 in static secondary device model selection need that modifies secondary to set
Standby model, updates static models information, and static models more new information is issued after the completion of updating;Secondary device parameter configuration model exists
After the model that static secondary device model chooses needs to modify, undated parameter configuration information, and issue secondary device allocation models
More new information.
Wherein, substation and equipment move back transportation unit 125 and move back fortune device model for selecting in static secondary device model,
Update static models information, secondary device parameter configuration model receive static secondary device model move back fortune information after, delete part
Parameter configuration;Static secondary device model issues plant stand, equipment stop information after deletion.
It is different from the prior art, on-line monitoring and O&M device the building supervision object of electrical secondary equipment of the invention exist
Line detection, automated validation, configuration dynamic generation and lower dress, state it is real-time on send automatically access process, realize secondary device across
The more plug and play of safety zone and regulating and controlling mechanism, effectively solve the maintenance of information of device model manual creation bring inaccuracy, no
Unanimously, not in time, the problems such as heavy workload.Substation secondary device model automatically configures technology by safeguarding what end automatically initiated
Substation secondary device is newly-increased, updates, and moves back the processes such as fortune, to realize that the long-range monitoring of transformer substation end secondary device provides number
According to the support of model.
Although the invention has been described by way of example and in terms of the preferred embodiments, but it is not for limiting the present invention, any this field
Technical staff without departing from the spirit and scope of the present invention, may be by the methods and technical content of the disclosure above to this hair
Bright technical solution makes possible variation and modification, therefore, anything that does not depart from the technical scheme of the invention, and according to the present invention
Technical spirit any simple modifications, equivalents, and modifications to the above embodiments, belong to technical solution of the present invention
Protection scope.
Claims (10)
1. a kind of on-line monitoring of electrical secondary equipment and O&M device characterized by comprising
Scheduling station, data network secondary device model automatically configure module, for constructing supervision object on-line checking, recognizing automatically
Card, configuration dynamic generation and lower dress, state it is real-time on send automatically access process, realize that secondary device crosses over safety zone and regulation
The plug and play of mechanism;
Substation secondary device model automatically configures module, for safeguarding that the substation secondary device that end automatically initiates increases newly, more
Newly, and the processes such as fortune are moved back, to realize that the long-range monitoring of transformer substation end secondary device provides the support of data model.
2. the on-line monitoring of electrical secondary equipment according to claim 1 and O&M device, which is characterized in that the scheduling
It includes: including storage, newly-increased regulation master device model maintenance list that main website, data network secondary device model, which automatically configure module,
Member, newly added equipment business, component maintenance unit, apparatus assembly, business datum not on send unit, node traffic, component move back O&M
Shield unit and node move back fortune maintenance unit;
Substation secondary device model automatically configures module, including substation increases unit newly, and equipment increases unit newly, and equipment updates single
Member, device model maintenance unit and substation and equipment move back transportation unit.
3. the on-line monitoring of electrical secondary equipment according to claim 2 and O&M device, which is characterized in that storage, new
Increase regulation master device model maintenance unit to be used to distribute corresponding unique ID according to master device basic static information is increased newly,
It needs to select business model information in conjunction with business, generates the static models file of XML file form, and will be by static models file
It is distributed to corresponding device node;Wherein, corresponding equipment carries out data acquisition according to static models file;Newly added equipment business,
Component maintenance unit is used for during equipment actual acquired data, modifies static models file according to business demand.
4. the on-line monitoring of electrical secondary equipment according to claim 2 and O&M device, which is characterized in that equipment group
Part, business datum not on send unit for being modified according to business demand to static models file, to realize to specified data
The shielding of acquisition.
5. the on-line monitoring of electrical secondary equipment according to claim 4 and O&M device, which is characterized in that node industry
Business, component move back fortune maintenance unit for sending unit according to same business need on monitoring the apparatus assembly, business datum not
Ask when having carried out the modification greater than preset threshold number to the same position of static models file, delete in static models file with
The corresponding sentence of business demand generates new static models file;Node moves back fortune maintenance unit and is used in the node traffic, group
After part moves back the modification that fortune maintenance unit completes static models file, control secondary device stops the acquisition to corresponding data.
