CN105574650A - Automatic modeling method for integrated system and equipment - Google Patents
Automatic modeling method for integrated system and equipment Download PDFInfo
- Publication number
- CN105574650A CN105574650A CN201510921174.6A CN201510921174A CN105574650A CN 105574650 A CN105574650 A CN 105574650A CN 201510921174 A CN201510921174 A CN 201510921174A CN 105574650 A CN105574650 A CN 105574650A
- Authority
- CN
- China
- Prior art keywords
- equipment
- information
- plant stand
- layer
- management
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 9
- 238000012423 maintenance Methods 0.000 claims description 7
- 238000000605 extraction Methods 0.000 claims description 3
- 238000010248 power generation Methods 0.000 abstract 1
- 230000007547 defect Effects 0.000 description 4
- 230000010354 integration Effects 0.000 description 2
- 238000004458 analytical method Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000005728 strengthening Methods 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0637—Strategic management or analysis, e.g. setting a goal or target of an organisation; Planning actions based on goals; Analysis or evaluation of effectiveness of goals
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
- G06Q50/06—Electricity, gas or water supply
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
Abstract
The invention relates to the technical field of power generation and operation, in particular to an automatic modeling method for integrated system and equipment to achieve panorama display, information supervision and equipment management and control for real-time operation information of automatic secondary equipment and system. The method comprises the following steps: building a basic information management module; building an automatic operation management module; and achieving communication and information sharing and calling of the modules.
Description
Technical field
The present invention relates to electrical production operation technical field, be specifically related to a kind of automation integrated system equipment modeling method.
Background technology
OMS automation model storehouse is the basis of the account information management of regulation and control center robotization place secondary device and automated system (equipment) operational management.Integrality, the accuracy of automation model information directly affect automatic operating management service, data supporting is done from data aspect to effectively the carrying out of business such as defect, maintenance of robotization secondary device, guarantee the real-time oversight to electrical network primary equipment and power grid regulation related system and management and control, thus the safety and reliability of powerful guarantee power regulation.
For strengthening the supervision and management to robotization electrical secondary system (equipment) further, promote integrality, the accuracy of automation model information, the operation of the business such as effective support robotization secondary device defect, maintenance, guarantee the real-time oversight to electrical network primary equipment and power grid regulation related system and management and control, Guo Wang company has carried out the building-up work of integral system and equipment modeling management platform.By the structure in automation model storehouse, achieve robotization account and throw functions such as moving back fortune management, immediate inquiring analysis, account information integrity, accuracy check, strengthen equipment choice and the application of business such as automated system (equipment) defect and maintenance etc. on its basis, form the process that closed loop management and control is optimized, guarantee the tighten management to robotization electrical secondary system (equipment), ensure the stable operation of power grid regulation business.
Summary of the invention
Technical matters to be solved by this invention is to provide a kind of automation integrated system equipment modeling method, and the panorama realizing robotization secondary device and system cloud gray model real-time information is shown, information is supervised and apparatus management/control.
Technical scheme of the present invention is:
A kind of automation integrated system equipment modeling method, comprises step:
(I) Basic Information Management module is set up
Substation information and device configuration information is extracted for riding in primary equipment account storehouse, extraction mechanism personal information in organizational structure storehouse with OMS; In described substation information and device configuration information, equipment is divided into plant stand layer, machine room layer, rack layer, mechanical floor and articulamentum five-layer structure, described device configuration information comprises device id, device name, equipment manufacturer and equipment technical parameters.
(II) automatic operating administration module is set up.
(III) command, control, communications, and information of optimized integration information management module and automatic operating administration module is shared and calls.
Step (II) comprises the following steps:
(II-1) according to the regulation of state's network regulation control center " data acquisition of regulation and administration application foundation and using standard (2014 editions) " (adjusting No. 112, skill) file, be rely on to build equipment pel management submodule with OMS, carry out sorting device pel according to device type and model and newly-increased, amendment and the delete function of equipment pel are provided.
(II-2) build automatic machine room graphical representation submodule, carry out presentation device at machine room and the physical message parameter of rack and the added and undercarriage of support equipment with patterned form.
(II-3) build equipment connection to show and management submodule, in patterned mode, management and maintenance is carried out, by the topological connection relation of equipment connecting relation presentation device to the port of equipment and annexation.
(II-4) build equipment search locating display submodule, give prominence to the position of equipment at plant stand layer, machine room layer, rack layer, mechanical floor and articulamentum by the location of searching graphic.
(II-5) build main plant stand geographic information displaying submodule, shown the geographic position of each main plant stand by gis map, click concrete plant stand and can show this main plant stand details, by the main plant stand in search location.
Beneficial effect of the present invention: the present invention is according to state's network regulation control center " data acquisition of management and running application foundation and using standard (2014 editions) " (adjusting No. 112, skill) file, be rely on OMS, build automation model storehouse, comprise automation equipment, automated system, automated system and equipment deficiency, the content such as automated system and overhaul of the equipments, table is built by system and device type, realize the overall Uniform Name of equipment and system module, and set up each table membership and incidence relation, form a set of automation model storehouse, as the base library of automatic management, and with automation model storehouse for core, realize maintenance, defect, the Model Selection of the traffic flows such as duty management and application, build complete specifications, flexibly, practical automatic management class function, guarantee the unified standard of automated system equipment and business, the panorama finally completing robotization secondary device and system cloud gray model real-time information is shown, information supervision and apparatus management/control.
Embodiment
Embodiment applies the modeling that technical scheme of the present invention carries out automation integrated system equipment, and the panorama achieving secondary device and system cloud gray model real-time information is shown, information is supervised and apparatus management/control, and concrete grammar is as follows:
(I) Basic Information Management module is set up
Substation information and device configuration information is extracted for riding in primary equipment account storehouse, extraction mechanism personal information in organizational structure storehouse with OMS; In described substation information and device configuration information, equipment is divided into plant stand layer, machine room layer, rack layer, mechanical floor and articulamentum five-layer structure, described device configuration information comprises device id, device name, equipment manufacturer and equipment technical parameters.
(II) automatic operating administration module is set up:
(II-1) according to the regulation of state's network regulation control center " data acquisition of regulation and administration application foundation and using standard (2014 editions) " (adjusting No. 112, skill) file, be rely on to build equipment pel management submodule with OMS, carry out sorting device pel according to device type and model and newly-increased, amendment and the delete function of equipment pel are provided.
(II-2) build automatic machine room graphical representation submodule, carry out presentation device at machine room and the physical message parameter of rack and the added and undercarriage of support equipment with patterned form.
(II-3) build equipment connection to show and management submodule, in patterned mode, management and maintenance is carried out, by the topological connection relation of equipment connecting relation presentation device to the port of equipment and annexation.
(II-4) build equipment search locating display submodule, give prominence to the position of equipment at plant stand layer, machine room layer, rack layer, mechanical floor and articulamentum by the location of searching graphic.
(II-5) build main plant stand geographic information displaying submodule, shown the geographic position of each main plant stand by gis map, click concrete plant stand and can show this main plant stand details, by the main plant stand in search location.
(III) command, control, communications, and information of optimized integration information management module and automatic operating administration module is shared and calls.
The above embodiment is only the preferred embodiments of the present invention, and and the feasible enforcement of non-invention exhaustive.For persons skilled in the art, to any apparent change done by it under the prerequisite not deviating from the principle of the invention and spirit, all should be contemplated as falling with within claims of the present invention.
Claims (1)
1. an automation integrated system equipment modeling method, is characterized in that it comprises the following steps:
(I) Basic Information Management module is set up
Substation information and device configuration information is extracted for riding in primary equipment account storehouse, extraction mechanism personal information in organizational structure storehouse with OMS; In described substation information and device configuration information, equipment is divided into plant stand layer, machine room layer, rack layer, mechanical floor and articulamentum five-layer structure, described device configuration information comprises device id, device name, equipment manufacturer and equipment technical parameters;
(II) automatic operating administration module is set up;
(III) command, control, communications, and information realizing described Basic Information Management module and automatic operating administration module is shared and calls;
Described step (II) comprises the following steps:
(II-1) according to the regulation of state's network regulation control center " data acquisition of regulation and administration application foundation and using standard (2014 editions) " (adjusting No. 112, skill) file, be rely on to build equipment pel management submodule with OMS, carry out sorting device pel according to device type and model and newly-increased, amendment and the delete function of equipment pel are provided;
(II-2) build automatic machine room graphical representation submodule, carry out presentation device at machine room and the physical message parameter of rack and the added and undercarriage of support equipment with patterned form;
(II-3) build equipment connection to show and management submodule, in patterned mode, management and maintenance is carried out, by the topological connection relation of equipment connecting relation presentation device to the port of equipment and annexation;
(II-4) build equipment search locating display submodule, give prominence to the position of equipment at plant stand layer, machine room layer, rack layer, mechanical floor and articulamentum by the location of searching graphic;
(II-5) build main plant stand geographic information displaying submodule, shown the geographic position of each main plant stand by gis map, click concrete plant stand and can show this main plant stand details, by the main plant stand in search location.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510921174.6A CN105574650A (en) | 2015-12-14 | 2015-12-14 | Automatic modeling method for integrated system and equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510921174.6A CN105574650A (en) | 2015-12-14 | 2015-12-14 | Automatic modeling method for integrated system and equipment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105574650A true CN105574650A (en) | 2016-05-11 |
Family
ID=55884753
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510921174.6A Pending CN105574650A (en) | 2015-12-14 | 2015-12-14 | Automatic modeling method for integrated system and equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105574650A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109962529A (en) * | 2019-03-14 | 2019-07-02 | 国网福建省电力有限公司 | A kind of on-line monitoring of electrical secondary equipment and O&M device |
-
2015
- 2015-12-14 CN CN201510921174.6A patent/CN105574650A/en active Pending
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109962529A (en) * | 2019-03-14 | 2019-07-02 | 国网福建省电力有限公司 | A kind of on-line monitoring of electrical secondary equipment and O&M device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104091231A (en) | Distribution network fault repairing commanding and processing system and method | |
CN102518553A (en) | Remote real-time monitoring system used for wind power station group | |
CN103093392A (en) | Electrical power system three-dimensional digitalization operation platform | |
CN103632312A (en) | Power grid resource module building method based on GIS (geographic information system) | |
CN104678962A (en) | Safety monitoring system used in power lines repairing operation and operating method based on safety monitoring system | |
CN103118114A (en) | BIM (building information modeling) collaborative designing system based on cloud servers | |
CN105760272B (en) | Monitoring backstage business customizing method and its system based on plug-in unit | |
CN104217305A (en) | Data acquiring and positioning monitoring system for quick urgent repair of power grid | |
CN102738789A (en) | Economical dispatch control system for cascade power station | |
CN110288176A (en) | Distribution monitoring analysis and repairing maneuvering platform based on power grid GIS | |
CN102324788A (en) | Power dispatching integrated anti-misoperation simulation comprehensive management platform | |
CN204810306U (en) | Moving ring monitoring system based on many nets fuse gateway | |
CN104050529A (en) | Power grid dispatching intelligent maintenance order and operation order system | |
CN206584222U (en) | A kind of supercentral station's centralized monitoring system | |
CN104915794A (en) | Multi-time-state full-service unified modeling method based on model center | |
CN106355256A (en) | Multivariate visualization overhaul management system | |
CN106227170A (en) | A kind of CIM integrating central management system producing equipment for PCB | |
CN110276516A (en) | Distribution monitoring analysis and repairing command methods based on power grid GIS | |
CN104237735A (en) | Modeling and fault analysis method combining fault indicator and power distribution terminal | |
CN105071376A (en) | Method for implementing integrated framework of main distribution network | |
CN102495615A (en) | Remote monitoring management system of large tonnage box girder transport and erection equipment group safety construction | |
CN113556377B (en) | Ship external field coating environment monitoring system | |
CN102289727A (en) | Comprehensive early-warning control system for grid scheduling | |
CN105574650A (en) | Automatic modeling method for integrated system and equipment | |
CN105636317A (en) | Intelligent street lamp management system and information processing method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20160511 |