6. the on-line monitoring of electrical secondary equipment according to claim 2 and O&M device, which is characterized in that substation is new
Increase unit to be used to that the SCD file of newly-increased substation to be added in initial static secondary device model in newly-increased substation,
Newly-built SCD version management substation, and be included in static secondary device model SCD version pipe control;Wherein, described initial quiet
State secondary device model is the initial SCD file that whole electrical secondary equipments are formed.
7. the on-line monitoring of electrical secondary equipment according to claim 2 and O&M device, which is characterized in that equipment is newly-increased
Unit imports, parses the SCD mould of the substation for selecting existing substation data model in static secondary device model
Type establishes newly-increased static models and collection model, after being successfully established in secondary device parameter configuration model, creates secondary device
Parameter configuration, then equipment newly-added information is issued by static secondary device model.
8. the on-line monitoring of electrical secondary equipment according to claim 2 and O&M device, which is characterized in that equipment updates
Unit imports, parses the SCD mould of the substation for selecting existing substation data model in static secondary device model
Type, modification need the secondary device model updated;After being successfully established in secondary device parameter configuration model, secondary device is updated
Parameter configuration, then equipment more new information is issued by static secondary device model.
9. the on-line monitoring of electrical secondary equipment according to claim 2 and O&M device, which is characterized in that device model
Maintenance unit updates static models information for the secondary device model that selection needs are modified in static secondary device model,
Static models more new information is issued after the completion of updating;Secondary device parameter configuration model chooses needs in static secondary device model
After the model of modification, undated parameter configuration information, and issue secondary device allocation models more new information.
10. the on-line monitoring of electrical secondary equipment according to claim 2 and O&M device, which is characterized in that substation
Transportation unit is moved back with equipment and moves back fortune device model for selecting in static secondary device model, updates static models information, it is secondary
Device parameter allocation models receive static secondary device model move back fortune information after, delete partial parameters configuration information;It is quiet after deletion
State secondary device model issues plant stand, equipment stop information.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910195465.XA CN109962529B (en) | 2019-03-14 | 2019-03-14 | On-line monitoring and operation and maintenance device of electrical secondary equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910195465.XA CN109962529B (en) | 2019-03-14 | 2019-03-14 | On-line monitoring and operation and maintenance device of electrical secondary equipment |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109962529A true CN109962529A (en) | 2019-07-02 |
CN109962529B CN109962529B (en) | 2022-09-09 |
Family
ID=67024432
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910195465.XA Active CN109962529B (en) | 2019-03-14 | 2019-03-14 | On-line monitoring and operation and maintenance device of electrical secondary equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109962529B (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112836989A (en) * | 2021-03-02 | 2021-05-25 | 东方电子股份有限公司 | Online initialization method for parameters of telecontrol communication device of transformer substation |
CN113242290A (en) * | 2021-05-07 | 2021-08-10 | 国网福建省电力有限公司 | Model sharing method |
CN113505972A (en) * | 2021-06-17 | 2021-10-15 | 国网电力科学研究院有限公司 | Secondary equipment model issuing configuration method |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102510127A (en) * | 2011-10-21 | 2012-06-20 | 南京南瑞继保电气有限公司 | Method for unifying models of on-line monitored first and secondary equipment of power grid |
CN105574650A (en) * | 2015-12-14 | 2016-05-11 | 国家电网公司 | Automatic modeling method for integrated system and equipment |
CN106951694A (en) * | 2017-03-07 | 2017-07-14 | 国网冀北电力有限公司 | A kind of secondary equipment in power system on-line monitoring system adaptive modeling method |
US20180091364A1 (en) * | 2016-09-29 | 2018-03-29 | Kyland Technology Co., Ltd. | Software-defined realization method based on protection and control system for intelligent substation |
-
2019
- 2019-03-14 CN CN201910195465.XA patent/CN109962529B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102510127A (en) * | 2011-10-21 | 2012-06-20 | 南京南瑞继保电气有限公司 | Method for unifying models of on-line monitored first and secondary equipment of power grid |
CN105574650A (en) * | 2015-12-14 | 2016-05-11 | 国家电网公司 | Automatic modeling method for integrated system and equipment |
US20180091364A1 (en) * | 2016-09-29 | 2018-03-29 | Kyland Technology Co., Ltd. | Software-defined realization method based on protection and control system for intelligent substation |
CN106951694A (en) * | 2017-03-07 | 2017-07-14 | 国网冀北电力有限公司 | A kind of secondary equipment in power system on-line monitoring system adaptive modeling method |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112836989A (en) * | 2021-03-02 | 2021-05-25 | 东方电子股份有限公司 | Online initialization method for parameters of telecontrol communication device of transformer substation |
CN113242290A (en) * | 2021-05-07 | 2021-08-10 | 国网福建省电力有限公司 | Model sharing method |
CN113242290B (en) * | 2021-05-07 | 2023-06-13 | 国网福建省电力有限公司 | Model sharing method |
CN113505972A (en) * | 2021-06-17 | 2021-10-15 | 国网电力科学研究院有限公司 | Secondary equipment model issuing configuration method |
Also Published As
Publication number | Publication date |
---|---|
CN109962529B (en) | 2022-09-09 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106951694B (en) | Adaptive modeling method for online monitoring system of secondary equipment of power system | |
CN104318027B (en) | The design method of model information table closed loop automatic interaction based on information table template | |
CN107069961B (en) | A kind of method of substation's telemechanical apparatus and regulation main website remote signalling automated closed-loop joint debugging | |
CN109962529A (en) | A kind of on-line monitoring of electrical secondary equipment and O&M device | |
CN103441570A (en) | One-button type sequential control operation control method based on integrated information platform | |
CN105262220B (en) | Substation's intelligence shutdown telecontrol information check method and system | |
CN106296127A (en) | A kind of dynamic construction system and method for intelligent substation operation flow | |
CN105976262B (en) | A kind of electric network model version sharing method based on plant stand granularity | |
CN104463696A (en) | Power grid operating risk recognition and prevention method and system | |
CN106130185A (en) | A kind of monitoring system of electric substation modeling method based on status monitoring information | |
CN109992571A (en) | A kind of intelligent substation configuration file line closed loop check system and method for calibration | |
CN107180314A (en) | A kind of O&M business model modeling method based on an electrical secondary system incidence relation | |
CN104184207A (en) | Integrated control method of digitalized traction substation of electrified railway | |
CN110266037A (en) | Distributed new based on topological auto-polymerization observes modeling method and system entirely | |
CN104063761A (en) | SCADA data development system based on smart grid | |
CN109473945A (en) | A kind of verification of relay protection model data and method of automatic configuration | |
CN104112183B (en) | The intelligent scheduling model management system and management method of intelligent substation plug and play | |
CN102185381B (en) | Method for processing SCD (substation configuration description) iteration of SCD model during automatic switching | |
CN106096835A (en) | Model center construction method between based on the isomery dispatching patcher of agency service | |
US20230350369A1 (en) | Integrated management and control system for power plant | |
CN106971272A (en) | Synchronous system and method is operated between a kind of dispatching automation main preparation system | |
CN107766949A (en) | Failure rapid rush-repair commander's business information exchange method based on meta-model | |
CN103944271A (en) | Intelligent transformer substation system based on Internet of Things technology and control method thereof | |
CN110502257A (en) | A kind of control of supervisory control of substation information and checking method | |
CN116094174A (en) | Knowledge graph-based power grid operation and maintenance monitoring method, system, equipment and medium |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |